Loading...
HomeMy WebLinkAboutWPO202100069 Plan - VSMP 2021-12-07VSMP PLAN LEGEND EXISTING 0 NEW 10 10 1.00' ---310--- ------ 310 311.5 TC x 311.5 TW x 311.5 BW x X e 10 1.0 5rXc 5781X Tw 5rX aw X RD RD O S S W W ev ®v O O GAS GAS DESCRIPTION BENCHMARK SITE PROPERTY LINE ADJACENT PROPERTY LINE VACATED PROPERTY LINE BUILDING SETBACK PARKING SETBACK ACCESS EASEMENT PARKING COUNT DIMENIONS GRADING EASEMENT INDEX CONTOUR INTERVAL CONTOUR SPOT EVELVATION TOP OF CURB ELEVATION TOP OF WALL ELEVATION BOTTOM OF WALL ELEVATION RETAINING WALL STAIRS BUILDING ROAD -EDGE OF PAVEMENT ROAD- CENTERLINE ROAD -FRONT OF CURB ROAD BACK OF CURB CG-2 STANDARD 6" CURB CG-6 STANDARD 6" CURB AND GUTTER CG-12 STANDARD ACCESS RAMP SIDEWALK BIKE PARKING PARKING SURFACE CROSSWALK HANDICAP ACCESSIBLE AISLE HANDICAP PARKING CONCRETE/PAVEMENT-SIDEWALK RIPRAP ASPHALT GRASS EC-3 MATTING EC-2 MATTING WETLAND TREELINE FENCE STREAM UTILITY EASEMENT UTILITY POLE LIGHT POLE OVERHEAD UTILITY OVERHEAD UTILITY GUY MANHOLE STORM LINE ROOF DRAIN DRAIN INLET DRAINAGE EASEMENT STORM DRAINAGE EASEMENT SEWER LINE SANITARY EASEMENT WATER LINE WATER METER WATER VALVE AND BOX FIRE HYDRANT WATER EASEMENT GAS LINE SCOTTSVILLE TIGER FUEL MARKET OWNER (TMP 130A1-00-00-04900) JAMES RIVER ROAD LLC 200 CARLTON RD CHARLOTTESVILLE, VA 22902 OPERATOR (TMP 130A1-00-00-04900) JAMES RIVER ROAD LLC 200 CARLTON RD CHARLOTTESVILLE, VA 22902 ZONING Town of Scottsville, Proffered ZMA-1985-00003 DISTRICT Scottsville LEGAL REFERENCE Tax Map 130A1 Parcel 49 DB 5482 PG 388 SITE COORDINATES 37.809120,-78.500863 BMP COORDINATES BIORETENTION BASIN: 37.808126,-78.501017 DETENTION POND: 37.807893,-78.501067 BMP MAINTENANCE REQUIREMENTS OWNER IS RESPONSIBLE FOR ALL MAINTENANCE REQUIREMENTS MAINTENANCE SHALL BE PERFORMED FOR THE POND AS INDICATED BELOW: 1. SEASONAL INSPECTION OF ALL INLETS FOR BLOCKAGES. 2. SEASONAL INSPECTION OF PRIMARY SPILLWAY FOR BLOCKAGES. 3. ANNUAL INSPECTION OF SIDE SLOPES AND POND BOTTOM FOR EROSION. IF EROSION IS IDENTIFIED, STABILIZE THE AREA IMMEDIATELY. 4. ANNUAL INSPECTION OF OUTLET PROTECTION RIPRAP FOR EROSION. IF EROSION IS IDENTIFIED, STABILIZE THE AREA IMMEDIATELY. 5. SEASONALLY MOW THE BANK OF THE POND TO PREVENT WOODY VEGETATION GROWTH. MAINTENANCE SHALL BE PERFORMED FOR THE BIORETENTION BASIN AS INDICATED BELOW: 1. SEASONAL INSPECTION OF ALL INLETS FOR BLOCKAGES. 2. ANNUAL INSPECTION OF SIDE SLOPES AND BIORETENTION BASIN FILTER MEDIA FOR EROSION. IF EROSION IS IDENTIFIED, STABILIZE THE AREA IMMEDIATELY. 3. SEASONALLY MOW THE BANK OF THE POND TO PREVENT WOODY VEGETATION GROWTH. GENERAL CONSTRUCTION NOTES FOR EROSION AND SEDIMENT CONTROL PLANS 1. The plan approving authority must be notified one week prior to the pre -construction conference, one week prior to the commencement of land disturbing activity, and one week prior to the final inspection. 2. All erosion and sediment control measures will be constructed and maintained according to minimum standards and specifications of the Virginia Erosion and Sediment Control Handbook and Virginia Regulations VR 625-02-00 Erosion and Sediment Control Regulations. 3. All erosion and sediment control measures are to be placed prior to or as the first step in clearing. 4. A co of the approved erosion and sediment control Ian shall be maintained on the site at all times. PY pP p 5. Prior to commencing land disturbing activities in areas other than indicated on these plans (including, but not limited to, off -site borrow or waste areas), the contractor shall submit a supplementary erosion control plan to the owner for review and approval by the plan approving authority. 6. The contractor is responsible for installation of any additional erosion control measures necessary to prevent erosion and sedimentation as determined by the plan approving authority. 7. All disturbed areas are to drain to approved sediment control measures at all times during land disturbing activities and during site development until final stabilization is achieved. 8. During dewatering operations, water will be pumped into an approved filtering device. 9. The contractor shall inspect all erosion control measures periodically and after each runoff producing rainfall event. Any necessary repairs or cleanup to maintain the effectiveness of the erosion control devices shall be made immediately. 10. All fill material to be taken from an approved, designated borrow area. 11. All waste materials shall be taken to an approved waste area. Earth fill shall be inert materials only, free of roots, stumps, wood, rubbish, and other debris. 12. Borrow or waste areas are to be reclaimed within 7 days of completion per Zoning Ordinance section 5.1.28. 13. All inert materials shall be transported in compliance with section 13-301 of the Code of Albemarle. 14. Borrow, fill or waste activity involving industrial -type power equipment shall be limited to the hours of 7:00am to 9:00pm. 15. Borrow, fill or waste activity shall be conducted in a safe manner that maintains lateral support, or order to minimize any hazard to persons, physical damage to adjacent land and improvements, and damage to any public street because o slides, sinking, or collapse. 16. The developer shall reserve the right to install, maintain, remove or convert to permanent stormwater management facilities where applicable all erosion control measures required by this plan regardless of the sale of any lot, unit, building or other portion of the property. 17. Temporary stabilization shall be temporary seeding and mulching. Seeding is to be at 75 Ibs/acre, and in the months of September to February to consist a 50/50 mix of Annual Ryegrass and Cereal Winter Rye, or in March and April to consist of Annual Rye, or May through August to consist of German Millet. Straw mulch is to be applied at 80lbs/100sf. Alternatives are subject to approved by the County erosion control inspector. 18. Permanent stabilization shall be lime and fertilizer, permanent seeding, and mulch. Agricultural grade limestone shall be applied at 90lbs/1000sf, incorporated into the top 4-6 inches of soil. Fertilizer shall be applied at 1000lbs/acre and consist of a 10-20-10 nutrient mix. Permanent seeding shall be applied at 180lbs/acre and consist of 95% Kentucky 31 or Tall Fescue and 0-5% Perennial Ryegrass or Kentucky Bluegrass. Straw mulch is to be applied at 80lbs/100sf. Alternatives are subject to approved by the County erosion control inspector. 19. Maintenance: All measures are to be inspected weekly and after each rainfall. Any damage or clogging to structural measures is to be repaired immediately. Silt traps are to be cleaned when 50% of the wet storage volume is filled with sediment. All seeded areas are to be reseeded when necessary to achieve a good stand of grass. Silt fence and diversion dykes which are collecting sediment to half their height must be cleaned and repaired immediately. 20. All temporary erosion and sediment control measures are to be removed within 30 days of final site stabilization, when measures are no longer needed, subject to approval by the County erosion control inspector. 