HomeMy WebLinkAboutSP201600023 Study 2016-05-01PRPc Traffic • Transportation • Stormwater • Civil TRAFFIC IMPACT STUDY ARDEN II PHASE 1 Charlottesville, VA Prepared for: Castle Development, C/O Scott Collins, P.E. Collins Engineering 200 Garrett Street, Suite K Charlottesville, VA 22902 Jeanie Alexander, P.E. EPR, P.C. 637 Berkmar Circle Charlottesville, Virginia 22901 May 2017 EPRipc EPR, P.C. "ENGINEERING & PLANNING RESOURCES" 637 BERKMAR CIRCLE, CHARLOTTESVILLE, VA 22901 Executive Summary This report provides a summary of the traffic impact analysis for the Arden II project located on the north side of Rio Road between Albemarle Square Drive and Putt Putt Place (Albemarle County parcels 06100-00-00-124E0, 06100-00-00-124F0, and 06100-00-00-124G0) in support of the special use permit application for Phase I only (Figure 1). While it is anticipated that the project will consist of two phases, only Phase 1 is considered in this study (Figure 2). The proposed land use includes: 150 apartments, a 120 room hotel, and a 50,000 square foot self -storage facility. The trip generation for the site is shown in the table below. Site Trip Generation item LU unit qty daily AM PM in out total in out total apartments 220 du 150 1033 15 62 77 65 35 100 hotel 310 or 120 1070 46 34 80 42 42 84 self -storage 151 ksf 50 125 4 3 7 7 6 13 totals 2228 65 99 164 114 83 197 Access to the site will be provided via Putt Putt Place and no connection is assumed between the project and Albemarle Square for this phase. The site trip distribution agreed upon by VDOT staff is shown in Figure 6. Included within this study are analyses of existing conditions, future no build conditions, and future build conditions for the year 2020 at the following intersections with Rio Road: Albemarle Square Drive/Mall Drive, Putt Putt Place, Old Brook Road, and Hillsdale Drive/Northfield Road. The analyses indicate that additional queue storage is needed today unrelated to the project at the locations listed below. It should be noted that this entire corridor is part of a small area plan currently underway. Phase II of the Rio/29 Small Area Plan project, expected to be complete in October 2017, will include further study of these intersections and a transportation plan. • Albemarle Square Drive and Mall Drive — eastbound left turn lane, westbound left turn and right turn lanes, • Old Brook Road — eastbound and westbound left turn lanes, southbound right turn lane, and • Northfield Road and Hillsdale Drive — eastbound left turn lane, westbound left turn lane, and northbound shared through/left turn lane. At the intersections of Putt Putt Place with Rio Road a traffic signal is nearly warranted today and with the addition of the future site traffic is warranted. With signalization, the intersection it is expected to operate at LOS A overall and LOS C or better for all movements. It is recommended that a traffic signal be installed at the intersection and that it be coordinated with the nearby Albemarle Square Drive/Mall Drive traffic signal. Due to the spacing between these two intersections a design exception will be required. It is also recommended that the westbound right turn lane be extended 50 feet to accommodate the increased queue. EPRipc EPR, P.C. "ENGINEERING H� PLANNING RESOURCES" 637 BERKMAR CIRCLE, CHARLOTTESVILLE, VA 22901 Table of Contents ExecutiveSummary..................................................................................................................... Introduction................................................................................................................................. ExistingConditions...................................................................................................................... ExistingLand Use................................................................................................................. Existing Transportation Network......................................................................................... ExistingTraffic Volumes....................................................................................................... Existing Peak Hour Traffic Operations................................................................................. Future 2020 No Build Conditions................................................................................................ FutureLand Use................................................................................................................... Future Transportation Network.......................................................................................... Future No Build Traffic Volumes.......................................................................................... Future No Build Peak Hour Traffic Operations.................................................................... Future2020 Build Conditions...................................................................................................... SiteTrip Generation............................................................................................................. Site Trip Distribution and Assignment................................................................................. Future Build Traffic Volumes............................................................................................... Future Build Traffic Operations........................................................................................... Conclusions and Recommendations........................................................................................... List of Tables i 1 2 2 2 3 3 5 5 5 5 5 7 7 7 7 8 9 1 Study Area Roadway Characteristics.................................................................................2 2 Existing Conditions Levels of Service, Delay, and Queues...............................................10 3 2020 No Build Conditions Levels of Service, Delay, and Queues....................................11 4 Site Trip Generation...........................................................................................................7 5 2020 Build Conditions Levels of Service, Delay, and Queues..........................................12 6 2020 Build Conditions Levels of Service, Delay, and Queues with Putt Putt Place Signalized........................................................................................................................13 List of Figures 1 Site Location 2 Phase 1 Concept Plan 3 Study Intersections 4 Existing Traffic Volumes 5 2020 No Build Traffic Volumes 6 Site Trip Distribution 7 Site Trip Assignment 8 2020 Build Traffic Volumes Appendices A VDOT Scoping Form B Traffic Counts C Existing Synchro Printouts D Existing SimTraffic Printouts E 2020 No Build Synchro Printouts F 2020 No Build SimTraffic Printouts G 2020 Build Synchro Printouts H 2O20 Build SimTraffic Printouts I Signal Warrant Analysis Memo J 2020 Build Synchro Printouts Putt Putt Place Signalized K 2020 Build SimTraffic Printouts Putt Putt Place Signalized Introduction This report provides a summary of the traffic impact analysis for Phase I of the Arden II project in support of the special use permit application. The site is comprised of Albemarle County parcels 06100-00-00-124E0, 06100-00-00-124F0, and 06100-00-00-124G0, located on the north side of Rio Road between Albemarle Square Drive and Putt Putt Place as shown in Figure 1. While it is anticipated that the project will consist of two phases, only Phase 1 is considered in this study. The Phase 1 concept plan is shown in Figure 2. The proposed land use includes: 150 apartments, a 120 room hotel, and a 50,000 square foot self -storage facility. Access to the site will be provided via Putt Putt Place and no connection is assumed between the project and Albemarle Square for this phase. Included within this study are analyses of existing conditions, future no build conditions, and future build conditions for the year 2020. The intersections analyzed are shown in Figure 3 and listed below: • Rio Road with Albemarle Square Drive and Mall Drive, • Rio Road with Putt Putt Place, • Rio Road with Old Brook Road, and • Rio Road with Northfield Road and Hillsdale Drive. All of the assumptions the report and analyses are based on are outlined in the VDOT scoping form contained in Appendix A. 1 Existing Conditions Existing Land Use Located in Albemarle County, the site currently contains Charlottesville Power Equipment but is primarily vacant. The land uses adjacent to the site include apartments, self -storage, a Putt Putt Golf center, and a Verizon store. The site is bounded by Arden Place to the north, Rio Road to the south, Albemarle Square to the west, and a variety of commercial uses to the east. The parcels on which the proposed development will be located are currently zoned C1, Commercial (61-124G) and HC, Highway Commercial (61-124E and 61-124F). The application is for a special use permit to allow for the hotel and residential uses. Existing Transportation Network Table 1 contains a description of the specific study area roadway characteristics. Table 1 Studv Area Roadwav Characteristics Functional Posted Bike Roadway Lanes Median Sidewalks Classification Speed Lanes Rio Road west of Putt minor arterial 40 mph 4 both sides both VA 631 Putt Place Mall Drive local np 2 yes none none Albemarle Square Drive local np 2 no none none Putt Putt Place private, local np 2 no disconnected none Old Brook Road major collector 30 mph 2 no west side none north of Rio Road Old Brook Road south of Rio Road local np 2 no none none Hillsdale Drive major collector 35 mph 2 no east side both VA 1427 Northfield Road VA 1427 local 30 mph 2 no none none Rio Road provides a significant link in the region's transportation network by connecting the commercial US 29 area to Downtown Charlottesville in a northwest/southeast direction. (Within this study Rio Road is considered an east -west roadway.) Both Old Brook Road to the north and Hillsdale Drive to the south also play a role in the greater transportation network connecting residential and commercial areas. The other study area roadways provide access to commercial areas including Fashion Square Mall and Albemarle Square and high density residential complexes. All of the study area intersections are currently signalized with the exception of Putt Putt Place and Rio Road. Below is a summary of the specific characteristics of each intersection shown in Figure 3. • Mall Drive and Albemarle Square Drive — Rio Road provides two through lanes and separate right and left turn lanes. The eastbound right turn lane is channelized. The Mall Drive approach provides separate left, through, and right turn lanes (the right turn 2 lane is channelized) and Albemarle Square Drive provides a shared through/right turn lane and a separate left turn lane. • Putt Putt Place — This is a "T" intersection controlled by a stop sign on the Putt Putt Place approach. Rio Road provides two through lanes in both directions and separate eastbound left turn and westbound right turn lanes. Putt Putt Place provides separate left and right turn lanes. • Old Brook Road — Rio Road provides two through lanes and separate left turn lanes in both directions. Old Brook Road provides a shared through/left turn lane and separate right turn lane on the southbound approach. The northbound approach is unmarked and assumed to be a single lane approach. • Hillsdale Drive and Northfield Road — Rio Road provides two through lanes and a separate left turn lane in both directions. Hillsdale Drive provides a shared through/left turn lane and separate right turn lane. Northfield Road provides a single lane approach. Existing Traffic Volumes Traffic counts were conducted at the study intersections on typical weekdays (Tuesday, Wednesday, or Thursday) in March 2017, when schools were in session and no significant weather events occurred (see Appendix B). The intersection turning movement counts were conducted from 7-9 AM and 4-6 PM and are shown in Figure 4. Existing Peak Hour Traffic Operations The study intersections were analyzed in Synch ro/SimTraffic (version 9) in accordance with the procedures stated in the 2000 and 2010 Highway Capacity Manual, and then simulated in SimTraffic 9 to identify the existing levels of service, delay by movement, and queuing. The analysis results from the Synch ro/SimTraffic reports (see Appendix C and Appendix D) are compiled in Table 2 located at the end of the report text. Field observations were conducted to verify the queue lengths calculated in SimTraffic. These observations were conducted on Tuesday, April 25t" during both peak periods. Comparing the observed queues to the SimTraffic queues, the SimTraffic queues are reasonable. SimTraffic considers vehicles traveling 10 mph or less to be part of the queue. The field observations did not include rolling vehicles as part of the queue explaining any discrepancies. The data collection sheets are included at the end of Appendix D. As shown in Table 2, all of the study area intersections operate at LOS C or better overall. The following individual movements operate at LOS E or F during the peak periods today: • Albemarle Square Drive and Mall Drive — northbound left turn, northbound through, southbound left turn, southbound shared through/right turn and • Putt Putt Place - southbound left turn. With the exception of the intersection of Putt Putt Place with Rio Road, the queues for multiple movements at each of the study intersections exceed the storage provided today as indicated in Table 2. The locations where the queues extend beyond the storage lanes are listed below with the length of queue in excess of the provided storage (rounded up to the nearest five feet). 