HomeMy WebLinkAboutSDP202000021 Checklist - Project Closeout 2021-12-08 SUBDIVISION/SITE PLAN
FILE CLOSEOUT /IMAGING CENTER INSTRUCTIONS
CHECLIST
Please complete this form within 30 days of finalaction,on place in folder and forward to CDA FOR
and status label. CDA will forward to the Imaging•Center for digital closeout QC
SDP/SUB`#S DeZOZO 00024PROJECT TITLE vi4 ()eve!o p1 te' t (ar (4)12 Si
FULL NAME OF LEAD REVIEWER. IjJin Metcalf /4 FINAL ACTION DATE: 12 8/?0Z
CountyView— -DApplication,Page 2 Data Entered
❑ Staff Report,Ground Water Assessment,or other documents placed in"Does&Pics"
Hardco.
py.—File Folder Closeout: Allitems listed should be placed in project folder,in reverse
chronological order(latest on top).
Please check each item included in this folder. To indicate that an item is not applicable to this file,place.an"N/A"
next to the check'box. The Lead Reviewer has the discretion to include any item deemed necessary to provide
clarity to the file,please indicate that item on the"Other"lines provided.
•
Digital Closeout Instructions: Below each item please indicate if Imaging Center is to scan the
document;or,if the document is already in digital format,can be saved to LaserFiche. Please provide the.digital
location(path/name)of the document in the space provided,
❑ Engineering Folder Information/documentation
0 Scan 0 Saved location •
DEr Application(signature copy) -1 h Q!d c Q Ir l g S
El Scan 0 Saved location U 'D a(!e d'
Qf�v i hat h w APelC
❑ Public Notification records/Abutting Owner correspondence
❑ Scan 0 Saved location
,Applicant Correspondence(to/from,memos/clnails 1�f
❑ Scan ❑ Saved location a •
r 1/P��4'�(:G' Z�S�ZUL
'Complete.set of printed Review Comments 1
0Scan 0 Saved location. V r i0 Acted
❑ Approved plan/plat(signed,or stamped"Approved"with Pl er/E ' eer name)
rgr Scan 0 Saved locations e
nP� � SCQn-+cd
0 Action Letter(Administrative Approval)
El Scan 0'Saved location
• . ❑ White Envelope-PC/BOS Meeting Package-•Staff Report(include plan/plat presented,PC/BOS Action
❑ Scan 0 Saved location
Letter)
❑ Ground Water Assessments'
0 Scan 0 Saved location
❑ Other(Please explain—i.e.Studies)
Scan 0 Saved location .
❑ Other(Please explain—i.e.Studies) •
❑. Scan 0 Saved location
❑ At the planner's discretion,copies of unapproved plans/plats may be placed in the file if it is.referenced in the
staff report or minutes and lends clarity to the review at a later date. If such plans are included,they should be
clearl marked as unapproved and contain a note clarifying why it was included.
•
Scan ❑ Saved location
•
Additional Information On:tlus,project:
• Planning Commission Minutes—may be obtained online or by contacting PC Recording Secretary
• 'Board of Supervisor Minutes—maybe obtained online or by contacting the Clerk of BOS
• Construction Documents—will be added to this folder after completion of project. Prior to completion,
documents maybe obtained by contacting the County Engineer.
•
NOTES: SDP/SUB project folders will be accepted by the Imaging Center when the.following items are complete:
1) Checklist is completed and included in folder; •
2). FoIder has a typed status label(same font&label color as project label)placed under the project label to _
;reflect current project status and date;
3) Documents are.Acco-fastened(except.plats/plans),and in(ihronological.order patest:documents on top);. -
4) Documents are sufficiently identified as to which need to be scanned or saved to LaserFiche,
If the above items are not complete,Imaging Center staff will circle the.incomplete item and return folder to the Chief of.
Planning for corrective action.
Issued 2/7/2008,Revised 4/1/2008,Revised 7/1/2009,Revised 2/9/2010,Revised 10 29-2012