21. This plan shall be void if the owner does not obtain a permit within 1 year of the date of approval. (Water Protection Ordinance section 17-204G.) 22. Permanent vegetation shall be installed on all denuded areas within nine (9) months after the date the land disturbing activity commenced. (Water Protection Ordinance section 17-207B) EXISTING USE Office Use PROPOSED USE Gas Station & Convenience Store LAND USE SCHEDULE EXISTING SF AC % Impervious Area 13,764 0.32 5.3% Wood/Managed Turf 243,676 5.59 94.65% Total 257,440 5.91 100.0% PROPOSED SF AC Building 9,310 0.21 3.6% Pavement 71,805 1.65 27.9% Impervious Area 81,115 176,325 257,440 1.86 31.5% Wood/Mans ed Turf 4.05 68.5% Total 5.91 100.0% Limits of Disturbance = 3.49 ac SOURCE OF BOUNDARY AND TOPOGRAPHY BOUNDARY & TOPOGRAPHIC INFORMATION FOR PARCEL PROVIDED BY: FORESIGHT SURVEY, PC 106 CROFTON PLAZA, SUITE 8 PALMYRA,VA 22963 FIELD SURVEY PERFORMED: SEPTEMBER 21, 2021 SURROUNDING TOPOGRAPHIC INFORMATION TAKEN FROM LIDAR Benchmark & Datum: NAD83 VIRGINIA STATE PLANE SOUTH GENERAL NOTES 1. The information and data shown or indicated with respect to the existing underground utilities at or contiguous to the site are based on information and data furnished to the owner and engineer by the owners of such underground facilities or others. The owner or engineer shall not be responsible for the accuracy or completeness of such information or data. The contractor shall have full responsibility for confirming the accuracy of the data, for locating all underground utilities, for coordination of the work with owners of such underground utilities during construction, for the safety and protection thereof and repairing any damage thereto resulting from the work. All of these conditions shall be met at no additional cost to the owner. The contractor shall contact "Miss Utilities" of Virginia at 1-800-552-7001 prior to the start of work. 2. When working adjacent to existing structures, poles, etc., the contractor shall use whatever methods that are necessary to protect structures from damage. Replacement of damaged structures shall be at the contractor's expense. 3. The contractor shall be responsible for protecting all existing site structures from damage and coordinating work so that the owner can make necessary arrangements to modify/protect existing structures from damages. 4. The contractor shall be responsible for notifying all utility owners, adjacent land owners whose property may be impacted and the Virginia Department of Transportation prior to completing any off -site work. 5. Contractor shall notify and coordinate all work involving existing utilities with utility owners, at least 72 hours prior to the start of construction. 6. Contractor shall immediately report any discrepancies between existing conditions and contract documents to the owner and engineer. 7. Contractor shall submit for the approval of the owner submittals of all specified materials listed in the plans, to include shop drawings, manufacturer's specifications and laboratory reports. the owner's approval of submittals will be general and will not relieve the the contractor from the responsibility of adherence to the contract and for any error that may exist. 8. All bare areas shall be scarified, limed, fertilized, seeded and mulched. 9. All trees, saplings, brush, etc. shall be removed from within the right of way and the drainage easements. 10. Visibility of all mechanical equipment from the Entrance Corridor shall be eliminated. 11.Retaining walls require separate building permits. 12. All water service lines, sanitary laterals, and sprinkler lines must be visually inspected by the Albemarle County Building Department from the main to the structure. 13. Where the flood level rim of plumbing fixtures are below the elevation of the manhole cover of the next upstream manhole in the public sewer, the fixtures shall be protected by a backwater valve installed in the building drain, branch of the building drain, or horizontal branch serving such fixtures. Plumbing fixtures having flood level rims above the elevation of the manhole cover of the next upstream manhole in the public sewer shall not discharge through a backwater valve. WP02021-OOXXX TAX MAP 130A1, PARCEL 47A, 49 ALBMARLE COUNTY, VIRGINIA VICINITY MAP SCALE: 1"=500' SITE BB&T© Vuglnla ABC Food Lion ® -, Rd Q Hardwares Lumpkin IMI Restaurant & Motei m CSx GFFlCE® Dollar Generale Chester Bed & Breakfast ` C & S Motors 0 Lrc-a, G 9 it 4 Union Baptist C Geological ConsultingQ & Testing, Inc Map provided by Google.com SHEETINDEX C1 COVER SHEET C2 EXISTING CONDITIONS C3 SITE, UTILITY & GRADING PLAN C4 SWM PLAN C5 STORM PROFILES & SECTIONS C6 STORM PROFILES & SECTIONS C7 EROSION & SEDIMENT CONTROL NARRATIVE C8 EROSION & SEDIMENT CONTROL PLAN PH 1 C9 EROSION & SEDIMENT CONTROL PLAN PH 2 C10 EROSION & SEDIMENT CONTROL PLAN PH 3 C11 EROSION & SEDIMENT CONTROL DETAILS SHIMP ENGINEERIN 32 LAND PLANNING - PROJECT MANAGEMENT 912 E. HIGH ST. 434.227.5140 CHARLOTTESVILLE VA, 22902 JUSTIN@SHIMP-ENGINEERING.COM SHIMP Y Lic N 5183 N21?sin Al til1G VSMP PLAN FOR SCOTTSVILLE TIGER FUEL MARKET ALBEMARLE COUNTY, VIRGINIA SUBMISSION: 2021.11.30 REVISION: 9111IN►[6a COVER SHEET 20.046 C1 IN \I I l /j �' r \ / /, I \\\ I e' \g _ // \\ / i %/ /// /-------' S 43°,j'4098. E �� fl i O n, i /'" /' / /' \V' / \ 1 I I —\ // IN \ \\\\ wl i / / O1z: _ //. S I \\ ,\\ // / \ \\ �. ..�` ` 2 11 \ \///I/� -- — \\ 1 -----\,_ CMP / "RIED) —yJ GvA)N. It N I �q \\ \` \/ ` / / ,�' / 1 I I \\ \\ \ 01 AIM TO BE i' \` :�k\`.p_ QYRFT ADJUSTED \RN. } _ e - / a EX. BOA TO BE RELOCATED OUTSIDE 1 \ y� — \ \ \ \ \ \ \\ J/^\ \\ I OF PROPOSED PAVEMENT \ \ \ \\ \\ \ / / I \ \ \ I\ \ /� I 1 TMP 13OAl-497. ` \ JAMES RIVER ROADC`\ '` '`\��; _ \\ \\ '' /'//i'///l '' \\ \\ \\ /;01// l I /8 �C.-:�............. DB 5482 PG \ \ \\ AAA !/ ................. ZONE: COMMERC L !� I .......... USE: SINGLE3 AM ACPSIDENTIAL`, % ��, \I l If! I \ \\ \ \ \\ \ \ I G / I II w W w - ..... .. \ WELL \ \ _ 1 \\\ 1 \ NN `\ N.\\ 1 \ \\\ \ J$, II •O� I �, \ \ \ \ \ \ 1 1 \\\�\\1 \ c 1 \\ I \I \,�// f _ �\ • \ A 1 1 I I \ t \ 1 — ' au au au—u�—w—wiw—au i > I \l \\ \ \1 1\ / SHIMP ENGINEERING LAND PLANNING - PROJECT MANAGEMENT \ \ \ \ CO n, i\ \ \ \ I \\\\ \ \ //� \\ \ I '\ \ \ \ I I \ \ k\ /— , 912 E. HIGH ST. 434.227.5140 1 \ \ \ \ \ \ \ \ \ \ \ \\ I \ \ \ \ ( \ \ \ \ \ \ \ \ \ / ---/ CHARLOTTESVILLE VA, 22902 JUSTIN@SHIMP-ENGINEERING.COM N. d, ll 'TMP 130A1-4)A,— \ JAMES RIVER ROA LLC DB 5563 PG J18 , 1 1 1 , l \ \ \1 ZONE: VILLAGE RESIDENTIAL 1 I\ \ \ \ f I I \\\\\\ __\ I it '\ USE: SINGLE FAMILY RIESIDENTIALI \ \ \ , I II\\\\ 2573 AC I\ 1 \ \ I \ \ \ / I \ N. ` LATERAL I I\1\ 1 \\ `` /lie ,ti' / \ \ 1 \ \\ \ I I 1 1 1 \ ' 11 / I / \ \ '90) ,\ \ / TO REMfa}IJd \\ \\ \ \ \ \ 1 I I 1 \\ / 1 1 \ , �� Li11c N 5183 ,I 1\ \ , 1\ 1 l\ '\ 1 \\\�FSS �lyG \TMP 130A1-48 \—__—\ d\�!\d;' % \ , \ 1 \ 1 1 \ \ \ \ \--- _/'--' N/F HILDRES</4TH3ODORE R — —\\ - �/ I \ \ \ h 1\ \ \ \ \ \ \ \ \ \ \\ 1 \ \ \ \ \-- — / \ I d \ \\ l \ \ \ \ \ \ I \\\ \ \ \ \ \\ ZONE: COMMERtL ,// ` —� O' \ \ \ '\ \ \ \ \ \ \ \ ' \ \\\\' 1 \ / / 1 USE: COMMERCIAL, / / — \\ �,d 0' , \ `� \ 1 \ \ \ \ \ \\\ \ \ \ \ \ \ \ �\ \ �\ O \ \\ \\ \III / I 1 \ \ \ \\ \ 1\\\ \ \ \ I / / N. o� // \ \ \ / , I , \— ;' i \ I `\ `. I I \ I \\ \ \\ 1 \\ \ \\ I \\ , /, VSMP PLAN FOR SCOTTSVILLE TIGER \ \ \ FUEL MARKET / 1 \ \ / I I I\ \ — \ \\\ \ \��\ i / I II \�- \\ \\ \ \\\ \\\ \\ \I \ \\\11 \\\\ \I \ I\ '1 \\ /'/ ,/' I 1 / /I \ ; - - \ - \\ �/ \ I \ 1 ` ; --'" i; ALBEMARLE COUNTY, VIRGINIA \ \----------- ---\ SUBMISSION: \ 1 1 1 1 � I / TMP 130A1—AD, \ \ ; \ JAMES RIVER ROAD, LL� / / \ \ 2021.11.30 IDS 5534 PG 249 \ \ I 1 I 1 \ 1 \ IAl \ 1 \ UNE: VILLAGE RESIDENTIAL \ \ �\\ II I 'I I \ \\\\I\\I\\ \I \ % j 11 \I I j _ 0\ / REVISION: 5.28ACN / \ ^\\ \\ \\ \ - 1 I I I I \ \ \ \ I r , 1 / _ J' / /'II �I /1 I I� /,/II If I .