3 • Albemarle Square Drive and Mall Drive — eastbound left turn 60 feet, westbound left turn 80 feet, westbound right turn 50 feet, • Old Brook Road — eastbound left turn 80 feet, westbound left turn 5 feet, and southbound right turn 15 feet, and • Northfield Road and Hillsdale Drive — eastbound left turn 15 feet, westbound left turn 60 feet, northbound shared through/left turn 50 feet. It should also be noted that the eastbound and westbound through queues at the intersection of Albemarle Square Drive/Mall Drive are lengthy at 495 feet and 595 feet, respectively. As is the eastbound through queue at Old Brook Road at approximately 420 feet. Extending the turn lanes on the Albemarle Square Drive/Mall Drive westbound approach, Old Brook Road eastbound and southbound approaches, and Hillsdale Drive westbound and northbound approaches would address the insufficient queuing areas. The Old Brook Road and Hillsdale Drive lane extensions appear to only require restriping. While the Albemarle Square Drive/Mall Drive extension would require moving the curb lines. The insufficient storage areas on the Albemarle Square Drive/Mall Drive eastbound approach, Old Brook Road westbound approach, and Hillsdale Drive/Northfield Road eastbound approach cannot be improved with striping. The challenge at these locations is that these turn lanes are located back to back with the adjacent signalized intersections' turn lanes. While there are operational deficiencies today at the study area intersections noted above, it is recommended that these not be addressed until the larger Rio/29 Small Area Plan traffic study is complete. 4 Future 2020 No Build Conditions Future Land Use A small area plan is currently underway along Route 29 and encompasses the Arden II parcels. Phase I of the Small Area Plan process wrapped up in March of 2017. The vision of the preferred land use alternative organizes future redevelopment around the node concept, with centers of higher density development at key intersections that could support future transit improvements. The Arden II site is located within a 10-minute walk of one of the three nodes located at the intersection of Rio Road with Route 29. Phase II of the Rio/29 Small Area Plan project, expected to be complete in October 2017, will work from the preferred land use alternative to develop a final land use plan, urban design plan, transportation plan, and implementation action plan. It appears that the proposed Arden II development is consistent with the direction the Albemarle County Small Area Plan process is headed. No specific developments have been identified in the immediate study area for consideration in the analysis. However, growth is expected and accounted for with a background growth rate of 1.0% per year, consistent with the VDOT scoping form assumptions. Future Transportation Network The only currently committed transportation project that may affect the study area is the Hillsdale Drive Extension project. This project is part of the Route 29 Solutions package and expands the parallel road network on the Route 29 corridor north of Charlottesville by completing a connection between Rio Road and Hydraulic Road east of Route 29. Construction began in late June and will be complete in the fall of 2017. The road will extend Hillsdale Drive south from its current end at Greenbrier Drive. The road will continue between the Pepsi -Cola and U.S. Post Office properties, through the Seminole Square Shopping Center and finally connect with Hydraulic Road opposite the Dominion Power property. No adjustments were made to the background traffic volumes as a result of this project. However, this connection was considered when developing the distribution and assignment for the new site traffic. Future No Build Traffic Volumes The future 2020 traffic volumes resulting from the background growth are shown in Figure 5. Future No Build Peak Hour Traffic Operations The study intersections were analyzed in Synchro/SimTraffic (version 9) to identify the future no build levels of service, delay by movement, and queuing and are shown in Table 3 located at the end of the report text. (See Appendices E and F for the analysis printouts.) Cycle lengths and phase splits were optimized for the analyses. 5 Nearly identical to existing conditions, all of the study area intersections are expected to operate at LOS C or better overall. The following individual movements operate at LOS E or F during the peak periods in future 2020 no build conditions: • Albemarle Square Drive and Mall Drive — northbound left turn, northbound through, southbound left turn, southbound shared through/right turn and • Putt Putt Place - southbound left turn. With the exception of the intersection of Putt Putt Place with Rio Road, the queues for multiple movements at each of the study intersections exceed the storage provided as indicated in Table 3. The locations where the queues extend beyond the storage lanes are listed below with the length of queue in excess of the provided storage (rounded up to the nearest five feet). These are the same locations noted in existing conditions. • Albemarle Square Drive and Mall Drive — eastbound left turn 60 feet, westbound left turn 80 feet, westbound right turn 50 feet, • Old Brook Road — eastbound left turn 80 feet, westbound left turn 10 feet, and southbound right turn 15 feet, and • Northfield Road and Hillsdale Drive — eastbound left turn 15 feet, westbound left turn 60 feet, northbound shared through/left turn 50 feet. It should also be noted that the eastbound and westbound through queues at the intersection of Albemarle Square Drive/Mall Drive are lengthy at 475 feet and 570 feet, respectively. As is the eastbound through queue at Old Brook Road at approximately 400 feet. As in existing conditions, extending the turn lanes on the Albemarle Square Drive/Mall Drive westbound approach, Old Brook Road eastbound and southbound approaches, and Hillsdale Drive westbound and northbound approaches would address the insufficient queuing areas. The Old Brook Road and Hillsdale Drive lane extensions appear to only require restriping. While the Albemarle Square Drive/Mall Drive extension would require moving the curb lines. The insufficient storage areas on the Albemarle Square Drive/Mall Drive eastbound approach, Old Brook Road westbound approach, and Hillsdale Drive/Northfield Road eastbound approach cannot be improved with striping. The challenge at these locations is that these turn lanes are located back to back with the adjacent signalized intersections' turn lanes. While there are operational deficiencies expected in the future at the study area intersections noted above, it is recommended that these not be addressed until the larger Rio/29 Small Area Plan traffic study is complete. 1.1 Future 2020 Build Conditions The proposed land use for Arden II Phase 1 includes: 150 apartments, a 120 room hotel, and a 50,000 square foot self -storage facility. Access to the site will be provided via Putt Putt Place and no connection is assumed between the project and Albemarle Square for this phase. The assumed future land use and transportation network surrounding the site are the same for the build conditions and no build conditions analyses. Site Trip Generation ITE Trip Generation 9th Edition was used to calculate the future site trips. No pass -by trips or internal capture were assumed. Table 4 provides a summary of the trip generation for the development. Approximately 2,228 new daily trips, 164 morning peak period trips, and 197 afternoon peak period trips are estimated for the development. Note that no trip reductions were taken for walking or biking. Table 4 Site Trip Generation item LU unit qty daily AM PM in out total in out total apartments 220 du 150 1033 15 62 77 65 35 100 hotel 310 or 120 1070 46 34 80 42 42 84 self -storage 151 ksf 50 125 4 3 7 7 6 13 totals 1 2228 65 99 164 114 83 197 Site Trip Distribution and Assignment The proposed site traffic assignment and distribution were developed based on an understanding of local traffic patterns, the impact of the Hillsdale Drive Extension project, and discussions with VDOT staff. These assumptions are part of the agreed upon Scoping Form contained in Appendix A. Beyond the immediate site, the following traffic distribution is assumed and shown in Figure 6. • 60% to/from the west via Rio Road, • 3% to/from Albemarle Square shopping center, • 2% to/from Fashion Square Mall, • 10% to/from the south via Hillsdale Drive, and • 25% to/from the southeast via Rio Road. Figure 7 illustrates the resulting traffic assignment through the study area. Future Build Traffic Volumes The trips generated by the proposed development, calculated and assigned to the study intersections as documented above, were added to the no build traffic volumes and are shown in Figure 8 for year 2020. 7 Future Build Traffic Operations The study intersections were analyzed in Synchro/SimTraffic (version 9) to identify the future build levels of service, delay by movement, and queuing. Any traffic signals analyzed are assumed to operate in coordination with one another and the timings and phasing are optimized to maximize travel capacity, minimize queuing, and minimize delays through the study area. The results of the analysis with the site traffic are shown in Table 5 (located at the end of the report text). (See Appendices G and H for the analysis printouts.) The build conditions analysis results are similar to the existing conditions and 2020 no build conditions. Comparing no build and build conditions, the overall intersection levels of service are unchanged as are the levels of service for the individual movements with the exception of the Putt Putt Place intersection. At Putt Putt Place the southbound left turn movement is expected to operate at LOS E and F during the morning and afternoon peak hours, respectively. With the addition of the site traffic, the locations previously identified in the existing and no build analyses continue to have queues that extend beyond the provided storage lane lengths. Also, the southbound approach at the intersection of Putt Putt Place with Rio Road has queues that are approximately 500 feet long. Signalization of Putt Putt Place and Rio Road One possible way to improve traffic operations at the intersection of Putt Putt Place with Rio Road is to install a traffic signal. A signal warrant analysis was conducted for the intersection and is included in Appendix I. The results of the analysis indicate that while a traffic signal is nearly warranted today, with Arden II Phase 1 a traffic a signal is warranted. The study intersections were reanalyzed assuming that the intersection of Putt Putt Place and Rio Road is signalized. The results of the analysis are shown in Table 6 (located at the end of the report text) and the analysis printouts are contained in Appendices J and K. With the installation of a traffic signal at Putt Putt Place and Rio Road all of the study area intersections are expected to have the same overall and individual movement levels of service as no build conditions with the exception of Putt Putt Place. At Putt Putt Place the intersection is expected to operate at overall LOS A with all individual movements operating at LOS C or better. With the installation of a traffic signal at Putt Putt Place, the locations previously identified in the no build analysis continue to have queues that extend beyond the provided storage lane lengths. Additionally, the westbound right turn queue at Putt Putt Place extends 50 feet beyond the provided storage lane. Extending the westbound right turn lane would require adjusting the existing curb lines. While there are operational deficiencies expected in the future at the study area intersections noted above, it is recommended that these not be addressed until the larger Rio/29 Small Area Plan traffic study is complete. H-1 Conclusions and Recommendations The traffic associated with Arden II Phase 1 will have a minimal impact on the traffic operations of the surrounding transportation network. The off -site intersections will operate at the same overall and individual movement levels of service during both peak periods analyzed with the addition of the Arden II Phase 1 site traffic. At the intersection of Putt Putt Place with Rio Road a traffic signal is nearly warranted today and is warranted with the addition of the future site traffic. With the installation of a traffic signal at the intersection it is expected to operate LOS A overall and LOS C or better for all movements. Without a traffic signal at this intersection the southbound left turn movement is expected to operate at LOS F during both peak periods. It is recommended that a traffic signal be installed at the intersection and that it be coordinated with the nearby Albemarle Square Drive and Mall Drive traffic signal. Due to the spacing between these two intersections a design exception will be required. It is also recommended that the westbound right turn lane be extended 50 feet to accommodate the increased queue. Unrelated to the Arden II Phase 1 project, the following improvements are needed and will improve traffic operations at the study area intersections. Rio Road at Albemarle Square Drive and Mall Drive — Extension of the westbound left and right turn lanes is needed to accommodate the existing queues. To extend the turn lanes the curb line along the median and outside lane will need to be adjusted. Extension of the eastbound left turn lane is also needed to accommodate existing queues. This is problematic because this turn lane is positioned back-to-back with the Route 29 dual westbound left turn lanes. Rio Road at Old Brook Road — Extension of the eastbound left turn lane and southbound right turn lane is needed to accommodate the existing queues. It appears that these improvements may be possible with markings only. Rio Road at Northfield Road and Hillsdale Drive — Extension of the westbound left turn lane and northbound shared through/left turn lane is needed to accommodate the existing queues. It appears that these improvements are possible with markings only. Rio Road at Old Brook Road, Northfield Road, and Hillsdale Drive — It is not possible to extend the turn lanes between the two signalized intersections. However, it should be noted that the queues extend beyond the provided storage by less than a car length. It is recommended that the operational deficiencies noted above not be addressed until the completion of the larger Rio/29 Small Area Plan traffic study. N Table 2 Existing Conditions Levels of Service, Delays, and Queues Approach Movement Storage AM PM LOS Delay Queue LOS Delay Queue 1. Rio Road/Albemarle Square Drive/Mail Drive EBL 260 A 8.4 64 B 17.6 317 Rio Road EBT 580 B 10.8 241 C 22.2 494 EBR 580 A 0 0 A 0 0 WBL 260 A 7.2 52 B 15.2 339 Rio Road WBT 890 B 13.3 292 C 24 593 WBR 80 A 8.4 122 B 15.7 130 NBL 