Loading...
HomeMy WebLinkAboutWPO201700052 Review Comments WPO VSMP 2021-10-15�q oe atg 401 McIntire Road, North Wing Charlottesville, VA 22902-4579 County of Albemarle Telephone:434-296-5532 m COMMUNITY DEVELOPMENT DEPARTMENT WWW.ALBEMARLE.ORG VSMP Permit Plan Review Project title: Dunlora Overlook - Amendment #4 Project file number: WP0201700052 Plan preparer: Collins Engineering [scott@collins-engineering.com] Owner or rep.: Dunlora Investments, LLC [alan@riverbenddev.com] Plan received date: Sept. 14, 2021 Date of comments: Oct. 15, 2021 Reviewer: David James [djames2@albemarle.org] County Code section 17-410 and Virginia Code §62.1-44.15:34 requires the VSMP authority to act on any VSMP permit by issuing a project approval or denial. This project is denied/approved. The rationale is given in the comments below. The VSMP application content requirements can be found in County Code section 17-401. General 1. Note: WPO Amendment #2 has been voided or withdrawn. See SDP202100023 review comments from John Anderson for reasoning. 2. Note: WPO Amendment #3 plans can be replaced with Amendment #4 once approved. 3. Note: Retaining wall design will need to be submitted & approved prior to building permit issuance. 4. Note: It appears that land disturbance will increase. Submit a DEQ permit modification. 5. Note: SWM facility easement, deed & plat will need to be recorded prior to FSP approval. 6. Please remove the revision notations (cloud & symbol) on the final plan for approval. 7. Please remove these notes/text on the cover with the red line through them. Engineering Review Comments Page 2 of 4 DUNLORA OVERLOOK `- - VSMP AMENDMENT #4 \_ WPO 201700052 (AMENDMENT #4 TO W PO 301600058) , NOMAGISTERIPLDISMU N EN<RLECO.I ,VIRGINIA VIQNITV MAP'y 1�9'�i1RS20:t�- ry? ice! =ss- -'A t -X- a LU me. ' sv N 'o OWNER ENGINEER — _ "�'" _ - ___ WNLOU 1NVE EM, LLC C=W ENGINEBUW _ •� y •S-'-` '�•'� 4555ECIXID SIAEET 5E, WM 900 NO GM S1RffT, SLUE - J j = C.NC.RLO WLIE, VA 33902 CIWLLOTfESV ,VA 13903 O J O A. Stormwater Pollution Prevention Plan (SWPPP) The SWPPP content requirements can be found in County Code section 17-405. A SWPPP must contain (1) a PPP, (2) an ESCP, (3) a SWMP, and (4) any TMDL measures necessary. 1. Submit the updated SWPPP. B. Pollution Prevention Plan (PPP) The PPP content requirements can be found in County Code section 17-404. 1. Update PPP exhibit sheet for this phase. C. Stormwater Management Plan (SWMP) VSMP Regulation 9VAC25-870-108 requires the VSMP authority to approve or disapprove a SWMP. This plan is denied, and the reasons are provided in the comments below. The stormwater management plan content requirements can be found in County Code section 17- 403. 1. Show the drainage structures for phase 2 lower lots. Runoff should not have to cross or drain into alleyway. (icing, <lcfs) 2. Include the drainage design (inlet DA map, profiles, worksheets, etc.). 3. SWF'B' - Determine saturation zone and need for seepage control 'anti -seep' collars for barrel through embankment. 4. Sheet 10 - Extend cross-section and show the retaining wall in'BASIN B SECTION'. 5. Please contact Ana Kilmer if the permittee would wish to reduce their nutrient credit purchase obligations with the agreement. With this current Amendment #4 once Engineering Review Comments Page 3 of 4 approved, only 5.11 Ib/yr TP credit are required. 5.52 TP have been purchased previously under WP0201600058. D. Erosion and Sediment Control Plan (ESCP) Virginia Code §62.1-44.15:55 requires the VESCP authority to approve or disapprove an ESCP. This plan is disapproved, and the reasons are provided in the comments below. The erosion control plan content requirements can be found in County Code section 17-402. 1. Please add a note to the cover &/or appropriate E&SC sheets to indicate what already has been completed (e.g., PHASE 1 LAYOUT COMPLETE). 2. Sheet 3 - E&SC notes & narrative a. Change the amount disturbed. b. Correct #11 info. 3. Sheet 5/5A -I believe you can remove this (temp.) wall now. A ROW diversion to slope drain might work there (3.11, 3.15). The VSMP permit application and all plans may be resubmitted for approval when all comments have been satisfactorily addressed. For re -submittals please provide 2 copies of the complete permit package with a completed application form. Engineering plan review staff are available from 2-4 PM on Thursdays, should you require a meeting to discuss this review. Process: After approval, erosion and sediment control and stormwater management improvements must be bonded. The bonding process begins when the plan is approved, and the applicant submits a bond estimate request form and fee to the Department of Community Development. A plan reviewer will prepare estimates and check parcel and easement information based on the approved plans. The County's Management Analyst will prepare bond agreement forms, which will need to be completed by the owner and submitted along with cash, certificates or sureties for the amounts specified. The agreements will need to be approved and signed by the County Attorney and County Engineer. This may take 2-4 weeks to obtain all the correct signatures and forms. Stormwater Management Facilities Maintenance agreements will also need to be completed and recorded. The County's Management Analyst or other staff will prepare the forms and check for ownership and signature information. The completed forms will need to be submitted to the County, who will record the agreement. After bonding and agreements are complete, county staff enters project information in a DEQ database for state application processing, if a DEQ permit is required. DEQ reviews the application information based on local VSMP authority approval. At this time, the DEQ portion of the application fees will need to be paid directly to the state. For fastest processing, this is done electronically with the emails provided on the application. DEQ should notify applicants with Engineering Review Comments Page 4 of 4 instructions on how to pay fees. When DEQ approves the application, they will issue a permit coverage letter, which must be posted at the construction site. After DEQ coverage is issued, via the coverage letter, the County can hold a pre -construction conference. Applicants must complete the request for a pre -construction conference form and pay the remainder of the application fee. The form identifies the contractor and responsible land disturber, and the fee remaining to be paid. This will be checked by county staff, and upon approval, a pre -construction conference will be scheduled with the County inspector. At the pre - construction conference, should everything proceed satisfactorily, a joint VSMP and grading permit will be issued by the County so that work may begin. County forms can be found on the county website forms center under engineering; httos://www.al bemarle.oriz/government/commu nity-development/aooly-for/engineering-aool ications