\ \ IN / r I r � / / I tO --' ItSH IRI RD 'r— j �\ ROUTE ( 1,01001 ' / ^ v IN\\ \\ \\ ��'/ / \\ l / / 1 ( 1 I 1 —_—— — — — — — — '/ /' / C / — \ IN \ /' // \ J------__—_— � \ -- I -'---- — // \— / � 1 I I I I I I n /� -------------- - - - - - FILE NO. I I I I . / ------------ '--_____ \ \ / / —--------- \ \ \ / ( / / / 1 , I I 1 1 1 I I I \ ' ,- _ '- ----_ -lt - I I I l ( I I 1 EXISTING CONDITIONS \\ / j / \\ // / /' — —\ \ \\ \\ \\ \ l — 'r _ __�' —__\ \�\ \\ \ \ \\ \\ // i j I I I I I l I I I I / \ 1 IN- � \\\ \ \ \ \ \ \ �\ \ / I111II \ If > \-, ,, �- , �, \\ \\ �. \ �\ �,, ,-, , ; / , t I I ; I I I I I I I t \\ & DEMOLITION PLAN - lilt I /_— ^\ \ \ \ / / 1 I \ \ \\ — \_ \ 1 \ '\ \ \ \ \ \ \\ / / / / / / / I 40 / / / / / / 0 $0 120 N. \\\ _ \\NN NI IN C2 \ \ \ \ \ \t \ 1 1 �\ \ // / / , / S�cae:/1">L4 , I, / II \ IN x IN IN IN y IN _\------ - _ IN 40 INN N IN IN NIN IN IN ',-'_/'' / \✓\ �/'' 1 \i \ \\ \\ /"/' /' / � a ry fop/ ry `� <�. \\ I j I I 11� \ i \\ -\ �_---- s.. /1�1r $ ry \ q�\r�Fl \\ \ \\\ \\ '— 1, RE CAT / 1\ \\ / IN IN\ NE W a� ea�b , ,-? `♦' ryry > '.P 4'\`. \ \ \ \ \ \ \` \�-__ r R + N > \``` 2� \ \ \ \ IN 8 4 r 2` „44_ t ryry.. a R,.%e ry 1 \ \ ♦ \ \..J / / //'— \ \ I IN IN IN IN ,Q \ �ry \ /,\/ /s 1 \ \ 422 a^�be R, t �Pc' \ `n lt; \ \\�,\ \ / 'XI \ \ \ � \ IN \ l \ry /� :N.' I 8 �q .:a /v F O 8-- I ` \ \`\ \ / 1 I/ \ \ W \ \ \ \ \ \ 1 IN \ \I \ \ y 1 d'y/�a�-w w w \ ry.. ` \ ,�Ay c` +ry�ry'7 IN,1 \ 1\\\\ `�\\ `PT \ \ \ 5° BEND N. ry \ \ \ \ \\\\\ \ \ \ \ I \ \ \\ \ \ \ IN \IN, IN \ \ \ \ \ Plo A �' \ 1 / I \ \ \ \ \ININ \ \ \ '\1 % j / / j / i / +ry 6. I+ '� �ry � ... I `'�'�; >�/ • / 1 \ 1 1 \ \\\ \ � \ \ \ 1 /f I) \ \ \ 1 ry N. i -1 45° BEN �e rV 1 1!� w y IN 4 .ry L I p N. 22.8 'Vy ry IN 426 ` q 42 1 iIf \ / / / / I \ F'pP� IN\ \ \ \ 1 \1 \ ' 1 / \ \ I I\ \ % 4 1 / CO j \ \ ry,W IN / IN NLATER L �% /�' \\\ \\ II \ \\ Qa / \\\ / \ \ I l \ 11 1 �/ \I \ ` / TO RE F IN 0. / / 11 / J I /\\\\\ \\\\\ \ \I \ \\\ \ \\\ \\1 \\ \\I \\I \\II\I 1 I \ IN I \ 11 1 11 I\\ \\ \ I IN / l\ \ C It IN IN NO I N,\ 1 \ \ \ \ \ IN INI N. ----- \ \ -\ / / I \ 1 \\ y ^ \ \\ IN IN I I I INN. 170 IN / \ 400 O4 IN 398 400 SHIMP ENGINEERING2. LAND PLANNING - PROJECT MANAGEMENT 912 E. HIGH ST. 434.227.5140 CHARLOTTESVILLE VA, 22902 JUSTIN@SHIMP-ENGINEERING.COM �F v . SHIMP Y Lic No. 5183 �z� c S)n AT V�G VSMP PLAN FOR SCOTTSVILLE TIGER FUEL MARKET ALBEMARLE COUNTY, VIRGINIA SUBMISSION: 2021.11.30 REVISION: / _ / I 1 / 396 1 11 \\ --- -\ \��\ _�/ / // I / ,--/ IRIS I I \ \ \\ \__ / / / I / l 1 1\\ H RD ROUTE 6 -- �_,' //'� 1 d6' -'' ^ v i l \\ \\\\ - // I \ \---- --_ It I \ -- /� _\ \ 96 // // \ \_� \ 1 / / / / "--__ _ _ = — `\___ / 1 — — ' \�C / 3 $_3 - -- /`� / \` \ \\ \` ��\ / I /' I! /� FILE N0. 20.046 39840D-3,94 -\ \\\\ \\ \\\\ /� SITE, UTILITY & GRADING 392 / - \ \ \ -----' / PLAN IN IN./ \ \ \ `\\\ \\ \\ \` \\ C \1 \ 40 0 40 80 120 C3 1 It IN, \ \ \ — — — — \ \ \ \ I / / Scale: 1"=40' AZ NE —3C, \ co_ A5 NE —3C� 8' LF 18 HDPE /NV. IN 412.00 I QUT 406 00 " VIN 1000 SF % ° PRETR TMENT AREA p \ \ \ \ \ \ , / \ , /' Q Al ' / �� VDOT 5A STONE LET A6 e /, TRENCH DRAIN �/ \\\ \ ' \ 1ti TR CH DRAIN \\_17 \-- / 0.18 AC , 9� S `\\ \\\\\\ \°�. e, _ — \� p ✓ Y \ \ / INLET A4 D I NEW 0 3C D a 3800 SF BIOR NT O ASIN TOP OF MEDIA 404, 0, 2 DEPTH // I I o \-----__, TOP OF STONE 402.50, 2.5 DEPTHS ~ BOTTOM OF STONE 400.00 / /���// ��IORETENTION�BASIN CC LL- N. co A3 NEW MH-1 vv vvv �� �/ I/ i� �� �� �� D �406 bp pcSHIMP \ \ \ / 4 \ R / _ ENGINEERING2. _.�� 398 400 \ \\ LAND PLANNING - PROJECT MANAGEMENT NLET A2A 396 I IE. \ \ D A = 0. 31 A C ( � 1 / Q�QQ / \ — �� \ 912 R HIGH ST. 434.227.5140 CNARLOTTESVILLE VA, 22902 JUSTIN@SHIMP-ENGINEERING.COM �O Eq Y \�A �0/ 1J1��0' / /„ COI\IC• / \' 3 / 6 I 42 x It o NEW I-3B \\\ 426 INLET A2 �`1 \\ / NN \\ 396 1// /// \\\ smmp a vi — — DA = 0.51 AC /' _ --�� 398 400 — M g 83 A � — — — ------ �� TOP (� \. - ' c�0 394 398 ' 5 — \ \ \ \ VSMP PLAN FOR _---- — �/ \ Ao — _ 392 / _ \ \\ \\ SCOTTSVILLE TIGER FUEL MARKET Da \ 3g �� — \\ \ \\ ALBEMARLE COUNTY, VIRGINIA \ \ \\ 1�''' _ 3g 2.00 \ \ \ SUBMISSION: \ al \ — — — — — v 0�� \ \ \ 2021.11.30 REVISION: HE \ \ —��1^\— —\\ \ FILE NO. \ 8 LF 18 HDPE \ \ \ \ \ \\ \ "NV. N 412.00 1 QU T 406.00— \ \ \ SWM PLAN y / 1000 SF \ Q A, ° PRETR TMENT AREA, \ 20 0 20 40 so �� ,-� I VDOT 5ii STONE \� — Scale: 1 "=20' 1 1� • I 440 435 430 425 420 415 410 405 N Lc)N� Lc)O �Nr) �� — 00 CJ—ci NO � cp — + — C) + n > J Li 00 J O CQ J I`7 Zi wowtd o� w wQNAUL z cn EXIST NG — GR DE — — 8.5 LF 15' HDPE ° 141 1 F 15" HDP @ 1.0% PE @ 1.0% rn rn r c F 15" HD 5 5 z �— o D— > > 17 z >- z 4 1b+00 10+50 STORM PROFILE A2- C5 %HOR1Z. SCALE: 1'=20', VERT. SCALE: 1'= 435 430 425 420 415 410 11 +00 11 +50 12+00 12+50 0 N m tH r700 N� _ — r- > + = 00 w 0 EXISTI G lij- J N mow— GRA E tea- w � z� cn ----- -- --- z�cn — ---- O 14 LF O 0 z 10+00 10+50 z STORM PROFILE A2-A2A C5 HORIZ. SCALE: 1"=20', VERT. SCALE: 1'=5' 435 435 430 430 425 425 420 420 415 415 410 410 4 13+00 13+50 14+00 14+50 15+00 15+50 az z � Q� co oee co Lo N ee _ z n 0 U 00 O — + w N Of J — F-- w 00 LLJ JO < -Q z0� cn�cn ------------ - .6% N Z„ O CD z 11 +00 11 +50 12+00 12+50 � 0+50 11 +00 11 +50 3 STORM PROFILE A4-TRENCH DRAIN C5 ) HORIZ. SCALE: 1"=20', VERT. SCALE: 1"=5' 440 435 430 425 420 415 410 405 16+0400 435 430 425 op 420 U Li/Jc NQ/.. 5183 � �0A�`sSIO 415 VSMP PLAN FOR 410 SCOTTSVILLE TIGER FUEL MARKET 45 12+00 12+50 13+00 13+56ALBEMARLE COUNTY, VIRGINIA SUBMISSION: 2021.11.30 REVISION: FILE NO. 20.046 STORM PROFILES C5 435 430 425 420 415 410 405 395 390 385 1.3 IA C) DETENTION POND WSE BIORETENTION BASIN WSE cl 1 YR:396.31 1 YR:405.01 0 10 YR:399.59 10 YR:405.32 100 YR:401.36 100 YR:405.48 w TOP OF DAM ELEV. C° i 403.00 cnUIRGHTEF) N GHADIE RIP RAP SPIL-WAY EXISTING GRADE z �i i @ 4. o • � 18 o __� i Do 71 — — — 1L -----�---� 12 / > Q— — — — A r — — — — — — o / 3800 SF FILTER MEDIA @ 2' 4 CHOKER LAYER + / DEPTH INSTALL 110% APPROVED 2" SAND VOLUME 2.5 CONTROL ORIFICE L INV. 396.00 TO FACE OPP SITE OF DAM cV > 10+00 10+50 FIL- C6 oT�ORSCAM: PRO VERE SCAAO 11 +00 11 +50 40.00' BIORETENTION BASIN WEIR DETAIL SECTION 'A' -'A' SCALE: 1 TOP OF GROUTED RIP -RAP SPILLWAY ELEV. 406.33 TOP OF BIORETENTION BASIN _ _ LL , TOP OF CONC. WEIR FILTER MEDIA ELEV. 404.50 _ — — 1.00' _ ELEV. 405.33 _.GROUT UP 1' FROM SPILLWAY ELEVATION 12.00' _ 1.00' TOP OF BIORETENTION BASIN STONE ELEV. 402.50 BIORETENTION BASIN WEIR DETAIL SECTION 'B'-'B' SCALE: 1 12+00 12+50 TOP OF GROUTED RIP -RAP SPILLWAY ELEV. 406.33 TOP OF CONC. WEIR 2•b ELEV. 405.00 BACKFILL 2' OVER END OF WEIR AND GROUT 13+00 BOTTOM OF DETENTION POND ELEV. 396.00 13+50 435 430 425 420 415 410 405 395 390 385 14+00 SHIMP ENGINEERIN G12. LAND PLANNING - PROJECT MANAGIMENT 912 E. HIGH ST. 434.227.5140 CHARLOTTESVILLE VA, 22902 JUSTIN@SHIMP-ENGINEERING.COM �F smmp a Lic No. 5183 fI I . I `S'srS)n A T c V�G VSMP PLAN FOR SCOTTSVILLE TIGER FUEL MARKET ALBEMARLE COUNTY, VIRGINIA SUBMISSION: 2021.11.30 REVISION: FILE NO. STORM PROFILES & SECTIONS 1 1� • I C6 PROJECT DESCRIPTION, GENERAL NOTES, EROSION & SEDIMENT CONTROL NOTES, AND SEQUENCE OF CONSTRUCTION PROJECT DESCRIPTION THE PURPOSE OF THIS PROJECT IS TO BUILD A GAS STATION, CONVENIENCE STORE, AND STORMWATER TREATMENT AREA. THE TOTAL AREA OF DISTURBANCE IS 3.49 ACRES. THE PROJECT INVOLVES THE FOLLOWING WORK ACTIVITIES: 1. THE CONTRACTOR SHALL COMPLY WITH ALL LOCAL AND STATE EROSION & SEDIMENT CONTROL PERMITTING REQUIREMENTS AND MAINTAIN ALL EROSION & SEDIMENT CONTROLS IN ACCORDANCE WITH THE PERMIT REQUIREMENTS. 