300 E 73.3 80 E 69.3 154 Mall Drive NBT 300 E 67.1 27 E 62.3 75 NBR 160 A 0 0 A 0 0 Albemarle SBL E 65.7 117 F 99.2 336 Square Drive SBT/SBR 100 E 62.8 95 E 57.4 100 Intersection B 13.5 C 29.2 2. Rio Road/Putt Putt Place EBL 300 B 13 93 B 13.9 142 Rio Road EBT 890 A 0 0 A 0 0 WBT A 0 2 A 0 0 Rio Road WBR 120 A 0 17 A 0 22 SBL E 41.8 253 E 40.3 175 Putt Putt Place SBR 100 C 16.9 100 C 17.9 99 Intersection A 2.3 A 1.8 3. Rio Road/Old Brook Road EBL 120 A 9.5 92 B 10.7 199 Rio Road EBT/EBR B 14.3 233 B 16.1 416 WBL 50 A 2.1 40 A 3.1 54 Rio Road WBT/WBR 150 A 3.5 109 A 4.2 134 Old Brook Road NBL/NBT/NBR D 35.4 72 D 36.5 61 SBL/SBT D 50.2 200 D 37.5 129 Old Brook Road SBR 60 D 35.6 75 D 36.2 73 Intersection B 12 B 11.2 4. Rio Road/Northfield Road/Hillsdale Drive EBL 40 A 4.5 53 A 3 47 Rio Road EBT/EBR 150 A 7.4 126 A 3.6 106 WBL 120 A 7.8 169 B 12.1 180 Rio Road WBT/WBR B 11 232 B 14.3 321 NBL/NBT 100 D 43.7 131 D 46 149 Hillsdale Drive NBR D 35.8 109 D 37.8 312 Northfield Road SBL/SBT/SBR D 46.4 179 D 37.4 105 Intersection B 13.4 B 13.9 10 Table 3 ZOZO No guild Conditions Levels of service, Delay, and Queues Approach Movement Storage AM LOS Delay Queue LOS 1. Rio Road/Albemarle Square Drive/Mall Drive Rio Road EBL 260 A 8.5 66 B EBT 580 B 10.8 224 C EBR 580 A 0 0 A Rio Road WBL 260 A 7.2 44 B WBT 890 B 13.4 299 C WBR 80 A 8.3 130 B Mall Drive NBL 300 E 73.3 66 E NBT 300 E 67.1 18 E NBR 160 A 0 0 A Albemarle Square Drive SBL E 66.4 105 F SBT/SBR 100 E 62.5 88 E Intersection B 13.3 C 2. Rio Road/Putt Putt Place Rio Road EBL 300 B 12.6 82 B EBT 890 A 0 2 A Rio Road WBT A 0 2 A WBR 120 A 0 16 A Putt Putt Place SBL E 37 205 F SBR 100 C 16.1 100 C Intersection A 2.1 A 3. Rio Road/Old Brook Road Rio Road EBL 120 A 9.2 95 B EBT/EBR B 14 225 B Rio Road WBL 50 A 2 38 A WBT/WBR 150 A 3.3 108 A Old Brook Road NBL/NBT/NBR D 35.2 63 D Old Brook Road SBL/SBT D 48.4 217 D SBR 60 D 35.4 75 D Intersection B 11.6 B 4. Rio Road/Northfield Road/Hillsdale Drive Rio Road EBL 40 A 4.3 48 A EBT/EBR 150 A 7.1 128 A Rio Road WBL 120 A 7.3 171 B WBT/WBR B 10.8 239 B Hillsdale Drive NBL/NBT 100 D 42.9 119 D NBR D 35.6 108 D Northfield Road SBL/SBT/SBR D 45.2 179 D Intersection B 13.1 B PM Delay Queue 18.3 317 22.6 474 0 0 15.6 339 24.5 568 15.7 130 69.3 152 62.3 74 0 10 99.2 333 57.4 100 29.5 14.4 128 0 0 0 0 0 28 69.5 126 18.5 98 2 11.2 199 16.5 401 3.3 56 4.3 137 36.6 57 37.6 116 36.2 74 11.5 2.9 52 3.5 120 13.1 180 14.7 353 46 149 37.8 290 37.5 107 14 laole S LULU tsuiia lAnaixionS Levels OT Jervice, uelay, ano Lzueues Approach Movement Storage AM PM LOS Delay I Queue LOS Delay Queue 1. Rio Road/Albemarle Square Drive/Mall Drive EBL 260 A 9.2 71 B 19.4 340 Rio Road EBT 580 B 11.4 278 C 23.5 550 EBR 580 A 0 0 A 0 16 WBL 260 A 7.5 56 B 16.7 339 Rio Road WBT 890 B 14.1 351 C 25.3 591 WBR 80 A 8.5 130 B 15.7 130 NBL 300 E 73.3 69 E 69.3 138 Mall Drive NBT 300 E 67.1 24 E 62.3 82 NBR 160 A 0 0 A 0 9 Albemarle SBL E 65.8 117 F 103.6 336 Square Drive SBT/SBR 100 E 62.6 86 E 57.4 100 Intersection B 14.1 C 30.3 2. Rio Road/Putt Putt Place EBL 300 B 13.4 144 C 16.7 241 Rio Road EBT 890 A 0 0 A 0 0 NBT A 0 13 A 0 5 Rio Road WBR 120 A 0 26 A 0 28 SBL F 60.6 499 F 83.2 511 Putt Putt Place SBR 100 C 19 100 C 22 100 Intersection A 4.3 A 3.8 3. Rio Road/Old Brook Road EBL 120 A 9.3 104 B 12.1 199 Rio Road EBT/EBR B 14.1 222 B 17.1 411 WBL 50 A 2.1 45 A 3.5 55 Rio Road WBT/WBR 150 A 3.4 126 A 4.8 144 Old Brook Road NBL/NBT/NBR D 36 65 D 36.5 62 SBL/SBT D 49.3 216 D 37.5 93 Old Brook Road SBR 60 D 36.2 75 D 36.1 72 Intersection B 11.7 B 11.9 4. Rio Road/Northfield Road/Hillsdale Drive EBL 40 A 4.2 51 A 3 48 Rio Road EBT/EBR 150 A 7 134 A 3.6 105 WBL 120 A 7.8 178 B 14.6 180 Rio Road WBT/WBR B 10.9 274 B 15.2 307 NBL/NBT 100 D 46.1 134 D 48.4 150 Hillsdale Drive NBR D 36.4 91 D 37.7 330 Northfield Road SBL/SBT/SBR D 46.2 172 D 37.4 101 Intersection B 13.2 B 14.4 12 Table 6 2020 Build Conditions Levels of Service, Delay, and Queues with Putt Putt Place Signalized Approach Movement Storage 2020 Build AM 2020 Build PM LOS Delay Queue LOS Delay Q ueue 1. Rio Road/Albemarle Square Drive/Mall Drive EBL 260 A 9.2 64 B 19.4 340 Rio Road EBT 580 B 11.4 256 C 23.5 562 EBR 580 A 0 0 A 0 64 WBL 260 A 7.4 45 B 16.4 340 Rio Road WBT 890 B 13.9 322 C 24.5 610 WBR 80 A 8.5 130 B 15.6 130 NBL 300 E 73.3 66 E 69.3 148 Mall Drive NBT 300 E 67.1 26 E 62.3 81 NBR 160 A 0 0 A 0 10 Albemarle SBL E 65.8 99 F 103.6 336 Square Drive SBT/SBR 100 E 62.6 92 E 57.4 100 Intersection B 14 C 29.9 2. Rio Road/Putt Putt Place EBL 300 A 8.3 123 B 11.9 166 Rio Road EBT 890 A 3.9 124 A 4 156 WBT B 12.3 261 B 13.6 301 Rio Road WBR 120 A 7.5 159 A 7.6 170 SBL C 25.9 159 C 26.2 142 Putt Putt Place SBR 100 C 24.1 100 C 27.1 98 Intersection A 9.7 A 9.9 3. Rio Road/Old Brook Road EBL 120 A 9.3 139 B 12.1 199 Rio Road EBT/EBR B 14.1 240 B 17.1 386 WBL 50 A 2.1 40 A 3.5 59 Rio Road WBT/WBR 150 A 3.4 114 A 4.8 148 Old Brook Road NBL/NBT/NBR D 36 68 D 36.5 61 SBL/SBT D 49.3 217 D 37.5 108 Old Brook Road SBR 60 D 36.2 75 D 36.1 74 Intersection B 11.7 B 11.9 4. Rio Road/Northfield Road/Hillsdale Drive EBL 40 A 4.2 49 A 3 45 Rio Road EBT/EBR 150 A 7 127 A 3.6 106 WBL 120 A 7.8 174 B 14.6 180 Rio Road WBT/WBR B 10.9 222 B 15.2 319 NBL/NBT 100 D 46.1 134 D 48.4 150 Hillsdale Drive NBR D 36.4 103 D 37.7 312 Northfield Road SBL/SBT/SBR D 46.2 177 D 37.4 104 Intersection B 13.2 B 14.4 13 f'. C a a au u C 0 u r-I Ln m t a N aJ i 3 Cxo iz O O N E E L 00 O Z 6/L L6Z/ZO O CO o ; 6/0 N 62/0� O z = 8�/9Z N cm Lo 9Z49 cm m cm Z/0 o -- 4 Z8/66 o E /ZZ ~ 01 M N .' 1 I „ LO Q_' E ii N r (n w c9 _ CD ti i � N Z9/9 �tZ/� �. N Or OL/8 �# Q 8L 6/58 96/9 (D co O � o LO � 9Z/L9 1- 0-) �z�/£06 ZE �/6Z ' � — LO � 0 0 O � E � 00 o Z 6/L L6Z/ZO 00 CO CD; 6/0 N 62/0� f �6/OZ �Ir 98/E9 O cv 0 Lo 9Z49 co r- co Z/0 o r- N LO Z8/66 N E/ZZ (0~ ti r- f' N f° ~ rn Z9/9 � .� 0�0 N ~tZ/� N ' OL/8 8L 6/58 co cm 0 9Z/L9m r� 96/9 co co ZE/6Z rn LO co co O X X i v O O 00 m O r N o Z 6/L r 00 L6Z/ZO Q O CO ; 6/0 N 62/0� Xm 6/OZ L6/09 _0 O z = 8t/9Z� cv m Lo 9Z49 cm r- �t Z/0� CD o N 4 86/6L'� Cc Z8/66 � E/ZZ 0 CO 01 of Er`• .. &S M N .' 1 I „ rn ► it _ > co C\j �9/9 m o c CD N rn OLl8 9,) t t �86/L8 (D (D o 99/Z6 ozm r� 96/9 --Oo- LO cc cc ZE �/6Z M m o co EPR, P,C. "ENGINEERING & PLANNING RESOURCES" EPRpc 637 BERKMAR CIRCLE, CHARLOTTESVILLE, VA 22901 Appendices EPRPc EPR, P,C. "ENGINEERING & PLANNING RESOURCES" 637 BERKMAR CIRCLE, CHARLOTTESVILLE, VA 22901 Appendix A VDOT Scoping Form VDOT Virginia Department Xof Transportation PRE -SCOPE OF WORK MEETING FORM Information on the Project Traffic Impact Analysis Base Assumptions The applicant is responsible for entering the relevant information and submitting the form to VDOT and the locality no less than three (3) business days prior to the meeting. If a form is not received by this deadline, the scope of work meeting may be postponed. Contact Information Consultant Name: Jeanie Alexander, P.E., EPR, P.C. Tele: 434.989.7681 E-mail: j.alexander@epr-pc.com Developer/Owner Name: Engineer: Scott Collins, P.E., Collins Engineering Tele: 434.293.3729 E-mail: scott@collins-engineering.com Project Information Project Name: Arden II Phasee 1 Locality/County: Albemarle Project Location: (Attach regional and site Northeast side of Rio Road between Albemarle Square Drive and Putt Putt Place specific location ma Submission Type Comp Plan ❑ Rezoning ❑ Site Plan ® Subd Plat ❑ Project Description: (Including details on the land Arden Place is a two phase project. The first phase includes: 150 apartment units, a use, acreage, phasing, access 120 bed hotel, and 50k sf of self storage space. Only Phase 1 is being analyzed at location, etc. Attach additional this time. sheet if necessary) Proposed Use(s): (Check all that apply; attach Residential ® Commercial ® Mixed Use ❑ Other ❑ additional pages as necessary) Residential Uses(s) 50 units Number of Units: 150 ITE LU Code(s): 220 apartments Other Use(s) ITE LU Code(s): 310 hotel Commercial Use(s) ITE LU Code(s): 151 warehouse Independent Variable(s): 120 beds Square Ft or Other Variable: Total Peak Hour Trip Less than 100 ❑ 100 — 499 ® 500 — 999 ❑ 1,000 or more ❑ Projection: It is important for the applicant to provide sufficient information to county and VDOT staff so that questions regarding geographic scope, alternate methodology, or other issues can be answered at the scoping meeting. Traffic Impact Analysis Assumptions Study Period Existing Year: 2017 Build -out Year: 2020 Design Year: North: Limits of property South: Rio Road Study Area Boundaries East: Hillsdale Drive West: Albemarle Square Drive/Mall Drive (Attach map) External Factors That Could Affect Project Hillsdale Drive Extension project - adjustments will be made to the trip distribution (Planned road improvements, to address this. other nearby developments) Consistency With Current zoning:Highway Commercial (HQ and Commercial (C-1). Comprehensive Plan Proposed uses are consistent with the current zoning or are part of a special use (Land use, transportation plan) permit for hotels and residential uses permitted within R-15. Available Traffic Data VDOT Historical ADTs. (Historical, forecasts) Road Name: Rio Road - 60% Road Name: Hillsdale Drive - 10% to/from Trip Distribution to/from west south (Attach sketch) Road Name: Rio Road - 25% Road Name: Albemarle Square - 3%, Mall to/from east Drive - 2% Annual Vehicle Trip Peak Period for Study ® AM ® PM ❑ SAT Growth Rate: 1% per year (check all that apply) Peak Hour of the Generator 1.Albemarle Square Dr/Mall 6' Dr/Rio Rd 2.Rio Road/Putt Putt Place 7. Study Intersections 3.Old Brook Rd/Rio Rd 8. and/or Road Segments (Attach additional sheets as 4.Hillsdale Dr/Northfield Rd/Rio 9' necessary) Rd 5. 10. Trip Adjustment Factors Internal allowance: El Yes ® No Pass -by allowance: El Yes ® No Reduction: s /o trips Reduction: /o trips ® Synchro ❑ HCS (v.2000/+) ❑ aaSIDRA ❑ CORSIM ® Other simtraffic Software Methodology for queuing (average of 10 runs - following TOSAM) Traffic Signal Proposed or Affected Putt Putt Place (Analysis software to be used, progression speed, cycle length) It is important for the applicant to provide sufficient information to county and VDOT staff so that questions regarding geographic scope, alternate methodology, or other issues can be answered at the scoping meeting. EPRpc EPR, P,C. "ENGINEERING & PLANNING RESOURCES" 637 BERKMAR CIRCLE, CHARLOTTESVILLE, VA 22901 Appendix B Traffic Counts Q 75 G r r r r � � N CB r 00 N M N N � O ca OpZ z C) N cz m LL () (n 0- -9 W ^i i.i O L 0 C O AU W U m c� (0 ^V i .E V J MOMM I—N V NM M IO Cr) 00 fl- O 00(O L000 LO ONO O MC6(Or N Cl) LO CD 00 LO (O LO LO M M 0) N C 0 M N N i0 M00 OO_O COO_ Oh 1- F O�OCD V �N f CO � ��OM N NI- NN NOD LO DLO a U) OOOOo 00000 00000 00 m a >a� O>N00 �00N M 0000 Mr- O r ) r (nN 0 r 0 LL 7 O00(O OM O aM-It f.- M(D O N1-00 L O��2NCrD N0) r-N1- NOfo"T0 � r co r O r NNM 00 CO N CO MV N CO wm V N m N�Orr 00 a—i 00 r {p NMM— M rOt1-r C,0000cMNf- 0 N M O N� CO CL Q (n 0 0 0 0 0 0 0 0 0 0 O O O O O O O L a 7 — 0 0CMrr LO —MNNO LO V,(M I - NM r LO O r Cj J W O LL 7 0000CD O—O— N NI-r NOOO O O O H N O N O't co M N't O M M M M 0 0 0 r V O r O m NO L000 COOOOW V Or LOMLO o F O MNN r N Cl) M Of--00h 0 N N N N V r r 6m N 0)a N C U) Co 0 0 0 0 O O O O Cl O O Co O O O O ca ca O W C, LO LO COO OI;tCO f--N N4N�N O C, Cl O J 04O LL ` M V a)00 V M O O N M 1- M CO V M M f- 0 0 0 LO 1-- N V M O M O M r r CO N O N N N NM O O m ODM(D NLo 7MNMLO Fit 0V) r OOOO N O a 1: ��: (2 HMO LO CO r rCD 7 N N NO LO C,; a Q co 0 0 0 0 0 0 0 0 0 0 O O O O O O O fU IL L NZ N LO If) ON Nr r-OM �r(O GOO OO E J r V 0 LL i OOr rN rN0NM r-W Nh OOO L V O 0 H L NI�O V LO CDN�� 'tMNmm N O) r r M r LO N W 00 r a—i LO O o O L L (q N Q Q Q Q O Q Q Q Q O O O LOO LOH Ou-)OLOH ` `y i O O O O C. O O O C O_� @ Q O N y e N d (n a o Q CB r C:) � � N CB r 00 N CMN N N O ca CC) z z C) LL Co (n 0- CL 0 O O C� O O v p Q) W O =U (C m c� c� 0 i V J 6) r N_O P- It'TLO CD Lr)O LO COD LL LO N O O H N N 0 C �p CAOCD OlO 0)l�rNO O CO�rN 000 F NNNNW 00 CA Orr n Q (n 000000a0oCDo CD a 0 a� O� M O T co 0 CD M 00 rN a' E J CD N 0 LL 7 C000 0000N-tT V CO L � N NO OOOM 000000 (prr � O O � NMtONM�N00Mr 0 r r C^D N Cl)r r CAS ONL-NM M r W Li Q a O O O O O O 00 0000 a 0 O rrrLf100r CD (0 O NO � N h 0 LO Ln E J LO N O LL 7 0 0 0 O r 0 0 0 r r N O H N O O C'M LO I� h LO 00 O CD m M r i0 CD LO CO CD LO CD 00 LO N M NO L-N NO F M CO N N NCD N 0 r r a a U) o00000000000 a cn OLU LO CD O) -�t N N CrON 00 0 E E J CD r O LL ` O)OO M0000 N. V CD LOB 00 L-NO MM m N W N N 7 O O m r r L CD ALA wN L000000 ZT N MOO^0)000 �p r MO 00000 O NCO LO CD a r Q � CD a Q 0 0 0 0 0 0 00 O O O O d O O LO O ccZ N 00 (0 C0000-m6m M000 E J O 0) 0 h r 2O 'al LL 0) L LO OmrrrN � N L000 00 ,O CD n N CD L E C r L O O N Nj N N 0 0 0 O O LL N co E C W Q Q Q Q E O= N> U U H Q oO L00� Odd N o)2 E M -v O 0 03 o00 W> N e U) _= 0 0 0 0 fO Q O)16 rn Y Y e d cc ao as ti 247 Q M O ,L^ V O W O U m Q O L 0 r_ U d Rio Out In Total 8921 F2FWI 14 15 29 906 1221 2127 88 1094 24 0 0 15 0 0 88 11091 24 0 Right Thru Le� Peds M 000y +' Q N000 �m r LOOS ♦ M M �J L f0 Ln0Lo LL O J L C of NN7 C L n O l n > O 2 � o N (D 2 — 0 — C L� s t- _ M NONL (� a) c Ny c0 N o0 O M N M 7 a a (L )4al njql l4p!2! sped 917 999 £6 0 6 b6 E 0 917 Z99 M 0 LLOZ SZ6 SE 8 El 69EOZ Ielol ul ln0 oiy 00 0■■ N N (1) O M O p Z z C) N t� m LL () (n 0- -9 W ^i i.i O L 0 C O AU W O U m c� (0 V .E V J iy O�LOM NLO MMM co CM M Mfg WO rl` M'CM Of1- It O 7 O (0 r1`00 W oO I-- COM 0) a)O LO c W LO Cl) �MM OMDM MD R 0 6 gNOW O F N N N M M N N N- N M N� a Q U) OOOCD CD 00000 0000 000 m a a� cK O� Or- O(O I-- W N WLO of V OOO a)0 N N N N O N r N N O N W M N O LL 7 WMONO O�COO GLOM EOM LO't cM n (O (D LO It co 'It N C) N N N NNN N N O 000 co N� V� NOV LO� WlO NW 0000 O T {p N(D O LO Cl) LOOr LO W Il- 'tCOIt V 0 o MN(M MN LO MNMLO I� CL N N O Q y 0 0 0 0 0 O O O O O 0000000 L a 7 0 NN I�I-- W - -- LWO NO f` N'tNNM4 N� 6 M J 7 O LL 7 a) LO N IqO co f-LO fMM MLO f.-M000 N N 7 t 0 H �O- V LO to- CO W000 V N W O� 0 0 a-i { M ip I- N W LO O LO N O f- M Cl) W Ci M 0 1­ O Cl) Cl) (OCl) COON00 M 'tz N 0 F NM CO MM M V MM� N a N Q U) C. 0 0 0 0 0 0 0 0 0 0 0 0 0 0 C. 0 ca ca 0 W O�t OM W C CD MMOO1-a) 0000 N NN I� - DLO N� 0 LL ` MO(O M V COO ITLO LO OMNO - OO It OI-OO OCl) I�COW COW V N O N N N N : N M N N 7 N M N L It co LO CD OOf-CON LO N-W000 O It N M� U') M N LO M� L6 M C) It CO f- O I- W f- M O CO f- W O O O (O LO (0 CO V O!-W CON h 61-O a N M LO LO Q 0 0 0 0 0 0 0 0 0 0 C) C) C) C) C) C) C) co W IL L tf— - Z.' K (fl W N M 0') N N O L O V O It C) C. 0 co a) N-MMO LO V LO It co NIO ItNO O LL i'tLO NM7 I-N N. 't0 000 L M L O 0 M O H L V MM' N'IT NOh (ON 000 O MMMNN V MM�N LO co 'tLOO N� N� �o o dYY �aaaa o aaaa 0 OL f6> > OHO LO H OLOO LO H � ` y L ` �O MIt O M7t -0 a0 N 0 0 0 0 C. O O O C 0 (L Q O N y e N d (n a o 00 0■■ CB r C:) � � N CB 00 � � N N M N N N O ca CC) z z C) LL Co (n 0- CL 0 O O (9 C� O O p W O =U (C m c� c� 0 i V J LnN Ln M Ln 00 N(0 M'q o r-0`0000r- rn'trn{o H M M O C m W)T co ON CNO00Ln� F CO) Cl) N N N O) N0) O Li CL OOOOOOooOOOO a 0 a� J N N- N M O� Cn 00 O O E 0 LL ` N M V W Lo LO LO CM N N N O co T 0 0 0 �NQ) V0�LO 0O00 (0 Ln to a)r-0 (A LO V r(0 0 M LO co C\l 0i O Li Q a 0 0 0 0 0 0 00 0000 a f0 O N �NN�tiMM(00 Mom- E J � � O LL 7 'It 01L-LO �t O�t0(D0 N L n V) N O H V Ln N704 0N000 a. M �0 LO lO N O� Q)�LAh L0 000N0 Oln oi F Cl) Cl) IV M� CT O Li a o 0 0 0 0 0 00 0 0 C. 0 a_0 cn ca O LLB N N N C4 00 'T 00 0 0 J (0 0 LL 0wo V0 M LOM 7rnw 00 H LSO OOD N N COM N0�� 0 L (00f O I--N 0000 N000 O OR �p O-00 L,(D I-(0000 O 00 I� OO M 00 Cl) Q cu 0) a 0- 0 0 0 0 0 0 00 O O O O d d� o LO O 0 Itt "'MN N� 00(0(0 CO 000 J O d1MO�- �g000�� .29 LL 0) i amM L-N't(O 0) 00 L 0 0 f (00 0 0 O (D U) L E 0 7 N t N N Lo CO N 0 0 0 p 0 t� cM cM M 000 MO � LL 0) E �WaaaaE5M:I>'o , H Q 0Lo 0LO0 OHa N O ` 7 o M p 00 00 V iO LO LO N o U) _= 0 0 0 0 fO Q O7to rn Y Y e d a> a` ) CL as ti 7 Q M O ,L^ V O ^V W O U m Q O L 0 r_ U d Rio Out In Total 1291 1454 2745 5 7 12 1296 1461 2 557 1721 1188 94 0 0 7 0 0 172 1195 1 941 0 Right Thru Le� Peds mom y 000LO a-- a N000 u�rm— v F COOCO O N O N LLB too�J N (0 C M D L c "a-i 1n �f0 (OO(O > O �Z N N 2VOV N N N _ O N �N N O ♦- coML O 7 N O N N Y NY F O O CO n O O O h 1� i a a aH 3491 njgi l4p!2! sped 96 9906 09 0 0 9 0 0 96 6904 09 0 609Z ZLZL L601 £6 S 9 969Z LOZL 69£3 lelol uI ln0 oiy r r r O Lo N O M r N O O O ZUz LL Cn Cn a_ E U) J 00 O 00" V1 � V� h M N Z N \D ^; O o0 O O N V l- N ID V M O v1 w N M V "o In 7 � � In l� In 7 -It -ItO In 7 O N V V V V �D M V V V v'i M O, N �D Q V V In C, CD7 � N 00 kn kn V kn �o v1 00 O V V In eq N M �C N M M kn --i r 01 V1 N 01 �C V M 01 V1 l- 'IT M O M o F A --� N O M l� N CD--i �--� .--i �--i �--� �--� O O l� M N l� M O M N �D N O M N 0\ N N N dam' y o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 b P. 0 o0 01 N V M 7 7 0\ r- V 'n C V O 01 r r N 00 M In 'D en W Ri a --� M N In N 00 N M O N N O W o0 7 M 01 7 7 o0 o0 M M 'D V'1 M_ 00 00 O l- 01 O N N N o0 N N 0 0 0 0 0 O o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O o 0 0 0 O O O �i O O O o 0 0 0 0 0 0 O o 0 0 0 0 0 0 0 0 0 0 0 0 0 O o 0 0 0 0 0 0 0 F Cw O O O O O O C C C O O O O O O O O O O O O O C O O O O O O O O O O a � a O w o 0 0 0 0 0 0 o c c o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o c o 0 0 0 0 0 O O O O O O O O C C O O O O O O O O O O O o 0 0 0 0 0 0 0 o O O O y W O O �D N -ItN �D N M N 'n N �D M 'D N N N 7i --� a1 cl ID o0 �o a\ o --� N M r- In M D, N N N N O N O N N N N N N 00 N N r- O N N �D o0 N N N N N to l- Ol N N N N 01 N V C, N N N a d y o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 P. o uj o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 W N Vl r kn 41 V O M o0 o �n N 01 M N O N h W �D �D v1 O o0 M v'1 N o0 N N N NC, l- O O 0 N N N N ,-. O O N o0 N N N N M In o0 -� N N N 00 oc N N N N cq O M Oi N N N V ao 7 00 O O a, O a1 NV O N O MV M 7 O Ol M N N I W cl M In N D1 0, w N M V M M M M M M M M N M M N O M M M M M M M M V M M M F GL 'd a x y0 l- oo O In O l� O a, 01 In O 01 W M o O 01 �D a w o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 F In l� lG V1 00 N 00 D1 M D1 V --i M O Q1 M N M �D M V C1 01 N l- r- 01 O N ^. N 0o N N --� --� 00 N --� N r-- N N ll- N N N N O\ N N N N O N N N Ri a a a a a a P. „� L, ov,ov, O •--� M 7 ov,ov, O --� M 7 o�no�n O .--� M 7 ov,ov, O •--� M 7 o�nov, O --� M 7 o�no�n O .7: M 7 ov,o O 7M 00 00 00 00 01 01 6� 01 6666 N N N N — — — — — — — — — O O O C� LL r r � r � Lo N LO Lfi Ln O M N N O O O ZUz is LL Cn Cn c � V 0 V N (D O > CO U a}i ti O o, � U a Co d v E o U J �y N M N N - N - - - � V1 M o0 01 v1 a1 r � 00 O V o\ --� v1 'n �o N l— 01 'nM M o1 InLn O 01 oo O oo 7 'n It N 0\ M �o V1 O l� N N F In In In O In In N �o N v1 l— r �c �c N 'n In -It V N O l— N 1, 7 I N N o� (1 o0 o, 7 �D O M o0 V1 O_ N �D M V to M N O r- O r O1 A F N cl N N N N o� N N N N O N M N N In In In N N N N N O o1 0 r a 0 N d r. y o o O o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 00 0 0 0 0 0 0 0 0 00 b P. o �.y a N N O In M h al o, N N — 7 �D l-- �o w) co N N N M o0 '. M O N M M M N r r- 0 N N N M N V D\ V '. N N M N o1 In 'n�� s. w �O N M N N o, 'D 7 v1 o l— N M 0o 'O y? N N M oo N N N N O V O N N o, N N N N o1 M l— �o V1 o0 N N N N N r- N r- O N M N N In V M --� N N N N o, --� cl 0 0 O O O O o O O O o 0 0 0 0 0 0 0 0 0 0 0 O O O O O o 0 0 0 0 0 0 Per 0 0 0 0 0 0 0 O O O O O O o 0 0 0 Cl 0 0 0 0 0 0 0 0 0 O o 0 0 0 0 0 F d C y .. ..... .... c o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 W 0 w o 0 0 0 0 0 0 0 0 0 0 0 o c o 0 0 0 0 0 0 0 0 0 0 0 o c o 0 0 0 0 0 0 0 O O O O O O O O O O O O O O O O O O O O 0 0 0 0 0 O O O O O O O y W M o0 a1 M �o 00 oo N ID oo O M 7 rl- 7 wn 'D 7 'D N ,p Ln O M o, r D\ C� o F V N N en r- M N o, N N N N �D V� --� oo cl N M O N oo N '. M M N M M N N M N cn cn M cn Ln oo M D\ 00 M N N C\ 7 oo O �n o\ o0 N a N o 0 0 0 0 0 0 0 o c o 0 0 0 0 c 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 a � a 0 w lD N '• �n \O V 01 l- O N �n 'n '. cV N oo wn '. 01 �n �D •-, wn O, �7 M oo ,-. �O ,� O N o0 0� �o �D oo O �o O �n �O ,-r co ,� l� l� oo l� V oo �O o0 N o0 N N N N N N N N O N M N M .-. M M N M .N-i M 00 Vl oino '. N 'r N h N V1 l� �--i N N � A Vl l� �--i N N � .�-i .r --� 00 '. '. N V1 oo � N N V W In O, M ll- N r- o0 V1 N 'n O to N �c r- O 01 ,-. M 7 M M M N M In N M M M It V h M M M M M N M N N O M V1 D1 GO F � � d Qa y o 0 0 0 0 0 0 0 0 0 0 0 00000 o 0 0 0 0 0 0 0 0 o c o 0 0000 b P. yD P-i c+' N l— a, o0 7 �o l— oo oo to �o kn ci Vl O a1 V l-- v r--M eq M M o1 r- 01 M N oo a .--� V •--� V •--� •--� •--� •--� •--� V1 N--�--� 1M M N 1p N M O w o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Cl 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 F 00 Q1 M 00 M V N M 00 o, N N N N N oo V o, N M N M 00 V l— lD Nt N l— 7 I ID O O o\ o P. D P.www D a. a. ww au. ao P. wwww D wa.wa o� CD ,O v, F" ov, 7M 7 0 7M : to 7 O 7M 7 O 7M LL y-+ y-+ a r r r r Lo CV LO f LO O M M N O N O ZUC)z N LLU)Cna_ c Q O /Ln V (D O CO U c O U ti co Lo C] V L C0 CIR 00 V �p In V N oo O c N tA +2 n b M O O N F �"� N N --� w 00 o0 S- M a ¢R O O O o 0 Cl p 0 0 0 0 abi O w 0 w oo I N O O O O O O p 0 0 0 0 O O O Cl O O O p 0 0 0 0 o O F O FL w O O O O O O p 0 0 0 0 'O O a �a o 0 w o 0 0 0 0 o p o 0 0 0 0 0 o C 0 0 Cl p 0 0 0 0 O _y O d d y o 0 0 0 0 o p o 0 0 0 a�i o a 0 w t�vi vt�ooInt-.-,00� v1 O r M �O h 7 N � N M N N Ooo O� V 00 V oo N N N oo Go M M oo lOo M hC� o p O 0O � V1 �R O 7:1 0 0 0 0 0 0 p 0 0 0 0 O � � o � of wn N an M D1 o. o 0 0 0 0 o p o 0 0 0 0 0 o •Y U yam. 0 y l� O N M O N N ID o0 .. ,�. N N el N 0 D, o\ w „ U• F wclvo � � oo oo '� �a o U y a a a, d o Lo N Lf') Ln O M N C S? 7 0 Cfl O CO � 00 —_ O U ti M LSD -Z� ti0 L E J Rio Out In Total 851 1068 1919 22 23 45 873 1091 1964 21 1047 0 0 3 20 0 0 241 1 0671 01 0 Right Thru Leo Peds yON� M N N 00 "N6 CD �000 7F d a ~ V) N� w O m L 0 0 0 L� M �W s� � O L C r �Z 000 C j 000 N N m > =000 7 0 0 n O O O L `1 � o 0)o = N y O O O O O O J 0_ 0_ H 4 91 n�l 34o!a sPed b L 9 OZ 0 0 8b 96L 0 0 toz 0OL8 OL6L Z9 9Z 9Z 886E 8 17b66 lelol ul 1n0 oia y-+ y-+ LL r r r 7 r 0 Lo N LO f LO O M LO N O N O ZUC)z CU LL Un Cn a_ c Q O /Ln V (D O CO U c O U ti co Lo C] V L C0 CIR O � N V vNi O Obi O 0O M '� o Oto NbN ooO 00 F N N N N 00 D\ a ti O O O O O O p 0 0 0 0 abi O w O w O O N6 0 ;- DO O --� CA N N W o0 00 � O O O O O O p 0 0 0 0 O O Py O O O O O p 0 0 0 0 o O F p FL Q y O O O O O O p 0 0 0 0 � O a 0 w o 0 0 0 0 0 0 0 0 0 0 0 0q O _y O R O \O eq N M r 'D IT N d, O 00 06~ 6 d y o 0 0 0 0 o p o 0 0 0 a�i o a O a o 0 0 0 0 o p O 0 0 0 0 w \c N 01 r- 7 V'1 ['- N l- 00 V �z N O V O N N N N Na, 01 D\ 00 6 7 Mi 7 v'1 v'1 00 v'1 O O O a\ 00 O O l� 01 a, � •-• Q O 0 0 0 0 cG O 411 U w 0 Pam.. z 0. NO' CD rn 00 .Mr OV N oMo O N O ra `� N a\ o. o 0 0 0 0 o p o 0 0 0 0 0 oU clj w „ �Wx��xx � ca P. P. P. P. W O .�• 7 O a> 9 aw d Lo N Lf') Ln O M CD N C S? 7 O Cfl O DD —_ O U ti M LSD -Z� ti0 V L E J Rio Out In Total 841 982 1823 13 17 1 30 854 999 1853 55 927 0 0 0 17 0 0 551 944 0 0 Right Thru Le� Peds N M F o00 N d — Q a O N y000 a O O O F co N O v L ca L 0 0 0 � � O L C �Z � 000 C o O O O _ y N m >I �000 IF F� u ~ F- �� O O O O L Y (a O p1 = � N Y N O O O N 000_ ` J a Q.H u el n�l Iq4 sPed 901 bL 9 LL 0 0 IC08 601, 0 0 LL6- 0 6 1 L£ 1 91, 6Z b£6L b06 0£06 lelol ul 1n0 oia d y-+ y-+ LL r r r 7 r 0 � Lf) N Lr) f O 'CO f-- N O O O ZUC)z U- U) C/) c Q O /Ln V (D O CO U c O U ti co Lo C] V L C0 CIR .� W O O l- M h V M N M M M N o0 N O a y O O O O O O p 0 0 0 0 � o w P4 a M N N M C O w N N M N C, oo C O Cl O O O O O p 0 0 0 0 O O Py O O O O O p 0 0 0 0 o O F O FL Q y O O O O O O p 0 0 0 0 'O O a p o o 0 0 0 0 0 0 0 0 0 w o 0 0 0 0 o p o 0 0 0 0 O O O O O O p 0 0 0 0 oQ O _y O R N Oro N r- O N M en M M M o0 M~ O F Q\ 6 d y o 0 0 0 0 o p o 0 0 0 a�i o a o a p o O O O O p O O Cl 0 .a o 0 w O rl O ,Mr c0 �D d, r en enM N N o0 N� 0 C7, oo 00 00 O O a Q O O O O O O O p 0 0 0 0 O ,1 P. a Z v a V'1 N O N OO 0 0 °•�000000p0000 a Ga o 0 0 o •j U pp �. enM N N N N o1 N c w „ �wx��xx � ca py py p..i P. OM O F Pr > 9, cn ' aw d Lo N Lf') Ln O M 00 N C S? 7 O CO O ti +� CO � 00 —_ O U ti M LSD -Z� ti0 V E J Rio Out In Total 1152 1330 22 3 11 1484 1155 1341 2496 80 1250 0 0 0 11 0 0 80 1261 0 0 Right Thru Le� Peds rnN� r000 co coa 000� a v �000 a — �~ N O N O L 0 0 0 �� � O L C r �Z O00 C 000 N N m > �000 'o ~ � =0 mr () O r N L ('a m 2 N N V 00 0 N 000 = O F� a'� I'� a N f0 J IL a aF- 491 n�l Iq4 sPed bLL ZLL L 8 0 0 19z" ELL 0 0 5Z9Z £t'Z 6 9l, t, Irl 609Z 6EZL lelol ul 1n0 oia • p 00 1` 0 70 00 C:) M 00 N 0 00 00 � M o M 0 z Z U iLinU)0- U m c� (0 ^V i � /E V J iy NM co OM (0N0)0)CD O LOCOIt'IT 0 0LON M V (M O0M C0 C6LDr NM 'IT Mr- LO V LOAN M MO c -p (D CD N COO r(D N MI- h MM(D O't O ��N 'IT(O �f�N (0 6�00rr F a r N (O N n { co M O Q U) 0 0 0 0 0 0 0 0 0 0 0000000 m a a� O� r�(0ON OCDCOO� LoLONmmNI� E E J 0 N O LL 00 OM(Orr W V (�tO (D CD rN ,I6(0M rrrNCO rrrrCp �NMN aa))rr L r r rLn W LO V Or0 M M M L.- 'trO CM rOr� (O � O ip 00(0 It r-wOIth CO CO(0000 o r rM N CD r(00 F CL Q U) 0 0 0 0 0 O O O O O 0000000 w a Y m� J LO LO ((')MN OCON MIS W(OrM0000 E LO 52 LL 7 00000 OOO rr r LO Or OOO r o LO�rOpM rN 000(M f-Mhh000 O N 6 O N O ip NMMM V (0 n(M C0 n OCO LO (M LO N M N N N N O N r CL C coM m N Q 0 0 0 0 0 0 0 0 0 0 O O CD O O O CD U) cu cu 0 W O N r M co r r N O S 0 LO M M O r 0 D r 0 C5 O r O LL ` 000 f-M(() V MI - CON Or O CM(0 I-'T �(0 LO(M LO LO LO(0ITN O LD Nr r NN C() NNNNO CON�MN LO rl- ONM DLO C00LOr LO �NM r r CD M r (D CM rCM7(D(O W ip TLO I'- L'- M V NN W F NMV(fl(` LO(C)LOV O r- 6h� r a N M r M 0 Q 0 0 0 0 0 0 0 0 0 0 O O O O O O O 0 (O IL L 0 o t O O NLnMM V (O LO rLOE rN� MOO NM N O ONOJ � N V)N _° LL L O O r O r O O O O O r CO 0 0 0 r 0 L O � L CM I�(C2co r� LO CD 00 �(0�� O) r r NN�NO MM(O 7 h N r � t N O o c r O ai m N 2 2 2 2 L L N (q (q Q Q Q Q O Q Q Q Q �o O O L- O i> Y1i U U O lOO LOB OLOOLO� ` `y i 2 � Or MIt O M7t 'O a0 O uHH O O O O C. O O O C 0 @ Q CM N y e N co (n a o Ml • poor— o0 70 00 C:) M 00 N 00 00 �oMOCMN a) C) M 0 C) Z Z U a)a)`C;) i.Lcf)U)a_ /� CL 0 O O C� O O p W 0 =U (C m c� c� 0 0� V J p co V �� aOOMC6 H N N O C 5 CO rCO NLn I.- MM NLO F NN(Drl-I- W CD C6 o. CL _0 o00000000000 a� O� ON CO M-It r-LOM M E E J CO 0 r O LL ` r CO CO �I�N00 hCD0� L N CO V COO aMD CO err M LO V O V CO O CM M p_ r a r C f MOI- I-000 o co� M O F c_ Q a 0 0 0 0 0 0 0O 0000 a Y +�+ m� J COOCONN�Lo MNCD 52 LL 7 O O O O O O O O O O O O � O W r N CO 1- 0) h000 r L nC') r O 'a. V ip V) 'T C0 I. O 'll I- co M N F NN� DM N �� r r a a U) 0 0 0 0 0 0 00 0 0 0 0 a_O cn O W C+1rrNhCOMCO I-rM OfJ 0Lq O LL ` CM V M I-I-M O_LO ONr C1 LO LOW CO LO H N N N N O m O r r L 0N M W M W O O O O r � O � O CO m r I-- *NNLO OCMr N O) O CO LL)LO Ln04 N 000 N� O a r Q � O a Q 0 0 0 0 0 0 00 O O O O Y� d Qf` O p � LO 0 mZ N 00 pMNMMN U) ON 0jr� E J co CDC O r 0 () lL p y i Q m 0 0 0 0 0 0 O 0 0 0 0 N O O n O N L E O ,r co 00 OrO O CO N N r 0» N O) a,of r _ Wm N co E C W Q Q Q Q E O= U U H Q 0Lo0LoO OHa N o5 2 7 O M o oon000000> rN o U) ==0000 mQ m Y Y e d a> a` ) CL as 247 t� Q oo ti 00 70000 M � N O 00 00 N M C'7 CIO Q M O ,L^ V O V 4) O U m Rio Out In Total 839 1107 1946 11 13 24 850 1120 1970 46 1055 6 0 0 12 1 0 46 10671 71 0 Right Thru Le� Peds N M N 0 0 0 Q _0 000 � N� y0 coLO co D_ 0_ �f- ♦- 1� n O O n O n M N J L U) ItC of f.0,- M M� m C N N O O O CDO> r� = Z a)N m > 5 `) '00 0 �r Q O 7 O a C t- m N- O VJ al W j a J a d H 3491 njql jgp,2 sped 49 LOL bL 0 I 01, I. 0 £9 L69 U 0 L96L 9LL 9Z ZL El E9L Ie10l uI ln0 oiy 7 • p 00 1` 0 70 00 C:) M 00 N 0 00 00 00 N M T- o M 0 0 z Z U a)a�� i.Lin Cl) 0- -9 W ^i i.i O L 0 C O AU W iy V V MLn O) ONnr-_LO �t a) LO LO LO 00 0 0 LO LO M c0 c0 co co M O N I-- I` O LO O LO N N Oj O N c Lfi LfJ -p CO LO IT OOm OW N O1` W LON It N. 0) 00 CO N co CO N V O 6 O F N N N N O M M N N N O a N N Q U)OO000 00000 0000000 m a a� O�''K OVOMN MVr—O7 MCOVVCANr ED rNNN 00 NNNNO 1-I`Mr0 r O LL ` wONI--I— MO)I-- VM O�CO OOrO N V LO LO N� CO CO LO M r Cr 00 0 N NNN OD c`')NNNr 0�6NCN r L In f�M m-t ;TI-- LO CON CO Nm ;T I - NM O N N 7 O'IT Ln V O r—w CO �r- r- o N V 0LOOOO F CL Q y 0 0 0 0 0 0 0 0 0 0 0000000 w a Y OO NN(+M -zrr MN LO LO LO c0 a0 Ln N (DOOO N 0 mU) E J r O LO 52 LL 7 0 0 0 0 0 O — O O r r N O r 0 0 0 N O rNr MI— M V NNr Wa(I OOO 0 r 7 0 r O (D f—N�MNf� m MOMM 00 OO LO aO LOO r 0 F Cl) Cl) N co N Cl) co M N M N It N M a Q C. 