2. INSTALLATION OF TEMPORARY AND PERMANENT EROSION AND SEDIMENT CONTROL MEASURES AS SHOWN ON THE PLAN AND DETAILS. 3. GRADING AND PLACEMENT OF FILL SHALL BE IN GENERAL ACCORDANCE WITH THE PLAN. 4. ESTABLISHMENT OF PERMANENT STABILIZATION OF ALL DISTURBED AREAS.. 5. CONSTRUCTION OF DRIVEWAY, SIDEWALKS, AND BUILDING PADS AS SHOWN ON THE SITE PLAN. EXISTING SITE CONDITIONS THE SITE IS A PREVIOUSLY DEVELOPED LOT WITH WOODED AND LAWN AREAS AND AN EXISTING ONE-STORY BUILDING. ADJACENT PROPERTIES ADJACENT PROPERTIES ARE OF A SIMILAR CHARACTER TO THIS SITE. OFF -SITE AREAS ANY OFFSITE ACTIVITIES WILL BE FROM SITES WITH APPROVED EROSION CONTROL PLANS. NO OFFSITE DISTURBANCE ANTICIPATED. OFFSITE DISPOSAL OF SPOILS MAY BE REQUIRED. SOILS THIS SITE CONTAINS THE FOLLOWING SOIL TYPES BASED ON NRCS SOIL MAPS FOR ALBEMARLE COUNTY VIRGINIA: MANASSAS SILT LOAM, USG B BUGLEY CHANNERY SILT LOAM, USG D BUFFSTAT SILT LOAM, USG B URBAN LAND CRITICAL EROSION AREAS CRITICAL EROSION AREAS EXIST WITHIN THE STREAM BUFFERS. NO WORK SHALL BE PERFORMED WITHIN THE STREAM BUFFERS. EROSION & SEDIMENT CONTROLS UNLESS OTHERWISE INDICATED, ALL EROSION AND SEDIMENT CONTROL PRACTICES WILL BE CONSTRUCTED AND MAINTAINED ACCORDING TO THE MINIMUM STANDARDS AND SPECIFICATIONS AS SET FORTH IN THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK, LATEST EDITION. THE MINIMUM STANDARDS OF THE VIRGINIA EROSION AND SEDIMENT CONTROL REGULATIONS SHALL BE ADHERED TO UNLESS OTHERWISE WAIVED OR APPROVED BY VARIANCE. CONSTRUCTION ENTRANCE (PCE) - 3.02 INSTALL AND MAINTAIN A CONSTRUCTION ENTRANCE, AS NECESSARY, THAT MEETS THE REQUIREMENTS OF STD. AND SPEC. 3.02 AND CONFORMS WITH THE REQUIREMENTS OF THE EROSION & SEDIMENT CONTROL PLAN. SILT FENCE (SF) - 3.05 SILT FENCING WILL BE INSTALLED AS A FIRST STEP IN CONSTRUCTION ACTIVITIES. LOCATION AND DETAILS ARE SHOWN ON THE PLANS. INLET PROTECTION (IP) - 3.07 INLET PROTECTION MEASURES AROUND THE NEW INLETS SHALL BE PROVIDED IN ACCORDANCE WITH STD. AND SPEC 3.07. SILT FENCE OR TEMPORARY STONE APPLICATIONS SHALL BE APPLIED AS APPROPRIATE FOR CURRENT GRADE CONDITIONS. OUTLET PROTECTION (OP) -3.18 THE INSTALLATION OF RIPRAP CHANNEL SECTIONS AND/OR STILLING BASINS BELOW STORM DRAIN OUTLETS TO REDUCE EROSION AND UNDER -CUTTING FROM SCOURING AT OUTLETS AND TO REDUCE FLOW VELOCITIES BEFORE STORMWATER ENTERS RECEIVING CHANNELS BELOW THESE OUTLETS. TEMPORARY SEDIMENT TRAP (ST) -3.13 A SMALL PONDING AREA, FORMED BY CONSTRUCTING AN EARTHEN EMBANKMENT WITH A STONE OUTLET ACROSS A DRAINAGE SWALE, TO DETAIN SEDIMENT LADEN RUNOFF FROM SMALL DISTURBED AREAS FOR ENOUGH TIME TO ALLOW MOST OF THE SUSPENDED SOLIDS TO SETTLE OUT. MAXIMUM EFFECTIVE LIFE IS 18 MONTHS. STD. AND SEPC 3.13. CHECK DAM (ST) -3.20 SMALL, TEMPORARY STONE DAMS CONSTRUCTED ACROSS A DRAINAGE DITCH TO REDUCE THE VELOCITY OF CONCENTRATED FLOWS, REDUCING EROSION OF THE SWALE OR DITCH. LIMITED TO USE IN SMALL OPEN CHANNELS WHICH DRAIN 10 ACRES OR LESS, SHOULD NOT BE USED IN LIVE STREAMS. STD. AND SPEC. 3.20. PERMANENT STABILIZATION TEMPORARY SEEDING (TS) - 3.31 TEMPORARY SEEDING SHALL BE APPLIED TO ALL DENUDED AREAS WITHIN SEVEN (7) DAYS TO DENUDED AREAS THAT MAY OR MAY NOT BE AT FINAL GRADE BUT WILL REMAIN DORMANT (UNDISTURBED) FOR LONGER THAN 14 DAYS. TEMPORARY SEEDING SHALL BE APPLIED IN CONFORMANCE WITH STD. AND SPEC. 3.31. PERMANENT SEEDING (PS) - 3.32 ALL DITCHES AND ADJACENT AREAS WITHIN 15 FT OF THE EDGE OF THE DITCHES SHALL BE SEEDED IN CONFORMANCE WITH STD. AND SPEC. 3.32. PERMANENT SEEDING SHALL BE APPLIED TO AREAS DELINEATED ON THESE PLANS WITHIN SEVEN (7) DAYS AFTER FINAL GRADE IS REACHED ON ANY PORTION OF THE SITE. PERMANENT SEEDING STABILIZES DISTURBED AREAS AND ENHANCES THE BEAUTY OF THE SITE. MULCHING (MU) - 3.35 APPLICATION OF PLANT RESIDUES OR OTHER SUITABLE MATERIALS TO THE SOIL SURFACE TO PREVENT EROSION AND FOSTER THE GROWTH OF VEGETATION. ORGANIC MULCHES (STRAW) HAVE BEEN FOUND TO BE THE MOST EFFECTIVE. RESPONSIBLE LAND DISTURBER: GENERAL NOTES 1. THE INFORMATION AND DATA SHOWN OR INDICATED WITH RESPECT TO THE EXISTING UNDERGROUND UTILITIES AT OR CONTIGUOUS TO THE SITE ARE BASED ON INFORMATION AND DATA FURNISHED TO THE OWNER AND ENGINEER BY THE OWNERS OF SUCH UNDERGROUND FACILITIES OR OTHERS. THE OWNER OR ENGINEER SHALL NOT BE RESPONSIBLE FOR THE ACCURACY OR COMPLETENESS OF SUCH INFORMATION OR DATA. THE CONTRACTOR SHALL HAVE FULL RESPONSIBILITY FOR CONFIRMING THE ACCURACY OF THE DATA, FOR LOCATING ALL UNDERGROUND UTILITIES, FOR COORDINATION OF THE WORK WITH OWNERS OF SUCH UNDERGROUND UTILITIES DURING CONSTRUCTION, FOR THE SAFETY AND PROTECTION THEREOF AND REPAIRING ANY DAMAGE THERETO RESULTING FROM THE WORK. ALL OF THESE CONDITIONS SHALL BE MET AT NO ADDITIONAL COST TO THE OWNER. THE CONTRACTOR SHALL CONTACT "MISS UTILITIES" OF VIRGINIA AT 1-800-552-7001 PRIOR TO THE START OF WORK. 2. WHEN WORKING ADJACENT TO EXISTING STRUCTURES, POLES, ETC., THE CONTRACTOR SHALL USE WHATEVER METHODS THAT ARE NECESSARY TO PROTECT STRUCTURES FROM DAMAGE. REPLACEMENT OF DAMAGED STRUCTURES SHALL BE AT THE CONTRACTOR'S EXPENSE. 3. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTING ALL EXISTING SITE STRUCTURES FROM DAMAGE AND COORDINATING WORK SO THAT THE OWNER CAN MAKE NECESSARY ARRANGEMENTS TO MODIFY/PROTECT EXISTING STRUCTURES FROM DAMAGES. 4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR NOTIFYING ALL UTILITY OWNERS, ADJACENT LAND OWNERS WHOSE PROPERTY MAY BE IMPACTED AND THE VIRGINIA DEPARTMENT OF TRANSPORTATION PRIOR TO COMPLETING ANY OFF -SITE WORK. 5. CONTRACTOR SHALL NOTIFY AND COORDINATE ALL WORK INVOLVING EXISTING UTILITIES WITH UTILITY OWNERS, AT LEAST 72 HOURS PRIOR TO THE START OF CONSTRUCTION. 6. CONTRACTOR SHALL IMMEDIATELY REPORT ANY DISCREPANCIES BETWEEN EXISTING CONDITIONS AND CONTRACT DOCUMENTS TO THE OWNER AND ENGINEER. 8. CONTRACTOR SHALL ADJUST ALL APPURTENANCES AS REQUIRED TO MATCH NEW GRADES. THE EXACT LOCATION OF APPURTENANCES SHALL BE COORDINATED WITH THE OWNER. 9. CONTRACTOR SHALL SUBMIT FOR THE APPROVAL OF THE OWNER SUBMITTALS OF ALL SPECIFIED MATERIALS LISTED IN THE PLANS, TO INCLUDE SHOP DRAWINGS, MANUFACTURER'S SPECIFICATIONS AND LABORATORY REPORTS. THE OWNER'S APPROVAL OF SUBMITTALS WILL BE GENERAL AND WILL NOT RELIEVE THE THE CONTRACTOR FROM THE RESPONSIBILITY OF ADHERENCE TO THE CONTRACT AND FOR ANY ERROR THAT MAY EXIST. EROSION & SEDIMENT CONTROL NOTES: 1. ALL VEGETATIVE AND STRUCTURAL EROSION & SEDIMENT CONTROL (E&S) PRACTICES WILL BE CONSTRUCTED AND MAINTAINED IN ACCORDANCE WITH THE MINIMUM SPECIFICATIONS OF THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK AND VIRGINIA REGULATION 9VAC25-840-40. 2. THE PLAN APPROVING AUTHORITY MUST BE NOTIFIED ONE WEEK PRIOR TO THE PRE -CONSTRUCTION CONFERENCE, ONE WEEK PRIOR TO COMMENCEMENT OF LAND DISTURBING ACTIVITY AND ONE WEEK PRIOR TO FINAL INSPECTION. THIS REQUIREMENT CAN BE WAIVED AT THE DISCRETION OF THE PLAN APPROVING AUTHORITY. 3. ALL EROSION AND SEDIMENT CONTROL MEASURES ARE TO BE PLACED PRIOR TO OR AS THE FIRST STEP IN CLEARING. 4.A COPY OF THE APPROVED EROSION AND SEDIMENT CONTROL PLAN SHALL BE MAINTAINED ONSITE AT ALL TIMES. 5. PRIOR TO COMMENCING LAND DISTURBING ACTIVITIES IN AREAS OTHER THAN INDICATED ON THESE PLANS (INCLUDING BUT NOT LIMITED TO, OF -SITE BORROW OR WASTE AREAS), THE CONTRACTOR SHALL SUBMIT A SUPPLEMENTRY EROSION AND SEDIMENT CONTROL PLAN TO THE OWNER FOR REVIEW AND APPROVAL BY THE PLAN REVIEWING AUTHORTY. 