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 C. U) a ca ca O W 't N N LO (M m CA Cl) It O N N W C� r r E D r M O M M co O LL ` C>00 V I-- M M r- CD (A V M I— CA M M M N LO V Cb V O M N cct- r 0 N N Cl M r M M N N r N N M L OO ON r- N MLOrLO COM iTr N NCMM N O pO p O r^MrW ip LO co LO LO(O (!O I- CO LO N N co o NNchN W M'tNMM M It O) O a N N O Q co 0 0 0 0 0 0 0 0 0 0 O O O O O O O N IL Y L o ONrO �Z m r Ac-3(� m co r E OL co rn LL L O O O r O O r O r N W O N O O O L O O H co N O IO O M 'Cl- co C0 m CMI) O r r r r O N O O r O r CT �o o aLiyY �aaaa o aaaa 0 OL f6> > �O OHO LOB (M7t OT OLO O M V H ` 10 a0 y O uHH L ` 0 0 C 0 C. O O O C 0 (L Q t>) N y e N d (n a o 7 • poor- 0 70 00 C:) M 00 N 00 00 ��cMN a) a) C) M 0 C) Z Z U a� C;) i.Lcf)U)a_ /� CL 0 O O C� O O p W O =U (C m c� c� 0 i V J LO O NI-M LO ItI-mM Lf) M M M w M V) H co h l�(ON M(VO 0 C 75 0 0 0) M I-- M 0 0 0 Cr mwN co to 1-MO F N M M N N co N r o. Q _0 o00000000000 a� 0 N N N N N O r r O O O O a' E r 0 J 0) r r O LL ` n M O L-(0 O M(0000 to Map LnM LfiMO NMNN�wapr L 0 V I-Ln LO NIt LO 000 O N 0) N CD f�CO L.hN. -It I-000 o N N O F o_ Q a o00000000000 a Y +�+ O` 0 J Cl) N LO It 0) 00 It 00 0 0 m � r � 52 LL 7 O O r O r I,- O r O O O L (rj N O H M M a N N't o N 0 0 0 O r LO r O ip Cl) M0 LOW LOM'T00M o MMtOM MM6 F M Cl) M Cl) 0) M O a a U) 000000000000 a cn OW LO cM M MN LO N000 Of E J In O LL ` I-aMI- f-N V 7f.- (0 O r r M N h r M MN N NM m N M oi O L O LO M W T 0 0 01 N N M N O^ m 0 0 r O r 0) m r Ln N(0h W(0 NrM F O N M V N N O N O j O I -: r 0 a r Q � a) a�000000000000 W LO Y a LL 7 O 0� Ln0 mZ N OJ CO�TOM�Ci CD 0 E J O C M h O LL p y i LLm�O or N(O 00 N 00 OO H 0 O N 0) 2 p C p�NM�00 0000 o6 r LL (0 O m 0 LL E W a a a a p=>> U U H Q 0Lo0Lo0 OHLL N o ` v,o M p 00 00 V LO LO LO a r1 N o U) _= 0 0 0 0 fO Q a)to N Y Y e d cc ao as 7 t� Q oo ti 00 70000 M � N O 00 00 00 N .4 c'7 CIO Q M O ,L^ V O <.i 4) O U m Rio Out In Total 1338 8 a]25337 1346 104 1214 20 0 1 7 0 0 10 11221 20 0 Right Thru Le� Peds -M N 000y - }I a N000 r0� m (� 0_ N 7 B M O M �m� O L N O N L 0 min N N J L U) C �� r�or� N N ca O� � 0 N cc NON > I N m > � � 0 � O r� s +- �N N c0 co J.5 a)t- (D J O a d H 3491 njql lqp!2! sped 6 9£66 SZ 0 0 0 0 zZM 9M 9Z 0 089Z E9ZL 8 0 E6OU ZL9Z E9ZIL Pol uI ln0 oiy ON Q� O Z 00 r-- 00 r 00 c) M 00 N 0 00 00 O M O M 0 z z L) L LL co VJ 0- 4-9 CD a Q O L- V C O AU W O O_ O o0 00 M l� r- O1 7 00 M N � _ r- N cq K r O O M 7 N 00 ll- l- M l- M p h .rr V'1 O Vn M O o0 01 00 �c pN - 7 N H N n N r-V M 7 CL 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 a O w h a, p Vl 110 th M 00 M l� V m M ^� O\ M 00 00 00 110 r-00 L� M M N N — — �c�--i Q\ M M Gi M T 00 V1 �° M O� M �O \D N M 00 M .�-i c0 In N N \D V'1 M V 00 00 In N N M M V V M 7 V l° .--i r 00 M d d o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 a, b� o� 'n �c r-- C;, M 00 00 00 7 00 V N N V'1 00 m 00 z° w O, C> N It N N O 00 In v1 00 �c l- 0,M 'yy N M N M O N N N M O, O wi V oD --+ w ~ 6 N N G d ti O O O O O O O O O O O O O O O p 0 a %� 2'i 7 O -• \o V o� p 7 'n [- ^ O, 7 -°yy N N N M 7 N `D r- 7 N V oo N O w h O� O D1 kn 7 T h -,n l� cq 00 V) N V1 V1 M � m --� N N 00 N N N N °, 00 00 � O 0— r- M N r- 0 0 0 W O G O �i Cq N v'1 N oo F, N N � LL y O O O O O O O Cl O O O O O O O O O O a 'd Z'N o0 N h O O O .--i N V --� --� M oo oo O z° w o0 01 r DO N V1 V1 M a1 N � N �n N -. N 01 07 --i �, N •--� 7 00 V1 M V'1 �O r- 1p �c 00 bA N M O M l� N x �' U" H o W� v o W)� v� 00 ° w> r— 0000 o0 00 00 0000 � y � � a � Q a� O Z 00 r- 0 r 00 M 00 N 0 00 00 O M N O M 0 C) Z z L) a) i.Lcf)U)a_ A-1 W C /� CL Cf 0 = O /O (� V p O p W O =U UC m c� c� 0 i v, J p Vl kn kn 7 00 M r N �4 N N Q 00 00 00 N GL Q O O O O O O p 0 0 0 0 0 C- O 0 w M 00�o 10 V00� O N N N 00 �..� oo l� N M 00 N M N 14 v'1 l- O1 cn �O h 4 d ,� OOOOOO p 0000 O abi O 00 z° w 7 7 N N N o0 O N 00 en N N N 0 V1 a1 N r V V7 M 01 N N 00 �h 1p 4 d4 0 0 0 0 0 0 00 0 0 0 0 PO- o `O r 0\ oN 00 w N ^' 00 --Oyy W O 00 Fri � O ' O O O O O O p 0 0 0 0 a 4 00 Z ID �.�. M M N OOO 7 r r U O 00 M V'1 l0 N M o0 v)"' V'1 w � E" mow° oW)oM 0 > >HH h000000> on q o o 0 0 0 0 0 o CIP)xx o y� U � P. Py WE 247 z� L O Z 00 ti 00 Q M � N O 00 00 N 5O CO C'7 Q M O ,L^ V O v O U m Rio Out In Total 8691 F2F301 29 19 48 898 1280 2178 4 1039 218 0 0 8 11 0 4 10471 229 0 Right Thru Le� Peds o0o y }I — Q N000 ornrn� y0 (O (O m o m LO o O N M y0 � 0 HO O � O V co Lr m O m� C Q L r O O O O Z N N m O Z _ lfj OLO � N N 0 E-4 NL N�_ O C 03 d N N y U +—F l0 00 M N In OMM MGM O 349-1 njql l4p!2! sped LL StL £L 0 0 LZ z 0 LL t7ZL LL 0 OV61 £Z8 ZIL909 Ielol ul ln0 oiy 7 KAI Q� O Z C:) r-- -0 N O M CCO N 00 O M O M 0 m Z z L) L LL co VJ 0- 4-9 CD a Q O L- V C O AU W O U m c� 0 i /'E^ v, J �h 7 i!1 00 N -It ;- m t 01 a, T '� r- I-- n 01 N 0000 l-�oO Vl 00 00 N 00 F°- In G MOhNN NNa1 MHO oo �n l�v�--''� N N N N M N N N N N H m O M N N N CL 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 a O ¢., NooM N'° aka O w O N N N N T M N N N p� M p�~ N N l��nD1O �00 Vi W �n �nN N�nOOO �i ro a1 O c0 l0 M O1 c1 0 . -. 0\ N '. r,CN M � O M Q1 � 01 00 0, M .m. M 00 d d o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 w b� O O V] i 0 N N N OO M N N 7 ll- Vl �o 01 a, N N r- 00 N 10 z° w Q1 O N n O CO V M O N^ 0 0 0 0 --� N M �0 O H d\ O co'. 0�0 .Nr l� 0�1 V\O1 v�l m �o M '• N 01 N00 O F M M M N N d ti 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 a 'i en 00 V1 7 O h O lc 7 V N lO 00 m N f� t M V V r- V1 Vl 0� w 01, r- c 0�00 yr rQ,v v��c 0000 W)� N N N O N N N N M N M M V'1 Vl N M M bA N O N 0 M V1 00 01 lO vl N 00 N 00 N F .-. .�-i '� gym. 7 G. .-r .-- o d y O O O O O O O O Cl O O O O O O O O 'O w 'd O z ID D1 7 M N O �!1 N V'1 00 01 a O 7 4l D, 7 z° w N In M �t lc M l� m o, wawa o wwww o o� E� oW)�v� V o��v� V1 ° w �H V 7 V Ch 0 0 0 CD 0Uy � y � � a � 7 a� O Z C:) r— N 70 N O CCO N 0 It 00 O co N CB 0C)Z z L) a) i.Lcf)U)a_ A-1 W C /� CL Cf 0 O = L O (� C� O O p W O =U UC m c� c� 0 0� v, J Ookn InN�O� M M o N a) N r N FYO- 00 00 O Q\ O ,7,en O Q +� CM ON1 lC0 0n0 7 ONO r M M F NMNN� GL Q O O O O O O p 0 0 0 0 O a o U W O W N M N N oMo O vo'ov,In m�poo �o O\ 01 O 7 N \D ,-. w 01 Q\ O\ N O\ O O L4 d O O O O O O p 0 0 0 0 O abi O y0 zw H � �D 7 to r- N l� 0 7 vl O M F M CA M 4 d4 O O O O O O p 0 0 0 0 0 a �cd �oknw CN , OW O W oc ,� N O w ovvrncov- n M M C7, N" N 0 en � 00 --� 01 V1 N M "t In In �p W � M 4 4. � O O O O O O O p 0 0 0 0 O QUi a a O Z a M N 7 O N 7 V7 M 1� M 00 ,� M GO O CD � O O O '23 7 U w o CD 44 F- yy P; G4 Pr Pr O py v °' O U V o m � v v v v> on o v en o 0 0 0 0 0 xx o y� 13 a) a) as WE 7 KA, L O Z O ti N r N O cM N 00 _ N E 66 C'7 co Q M O ,L^ V O W O U m Rio Out In Total 14291 1 1429 2858 6 11 17 1435 1440 28758 13 1238 178 0 1 6 4 0 14 1244 182 0 Right Thru Left Peds vM� o0o y a N000 aoNo 0 v N N ♦ _ N 'o o L f0 L y N N w N J L tl! "a-i t0 00 7 L o ODOOD ` r�� O �o m r Z N N `M O M v vs Z O O L ^, VJ m C = N Y N Y (0 W j �F O (O (o � co co N J N (O LL7 l!) N N� O 34al njql l4p!2! sped £Lu66 99 0 96 0 £ 0 0 9L OM 99 0 8Z5Z 9866 CKF71 9L £ £6 Z69Z Z8LIL 0££3 lelol ul ln0 oiy EPRPc EPR, P,C. "ENGINEERING & PLANNING RESOURCES" 637 BERKMAR CIRCLE, CHARLOTTESVILLE, VA 22901 Appendix C Existing Synchro Printouts HCM 2010 Signalized Intersection Summary 1: Mall Drive/Albemarle Square & Rio Road 04/21/2017 Moveme EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL Lane Configurations Vi ++ K IN ++ ?F Vi + if IN Traffic Volume (veh/h) 46 866 13 24 1109 88 8 1 5 35 5 29 Future Volume (veh/h) 46 866 13 24 1109 88 8 1 5 35 5 29 Number 1 6 16 5 2 12 7 4 14 3 8 18 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Adj Sat Flow, veh/hlln 1863 1863 1545 1900 1881 1900 1520 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 49 931 0 26 1192 12 9 1 0 38 5 6 Adj No. of Lanes 1 2 1 1 2 1 1 1 1 1 1 0 Peak Hour Factor 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 Percent Heavy Veh, % 2 2 23 0 1 0 25 0 0 0 0 0 Cap, veh/h 382 2371 880 471 2340 1057 33 44 37 110 48 57 Arrive On Green 0.06 0.67 0.00 0.05 0.65 0.65 0.02 0.02 0.00 0.06 0.06 0.06 Sat Flow, veh/h 1774 3539 1313 1810 3574 1615 1448 1900 1615 1810 788 945 Grp Volume(v), veh/h 49 931 0 26 1192 12 9 1 0 38 0 11 Grp Sat Flow(s),veh/h/In 1774 1770 1313 1810 1787 1615 1448 1900 1615 1810 0 1733 Q Serve(g_s), s 1.1 16.5 0.0 0.6 24.2 0.4 0.9 0.1 0.0 2.8 0.0 0.8 Cycle Q Clear(g_c), s 1.1 16.5 0.0 0.6 24.2 0.4 0.9 0.1 0.0 2.8 0.0 0.8 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.55 Lane Grp Cap(c), veh/h 382 2371 880 471 2340 1057 33 44 37 110 0 105 V/C Ratio(X) 0.13 0.39 0.00 0.06 0.51 0.01 0.27 0.02 0.00 0.35 0.00 0.10 Avail Cap(c_a),veh/h 429 2371 880 533 2340 1057 233 305 260 207 0 198 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 0.00 1.00 Uniform Delay (d), s/veh 8.2 10.3 0.0 7.2 12.5 8.4 67.2 66.9 0.0 63.1 0.0 62.1 Incr Delay (d2), s/veh 0.2 0.5 0.0 0.1 0.8 0.0 6.0 0.3 0.0 2.6 0.0 0.6 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/In 0.6 8.2 0.0 0.3 12.2 0.2 0.4 0.0 0.0 1.5 0.0 0.4 LnGrp Delay(d),s/veh 8.4 10.8 0.0 7.2 13.3 8.4 73.3 67.1 0.0 65.7 0.0 62.8 LnGrp LOS A B A B A E E E E Approach Vol, veh/h 980 1230 10 49 Approach Delay, s/veh 10.7 13.1 72.7 65.0 Approach LOS B B E E imer Assigned Phs 1 2 4 5 6 8 Phs Duration (G+Y+Rc), s 16.3 99.5 9.7 14.2 101.6 14.5 Change Period (Y+Rc), s 7.8 7.8 6.5 7.8 7.8 6.0 Max Green Setting (Gmax), s 12.2 61.2 22.5 11.2 62.2 16.0 Max Q Clear Time (g_c+I1), s 3.1 26.2 2.9 2.6 18.5 4.8 Green Ext Time (p-c), s 0.1 30.1 0.0 0.0 36.4 0.1 Intersection Summary HCM 2010 Ctrl Delay 13.5 HCM 2010 LOS B Rio Road -Arden Existing AM Synchro 9 Report EPR Page 1 HCM 2010 TWSC 2: Rio Road & Putt Putt Place 04/21/2017 Intersection Int Delay, s/veh 2.3 EBL EBT BR Lane Configurations Ij ++ ++ K V Traffic Vol, veh/h 54 816 1067 24 57 103 Future Vol, veh/h 54 816 1067 24 57 103 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None None - None Storage Length 350 - 170 0 100 Veh in Median Storage, # - 0 0 - 0 - Grade, % - 0 0 - 0 - Peak Hour Factor 86 86 86 86 86 86 Heavy Vehicles, % 11 3 2 13 4 6 Mvmt Flow 63 949 1241 28 66 120 Major/Minor Majorl Major2 Minor2 Conflicting Flow All 1241 0 0 1841 620 Stage 1 - - - 1241 - Stage 2 - 600 - Critical Hdwy 4.32 6.88 7.02 Critical Hdwy Stg 1 - 5.88 - Critical Hdwy Stg 2 - 5.88 - Follow-up Hdwy 2.31 3.54 3.36 Pot Cap-1 Maneuver 510 — 65 421 Stage 1 - 232 - Stage 2 - 505 - Platoon blocked, % Mov Cap-1 Maneuver 510 —57 421 Mov Cap-2 Maneuver - 162 - Stage 1 232 Stage 2 443 Approach EB _ WB HCM Control Delay, s 0.8 0 25.8 HCM LOS D Finor Lane/Major Mvmt EBL EBT WBT WBR SBLn1 SBLn2 Capacity (veh/h) 510 162 421 HCM Lane V/C Ratio 0.123 0.409 0.284 HCM Control Delay (s) 13 41.8 16.9 HCM Lane LOS B E C HCM 95th %tile Q(veh) 0.4 1.8 1.2 Wes -: Volume exceeds capacity $: Delay exceeds 300s +: Computation Not Defined ': All major volume in platoon Rio Road —Arden Existing AM Synchro 9 Report EPR Page 2 HCM Signalized Intersection Capacity Analysis 3: Old Brook Drive & Rio Road 04/21/2017 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Vi + U IN + T+ +' K Traffic Volume (vph) 54 707 14 7 1067 46 20 0 17 126 0 99 Future Volume (vph) 54 707 14 7 1067 46 20 0 17 126 0 99 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Total Lost time (s) 6.0 6.0 6.0 6.0 6.0 6.0 6.0 Lane Util. Factor 1.00 0.95 1.00 0.95 1.00 1.00 1.00 Frt 1.00 1.00 1.00 0.99 0.94 1.00 0.85 Flt Protected 0.95 1.00 0.95 1.00 0.97 0.95 1.00 Satd. Flow (prot) 1770 3560 1583 3554 1736 1787 1599 Flt Permitted 0.19 1.00 0.26 1.00 0.78 0.73 1.00 Satd. Flow (perm) 354 3560 427 3554 1388 1373 1599 Peak -hour factor, PHF 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 Adj. Flow (vph) 61 803 16 8 1212 52 23 0 19 143 0 112 RTOR Reduction (vph) 0 1 0 0 2 0 0 36 0 0 0 97 Lane Group Flow (vph) 61 818 0 8 1263 0 0 6 0 0 143 16 Heavy Vehicles (%) 2% 1% 7% 14% 1% 0% 0% 0% 0% 1% 0% 1% Turn Type pm+pt NA pm+pt NA Perm NA Perm NA Perm Protected Phases 1 6 5 2 4 8 Permitted Phases 6 2 4 8 8 Actuated Green, G (s) 55.5 50.7 70.2 59.4 14.0 14.0 14.0 Effective Green, g (s) 55.5 50.7 70.2 59.4 14.0 14.0 14.0 Actuated g/C Ratio 0.58 0.53 0.73 0.62 0.15 0.15 0.15 Clearance Time (s) 6.0 6.0 6.0 6.0 6.0 6.0 6.0 Vehicle Extension (s) 2.5 5.0 2.5 5.0 5.0 2.5 2.5 Lane Grp Cap (vph) 274 1876 473 2194 201 199 232 v/s Ratio Prot c0.01 0.23 0.00 c0.36 v/s Ratio Perm 0.12 0.01 0.00 c0.10 0.01 v/c Ratio 0.22 0.44 0.02 0.58 0.03 0.72 0.07 Uniform Delay, dl 9.2 14.0 4.6 10.9 35.3 39.2 35.5 Progression Factor 1.00 1.00 0.45 0.28 1.00 1.00 1.00 Incremental Delay, d2 0.3 0.3 0.0 0.5 0.1 11.0 0.1 Delay (s) 9.5 14.3 2.1 3.5 35.4 50.2 35.6 Level of Service A B A A D D D Approach Delay (s) 14.0 3.5 35.4 43.7 Approach LOS B A D D Intersection Summary HCM 2000 Control Delay 12.0 HCM 2000 Level of Service B HCM 2000 Volume to Capacity ratio 0.58 Actuated Cycle Length (s) 96.2 Sum of lost time (s) 18.0 Intersection Capacity Utilization 62.5% ICU Level of Service B Analysis Period (min) 15 c Critical Lane Group Rio Road -Arden Existing AM Synchro 9 Report EPR Page 3 HCM Signalized Intersection Capacity Analysis 4: Hillsdala Drive/Northfield Road & Rio Road 04/21/2017 Movement EBL EBT EBR WBL WBT WBR NBL NBT SBT SBR Lane Configurations Vi + U IN + T+ if Traffic Volume (vph) 11 745 73 229 1047 4 53 10 102 51 71 22 Future Volume (vph) 11 745 73 229 1047 4 53 10 102 51 71 22 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Total Lost time (s) 6.0 6.0 6.0 6.0 6.0 6.0 6.0 Lane Util. Factor 1.00 0.95 1.00 0.95 1.00 1.00 1.00 Frt 1.00 0.99 1.00 1.00 1.00 0.85 0.98 Flt Protected 0.95 1.00 0.95 1.00 0.96 1.00 0.98 Satd. Flow (prot) 1805 3458 1719 3573 1618 1495 1814 Flt Permitted 0.22 1.00 0.22 1.00 0.58 1.00 0.85 Satd. Flow (perm) 413 3458 396 3573 974 1495 1578 Peak -hour factor, PH 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89 Adj. Flow (vph) 12 837 82 257 1176 4 60 11 115 57 80 25 RTOR Reduction (vph) 0 6 0 0 0 0 0 0 98 0 6 0 Lane Group Flow (vph) 12 913 0 257 1180 0 0 71 17 0 156 0 Heavy Vehicles (%) 0% 3% 3% 5% 1 % 0% 15% 0% 8% 0% 0% 5% Turn Type pm+pt NA pm+pt NA Perm NA Perm Perm NA Protected Phases 1 6 5 2 4 8 Permitted Phases 6 2 4 4 8 Actuated Green, G (s) 55.5 50.7 70.2 59.4 14.0 14.0 14.0 Effective Green, g (s) 55.5 50.7 70.2 59.4 14.0 14.0 14.0 Actuated g/C Ratio 0.58 0.53 0.73 0.62 0.15 0.15 0.15 Clearance Time (s) 6.0 6.0 6.0 6.0 6.0 6.0 6.0 Vehicle Extension (s) 2.5 5.0 2.5 5.0 5.0 5.0 2.5 Lane Grp Cap (vph) 307 1822 474 2206 141 217 229 v/s Ratio Prot 0.00 0.26 c0.08 c0.33 v/s Ratio Perm 0.02 c0.32 0.07 0.01 c0.10 v/c Ratio 0.04 0.50 0.54 0.53 0.50 0.08 0.68 Uniform Delay, dl 8.8 14.6 6.8 10.5 37.9 35.5 39.0 Progression Factor 0.51 0.47 1.00 1.00 1.00 1.00 1.00 Incremental Delay, d2 0.0 0.4 1.0 0.5 5.8 0.3 7.4 Delay (s) 4.5 7.4 7.8 11.0 43.7 35.8 46.4 Level of Service A A A B D D D Approach Delay (s) 7.3 10.4 38.8 46.4 Approach LOS A B D D Intersection Summary f HCM 2000 Control Delay 13.4 HCM 2000 Level of Service B HCM 2000 Volume to Capacity ratio 0.59 Actuated Cycle Length (s) 96.2 Sum of lost time (s) 18.0 Intersection Capacity Utilization 65.2% ICU Level of Service C Analysis Period (min) 15 c Critical Lane Group Rio Road -Arden Existing AM Synchro 9 Report EPR Page 4 HCM 2010 Signalized Intersection Summary 1: Mall Drive/Albemarle Square & Rio Road 04/21/2017 Moveme EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL Lane Configurations Vi ++ K IN ++ ?F Vi + if IN Traffic Volume (veh/h) 96 1056 60 94 1195 172 70 24 62 178 16 132 Future Volume (veh/h) 96 1056 60 94 1195 172 70 24 62 178 16 132 Number 1 6 16 5 2 12 7 4 14 3 8 18 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Adj Sat Flow, veh/hlln 1900 1881 1900 1900 1881 1900 1881 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 101 1112 0 99 1258 100 74 25 0 187 17 30 Adj No. of Lanes 1 2 1 1 2 1 1 1 1 1 1 0 Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 Percent Heavy Veh, % 0 1 0 0 1 0 1 0 0 0 0 0 Cap, veh/h 300 1949 880 353 1948 880 125 133 113 207 71 125 Arrive On Green 0.07 0.55 0.00 0.07 0.55 0.55 0.07 0.07 0.00 0.11 0.11 0.11 Sat Flow, veh/h 1810 3574 1615 1810 3574 1615 1792 1900 1615 1810 618 1090 Grp Volume(v), veh/h 101 1112 0 99 1258 100 74 25 0 187 0 47 Grp Sat Flow(s),veh/h/In 1810 1787 1615 1810 1787 1615 1792 1900 1615 1810 0 1708 Q Serve(g_s), s 3.2 28.8 0.0 3.1 34.6 4.2 5.6 1.7 0.0 14.3 0.0 3.5 Cycle Q Clear(g_c), s 3.2 28.8 0.0 3.1 34.6 4.2 5.6 1.7 0.0 14.3 0.0 3.5 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.64 Lane Grp Cap(c), veh/h 300 1949 880 353 1948 880 125 133 113 207 0 195 V/C Ratio(X) 0.34 0.57 0.00 0.28 0.65 0.11 0.59 0.19 0.00 0.90 0.00 0.24 Avail Cap(c_a),veh/h 330 1949 880 371 1948 880 288 305 260 207 0 195 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 0.00 1.00 Uniform Delay (d), s/veh 16.7 21.0 0.0 14.6 22.4 15.4 63.2 61.4 0.0 61.2 0.0 56.5 Incr Delay (d2), s/veh 0.9 1.2 0.0 0.6 1.7 0.3 6.2 1.0 0.0 37.9 0.0 0.9 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/In 1.6 14.5 0.0 1.6 17.4 1.9 3.0 1.0 0.0 9.3 0.0 1.7 LnGrp Delay(d),s/veh 17.6 22.2 0.0 15.2 24.0 15.7 69.3 62.3 0.0 99.2 0.0 57.4 LnGrp LOS B C B C B E E F E Approach Vol, veh/h 1213 1457 99 234 Approach Delay, s/veh 21.9 22.9 67.6 90.8 Approach LOS C C E F mer 2 6 Assigned Phs 1 2 4 5 6 8 Phs Duration (G+Y+Rc), s 17.6 84.1 16.3 17.6 84.1 22.0 Change Period (Y+Rc), s 7.8 7.8 6.5 7.8 7.8 6.0 Max Green Setting (Gmax), s 12.2 61.2 22.5 11.2 62.2 16.0 Max Q Clear Time (g_c+I1), s 5.2 36.6 7.6 5.1 30.8 16.3 Green Ext Time (p-c), s 0.2 23.1 0.3 0.1 29.0 0.0 Intersection Summary HCM 2010 Ctrl Delay 29.2 HCM 2010 LOS C Rio Road -Arden Existing PM Synchro 9 Report EPR Page 1 HCM 2010 TWSC 2: Rio Road & Putt Putt Place 04/21/2017 Intersection Int Delay, s/veh 1.8 EBL EBT BT WBR Lane Configurations Ij ++ ++ K V Traffic Vol, veh/h 114 1129 1261 80 26 121 Future Vol, veh/h 114 1129 1261 80 26 121 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None None - None Storage Length 350 - 170 0 100 Veh in Median Storage, # - 0 0 - 0 - Grade, % - 0 0 - 0 - Peak Hour Factor 95 95 95 95 95 95 Heavy Vehicles, % 1 0 1 0 0 1 Mvmt Flow 120 1188 1327 84 27 127 Major/Minor Majorl Major2 Minor2 Conflicting Flow All 1327 0 0 2161 664 Stage 1 - - - 1327 - Stage 2 - 834 - Critical Hdwy 4.12 6.8 6.92 Critical Hdwy Stg 1 - 5.8 - Critical Hdwy Stg 2 - 5.8 - Follow-up Hdwy 2.21 3.5 3.31 Pot Cap-1 Maneuver 522 42 406 Stage 1 - 216 - Stage 2 - 392 - Platoon blocked, % Mov Cap-1 Maneuver 522 32 406 Mov Cap-2 Maneuver - 129 - Stage 1 216 Stage 2 302 Approach EB SB HCM Control Delay, s 1.3 0 21.9 HCM LOS C Finor Lane/Major Mvmt EBL EBT WBT WBR SB1_n1 SBLn2 Capacity (veh/h) 522 129 406 HCM Lane V/C Ratio 0.23 0.212 0.314 HCM Control Delay (s) 13.9 40.3 17.9 HCM Lane LOS B E C HCM 95th %tile Q(veh) 0.9 0.8 1.3 Rio Road —Arden Existing PM Synchro 9 Report EPR Page 2 HCM Signalized Intersection Capacity Analysis 3: Old Brook Drive & Rio Road 04/21/2017 Movement i EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Vi + U IN + T+ +' K Traffic Volume (vph) 102 1136 25 20 1221 105 14 1 12 43 2 82 Future Volume (vph) 102 1136 25 20 1221 105 14 1 12 43 2 82 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Total Lost time (s) 6.0 6.0 6.0 6.0 6.0 6.0 6.0 Lane Util. Factor 1.00 0.95 1.00 0.95 1.00 1.00 1.00 Frt 1.00 1.00 1.00 0.99 0.94 1.00 0.85 Flt Protected 0.95 1.00 0.95 1.00 0.97 0.95 1.00 Satd. Flow (prot) 1805 3598 1805 3532 1740 1813 1599 Flt Permitted 0.13 1.00 0.14 1.00 0.85 0.71 1.00 Satd. Flow (perm) 238 3598 262 3532 1523 1356 1599 Peak -hour factor, PH 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 Adj. Flow (vph) 109 1209 27 21 1299 112 15 1 13 46 2 87 RTOR Reduction (vph) 0 1 0 0 4 0 0 11 0 0 0 74 Lane Group Flow (vph) 109 1235 0 21 1407 0 0 18 0 0 48 13 Heavy Vehicles (%) 0% 0% 0% 0% 1 % 1 % 0% 0% 0% 0% 0% 1 % Turn Type pm+pt NA pm+pt NA Perm NA Perm NA Perm Protected Phases 1 6 5 2 4 8 Permitted Phases 6 2 4 8 8 Actuated Green, G (s) 62.7 55.3 70.5 59.2 15.4 15.4 15.4 Effective Green, g (s) 62.7 55.3 70.5 59.2 15.4 15.4 15.4 Actuated g/C Ratio 0.63 0.55 0.70 0.59 0.15 0.15 0.15 Clearance Time (s) 6.0 6.0 6.0 6.0 6.0 6.0 6.0 Vehicle Extension (s) 2.5 5.0 2.5 5.0 5.0 2.5 2.5 Lane Grp Cap (vph) 265 1989 359 2090 234 208 246 v/s Ratio Prot c0.03 0.34 0.01 c0.40 v/s Ratio Perm 0.23 0.03 0.01 c0.04 0.01 v/c Ratio 0.41 0.62 0.06 0.67 0.08 0.23 0.05 Uniform Delay, dl 9.9 15.2 7.2 13.8 36.2 37.1 36.1 Progression Factor 1.00 1.00 0.43 0.24 1.00 1.00 1.00 Incremental Delay, d2 0.8 0.9 0.0 0.9 0.3 0.4 0.1 Delay (s) 10.7 16.1 3.1 4.2 36.5 37.5 36.2 Level of Service B B A A D D D Approach Delay (s) 15.6 4.2 36.5 36.6 Approach LOS B A D D Intersection Summary HCM 2000 Control Delay 11.2 HCM 2000 Level of Service B HCM 2000 Volume to Capacity ratio 0.57 Actuated Cycle Length (s) 100.0 Sum of lost time (s) 18.0 Intersection Capacity Utilization 66.0% ICU Level of Service C Analysis Period (min) 15 c Critical Lane Group Rio Road -Arden Existing PM Synchro 9 Report EPR Page 3 HCM Signalized Intersection Capacity Analysis 4: Hillsdala Drive/Northfield Road & Rio Road 04/21/2017 Movement EBL EBT EBR WBL WBT WBR NBL SBT SBR PIRW Lane Configurations Vi + U IN + T+ if Traffic Volume (vph) 16 1113 56 182 1244 14 86 31 297 25 18 13 Future Volume (vph) 16 1113 56 182 1244 14 86 31 297 25 18 13 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Total Lost time (s) 6.0 6.0 6.0 6.0 6.0 6.0 6.0 Lane Util. Factor 1.00 0.95 1.00 0.95 1.00 1.00 1.00 Frt 1.00 0.99 1.00 1.00 1.00 0.85 0.97 Flt Protected 0.95 1.00 0.95 1.00 0.96 1.00 0.98 Satd. Flow (prot) 1805 3584 1770 3566 1743 1599 1736 Flt Permitted 0.14 1.00 0.13 1.00 0.76 1.00 0.82 Satd. Flow (perm) 266 3584 246 3566 1376 1599 1448 Peak -hour factor, PH 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 Adj. Flow (vph) 17 1197 60 196 1338 15 92 33 319 27 19 14 RTOR Reduction (vph) 0 3 0 0 0 0 0 0 270 0 10 0 Lane Group Flow (vph) 17 1254 0 196 1353 0 0 125 49 0 50 0 Heavy Vehicles (%) 0% 0% 0% 2% 1% 7% 7% 0% 1% 4% 0% 8% Turn Type pm+pt NA pm+pt NA Perm NA Perm Perm NA Protected Phases 1 6 5 2 4 8 Permitted Phases 6 2 4 4 8 Actuated Green, G (s) 62.7 55.3 70.5 59.2 15.4 15.4 15.4 Effective Green, g (s) 62.7 55.3 70.5 59.2 15.4 15.4 15.4 Actuated g/C Ratio 0.63 0.55 0.70 0.59 0.15 0.15 0.15 Clearance Time (s) 6.0 6.0 6.0 6.0 6.0 6.0 6.0 Vehicle Extension (s) 2.5 5.0 2.5 5.0 5.0 5.0 2.5 Lane Grp Cap (vph) 280 1981 345 2111 211 246 222 v/s Ratio Prot 0.00 0.35 c0.06 c0.38 v/s Ratio Perm 0.03 0.34 c0.09 0.03 0.03 v/c Ratio 0.06 0.63 0.57 0.64 0.59 0.20 0.22 Uniform Delay, dl 8.5 15.4 10.3 13.4 39.4 36.9 37.1 Progression Factor 0.35 0.18 1.00 1.00 1.00 1.00 1.00 Incremental Delay, d2 0.1 0.7 1.7 0.9 6.6 0.8 0.4 Delay (s) 3.0 3.6 12.1 14.3 46.0 37.8 37.4 Level of Service A A B B D D D Approach Delay (s) 3.6 14.0 40.1 37.4 Approach LOS A B D D Intersection Summary HCM 2000 Control Delay 13.9 HCM 2000 Level of Service B HCM 2000 Volume to Capacity ratio 0.65 Actuated Cycle Length (s) 100.0 Sum of lost time (s) 18.0 Intersection Capacity Utilization 70.9% ICU Level of Service C Analysis Period (min) 15 c Critical Lane Group Rio Road -Arden Existing PM Synchro 9 Report EPR Page 4 EPRPc EPR, P,C. "ENGINEERING & PLANNING RESOURCES" 637 BERKMAR CIRCLE, CHARLOTTESVILLE, VA 22901 Appendix D Existing SimTraffic Printouts Queuing and Blocking Report Existing AM 04/21/2017 Intersection: 1: Mall Drive/Albemarle Square & Rio Road Movement EB EB EB WB WB WB WB NB NB SB SB Directions Served L T T L T T R L T L TR Maximum Queue (ft) 64 241 194 52 276 292 122 80 27 117 95 Average Queue (ft) 22 78 42 14 79 91 18 13 1 36 26 95th Queue (ft) 48 183 126 40 199 222 79 47 10 82 66 Link Distance (ft) 579 579 892 892 293 293 321 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) 340 340 130 100 Storage Blk Time (%) 0 4 0 1 1 Queuing Penalty (veh) 0 3 1 0 0 Intersection: 2: Rio Road & Putt Putt Place Movement EB WB WB WB SB SB Directions Served L T T R L R Maximum Queue (ft) 93 2 2 17 253 100 Average Queue (ft) 29 0 0 1 57 54 95th Queue (ft) 68 2 2 7 157 99 Link Distance (ft) 1338 1338 523 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) 350 170 100 Storage Blk Time (%) 5 1 Queuing Penalty (veh) 6 1 Intersection: 3: Old Brook Drive & Rio Road Movement EB EB EB WB WB WB NB SB SB Directions Served L T TR L T TR LTR LT R Maximum Queue (ft) 92 202 233 40 105 109 72 200 75 Average Queue (ft) 30 86 106 4 42 46 21 82 45 95th Queue (ft) 67 162 185 19 83 88 52 160 89 Link Distance (ft) 1338 1338 154 154 417 562 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) 200 65 75 Storage Blk Time (%) 0 0 0 3 11 1 Queuing Penalty (veh) 0 0 0 0 11 1 Intersection: 4: Hillsdala Drive/Northfield Road & Rio Road Movement EB EB EB WB WB WB NB NB SB Directions Served L T TR L T TR LT R LTR Maximum Queue (ft) 53 126 122 169 232 219 131 109 179 Average Queue (ft) 9 59 62 72 99 85 50 42 78 95th Queue (ft) 34 106 107 130 182 168 103 80 144 Link Distance (ft) 154 154 817 817 538 524 Upstream Blk Time (%) 0 0 Queuing Penalty (veh) 0 0 Storage Bay Dist (ft) 55 180 150 Storage Blk Time (%) 0 13 0 0 0 Queuing Penalty (veh) 0 1 1 1 0 Network Summary Network wide Queuing Penalty: 27 Rio Road —Arden SirnTraffic Report EPR Page 1 Queuing and Blocking Report Existing PM 04/21/2017 Intersection: 1: Mall Drive/Albemarle Square & Rio Road Movement EB EB EB WB WB WB WB NB NB SB SB Directions Served L T T L T T R L T L TR Maximum Queue (ft) 317 494 416 339 572 593 130 154 75 336 100 Average Queue (ft) 83 280 228 79 304 326 68 61 23 199 78 95th Queue (ft) 237 447 387 227 525 550 159 120 58 341 129 Link Distance (ft) 579 579 892 892 293 293 321 Upstream Blk Time (%) 0 0 4 Queuing Penalty (veh) 0 0 0 Storage Bay Dist (ft) 340 340 130 100 Storage Blk Time (%) 0 4 0 7 29 1 33 4 Queuing Penalty (veh) 0 4 0 7 50 3 49 8 Intersection: 2: Rio Road & Putt Putt Place Movement EB WB SB SB Directions Served L R L R Maximum Queue (ft) 142 22 175 99 Average Queue (ft) 53 2 37 53 95th Queue (ft) 107 13 117 92 Link Distance (ft) 523 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) 350 170 100 Storage Blk Time (%) 2 2 Queuing Penalty (veh) 3 0 Intersection: 3: Old Brook Drive & Rio Road Movement EB EB EB WB WB WB NB SB SB Directions Served L T TR L T TR LTR LT R Maximum Queue (ft) 199 408 416 54 134 133 61 129 73 Average Queue (ft) 66 154 172 12 59 64 16 31 33 95th Queue (ft) 144 305 322 39 110 112 45 81 69 Link Distance (ft) 1338 1338 154 154 417 562 Upstream Blk Time (%) 0 0 Queuing Penalty (veh) 0 1 Storage Bay Dist (ft) 200 65 75 Storage Blk Time (%) 0 3 0 8 1 1 Queuing Penalty (veh) 0 3 1 2 1 0 Intersection: 4: Hillsdala Drive/Northfield Road & Rio Road Movement EB EB EB WB WB WB NB NB SB Directions Served L T TR L T TR LT R LTR Maximum Queue (ft) 47 106 102 180 321 309 149 312 105 Average Queue (ft) 11 47 42 82 148 149 80 116 38 95th Queue (ft) 37 92 86 155 257 259 146 226 81 Link Distance (ft) 154 154 817 817 538 524 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) 55 180 150 Storage Blk Time (%) 0 12 0 3 1 5 Queuing Penalty (veh) 2 2 1 6 2 5 Network Summary Network wide Queuing Penalty: 151 Rio Road —Arden SirnTraffic Report EPR Page 1 1i91 is E�lPomq WWWonuq M6 p 2ongryonuq f l I 7� 1 a48zYYM Eszgwnuq L\ _ o VI q,InYo!u 1PI2 coin" ERq,ornF NoWPonuq S S NOVPponu9 M622po" Msz2ponuq 2agpponuq zonrpponuq bN cF11cn62 jY 4626 019 B��F % A � Q 4 �k4s s���•�vE�t� ���'a��►i��7�ii7 r�iti� e, v v %�64xV EPRPc EPR, P,C. "ENGINEERING & PLANNING RESOURCES" 637 BERKMAR CIRCLE, CHARLOTTESVILLE, VA 22901 Appendix E 2020 No Build Synchro Printouts HCM 2010 Signalized Intersection Summary 1: Mall Drive/Albemarle Square & Rio Road 04/21/2017 Moveme EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL Lane Configurations Vi ++ K IN ++ ?F Vi + if IN Traffic Volume (veh/h) 46 892 13 24 1143 88 8 1 5 35 5 29 Future Volume (veh/h) 46 892 13 24 1143 88 8 1 5 35 5 29 Number 1 6 16 5 2 12 7 4 14 3 8 18 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Adj Sat Flow, veh/hlln 1863 1863 1545 1900 1881 1900 1520 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 49 959 0 26 1229 12 9 1 0 38 5 0 Adj No. of Lanes 1 2 1 1 2 1 1 1 1 1 1 0 Peak Hour Factor 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 Percent Heavy Veh, % 2 2 23 0 1 0 25 0 0 0 0 0 Cap, veh/h 373 2381 883 462 2350 1062 33 44 37 105 110 0 Arrive On Green 0.06 0.67 0.00 0.05 0.66 0.66 0.02 0.02 0.00 0.06 0.06 0.00 Sat Flow, veh/h 1774 3539 1313 1810 3574 1615 1448 1900 1615 1810 1900 0 Grp Volume(v), veh/h 49 959 0 26 1229 12 9 1 0 38 5 0 Grp Sat Flow(s),veh/h/In 1774 1770 1313 1810 1787 1615 1448 1900 1615 1810 1900 0 Q Serve(g_s), s 1.1 17.0 0.0 0.6 25.1 0.4 0.9 0.1 0.0 2.8 0.3 0.0 Cycle Q Clear(g_c), s 1.1 17.0 0.0 0.6 25.1 0.4 0.9 0.1 0.0 2.8 0.3 0.0 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 Lane Grp Cap(c), veh/h 373 2381 883 462 2350 1062 33 44 37 105 110 0 V/C Ratio(X) 0.13 0.40 0.00 0.06 0.52 0.01 0.27 0.02 0.00 0.36 0.05 0.00 Avail Cap(c_a),veh/h 419 2381 883 524 2350 1062 233 305 260 207 217 0 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 0.00 Uniform Delay (d), s/veh 8.2 10.3 0.0 7.1 12.5 8.3 67.2 66.9 0.0 63.4 62.3 0.0 Incr Delay (d2), s/veh 0.2 0.5 0.0 0.1 0.8 0.0 6.0 0.3 0.0 3.0 0.2 0.0 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/In 0.6 