6. THE CONTRACTOR IS RESPONSIBLE FOR INSTALLATION OF ANY ADDITIONAL EROSION AND SEDIMENT CONTROL MEASURES NECESSARY TO PREVENT EROSION AND SEDIMENTATION AS DETERMINED BY THE PLAN REVIEWING AUTHORITY. 7. ALL DISTURBED AREAS ARE TO DRAIN TO APPROVED SEDIMENT CONTROL MEASURES AT ALL TIMES DURING LAND DISTURBING ACTIVIES AND DURING SITE DEVELOPMENT UNTIL FINAL STABALIZATION IS ACHEIVED. 8. DURING DEWATERING OPERATIONS, WATER WILL BE PUMPED INTO AN APPROVED FILTERING DEVICE. 9.THE CONTRACTOR SHALL INSPECT ALL EROSION CONTROL MEASURES PERIODICALY AND AFTER EACH RUN-OFF PRODUCING STORM EVENT. ANY NECESSARY REPARIS OR CLEANUP TO MAINTAIN THE EFFECTIVENESS OF THE EROSION CONTROL DEVICES SHALL BE MADE IMMEDIATELY. 10. INSTALL AND MAINTAIN CONSTRUCTION ENTRANCES FOR ENTIRE PROJECT AT ALL LOCATIONS WHERE VEHICLES ENTER/LEAVE THE WORK AREA AND WHERE SOIL IS STOCKPILED. 11. MAINTAIN ALL EROSION AND SEDIMENT CONTROL UNTIL THE COMPLETION OF FINAL STABILIZATION. UNLESS OTHERWISE NOTED ON THE PLANS REMOVE ALL EROSION & SEDIMENT CONTROLS FOLLOWING THE ESTABLISHMENT OF A PERMANENT VEGETATIVE COVER AND COMPLETION OF FINAL STABILIZATION. EROSION & SEDIMENT CONTROL PERMITTING 1. CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING ALL LOCAL AND STATE EROSION AND SEDIMENT CONTROL PERMITS AND MAINTAINING ALL EROSION AND SEDIMENT CONTROLS IN ACCORDANCE WITH THE PERMIT REQUIREMENTS. •Cut_ C u:►_ a ►I SWIM QUANTITY: SITE RUNOFF IS MANAGED BY A BIORETENTION BASIN AND DETENTION POND WHICH WILL RELEASE RUNOFF AT RATES THAT COMPLY WITH 9VAC25-870-66.B.3 AND 9VAC25-870-66.D THROUGH MEETING THE ENERGY BALANCE EQUATION. THIS PROJECT WILL DISTURB AN AREA OF 3.49 ACRES WHERE ALL IMPERVIOUS SURFACE RUNOFF WILL BE ROUTED TO A NEW BIORETENTION BASIN AND STORMWATER DETENTION POND. THE SURROUNDING MANAGED TURF IS SHEETFLOW RUNOFF, WITH SOME AREAS DRAINING TO THE NEW DETENTION POND AS SHOWN IN DRAINAGE AREA MAPS. BMP COORDINATES: BIORETENTION BASIN: 37.808126,-78.501017 DETENTION POND: 37.807893,-78.501067 SWIM QUALITY: STORMWATER QUALITY COMPLIES WITH 9VAC25-870-65 THROUGH THE USE OF A BIORETENTION BASIN WHICH PROVIDES 2.27 LBS/YR OF TREATMENT AND THE PURCHASE OF 1.36 LB/YR OF NUTRIENT CREDITS TO ACHIEVE THE TOTAL TREATMENT REQUIREMENT OF 3.63 LB/YR. MANAGEMENT STRATEGY AND SEQUENCE OF CONSTRUCTION THE FOLLOWING ARE THE PROPOSED MANAGEMENT STRATEGIES AND DETAILED SEQUENCE OF CONSTRUCTION. REQUIRED PERMITS MUST BE IN -HAND BEFORE WORK BEGINS: Nffrlwl 1. INSTALL CONSTRUCTION ENTRANCE. TRUCKS SHALL BE CLEANED PRIOR TO LEAVING THE SITE. 2. INSTALL CLEAN WATER DIVERSIONS. 3. INSTALL SILT FENCE ALONG SOUTHEAST CORNER OF PROPERTY. 5. INSTALL SEDIMENT TRAPS #1 AND #2. 6. INSTALL DIVERSION DIKES AND RIGHT-OF-WAY DIVERSION. 7. CONTACT THE ENGINEER AND ALBEMARLE COUNTY FOR INSPECTION AND APPROVAL OF ALL E&S CONTROL MEASURES. 8. UPON APPROVAL OF E&S CONTROL MEASURES, BEGIN WHOLESALE CLEARING, AND GRADING WITHIN PHASE 1 LIMITS OF DISTURBANCE. PHASE 2 1. DEMO EXISTING BUILDING AND PAVEMENT AND PERFORM EXCAVATION FOR FOOTINGS. 2. INSTALL CURB AND GUTTER EXCEPT AT SEDIMENT TRAP #1. 3. AS STORM STRUCTURES ARE INSTALLED, PROVIDE INLET AND OUTLET PROTECTION. 4. BRING AREAS TO GRADE AND STABILIZE SLOPES OUTSIDE PERIMETER OF CURB. 5. INSTALL BIORETENTION BASIN AND STABILIZE AREA. PHASE 3 1. REMOVE SEDIMENT TRAP #1 AND INSTALL REMAINING CURB AND SURFACE ASPHALT. 2. REMOVE SEDIMENT TRAP #2 AND CONVERT TO FINAL DETENTION POND. 3. MAINTAIN PERIMETER CONTROLS UNTIL ROAD CONSTRUCTION IS COMPLETED AND AREA HAS ACHIEVED TEMPORARY STABILIZATION. 4. AS AREAS ARE BROUGHT TO GRADE, APPLY MULCHING, TEMPORARY SEEDING AND PERMANENT SEEDING AS SHOW ON SHEET C9. 5. ESTABLISH AND MAINTAIN PERMANENT STABILIZATION, INCLUDING VEGETATION OF ALL SLOPES AND GRASSED AREAS. 6. CLEAN OUT ALL SEDIMENT BUILD UP FROM STORM INLETS. 7. ONCE SITE HAS REACHED STABILIZATION, CONTACT THE ENGINEER AND ALBEMARLE COUNTY FOR INSPECTION AND APPROVAL BEFORE REMOVAL OF PERIMETER CONTROLS. CONSTRUCTION MAINTENANCE THE FOLLOWING CONSTRUCTION MAINTENANCE PRACTICES SHALL BE FOLLOWED AT THE SITE. 1. ALL E&S CONTROL MEASURES WILL BE CHECKED DAILY AND AFTER EACH SIGNIFICANT RAIN EVENT. ALL DEFICIENCIES IDENTIFIED DURING THESE INSPECTIONS SHALL BE CORRECTED AS SOON AS PRACTICABLE. 2. THE SILT FENCE BARRIER SHALL BE REGULARLY CHECKED FOR UNDERMINING, DETERIORATION OR SIGNIFICANT EROSION. SEDIMENT SHALL BE REMOVED AFTER EACH STORM EVENT AND WHEN THE LEVEL OF SEDIMENT DEPOSITION REACHES HALF THE HEIGHT OF THE CONTROL. 3. THE CONTRACTOR IS RESPONSIBLE FOR ADHERING TO ALL MAINTENANCE REQUIREMENTS SET FORTH IN THE CURRENT EDITION OF THE VIRGINIA SEDIMENT AND EROSION CONTROL MANUAL, OTHER APPLICABLE COMMONWEALTH OF VIRGINIA REGULATIONS AND THE PROJECT SPECIFICATIONS. 4. ALL SEEDED AREAS WILL BE REGULARLY CHECKED TO ENSURE THAT A GOOD STAND OF GRASS IS MAINTAINED. 5. ALL AREAS SHALL BE MAINTAINED IN ACCORDANCE WITH THE REQUIREMENTS OF THIS E&S CONTROL PLAN. ENVIRONMENTAL CONTROLS 1. CONTRACTOR SHALL PROVIDE AND MAINTAIN ALL ENVIRONMENTAL CONTROL MEASURES SO AS TO COMPLY WITH LOCAL ORDINANCES, STATE AND FEDERAL LAWS AND REGULATIONS APPLICABLE TO WATER POLLUTION IN WATERS OF THE STATE AND IN INTERSTATE WATERS. 2. CONTRACTOR SHALL MINIMIZE THE POTENTIAL FOR AIR POLLUTION BY THE USE OF EMISSION CONTROL EQUIPMENT ON CONTRACTOR OPERATED EQUIPMENT, SHUT -DOWN OF MOTORIZED EQUIPMENT WHEN NOT IN USE, AND ACTIVELY CONTROLLING DUST EMISSIONS THROUGHOUT THE PROJECT. 3. ANY WASTE DISCOVERED DURING THE PROJECT SHALL NOT BE MOVED WITH OUT PRIOR AUTHORIZATION OF THE OWNER AND BE DIRECT -LOADED INTO COVERED ROLL -OFF CONTAINERS FOR TEMPORARY STORAGE PRIOR TO DISPOSAL IN A PERMITTED LANDFILL. TABLE 3.32-D SITE SPECIFIC SEEDING MIXTURES FOR PIEDMONT AREA Total Lbs. Per Acre Minimum Care Lawn - Commercial or Residential 175-200 lbs. - Kentucky 31 or Turf -Type Tall Fescue 95-100% - Improved Perennial Rycgrass 0.5% - Kentucky Bluegrass 0-5% Hiph-Maintenance Lawn 200-250 lbs. • Kentucky 31 or Turf -Type Tall Fescue 100% General SloK(3.1 or less) - Kentucky 31 Fescue 128 lbs, - Red Top Grass 2 lbs. - Seasonal Nurse Crop ` 20 lbs. 150 Its. Low -Maintenance Slope (Steeper than 3:11 - Kentucky 31 Fescue 108 lbs. - Red Tap Grass 2 lbs. - Seasonal Nurse Crop ` 20lbs. - Crownvetch " 20 Ihs. 150 lbs. ' Use seasonal nurse crop in accordance with seeding dates as stated below: February 16th through April ...................... Annual Rye May 1st through August 15th ..................... Foxtail Millet August 16th through October ...................... Annual Rye November through February 15th................... Winter Rye " Substitute Sericea lespedeza for Crownvetch east of Farmviile, Va. (May through September use hulled Sericea, all other periods, use unhulled Sericea). If Flatpea is used in lieu of Crownvetch, increase rate to 30 lbs./acre. All legume seed must be properly inoculated. Weeping Lovegrass may be added to any slope or low -maintenance mix during warmer seeding periods; add 10-20 lbs./acre in mixes. 1 PERMANENT C7 Not To Scale SEEDING (PS MINIMUM STANDARDS (MS)-. All applicable Virginia Erosion and Sediment Control Regulations and Minimum Standards shall be adhered to during all phases of construction. These include, but are not limited to the following: 1. STABLIZATION OF DENUDED AREAS: Permanent or temporary soil stabilization shall be applied to bare areas within seven days after final grade is reached on any portion of the site. Temporary soil stabilization shall be applied within seven days to denuded areas that may not be at final grade, but will remain dormant or undisturbed for longer than 7 days. Permanent stabilization shall be applied at areas that are to be left dormant for more than 1 year. 2. STABILIZATION OF SOIL STOCKPILES: During construction of the project, soil stockpiles shall be stabilized or protected with sediment trapping measures. The applicant is responsible for temporary protection and permanent stabilization of all soil stockpiles on site as well as soil intentionally transported from the project site. 3.PERMANENT VEGETATIVE COVER A permanent vegetative cover shall be established on denuded areas not otherwise permanently stabilized. Permanent vegetation shall not be considered established until a ground cover is achieve that, in the opinion of the city Inspector, is uniform and mature enough to survive to inhibit erosion. 4. TIMING & STABILIZATION OF SILT TRAPPING MEASURES: Sediment basins and traps, perimeter dikes, sediment barriers and other measures intended to trap sediment shall be constructed as a first step in any land disturbing activity and shall be made functional before upslope land disturbance takes place. 5. STABILIZATION OF EARTHEN STRUCTURES: Stabilization measures shall be applied to earthen structures such as dams, dikes and diversions immediately after installation. 6. SEDIMENT TRAPS AND BASINS: A sediment basin shall control surface runoff from disturbed areas that is comprised of flow from drainage areas greater than or equal to three acres. The sediment basin shall be designed and constructed to accommodate the anticipated sediment loading for the land disturbing activity. The outfall device or system device shall take into account the total drainage area flowing through the disturbed area to be served by the basin. 7. CUT AND FILL SLOPES: Cut and fill slopes shall be designed and constructed in a manner that will minimize erosion. Slopes that are found to be eroding excessively within one year of permanent stabilization shall be provided with additional slope stabilizing measures until the problem is corrected. & CONCENTRATED RUN-OFF DOWN CUT OR FILL SLOPES: Concentrated runoff shall not flow down cut or fill slopes unless contained within an adequate temporary or permanent channel, flume, or slope drain structure. 9.WATER SEEPS FROM A SLOPE FACE: Whenever water seeps from a slope face, adequate drainage or other protection shall be provided. 10.STORM SEWER INLET PROTECTION: All storm sewer inlets that are made operable during construction shall P 9 be protected so that sediment -laden water cannot enter the conveyance system without first being filtered or otherwise treated to remove sediment. 11. STABILIZATION OF OUTLETS: Before newly constructed stormwater conveyance channels are made operational, adequate outlet protection and any required temporary or permanent channel lining shall be installed in both the conveyance channel and receiving channel. 12. WORK IN LIVE WATERCOURSES: When work in a live watercourse is performed, precautions shall be taken to minimize encroachment, control sediment transport and stabilize the work area to the greatest extent possible during construction. Nonerodible material shall be used for the construction of causeways and cofferdams. Earthen fill may be used for these structures if armored by nonerodible cover materials. 13.CROSSING A LIVE WATERCOURSE: When a live watercourse must be crossed by construction vehicles more than twice in any six month period, a temporary stream crossing constructed of nonerodible materials shall be provided. 14. APPLICABLE REGULATIONS: All applicable federal, state and local regulations pertaining to working in or crossing live watercourses shall be met. 15.STABILIZATION OF BED AND BANKS The bed and banks of a watercourse shall be stabilized immediately after work in the watercourse is completed. 16.UNDERGROUND UTILITIES: Underground utilities shall be installed in accordance with the following standards in addition to other criteria: o.No more than 500 linear feet of trench may be opened at one time b.Excavated material shall be placed on the uphill side of trenches c.Effluent for dewatering operations shall be filtered or passed through approved sediment trapping device, or both, and discharged in a manner that does not adversely affect flowing streams or offsite property. d.Material used for backfilling trenches shall be properly compacted in order to minimize erosion and promote stabilization. e.Restabilization shall be accomplished in accordance with these regulations. f. Applicable safety regulations shall be complied with. 17.CONSTRUCTION ACCESS ROUTES: Where construction vehicle access routes intersect paved public roads, provisions shall be made to minimize the transport of sediment by vehicular tracking onto paved surfaces. Where sediment is transported on to a public road surface, the road shall be cleaned thoroughly at the end of each day. Sediment shall be removed by shoveling or sweeping and transported to a sediment control disposal area. Street washing shall be allowed only after sediment is removed in this manner. This provision shall apply to individual lots as well as to larger land disturbing activities. 18.TEMPORARY E&S CONTROL MEASURE REMOVAL: All temporary erosion and sediment control measures shall be removed within 30 days after final site stabilization or after temporary measures are no longer needed, unless otherwise authorized by the local program authority. Trapped sediment and the disturbed soil areas resulting from the disposition of temporary measures shall be permanently stabilized to prevent further erosion and sediment. 19.ADEQUACY OF RECEIVING CHANNELS: Properties and waterways downstream from the development site shall be protected from sediment deposition, erosion and damage, due to increases in volume, velocity and peak flow rates of stormwater runoff for the stated frequency storm of 24-hour duration. SHIMP ENGINEERING2. LAND PLANNING - PROJECT MANAGEMENT 912 E. HIGH ST. 434.227.5140 CHARLOTTESVILLE VA, 22902 JUSTIN@SHIMP-ENGINEERING.COM �F sxlIV a Lic No. 5183 �2 ( I 44 I O A MMvy\\\ /!n/�f f VS)ntk/eI B VSMP PLAN FOR SCOTTSVILLE TIGER FUEL MARKET ALBEMARLE COUNTY, VIRGINIA SUBMISSION: 2021.11.30 REVISION: FILE NO. E & S NARRATIVE 20.046 C7 ZZ It . It ,4 �` ♦ / / / \ \ \ d`4'\6♦f , �♦ " I � ' r 1 \\ \ ' I ( /// — � \\\ `�\—�------ //1 ♦ 3/ 1 aD -NT TRAP p, \ �?.� . ; ("2 , RAIN E AREA 1 .36 A� ��� IN TMP 130Al-49 JAMES RIVER ROAD fcLC`, \ DB 5482 PG 38$ \\ \ ZONE: COMMERCy7\L USE: SINGLE FAMILY SIDENTIAL`, \ - o- •\ '\�'`,\a \ / `\ Ij l ( I\ '\ \\ \\ \\ \ I -.-.-. 3.332 AC� / w 1 / \ / WELL \I // // / / / ga/ .aryry \ 1 \\ \\ \ \\ \ I \ \1\ \ \ I'I�ll Jll \ SOIL EROSION & SEDIMENT CONTROL SYMBOLS SYMBOL N0. TITLE KEY 3.02 CONSTRUCTION ENTRANCE PC —x —x —x —x — 3.05 SILT FENCE SF 3.09 TEMPORARY DIVERSION DIKE DD [DRAWN TO SCALE] 3.13 TEMPORARY SEDIMENT TRAP ST 3.18 OUTLET PROTECTION OP 3.31 TEMPORARY SEEDING TS 3.32 PERMANENT SEEDING PS 3.35 MULCH MU 3.39 DUST CONTROL DC LIMITS OF DISTURBANCE �— SEDIMENT TRAP DRAINAGE AREA SEQUENCE OF CONSTRUCTION PHASE 1 1.INSTALL CONSTRUCTION ENTRANCE. TRUCKS SHALL BE CLEANED PRIOR TO LEAVING THE SITE. 2. INSTALL CLEAN WATER DIVERSIONS. 3. INSTALL DIVERSION DIKES AND RIGHT—OF—WAY DIVERSIONS. 