8.4 0.0 0.3 12.6 0.2 0.4 0.0 0.0 1.5 0.2 0.0 LnGrp Delay(d),s/veh 8.5 10.8 0.0 7.2 13.4 8.3 73.3 67.1 0.0 66.4 62.5 0.0 LnGrp LOS A B A B A E E E E Approach Vol, veh/h 1008 1267 10 43 Approach Delay, s/veh 10.7 13.2 72.7 66.0 Approach LOS B B E E mer 7 Assigned Phs 1 2 4 5 6 8 Phs Duration (G+Y+Rc), s 16.3 99.8 9.7 14.2 102.0 14.1 Change Period (Y+Rc), s 7.8 7.8 6.5 7.8 7.8 6.0 Max Green Setting (Gmax), s 12.2 61.2 22.5 11.2 62.2 16.0 Max Q Clear Time (g_c+l l ), s 3.1 27.1 2.9 2.6 19.0 4.8 Green Ext Time (p-c), s 0.1 29.9 0.0 0.0 36.8 0.1 Intersection Summary HCM 2010 Ctrl Delay 13.3 HCM 2010 LOS B Rio Road -Arden 2020 No Build AM Synchro 9 Report EPR Page 1 HCM 2010 TWSC 2: Rio Road & Putt Putt Place 04/21/2017 Intersection Int Delay, s/veh 2.1 EBL EBT _ WBT WBR Lane Configurations Ij ++ ++ K Vi if Traffic Vol, veh/h 54 841 1099 24 57 103 Future Vol, veh/h 54 841 1099 24 57 103 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None None - None Storage Length 350 - 170 0 100 Veh in Median Storage, # - 0 0 - 0 - Grade, % - 0 0 - 0 - Peak Hour Factor 92 92 92 92 92 92 Heavy Vehicles, % 11 3 2 13 4 6 Mvmt Flow 59 914 1195 26 62 112 Major/Minor Minor2 Conflicting Flow All 1195 0 0 1769 597 Stage 1 - - - 1195 - Stage 2 - 574 - Critical Hdwy 4.32 6.88 7.02 Critical Hdwy Stg 1 - 5.88 - Critical Hdwy Stg 2 - 5.88 - Follow-up Hdwy 2.31 3.54 3.36 Pot Cap-1 Maneuver 532 73 436 Stage 1 - 246 - Stage 2 - 521 - Platoon blocked, % Mov Cap-1 Maneuver 532 65 436 Mov Cap-2 Maneuver - 173 - Stage 1 246 Stage 2 463 Approach EB _ WB SB HCM Control Delay, s 0.8 0 23.5 HCM LOS C Finor Lane/Major Mvmt EBL EBT WBT WBR S131_n1 SBLn2 Capacity (veh/h) 532 173 436 HCM Lane V/C Ratio 0.11 0.358 0.257 HCM Control Delay (s) 12.6 37 16.1 HCM Lane LOS B E C HCM 95th %tile Q(veh) 0.4 1.5 1 Rio Road —Arden 2020 No Build AM Synchro 9 Report EPR Page 2 HCM Signalized Intersection Capacity Analysis 3: Old Brook Drive & Rio Road 04/21/2017 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SOW SBT SBR Lane Configurations Vi + U IN + T+ +' K Traffic Volume (vph) 54 728 14 7 1099 46 20 0 17 126 0 99 Future Volume (vph) 54 728 14 7 1099 46 20 0 17 126 0 99 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Total Lost time (s) 6.0 6.0 6.0 6.0 6.0 6.0 6.0 Lane Util. Factor 1.00 0.95 1.00 0.95 1.00 1.00 1.00 Frt 1.00 1.00 1.00 0.99 0.94 1.00 0.85 Flt Protected 0.95 1.00 0.95 1.00 0.97 0.95 1.00 Satd. Flow (prot) 1770 3560 1583 3554 1737 1787 1599 Flt Permitted 0.20 1.00 0.26 1.00 0.78 0.73 1.00 Satd. Flow (perm) 364 3560 437 3554 1391 1375 1599 Peak -hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Adj. Flow (vph) 59 791 15 8 1195 50 22 0 18 137 0 108 RTOR Reduction (vph) 0 1 0 0 2 0 0 34 0 0 0 93 Lane Group Flow (vph) 59 805 0 8 1243 0 0 6 0 0 137 15 Heavy Vehicles (%) 2% 1% 7% 14% 1% 0% 0% 0% 0% 1% 0% 1% Turn Type pm+pt NA pm+pt NA Perm NA Perm NA Perm Protected Phases 1 6 5 2 4 8 Permitted Phases 6 2 4 8 8 Actuated Green, G (s) 55.1 50.3 69.5 58.7 13.6 13.6 13.6 Effective Green, g (s) 55.1 50.3 69.5 58.7 13.6 13.6 13.6 Actuated g/C Ratio 0.58 0.53 0.73 0.62 0.14 0.14 0.14 Clearance Time (s) 6.0 6.0 6.0 6.0 6.0 6.0 6.0 Vehicle Extension (s) 2.5 5.0 2.5 5.0 5.0 2.5 2.5 Lane Grp Cap (vph) 281 1882 478 2193 198 196 228 v/s Ratio Prot c0.01 0.23 0.00 c0.35 v/s Ratio Perm 0.11 0.01 0.00 c0.10 0.01 v/c Ratio 0.21 0.43 0.02 0.57 0.03 0.70 0.07 Uniform Delay, dl 9.0 13.6 4.5 10.7 35.1 38.8 35.3 Progression Factor 1.00 1.00 0.45 0.26 1.00 1.00 1.00 Incremental Delay, d2 0.3 0.3 0.0 0.5 0.1 9.6 0.1 Delay (s) 9.2 14.0 2.0 3.3 35.2 48.4 35.4 Level of Service A B A A D D D Approach Delay (s) 13.6 3.3 35.2 42.6 Approach LOS B A D D Intersection Summary HCM 2000 Control Delay 11.6 HCM 2000 Level of Service B HCM 2000 Volume to Capacity ratio 0.57 Actuated Cycle Length (s) 95.1 Sum of lost time (s) 18.0 Intersection Capacity Utilization 63.3% ICU Level of Service B Analysis Period (min) 15 c Critical Lane Group Rio Road -Arden 2020 No Build AM Synchro 9 Report EPR Page 3 HCM Signalized Intersection Capacity Analysis 4: Hillsdala Drive/Northfield Road & Rio Road 04/21/2017 Movement EBL EBT EBR WBL WBT WBR NBL NBT SBT SBR Lane Configurations Vi + U IN + T+ if Traffic Volume (vph) 11 768 73 229 1079 4 53 10 102 51 71 22 Future Volume (vph) 11 768 73 229 1079 4 53 10 102 51 71 22 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Total Lost time (s) 6.0 6.0 6.0 6.0 6.0 6.0 6.0 Lane Util. Factor 1.00 0.95 1.00 0.95 1.00 1.00 1.00 Frt 1.00 0.99 1.00 1.00 1.00 0.85 0.98 Flt Protected 0.95 1.00 0.95 1.00 0.96 1.00 0.98 Satd. Flow (prot) 1805 3459 1719 3573 1619 1495 1814 Flt Permitted 0.22 1.00 0.22 1.00 0.59 1.00 0.86 Satd. Flow (perm) 414 3459 401 3573 996 1495 1579 Peak -hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Adj. Flow (vph) 12 835 79 249 1173 4 58 11 111 55 77 24 RTOR Reduction (vph) 0 6 0 0 0 0 0 0 95 0 6 0 Lane Group Flow (vph) 12 908 0 249 1177 0 0 69 16 0 150 0 Heavy Vehicles (%) 0% 3% 3% 5% 1% 0% 15% 0% 8% 0% 0% 5% Turn Type pm+pt NA pm+pt NA Perm NA Perm Perm NA Protected Phases 1 6 5 2 4 8 Permitted Phases 6 2 4 4 8 Actuated Green, G (s) 55.1 50.3 69.5 58.7 13.6 13.6 13.6 Effective Green, g (s) 55.1 50.3 69.5 58.7 13.6 13.6 13.6 Actuated g/C Ratio 0.58 0.53 0.73 0.62 0.14 0.14 0.14 Clearance Time (s) 6.0 6.0 6.0 6.0 6.0 6.0 6.0 Vehicle Extension (s) 2.5 5.0 2.5 5.0 5.0 5.0 2.5 Lane Grp Cap (vph) 310 1829 475 2205 142 213 225 v/s Ratio Prot 0.00 0.26 c0.07 c0.33 v/s Ratio Perm 0.02 0.31 0.07 0.01 c0.10 v/c Ratio 0.04 0.50 0.52 0.53 0.49 0.07 0.67 Uniform Delay, dl 8.6 14.3 6.5 10.4 37.5 35.3 38.6 Progression Factor 0.50 0.47 1.00 1.00 1.00 1.00 1.00 Incremental Delay, d2 0.0 0.4 0.8 0.5 5.4 0.3 6.6 Delay (s) 4.3 7.1 7.3 10.8 42.9 35.6 45.2 Level of Service A A A B D D D Approach Delay (s) 7.1 10.2 38.4 45.2 Approach LOS A B D D Intersection Summary HCM 2000 Control Delay 13.1 HCM 2000 Level of Service B HCM 2000 Volume to Capacity ratio 0.58 Actuated Cycle Length (s) 95.1 Sum of lost time (s) 18.0 Intersection Capacity Utilization 65.8% ICU Level of Service C Analysis Period (min) 15 c Critical Lane Group Rio Road -Arden 2020 No Build AM Synchro 9 Report EPR Page 4 HCM 2010 Signalized Intersection Summary 1: Mall Drive/Albemarle Square & Rio Road 04/21/2017 Moveme EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL Lane Configurations Vi ++ K IN ++ ?F Vi + if IN Traffic Volume (veh/h) 96 1088 60 94 1231 172 70 24 62 178 16 132 Future Volume (veh/h) 96 1088 60 94 1231 172 70 24 62 178 16 132 Number 1 6 16 5 2 12 7 4 14 3 8 18 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Adj Sat Flow, veh/hlln 1900 1881 1900 1900 1881 1900 1881 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 101 1145 0 99 1296 100 74 25 0 187 17 30 Adj No. of Lanes 1 2 1 1 2 1 1 1 1 1 1 0 Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 Percent Heavy Veh, % 0 1 0 0 1 0 1 0 0 0 0 0 Cap, veh/h 291 1949 880 343 1948 880 125 133 113 207 71 125 Arrive On Green 0.07 0.55 0.00 0.07 0.55 0.55 0.07 0.07 0.00 0.11 0.11 0.11 Sat Flow, veh/h 1810 3574 1615 1810 3574 1615 1792 1900 1615 1810 618 1090 Grp Volume(v), veh/h 101 1145 0 99 1296 100 74 25 0 187 0 47 Grp Sat Flow(s),veh/h/In 1810 1787 1615 1810 1787 1615 1792 1900 1615 1810 0 1708 Q Serve(g_s), s 3.2 30.0 0.0 3.1 36.2 4.2 5.6 1.7 0.0 14.3 0.0 3.5 Cycle Q Clear(g_c), s 3.2 30.0 0.0 3.1 36.2 4.2 5.6 1.7 0.0 14.3 0.0 3.5 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.64 Lane Grp Cap(c), veh/h 291 1949 880 343 1948 880 125 133 113 207 0 195 V/C Ratio(X) 0.35 0.59 0.00 0.29 0.67 0.11 0.59 0.19 0.00 0.90 0.00 0.24 Avail Cap(c_a),veh/h 322 1949 880 361 1948 880 288 305 260 207 0 195 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 0.00 1.00 Uniform Delay (d), s/veh 17.3 21.3 0.0 15.0 22.7 15.4 63.2 61.4 0.0 61.2 0.0 56.5 Incr Delay (d2), s/veh 1.0 1.3 0.0 0.7 1.8 0.3 6.2 1.0 0.0 37.9 0.0 0.9 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/In 1.7 15.1 0.0 1.6 18.3 1.9 3.0 1.0 0.0 9.3 0.0 1.7 LnGrp Delay(d),s/veh 18.3 22.6 0.0 15.6 24.5 15.7 69.3 62.3 0.0 99.2 0.0 57.4 LnGrp LOS B C B C B E E F E Approach Vol, veh/h 1246 1495 99 234 Approach Delay, s/veh 22.3 23.4 67.6 90.8 Approach LOS C C E F mer 6 Assigned Phs 1 2 4 5 6 8 Phs Duration (G+Y+Rc), s 17.6 84.1 16.3 17.6 84.1 22.0 Change Period (Y+Rc), s 7.8 7.8 6.5 7.8 7.8 6.0 Max Green Setting (Gmax), s 12.2 61.2 22.5 11.2 62.2 16.0 Max Q Clear Time (g_c+l l ), s 5.2 38.2 7.6 5.1 32.0 16.3 Green Ext Time (p-c), s 0.2 21.8 0.3 0.1 28.2 0.0 Intersection Summary HCM 2010 Ctrl Delay 29.5 HCM 2010 LOS C Rio Road -Arden 2020 No Build PM Synchro 9 Report EPR Page 1 HCM 2010 TWSC 2: Rio Road & Putt Putt Place 04/21/2017 Intersection Int Delay, s/veh 2 EBL EBT Lane Configurations Ij ++ ++ K Vi if Traffic Vol, veh/h 114 1163 1299 80 26 121 Future Vol, veh/h 114 1163 1299 80 26 121 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None None - None Storage Length 350 - 170 0 100 Veh in Median Storage, # - 0 0 - 0 - Grade, % - 0 0 - 0 - Peak Hour Factor 95 95 95 95 95 95 Heavy Vehicles, % 1 0 1 0 0 1 Mvmt Flow 120 1224 1367 84 27 127 Major/Minor Majorl Major2 'A Minor2 Conflicting Flow All 1367 0 0 2219 684 Stage 1 - - - 1367 - Stage 2 - 852 - Critical Hdwy 4.12 7.5 6.92 Critical Hdwy Stg 1 - 6.5 - Critical Hdwy Stg 2 - 6.5 - Follow-up Hdwy 2.21 3.5 3.31 Pot Cap-1 Maneuver 504 — 25 393 Stage 1 - 158 - Stage 2 - 325 - Platoon blocked, % Mov Cap-1 Maneuver 504 — 20 393 Mov Cap-2 Maneuver - 82 - Stage 1 120 Stage 2 248 Approach EB HCM Control Delay, s 1.3 0 27.5 HCM LOS D Ftinor Lane/Major Mvmt EBL EBT WBT WBR SBLnl SBLn2 Capacity (veh/h) 504 82 393 HCM Lane V/C Ratio 0.238 0.334 0.324 HCM Control Delay (s) 14.4 69.5 18.5 HCM Lane LOS B F C HCM 95th %tile Q(veh) 0.9 1.3 1.4 Wes -: Volume exceeds capacity $: Delay exceeds 300s +: Computation Not Defined ': All major volume in platoon Rio Road —Arden 2020 No Build PM Synchro 9 Report EPR Page 2 HCM Signalized Intersection Capacity Analysis 3: Old Brook Drive & Rio Road 04/21/2017 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBI � SM Lane Configurations Vi + U IN + T+ +' K Traffic Volume (vph) 102 1170 25 20 1258 105 14 1 12 43 2 82 Future Volume (vph) 102 1170 25 20 1258 105 14 1 12 43 2 82 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Total Lost time (s) 6.0 6.0 6.0 6.0 6.0 6.0 6.0 Lane Util. Factor 1.00 0.95 1.00 0.95 1.00 1.00 1.00 Frt 1.00 1.00 1.00 0.99 0.94 1.00 0.85 Flt Protected 0.95 1.00 0.95 1.00 0.97 0.95 1.00 Satd. Flow (prot) 1805 3599 1805 3533 1740 1813 1599 Flt Permitted 0.12 1.00 0.13 1.00 0.85 0.71 1.00 Satd. Flow (perm) 221 3599 242 3533 1523 1356 1599 Peak -hour factor, PHF 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 Adj. Flow (vph) 109 1245 27 21 1338 112 15 1 13 46 2 87 RTOR Reduction (vph) 0 1 0 0 3 0 0 11 0 0 0 74 Lane Group Flow (vph) 109 1271 0 21 1447 0 0 18 0 0 48 13 Heavy Vehicles (%) 0% 0% 0% 0% 1% 1% 0% 0% 0% 0% 0% 1% Turn Type pm+pt NA pm+pt NA Perm NA Perm NA Perm Protected Phases 1 6 5 2 4 8 Permitted Phases 6 2 4 8 8 Actuated Green, G (s) 62.6 55.2 70.8 59.3 15.4 15.4 15.4 Effective Green, g (s) 62.6 55.2 70.8 59.3 15.4 15.4 15.4 Actuated g/C Ratio 0.63 0.55 0.71 0.59 0.15 0.15 0.15 Clearance Time (s) 6.0 6.0 6.0 6.0 6.0 6.0 6.0 Vehicle Extension (s) 2.5 5.0 2.5 5.0 5.0 2.5 2.5 Lane Grp Cap (vph) 255 1984 350 2092 234 208 246 v/s Ratio Prot c0.03 0.35 0.01 c0.41 v/s Ratio Perm 0.23 0.04 0.01 c0.04 0.01 v/c Ratio 0.43 0.64 0.06 0.69 0.08 0.23 0.05 Uniform Delay, dl 10.4 15.6 7.5 14.1 36.3 37.2 36.1 Progression Factor 1.00 1.00 0.43 0.24 1.00 1.00 1.00 Incremental Delay, d2 0.8 1.0 0.0 1.0 0.3 0.4 0.1 Delay (s) 11.2 16.5 3.3 4.3 36.6 37.6 36.2 Level of Service B B A A D D D Approach Delay (s) 16.1 4.3 36.6 36.7 Approach LOS B A D D Intersection Summary HCM 2000 Control Delay 11.5 HCM 2000 Level of Service B HCM 2000 Volume to Capacity ratio 0.58 Actuated Cycle Length (s) 100.1 Sum of lost time (s) 18.0 Intersection Capacity Utilization 67.0% ICU Level of Service C Analysis Period (min) 15 c Critical Lane Group Rio Road -Arden 2020 No Build PM Synchro 9 Report EPR Page 3 HCM Signalized Intersection Capacity Analysis 4: Hillsdala Drive/Northfield Road & Rio Road 04/21/2017 Movement EBL EBT EBR WBL WBT WBR NBL NBT - Lane Configurations Vi + U IN + T+ if Traffic Volume (vph) 16 1147 56 182 1282 14 86 31 297 25 18 13 Future Volume (vph) 16 1147 56 182 1282 14 86 31 297 25 18 13 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Total Lost time (s) 6.0 6.0 6.0 6.0 6.0 6.0 6.0 Lane Util. Factor 1.00 0.95 1.00 0.95 1.00 1.00 1.00 Frt 1.00 0.99 1.00 1.00 1.00 0.85 0.97 Flt Protected 0.95 1.00 0.95 1.00 0.96 1.00 0.98 Satd. Flow (prot) 1805 3585 1770 3566 1743 1599 1736 Flt Permitted 0.13 1.00 0.12 1.00 0.76 1.00 0.82 Satd. Flow (perm) 248 3585 228 3566 1377 1599 1448 Peak -hour factor, PH 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 Adj. Flow (vph) 17 1233 60 196 1378 15 92 33 319 27 19 14 RTOR Reduction (vph) 0 3 0 0 0 0 0 0 270 0 10 0 Lane Group Flow (vph) 17 1290 0 196 1393 0 0 125 49 0 50 0 Heavy Vehicles (%) 0% 0% 0% 2% 1% 7% 7% 0% 1% 4% 0% 8% Turn Type pm+pt NA pm+pt NA Perm NA Perm Perm NA Protected Phases 1 6 5 2 4 8 Permitted Phases 6 2 4 4 8 Actuated Green, G (s) 62.6 55.2 70.8 59.3 15.4 15.4 15.4 Effective Green, g (s) 62.6 55.2 70.8 59.3 15.4 15.4 15.4 Actuated g/C Ratio 0.63 0.55 0.71 0.59 0.15 0.15 0.15 Clearance Time (s) 6.0 6.0 6.0 6.0 6.0 6.0 6.0 Vehicle Extension (s) 2.5 5.0 2.5 5.0 5.0 5.0 2.5 Lane Grp Cap (vph) 270 1976 338 2112 211 246 222 v/s Ratio Prot 0.00 0.36 c0.07 c0.39 v/s Ratio Perm 0.03 0.34 c0.09 0.03 0.03 v/c Ratio 0.06 0.65 0.58 0.66 0.59 0.20 0.22 Uniform Delay, dl 8.8 15.7 11.2 13.6 39.4 37.0 37.1 Progression Factor 0.32 0.17 1.00 1.00 1.00 1.00 1.00 Incremental Delay, d2 0.1 0.8 2.0 1.0 6.6 0.8 0.4 Delay (s) 2.9 3.5 13.1 14.7 46.0 37.8 37.5 Level of Service A A B B D D D Approach Delay (s) 3.5 14.5 40.1 37.5 Approach LOS A B D D Intersection Summary HCM 2000 Control Delay 14.0 HCM 2000 Level of Service B HCM 2000 Volume to Capacity ratio 0.66 Actuated Cycle Length (s) 100.1 Sum of lost time (s) 18.0 Intersection Capacity Utilization 71.9% ICU Level of Service C Analysis Period (min) 15 c Critical Lane Group Rio Road -Arden 2020 No Build PM Synchro 9 Report EPR Page 4 EPRPc EPR, P,C. "ENGINEERING & PLANNING RESOURCES" 637 BERKMAR CIRCLE, CHARLOTTESVILLE, VA 22901 Appendix F 2020 No Build SimTraffic Printouts Queuing and Blocking Report 2020 