4. INSTALL SEDIMENT TRAPS #1 AND #2. 5.CONTACT THE ENGINEER AND ALBEMARLE COUNTY FOR INSPECTION AND APPROVAL OF ALL E&S CONTROL MEASURES. 6. UPON APPROVAL OF E&S CONTROL MEASURES, BEGIN WHOLESALE CLEARING, AND GRADING WITHIN PHASE 1 LIMITS OF DISTURBANCE. / / / !! a ♦ \ \\ \ \ \ \ \ \ / / // / / / A\ . \ \ \ \ Olt N. 4 + J, A i 1 A A v A ✓ A ` \ V 1 V\% I I V A\ v A \ co �01 TMP RIVER R AN, \ 1 \ \ \ \\ �\\ I I \ 11 JAMES RIVER ROA LLC \ \I \I I \ \ \ 1 11 II— / NIP' \ DID 5563 PG 41 8 1 l I \ I I I \I \\11\ II j ( J _ ZONE VILLAGE RESIDENTIAL II� \ I II -- v. _ 1 USE: SINGLE FAMILY RIESIDENTIALI \ \ \ \ 11\ 1 \ ` / //' I \ 1 \ I II I \\ __---/ \\ x �` /j' ( \ \\ 2.573 AC I \ 1 \ \I 11 \ 1 \ Q'O O LATERAL S D 0 REMAkKI \ \ ) \ \ \ \ \ — //\TMP 130A1-48 \ �- rt\6�' I 1k--' /-I \ / 1 1 \ I 1 \ \ \ \ \\\\\\\ \i N/F DE�27-9 CH�LDREa, TH3ODORE R / --�\\ ---- 3-73 ZONE: COMMER`CIkL- / / I USE: COMMERCIAL/ 2 AC ------------ s \ It \ 1 1 \ \ I \11\\1 V1 IMENT T P 2—'' \\\ \\ \ \ 1 \ \ \ I\ \ I \ \ I \ I \ I I-- 1 DRAINAGE 1i = 0.84 AC TM130A— \ \\\ \ \___________ \ 1-47B \ JAMES JIVER ROAD, LL-\ DB534 PG 249 'ZQNE: VII� AGE RESIDE IAL —1E: _OPEN —\\ \ \\ / I 11II \I \ I.2 \ \ _ \ ZI � II II I ,' / \ 111 \\ 402�-- 400 _ 399 SHIMP ENGINEERING2. LAND PLANNING - PROJECT MANAGEMENT 912 E. HIGH ST. 434.227.5140 CHARLOTTESVILLE VA, 22902 JUSTIN@SHIMP-ENGINEERING.COM smmp a Lic No. 5183 �z�c S)n AT V�G VSMP PLAN FOR SCOTTSVILLE TIGER FUEL MARKET ALBEMARLE COUNTY, VIRGINIA SUBMISSION: 2021.11.30 REVISION: 1, — / /' �7394 \\ \__\ \� \�—' / /' / l j l 1 I I I I 11 \1111r \ I \\---___— �\ ROUTE 6 �1J.Y00' ` / v \ \ \\ `\ \� �/ / I \\ l / / j I I j I I 1 11 'V \ —— /'1 ________ ______ / \ \\ \ \\ � \ — — — — `\ ,�__—__' — /— — 394 eA0/ ` ` �\ \\\\ I/ / /// /' // 1 II111II \\ I —' '—_ / �' ---- � / I / j / / I I I I I I I A / ---- \ i / i I ------ FILE NO. — ---------------- \`� \�\ \ \\ \\ \ j 1 / i / / l 11 I 1 I I I 11111I — 20.046 I j i \�� -- / � \`___ � I i I 1 i � I I / _ ------ ----- E & S PLAN PH1 It I I III, l l II \ \ `\ —\ \\ \\ \ \ \\ `\ \` \`_ \ `�_ / Ill �\ \ ------ / '/ C412 1. _!� \�A8 SOIL EROSION & SEDIMENT CONTROL SYMBOLS g QI\ I \ \ I /� ,/ \ \ ENE N, JIf _—,_' / I\ /, / / � ,/ // �. ,♦ /A' / d° a .,.. TRENCH DRAIN < .�7 \ e - `r/' \ \ \\ \\ \\ ��` -- \ � \ I �/ / '\\ \ \\ ev RE CAT / �/ /. _+—N. ry / f NE IN4 �"�<ye--.. -�P` 1' :90,-EN NEW D1, 77 IN IN. co 42 W 5° BE*P� ,` NEWMH-1 \ D % R / �... y6\ \ X PF \ \ \ I \ I pryry/°S\ SYMBOL N 0, TI TLE KEY 3.02 CONSTRUCTION ENTRANCE PC — x — x — x — x — 3.05 SILT FENCE SF ® 3.08 CULVERT INLET PROTECTION CIP 3.09 TEMPORARY DIVERSION DIKE DD [DRAWN TO SCALE] 3.13 TEMPORARY SEDIMENT TRAP ST loomm 3.18 OUTLET PROTECTION OP 3.31 TEMPORARY SEEDING TS 3.32 PERMANENT SEEDING PS 3.35 MULCH MU 3.39 DUST CONTROL DC m m� m m� m m LIMITS OF DISTURBANCE ----' SEDIMENT TRAP DRAINAGE AREA SEQUENCE OF CONSTRUCTION PHASE 2 1. DEMO EXISTING BUILDING AND PAVEMENT AND PERFORM EXCAVATION FOR FOOTINGS. 2.INSTALL CURB AND GUTTER EXCEPT AT SEDIMENT TRAP. 3. AS STORM STRUCTURES ARE INSTALLED, PROVIDE INLET AND OUTLET PROTECTION. 4. BRING AREAS TO GRADE AND STABILIZE SLOPES OUTSIDE PERIMETER OF CURB. 5. INSTALL BIORETENTION BASIN AND STABILIZE AREA. , .w � �.:�� , \ s,. ry, y l 45° BEN 12 a I (.� k' a N \ \ / I o \ , \ 4 > l \ 1 1 l \ \ \ \\ \ \ 426 NEW I-3B a$ amwN. -420 \ I / / / / / / I - \ I rs /: ry,. , \ \ \ \ \ \ \ \ \ \ \\\-� I \ \ , I\ \ \ \ \ \ `\ \ \ �� • '' SHIMP ENGINEERING2. ONLINE 7JpJ1 \ ,` / /� LAND PLANNING -PROJECT MANAGEMENT AY STATIONS TMP 130A1-4�A I \ \ 1 1 \\ I I 1 1 I l \ \ \ a/` \ \ \ / / — / \ \ \ \ 1\ \ I \ JAMES RIVER ROA1 \ 1 l I II I1 I\\ \ \ , LLC _ 912 E. HIGH ST. 434.227.5140DB PG 8r ZONE: VILLAGE RESIDENTIAL \ I CHARLOTTESVILLE VA, 22902 JUSTIN SHIMP-ENGINEERING.COM \� \\ USE: SINGLE FAMILY RIESIDENTIALI 2.573 AC I �\ \ \\ \ \ II I II\�\, I , I \ \ \\ '--_ �' ' •/ / I \ I 1 A A NE \ 1 \ \ \ \ \ \\ \ I I I I \ \ \ � 3 LATER RE LF 18" HDPE / / \ — — — — Re \ H cH% V. IN 412.00 \ \ \ \ \ \ \ \ UT 406.00Al \ \ \ \ \ IN \ / `\TMP 13OA1-48 \I a- � gI = f 1�1000 6, ` \ \ 1 l \ \ I \ \ \\\ \\\ \ i \ \ \ I \ `\ \ —__ N/F CHILDRESS, THEODORE R �\ '�-____ _ I 1 PRETR TMENT AREA, \ , \ \ 1 I \\ \\ \ \ \\ \ I\ \\\\\ \\\\\ \ \ \ \ \\ ��__ /,/ // / U � / 4 / \ ■ V OT ST STONE \ --^ \ \ l \ \ \ \\ \ \ \ l„ \ / • SHIMP D�"21-9T /4�,373 , \ : v / I \ h \ ` \ \ \ \ \ \ 1 \ \\\ \ \ \ \ , /�... / ZONE: COMMER`CML ' 2 \ ` \ \ \ \ \ \ \ \\\\ l \ \ \ /'-• \ �� ----- / LiI/c N 5183 USE: COMMERCIAL _ ' ` k / +0 ` \ I `I \ \I \ \ \ \\ 1\ \\ \\\\ \ \ \ \\ ` 1 1 \ \ ' / / ,' A �G I 4 I I I \ \ \\ \\ \\ 1\ \I \\ \\\ \\\\ -- -I \\ \\ \\ \ \ \\ ' \ \ / // `ssl0 AL F'l1 A v I I \ v \ \ I \ \ I \ \ 1 \ \ \\\ \ \ 1 \ 1 `�\ �\ / /� \- - - - - - - - - - / _ // ,_��i-^ \ `\ .-' 3800 SF BIOR N SIN / ,x \ TOP OF MEDIA 404. 0, 2' EPTH /,' j j \` \ \ \ \ \ 1 -\ TOP OF STONE 402.50, DEPT / v / I a �- ` \ �\ �_-/� I ( I \ \ \ ��( \ \ \ \\\ \\ \ 1 / 1 / ->• \ I I \,/\ \ \ I 1\ I \\ 1 \ \\ 1 ,/ I I I I VSMP PLAN FOR I 1 ) BOTTOM OF STONE 00.00 / k / , o IORET,NTION BASIN COOR ES: 37.808 6,-78.501017 \\\ \ ` `�\ // ( 1, / t \\ 11 I \,\ \\ \\ II I \\II\ 1\\\\ \ \ \\ 11 \ 7 // /--'�'' / ) I �/r Y SCOTTSVILLE TIGER J!' / /I S€61MENT TRAP2�v \\ \\ // �i \ l I 1 \ \ \ \ \ \ II \\\\11 \ \ \ \ I I / /^� �// o /,-\ DRAINAGE AREA = !84 AC ` \ -- ' \ I I I I \ \ \ \\ I \ \ , I I / / r / FUEL MARKET ELE\NC. /\\ ; ,/ / , 06 M 130A1 ROAD, \ \ \ \\ \ / I 11 ) 1 I \I I 1 111 \\ \I\ \✓I \ \\\ •__'• \\ )I 11 \ 40 40 / / J (3, IVER ROAD, LL� i I \ / \ ` / /- _ / / DB �534 PG 249 \\ \ \\ \ I I II I \1 \ 1\\ 11 \ \ \ 1 \ II ' 4 X`— - *61 NE VILtAG OPENIDEIIAL "406 C$ APR ` 9.28 Ac`.\- \, \\ \ — \ ; I I i 11 i i I \I �\\\\\\I I \ / ` I i I / ALBEMARLE COUNTY VIRGINIA —I1 \ SUBMISSI ON: RA- 4002021.11.30 %394 REVISION:IRISH R�� I--- ROUTE 6 40- - - - 1 _ '__—_— ✓ i / r \ / ✓ ST ANDP 7� ,' ,/ \ \`__-\ \\ ' � ' / JI l � I I � / I \\111 / \, ----- - ---- , /' \ _ / \\ -, �'- / ----- `---------- / \ \\ ,--�OP ECE� yes / _/ \ ------------------\` (/ __ _ — — \ 394 / I n IN ___ \�\\^\ \I!p AM`\ \ \ \ \\\ \\\\ '^__' ``\ /'-' / // I / I 1 / I � / / / / � I I I I I I 1\'' � \��-_____ 10P\ \\ \`\\\ \ \ \' ^�\� \\\\\ /'J I/ I I I/ I / /I \ 098 FILE NO. ` \ / `\/ I / I I I I III I �/ \ — ��392 \\ N. \\ \ \ \\�_ \'-------' / % I I I I I I I `�� ` \ \ `. \\ \ 20.046 DPE \ \ \ 12'� H /-- \ \ \ -- -- \ \ \ LF 9 9s \ _ ( ( E & S PLAN PH2 \\\ \ \ \\ \ \ — ' \ \- 0 W 3 6. 00 \ \\ \ \ � — `� / / / � / / / / / I I I I � \ \\ `_ \ \\ \ \ \ — — \\<. �Q-�`392 \\ \ \ �\ �\ \\` \ `� / / ,/ // l j / / I II I I I \h ,-� / , \ \ \\ \\ , `V. NN IN 1 ------------ SOIL EROSION & SEDIMENT CONTROL SYMBOLS IV /— O-i__ _ —J% SIGN \ 1 ^ NN 07, NN NE D " , ' 1 // /,/ j // ,/ /°� / / /,.a°' m � •' ^ TRENCH DRAIN •'/a 1 `�` _ Slp \\ \ \\ \\ \\ \\ \ ^\— \ � \ � / '' /� \\\ RE " CAT / 0' / / ~"`o, e \ 9> NE W 90' EN ,� a e,� a ry o NEW ryry ry .^� d (/ �© ry+ l ry +5' wP-2 - - - ^s} cc � 422 \ ^ / W a a._ O4'�i<c �o N \ a , e `\ L `\� \ �\ \\!C / .01 NEWM 1 1 I w w w \ MO Rry O}ryM ,y \ / / 5' BEND ,y s'ti'^ , a,> "ryry, R .V o' q' .th'h ^ o? ro. 20. ,e• ^Q A �� \ \ \� \ \ F�" I \ \ \ \ \ \ \ \ / 0 �ywv / - � ° BEND' ry �v2 o a <v/ 45 -' v EE AN ,� / e �di 26 NN NE I-313 •aX �hq4, ryry � m ryry �. \ \ \\ I I , N-42 SHIMP ENGINEERING26 LAND PLANNING -PROJECT MANAGEMENT \_`\ \ \ I \ /\ 912 E. HIGH ST. 434.227.5140 \ \ / 73 \ \ — \ ]` / CHARLOTTESVILLE VA, 22902 JUSTIN@SHIMP-ENGINEERING.COM AY STATIONS / \ i'\_ i 1 \ \ \ \ \ \ 1 ,\\ 1 \ \ 1 I I l \ \ \ \ \\ TMP 130A1-4�A \ \ \\ 1 I I \ \ \ >�` JAMES RIVER ROA( LLC \ 1 \ 1 \ 1 \ I \ \� \\ \ I DB 5563 PG 41 8 ZONE: VILLAGE RESIDENTIAL 1 I \ \ 1 I \ \ 1 l \ \ USE: SINGLE FAMILY RESIDENTIAL'\ \ 11\ \) \A HE 3C:' I\ \ ,\ \ \ \ 1 \ II \ /--_ \ \\\ 2.573 AC OP \ \ \ LATER TO RE F 0 LF 18" HDPE \\ \\ \ \ 1 1 I I 1 1 \ \ \ \ \ \ \ \ \ \ \ , V. IN 412.00 [ ♦ ,/ / / I �Z _\ `\ \ %UT 406.00 ,\ \\ \ / \ \ \ \I \\ \ 1 \ \\ \� \\ \\ \ — -' U . SffiMP --_---' \I 1\ 1 11 1\\ \\ \\\\ \ \\\\\ I\ II \ \ \\ \ \\\ \ L10 N 5183 "a \ \\ \ \ \ \ I / r \ \ \ �G Q/ \TMP 130A1-48 \\ _ -''��_ e� �%% 1000 SF ` \ \ 1 \ \ \ \ \ \\ \\\ \ i \ \ \ \ \ - t N/F CHILDRESS, THEODORE R __-�\ _ m PRETR TMENT AREA, \ _\ \ 1 I \ \ \ \ \ \ \ \ \ \ \_' D�-2T'9.. t4 J_373 , \ �_ : µ I VDOT S�STONE \ � I^ \ ` \ \ \ \ \ 1 \ \ IO AL ZONE: COMMERCL �- / \ \\ \ \ \\ \ \ / / 1 USE: COMMERCIA / \\ \�, a'` \ \\ / /-��\ \ . III / \ 2 AC \ / � j rJ Av / / ' . -h / r6�� A v\ vv i t V ` . / - - V A vv v I \ v uv v vv vv A vv -vv ,- VSMP PLAN FOR 3800 SF BIOR N SIN SCOTTSVILLE TIGER TOP OF MEDIA 404. 0, 2' EPTH // 1 `O \ ___-_-- -\ \ \ \\ \\ -' / \ \ 1 \ \ \\ \ \1\\ \ -\ \ \ I \ \ // ' o - \ \ -� \ ,\\ 1 FUEL MARKET TOP OF STONE 402.50, DEPT c -> / I v \ \ \ --/ / I \ \ \ ` \ 1\\\, \ \ \ / / / 1 / BOTTOM OF STONE 00.00 / ' / \ \ I l Jc \ 1 \ \ 1 \ \ \ I- ' ' I I / IORETENTION BASIN COORD11dA�ES: \J \ N�i� / / v) 37.808126,-78.501017 / J / / O<O MP 130A1-47B \ \\ \ \-------- I I 1 \ 40 40 J , �i -- _ \ - 1 1 I \\ \\ �u \ \ JE5 RIVER ROAD, LLB \ ALBEMARLE COUNTY VIRGINIA DB 5534 PG 249 \\ \ \\\ \ / / I \ II 1\ I I `I\\\\\ II �� \\\ \ \\ it\\ \/ SUBMISSION: NE VILLAGE RESIDENTIAL \ \ \ \ - / I I I , 1 \\ \\ \ 1 � \ \ / \ \ I I / // -U.SE: OR N -\\ \ \\ I 11 I 1 II I \ \ \ \ I ! / ,658 AG v v 2021.11.30 / / \ -�\400 04 \ \\ \ \ -- r / / I I I 1 I \ \ r \ r�i AQA \ - , 1 I REVISION. \\11 �400 _ 1 \\1 398 \\\ \\ I \ 1 1 I — 1 IRISH RIROUTE 6 ERG0�1 ` ` - /l II mi\ I\ \ \ ____-- 4 - - - - '' 42 '-------- -- -'' / /' \ \ -'� TOP /- / \ \ l J 1 III I I \\- - - - - - - - - `_\ -'___- __________ - / \ \♦ 396 39$ 400 / / I / , A03.' '(OP\OF \ \ \ . \ r , / / / / / , / ! ! ! ! FILE NO. _,�_-- _ 20.046 40 400 398" 3.9.6—"E & S PLAN PH3 \2' NDPE_- \ \\ \ \ / / 40 0 40 40 120 0 \\/Scale: 1 "=40' cio 1 \I \ \ \\ \\ \\ \\ \\ \\ \\� \\ \ c\ \' \�\ \\ \ \\ \\ \\ \\ \ 1 1 /' ORGANIC MULCH MATERIALS AND APPLICATION RATES RATES: MULCHES: NOTES: Per Acre Per 1000 sq. ft. Straw or Hay lZ - 2 tons 70 - 90 lbs. Free from weeds and coarse (Minimum 2 matter. Must be anchored. tons for Spread with mulch blower or winter cover) by hand. Fiber Mulch Minimum 35 lbs. Do not use as mulch for 1500 lbs. winter cover or during hot, dry periods.* Apply as slurry. Corn Stalks 4 - 6 tons 185 - 275 lbs. Cut or shredded in 4-6" lengths. Air-dried. Do not use in fine turf aeras. Apply with mulch blower or by hand. Wood Chips 4 - 6 tons 185 - 275 lbs. Free of coarse matter. Air- dried. Treat with 12 lbs nitrogen per ton. Do not use in fine turf areas. Apply with mulch blower, chip handler, or by hand. Bark Chips 50 - 70 cu. 1-2 cu. yds. Free of coarse matter. Air - or yds. dried. Do not use in fine Shredded turf areas. Apply with Bark mulch blower, chip handler, or by hand. * When fiber mulch is the only available mulch during periods when straw should be used, apply at a minimum rate of 2000 lbs./ac. or 45 lbs./1000 sq. ft. 1 MULCHING MU C 11 Not To Scale CONSTRUCTION OF A SILT FENCE (WITHOUT WIRE SUPPORT) 1. SET THE STAKES. 2. EXCAVATE A 4"X 4" TRENCH UPSLOPE ALONG THE LINE OF STAKES. FLOW 3. STAPLE FILTER MATERIAL TO STAKES AND EXTEND IT INTO THE TRENCH. FLOW 4. BACKFILL AND COMPACT THE EXCAVATED SOIL. SHEET FLOW INSTALLATION (PERSPECTIVE VIEW) POINTS A SHOULD BE HIGHER THAN POINT B. DRAINAGEWAY INSTALLATION (FRONT ELEVATION) r4 'N� SILT FENCE (SF) TABLE 3.31-B ACCEPTABLE TEMPORARY SEEDING PLANT MATERIALS "QUICK REFERENCE FOR ALL REGIONS" Rate Planting Dates 1 s Sept. 1 - Feb. 15 50/50 Mix of Annual Ryegrass (Lolium multi-florum) & 50 -100 Cereal (Winter) Rye (Secale cereale) Feb. 16 - Apr. 30 Annual Ryegrass 60 - 100 (Lolium multi-florum) May 1 - Aug 31 German Millet 50 (Setaria italica) Source: Va. DSWC TEMPORARY SEEDING C 11 Not To Scale TABLE 3.39-A ADHESIVES USED FOR DUST CONTROL Water Application Dilution Type of Rate Adhesive (Adhesive: Water) Nozzle Gallons/Acre Anionic Asphalt Emulsion 7:1 Coarse Spray 1,200 Latex Emulsion 12.5:1 Fine Spray 235 Resin in Water 4:1 Fine Spray 300 Acrylic Emulsion (Non -Traffic) Acrylic Emulsion (Traffic) 3.5:1 Coarse Spray (!)DUST CONTROL DC C11 Not To Scale 107. SETTLEMENT 7:1 Coarse Spray 450 350 aCl1 Not To Scale '11 DRY STORAGF__ �,.► PIPE OUTLET CONDITIONS A A WETSTORAGE S 67 CU.YDIAE \ (EXCAVATED) FILTER CLOTH ORIGINAL GROUND 3d0 EL=A Bottom Surface Area ELEV. do s PIPE OUTLET TO FLAT SEE PLATE 3.13-1 COARSE AGGREGATE CLASS I RIPRAP AREA WITH NO DEFINED Cjt CROSS SECTION OF OUTLET PLAN VIEW CHANNEL CLASS I RIPRAP LENGTH (IN FEET) = L a 6 X DRAINAGE AREA _ (IN AC.) DIVERSION 0 '° -� DIKE = d SECTION A -A FILTER CLOTH KEY IN C-9": RECOMMENDED FOR ENTIRE PERIMETER A� COARSE AGGREGATE"�j/ \ // EXCAVATED FILTER CLOTH AREA � COARSE AGGREGATE SHALL BE VDOT #3, #357 OR #5 OUTLET (PERSPECTIVE VIEW) Sediment Trap Design Data Weir DA Wet D1 Wet Vol. Bottom Dry D2 Dry Vol. Top SA No. A B C H ft) Z (ft.) Length (ACS.) Vol. (ft.) Cy SA (sq. Vol. (ft) Cy (sq. fl.) (ft) (Req.) (Prov.) ft.) (Req.) (Prov.) 1 407.0 410.0 412.0 3.0 2.0 8.0 1.36 91.1 3.0 91.7 651.0 91.1 2.0 95.3 1575.0 2 394.0 397.0 399.0 3.0 2.0 5.0 0.84 56.3 3.0 344.3 2742.0 56.3 2.0 302.7 4602.0 sC$� Not To Scale Width 6 TYPICAL DITCH DETAIL C 11 Not To Scale CULVERT INLET PROTECTION DISTANCE IS 6' MINIMUM IF FLOW IS TOWARD EMBANKMENT FLOW USE STONE FOR ALL CULVERTS *OPTIONAL STONE COMBINATION P h' FLOW 2.5' TRAP (ST 70' MIN. A FILTERCLOTH 6"MIN. I A SIDE ELEVATION EXISTING GROUND 79 MIN. B WASHRACK (OPTIONAL) pl / . 7 to 12' MIN. � �- �VDOTCI COURSE AGGREGATE MUST EXTEND FULL WIDTH OF INGRESS AND EGRESS OPERATION I �-- POSITIVE DRAINAGE B TO SEDIMENT TRAPPING DEVICE PLAN VIEW SECTION A -A SECTION B-B I ado (MIN.) ����}����+,icePIPE OUTLET TO WELL DEFINED CHANNEL PLAN VIEW I�� ��� �1�� �►ice �� �Ii� ��.��/=1111111 . SECTION A -A FILTER CLOTH KEY IN 6"-9"; RECOMMENDED FOR ENTIRE PERIMETER NOTES: 1. APRON LINING MAY BE RIPRAP, GROUTED RIPRAP, :. BASKET, OR CONCRETE' 2. 1. IS THE LENGTH OF THE REPRAP APRON AS CALCULATED USING PLATES 3.18-3 AND Lu E AI T. LESS THAN 6 INCHES. Source: Va. DSWC 9 ) OUTLET PROTECTION (OP C 11 Not To Scale EXISTING PAVEMENT 5:1 MOUNTABLE BERM (OPTIONAL) 10' MIN. _L SOURCE: ADAPTED from 1983 Maryland Siandards for Soil erosion and Sediment Control, and Va. DSWC 10 CONSTRUCTION ENTRANCE (CE � r..11 Notes Plate 3.02-1 Plate 3.18-1 SHIMP ENGINEERIN G12. LAND PLANNING - PROJECT MANAGEMENT 912 E. HIGH ST. 434.227.5140 CHARLOTTESVILLE VA, 22902 JUSTIN@SHIMP-ENGINEERING.COM OF SIRMP a Lic No. 5183 nn�z� c O�`ss%!1 AT V�C VSMP PLAN FOR SCOTTSVILLE TIGER FUEL MARKET ALBEMARLE COUNTY, VIRGINIA SUBMISSION: 2021.11.30 REVISION: FILE NO. 20.046 Ifffl will 1111 milli 11 ff== tt VDOT p3, #357, #5, #56 OR #57 COARSE AGGREGATE CLASS I RIPRAP E & S Control Details TYPICAL VEE-SHAPED DIVERSION HI REPLACE SILT FENCE IN " HORSESHOE "WHEN HIGH VELOCITY OF FLOW IS EXPECTED s TEMPORARY DIVERSION DV C 11 Not To Scale 7 C11 Not To Scale C 11