No Build AM 04/21/2017 Intersection: 1: Mall Drive/Albemarle Square & Rio Road Movement EB EB EB WB WB WB WB NB NB SB SB Directions Served L T T L T T R L T L TR Maximum Queue (ft) 66 224 174 44 294 299 130 66 18 105 88 Average Queue (ft) 23 77 42 13 75 91 23 11 1 34 26 95th Queue (ft) 50 176 119 36 201 223 93 42 8 78 62 Link Distance (ft) 579 579 892 892 293 293 321 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) 340 340 130 100 Storage Blk Time (%) 0 0 4 0 1 0 Queuing Penalty (veh) 0 0 3 1 0 0 Intersection: 2: Rio Road & Putt Putt Place Movement EB EB WB WB WB SB SB Directions Served L T T T R L R Maximum Queue (ft) 82 2 2 2 16 205 100 Average Queue (ft) 26 0 0 0 0 57 55 95th Queue (ft) 64 2 2 2 5 143 101 Link Distance (ft) 892 1338 1338 523 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) 350 170 100 Storage Blk Time (%) 5 1 Queuing Penalty (veh) 5 1 Intersection: 3: Old Brook Drive & Rio Road Movement EB EB EB WB WB WB NB SB SB Directions Served L T TR L T TR LTR LT R Maximum Queue (ft) 95 195 225 38 105 108 63 217 75 Average Queue (ft) 31 89 109 3 41 45 20 79 49 95th Queue (ft) 69 162 190 19 83 87 50 160 91 Link Distance (ft) 1338 1338 154 154 417 562 Upstream Blk Time (%) 0 Queuing Penalty (veh) 0 Storage Bay Dist (ft) 200 65 75 Storage Blk Time (%) 0 0 2 12 1 Queuing Penalty (veh) 0 0 0 12 1 Intersection: 4: Hillsdala Drive/Northfield Road & Rio Road Movement EB EB EB WB WB WB NB NB SB Directions Served L T TR L T TR LT R LTR Maximum Queue (ft) 48 125 128 171 239 209 119 108 179 Average Queue (ft) 8 62 61 79 101 89 46 41 81 95th Queue (ft) 32 109 108 146 189 170 94 77 142 Link Distance (ft) 154 154 817 817 538 524 Upstream Blk Time (%) 0 0 Queuing Penalty (veh) 0 0 Storage Bay Dist (ft) 55 180 150 Storage Blk Time (%) 0 14 0 1 0 Queuing Penalty (veh) 0 2 1 2 0 Network Summary Network wide Queuing Penalty: 28 Rio Road —Arden SirnTraffic Report EPR Page 1 Queuing and Blocking Report 2020 No Build PM 04/21/2017 Intersection: 1: Mall Drive/Albemarle Square & Rio Road Movement EB EB EB WB WB WB WB NB NB NB SB SB Directions Served L T T L T T R L T R L TR Maximum Queue (ft) 317 474 432 339 551 568 130 152 74 10 333 100 Average Queue (ft) 73 274 227 88 313 333 67 63 24 0 204 80 95th Queue (ft) 194 423 380 253 523 546 157 123 61 9 346 128 Link Distance (ft) 579 579 892 892 293 293 321 Upstream Blk Time (%) 5 Queuing Penalty (veh) 0 Storage Bay Dist (ft) 340 340 130 200 100 Storage Blk Time (%) 0 3 0 8 29 0 35 4 Queuing Penalty (veh) 0 3 0 7 51 3 51 7 Intersection: 2: Rio Road & Putt Putt Place Movement EB WB SB SB Directions Served L R L R Maximum Queue (ft) 128 28 126 98 Average Queue (ft) 54 2 31 53 95th Queue (ft) 106 15 80 90 Link Distance (ft) 523 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) 350 170 100 Storage Blk Time (%) 1 1 Queuing Penalty (veh) 1 0 Intersection: 3: Old Brook Drive & Rio Road Movement EB EB EB WB WB WB NB SB SB Directions Served L T TR L T TR LTR LT R Maximum Queue (ft) 199 394 401 56 131 137 57 116 74 Average Queue (ft) 73 160 182 13 58 66 15 33 35 95th Queue (ft) 163 317 340 39 105 115 43 81 71 Link Distance (ft) 1338 1338 154 154 417 562 Upstream Blk Time (%) 0 0 Queuing Penalty (veh) 0 1 Storage Bay Dist (ft) 200 65 75 Storage Blk Time (%) 0 3 0 9 1 1 Queuing Penalty (veh) 0 4 0 2 1 0 Intersection: 4: Hillsdala Drive/Northfield Road & Rio Road Movement EB EB EB WB WB WB NB NB SB Directions Served L T TR L T TR LT R LTR Maximum Queue (ft) 52 120 104 180 353 337 149 290 107 Average Queue (ft) 14 49 44 87 158 152 79 112 39 95th Queue (ft) 41 96 88 170 281 277 147 212 84 Link Distance (ft) 154 154 817 817 538 524 Upstream Blk Time (%) 0 Queuing Penalty (veh) 0 Storage Bay Dist (ft) 55 180 150 Storage Blk Time (%) 1 13 0 4 1 3 Queuing Penalty (veh) 3 2 2 7 2 4 Network Summary Network wide Queuing Penalty: 152 Rio Road —Arden SirnTraffic Report EPR Page 1 EPRPc EPR, P,C. "ENGINEERING & PLANNING RESOURCES" 637 BERKMAR CIRCLE, CHARLOTTESVILLE, VA 22901 Appendix G 2020 Build Synchro Printouts HCM 2010 Signalized Intersection Summary 1: Mall Drive/Albemarle Square & Rio Road 04/21/2017 Moveme EBL EBT EBR WBL WBT WBR NBL NBT NBR I SBL Lane Configurations Vi ++ K IN ++ ?F Vi + if IN Traffic Volume (veh/h) 46 931 13 26 1202 91 8 1 6 37 5 29 Future Volume (veh/h) 46 931 13 26 1202 91 8 1 6 37 5 29 Number 1 6 16 5 2 12 7 4 14 3 8 18 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Adj Sat Flow, veh/hlln 1863 1863 1545 1900 1881 1900 1520 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 49 1001 0 28 1292 15 9 1 0 40 5 6 Adj No. of Lanes 1 2 1 1 2 1 1 1 1 1 1 0 Peak Hour Factor 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 Percent Heavy Veh, % 2 2 23 0 1 0 25 0 0 0 0 0 Cap, veh/h 351 2362 876 444 2337 1056 33 44 37 111 49 58 Arrive On Green 0.06 0.67 0.00 0.05 0.65 0.65 0.02 0.02 0.00 0.06 0.06 0.06 Sat Flow, veh/h 1774 3539 1313 1810 3574 1615 1448 1900 1615 1810 788 945 Grp Volume(v), veh/h 49 1001 0 28 1292 15 9 1 0 40 0 11 Grp Sat Flow(s),veh/h/In 1774 1770 1313 1810 1787 1615 1448 1900 1615 1810 0 1733 Q Serve(g_s), s 1.1 18.4 0.0 0.7 27.4 0.5 0.9 0.1 0.0 3.0 0.0 0.8 Cycle Q Clear(g_c), s 1.1 18.4 0.0 0.7 27.4 0.5 0.9 0.1 0.0 3.0 0.0 0.8 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.55 Lane Grp Cap(c), veh/h 351 2362 876 444 2337 1056 33 44 37 111 0 107 V/C Ratio(X) 0.14 0.42 0.00 0.06 0.55 0.01 0.27 0.02 0.00 0.36 0.00 0.10 Avail Cap(c_a),veh/h 398 2362 876 503 2337 1056 233 305 260 207 0 198 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 0.00 1.00 Uniform Delay (d), s/veh 8.9 10.8 0.0 7.4 13.1 8.5 67.2 66.9 0.0 63.0 0.0 62.0 Incr Delay (d2), s/veh 0.3 0.6 0.0 0.1 0.9 0.0 6.0 0.3 0.0 2.8 0.0 0.6 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/In 0.6 9.1 0.0 0.3 13.8 0.2 0.4 0.0 0.0 1.6 0.0 0.4 LnGrp Delay(d),s/veh 9.2 11.4 0.0 7.5 14.1 8.5 73.3 67.1 0.0 65.8 0.0 62.6 LnGrp LOS A B A B A E E E E Approach Vol, veh/h 1050 1335 10 51 Approach Delay, s/veh 11.3 13.9 72.7 65.1 Approach LOS B B E E Assigned Phs 1 2 4 5 6 8 Phs Duration (G+Y+Rc), s 16.3 99.3 9.7 14.4 101.2 14.6 Change Period (Y+Rc), s 7.8 7.8 6.5 7.8 7.8 6.0 Max Green Setting (Gmax), s 12.2 61.2 22.5 11.2 62.2 16.0 Max Q Clear Time (g_c+l l ), s 3.1 29.4 2.9 2.7 20.4 5.0 Green Ext Time (p-c), s 0.1 28.7 0.0 0.0 36.8 0.1 Intersection Summary HCM 2010 Ctrl Delay 14.1 HCM 2010 LOS B Rio Road -Arden 2020 Build AM Synchro 9 Report EPR Page 1 HCM 2010 TWSC 2: Rio Road & Putt Putt Place 04/21/2017 Intersection Int Delay, s/veh 4.3 EBL EBT _ WBT WBR SBL SBR — Lane Configurations Ij ++ ++ K Vi if Traffic Vol, veh/h 96 841 1099 47 92 167 Future Vol, veh/h 96 841 1099 47 92 167 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None None - None Storage Length 350 - 170 0 100 Veh in Median Storage, # - 0 0 - 0 - Grade, % - 0 0 - 0 - Peak Hour Factor 92 92 92 92 92 92 Heavy Vehicles, % 11 3 2 13 4 6 Mvmt Flow 104 914 1195 51 100 182 Major/Minor _ Minor2 Conflicting Flow All 1195 0 0 1861 597 Stage 1 - - - 1195 - Stage 2 - 666 - Critical Hdwy 4.32 6.88 7.02 Critical Hdwy Stg 1 - 5.88 - Critical Hdwy Stg 2 - 5.88 - Follow-up Hdwy 2.31 3.54 3.36 Pot Cap-1 Maneuver 532 — 63 436 Stage 1 - 246 - Stage 2 - 467 - Platoon blocked, % Mov Cap-1 Maneuver 532 — 51 436 Mov Cap-2 Maneuver - 158 - Stage 1 246 Stage 2 376 Approach EB HCM Control Delay, s 1.4 0 33.8 HCM LOS D Finor Lane/Major Mvmt EBL EBT WBT WBR SB1_n1 SBLn2 Capacity (veh/h) 532 158 436 HCM Lane V/C Ratio 0.196 0.633 0.416 HCM Control Delay (s) 13.4 60.6 19 HCM Lane LOS B F C HCM 95th %tile Q(veh) 0.7 3.5 2 Wes -: Volume exceeds capacity $: Delay exceeds 300s +: Computation Not Defined ': All major volume in platoon Rio Road —Arden 2020 Build AM Synchro 9 Report EPR Page 2 HCM Signalized Intersection Capacity Analysis 3: Old Brook Drive & Rio Road 04/21/2017 Movement EBL EQ)♦EBR WBL WBT WBR NBL NBT NBR SM7-- SBT SBR Lane Configurations Vi + U IN + T+ +' K Traffic Volume (vph) 54 763 14 7 1122 46 20 0 17 126 0 99 Future Volume (vph) 54 763 14 7 1122 46 20 0 17 126 0 99 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Total Lost time (s) 6.0 6.0 6.0 6.0 6.0 6.0 6.0 Lane Util. Factor 1.00 0.95 1.00 0.95 1.00 1.00 1.00 Frt 1.00 1.00 1.00 0.99 0.94 1.00 0.85 Flt Protected 0.95 1.00 0.95 1.00 0.97 0.95 1.00 Satd. Flow (prot) 1770 3561 1583 3555 1737 1787 1599 Flt Permitted 0.19 1.00 0.25 1.00 0.78 0.73 1.00 Satd. Flow (perm) 351 3561 415 3555 1394 1375 1599 Peak -hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Adj. Flow (vph) 59 829 15 8 1220 50 22 0 18 137 0 108 RTOR Reduction (vph) 0 1 0 0 2 0 0 34 0 0 0 93 Lane Group Flow (vph) 59 843 0 8 1268 0 0 6 0 0 137 15 Heavy Vehicles (%) 2% 1% 7% 14% 1% 0% 0% 0% 0% 1% 0% 1% Turn Type pm+pt NA pm+pt NA Perm NA Perm NA Perm Protected Phases 1 6 5 2 4 8 Permitted Phases 6 2 4 8 8 Actuated Green, G (s) 56.9 52.1 71.4 60.6 13.9 13.9 13.9 Effective Green, g (s) 56.9 52.1 71.4 60.6 13.9 13.9 13.9 Actuated g/C Ratio 0.58 0.54 0.73 0.62 0.14 0.14 0.14 Clearance Time (s) 6.0 6.0 6.0 6.0 6.0 6.0 6.0 Vehicle Extension (s) 2.5 5.0 2.5 5.0 5.0 2.5 2.5 Lane Grp Cap (vph) 275 1906 464 2214 199 196 228 v/s Ratio Prot c0.01 0.24 0.00 c0.36 v/s Ratio Perm 0.11 0.01 0.00 c0.10 0.01 v/c Ratio 0.21 0.44 0.02 0.57 0.03 0.70 0.07 Uniform Delay, dl 9.0 13.8 4.6 10.8 35.9 39.7 36.1 Progression Factor 1.00 1.00 0.45 0.27 1.00 1.00 1.00 Incremental Delay, d2 0.3 0.3 0.0 0.5 0.1 9.6 0.1 Delay (s) 9.3 14.1 2.1 3.4 36.0 49.3 36.2 Level of Service A B A A D D D Approach Delay (s) 13.8 3.4 36.0 43.5 Approach LOS B A D D Intersection Summary HCM 2000 Control Delay 11.7 HCM 2000 Level of Service B HCM 2000 Volume to Capacity ratio 0.57 Actuated Cycle Length (s) 97.3 Sum of lost time (s) 18.0 Intersection Capacity Utilization 64.0% ICU Level of Service B Analysis Period (min) 15 c Critical Lane Group Rio Road -Arden 2020 Build AM Synchro 9 Report EPR Page 3 HCM Signalized Intersection Capacity Analysis 4: Hillsdala Drive/Northfield Road & Rio Road 04/21/2017 Movement EBL EBT EBR WBL WBT WBR NBL NBT Lane Configurations Vi + U IN + T+ if Traffic Volume (vph) 11 792 83 229 1095 4 60 10 102 51 71 22 Future Volume (vph) 11 792 83 229 1095 4 60 10 102 51 71 22 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Total Lost time (s) 6.0 6.0 6.0 6.0 6.0 6.0 6.0 Lane Util. Factor 1.00 0.95 1.00 0.95 1.00 1.00 1.00 Frt 1.00 0.99 1.00 1.00 1.00 0.85 0.98 Flt Protected 0.95 1.00 0.95 1.00 0.96 1.00 0.98 Satd. Flow (prot) 1805 3455 1719 3573 1615 1495 1814 Flt Permitted 0.21 1.00 0.21 1.00 0.58 1.00 0.85 Satd. Flow (perm) 404 3455 381 3573 980 1495 1574 Peak -hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Adj. Flow (vph) 12 861 90 249 1190 4 65 11 111 55 77 24 RTOR Reduction (vph) 0 7 0 0 0 0 0 0 95 0 6 0 Lane Group Flow (vph) 12 944 0 249 1194 0 0 76 16 0 150 0 Heavy Vehicles (%) 0% 3% 3% 5% 1% 0% 15% 0% 8% 0% 0% 5% Turn Type pm+pt NA pm+pt NA Perm NA Perm Perm NA Protected Phases 1 6 5 2 4 8 Permitted Phases 6 2 4 4 8 Actuated Green, G (s) 56.9 52.1 71.4 60.6 13.9 13.9 13.9 Effective Green, g (s) 56.9 52.1 71.4 60.6 13.9 13.9 13.9 Actuated g/C Ratio 0.58 0.54 0.73 0.62 0.14 0.14 0.14 Clearance Time (s) 6.0 6.0 6.0 6.0 6.0 6.0 6.0 Vehicle Extension (s) 2.5 5.0 2.5 5.0 5.0 5.0 2.5 Lane Grp Cap (vph) 305 1850 462 2225 140 213 224 v/s Ratio Prot 0.00 0.27 c0.07 c0.33 v/s Ratio Perm 0.02 c0.32 0.08 0.01 c0.10 v/c Ratio 0.04 0.51 0.54 0.54 0.54 0.07 0.67 Uniform Delay, dl 8.6 14.4 6.9 10.4 38.7 36.1 39.5 Progression Factor 0.49 0.45 1.00 1.00 1.00 1.00 1.00 Incremental Delay, d2 0.0 0.4 0.9 0.5 7.4 0.3 6.7 Delay (s) 4.2 7.0 7.8 10.9 46.1 36.4 46.2 Level of Service A A A B D D D Approach Delay (s) 7.0 10.3 40.4 46.2 Approach LOS A B D D Intersection Summary HCM 2000 Control Delay 13.2 HCM 2000 Level of Service B HCM 2000 Volume to Capacity ratio 0.58 Actuated Cycle Length (s) 97.3 Sum of lost time (s) 18.0 Intersection Capacity Utilization 66.8% ICU Level of Service C Analysis Period (min) 15 c Critical Lane Group Rio Road -Arden 2020 Build AM Synchro 9 Report EPR Page 4 HCM 2010 Signalized Intersection Summary 1: Mall Drive/Albemarle Square & Rio Road 04/21/2017 Moverni PF EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL I SBT SBR Lane Configurations Vi ++ K IN ++ ?F Vi + if IN Traffic Volume (veh/h) 96 1156 60 96 1281 174 70 24 64 181 16 132 Future Volume (veh/h) 96 1156 60 96 1281 174 70 24 64 181 16 132 Number 1 6 16 5 2 12 7 4 14 3 8 18 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Adj Sat Flow, veh/hlln 1900 1881 1900 1900 1881 1900 1881 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 101 1217 0 101 1348 102 74 25 0 191 17 30 Adj No. of Lanes 1 2 1 1 2 1 1 1 1 1 1 0 Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 Percent Heavy Veh, % 0 1 0 0 1 0 1 0 0 0 0 0 Cap, veh/h 279 1948 880 323 1948 880 125 133 113 207 71 125 Arrive On Green 0.07 0.55 0.00 0.07 0.55 0.55 0.07 0.07 0.00 0.11 0.11 0.11 Sat Flow, veh/h 1810 3574 1615 1810 3574 1615 1792 1900 1615 1810 618 1090 Grp Volume(v), veh/h 101 1217 0 101 1348 102 74 25 0 191 0 47 Grp Sat Flow(s),veh/h/In 1810 1787 1615 1810 1787 1615 1792 1900 1615 1810 0 1708 Q Serve(g_s), s 3.2 32.9 0.0 3.2 38.6 4.3 5.6 1.7 0.0 14.6 0.0 3.5 Cycle Q Clear(g_c), s 3.2 32.9 0.0 3.2 38.6 4.3 5.6 1.7 0.0 14.6 0.0 3.5 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.64 Lane Grp Cap(c), veh/h 279 1948 880 323 1948 880 125 133 113 207 0 195 V/C Ratio(X) 0.36 0.62 0.00 0.31 0.69 0.12 0.59 0.19 0.00 0.92 0.00 0.24 Avail Cap(c_a),veh/h 310 1948 880 341 1948 880 288 305 260 207 0 195 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 0.00 1.00 Uniform Delay (d), s/veh 18.3 22.0 0.0 15.9 23.3 15.5 63.2 61.4 0.0 61.4 0.0 56.5 Incr Delay (d2), s/veh 1.1 1.5 0.0 0.8 2.0 0.3 6.2 1.0 0.0 42.2 0.0 0.9 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/In 1.7 16.6 0.0 1.6 19.5 2.0 3.0 1.0 0.0 9.7 0.0 1.7 LnGrp Delay(d),s/veh 19.4 23.5 0.0 16.7 25.3 15.7 69.3 62.3 0.0 103.6 0.0 57.4 LnGrp LOS B C B C B E E F E Approach Vol, veh/h 1318 1551 99 238 Approach Delay, s/veh 23.2 24.1 67.6 94.5 Approach LOS C C E F er 1 2 8 Assigned Phs 1 2 4 5 6 8 Phs Duration (G+Y+Rc), s 17.6 84.1 16.3 17.6 84.1 22.0 Change Period (Y+Rc), s 7.8 7.8 6.5 7.8 7.8 6.0 Max Green Setting (Gmax), s 12.2 61.2 22.5 11.2 62.2 16.0 Max Q Clear Time (g_c+I1), s 5.2 40.6 7.6 5.2 34.9 16.6 Green Ext Time (p-c), s 0.2 19.9 0.3 0.2 26.0 0.0 Intersection Summary HCM 2010 Ctrl Delay 30.3 HCM 2010 LOS C Rio Road -Arden 2020 Build PM Synchro 9 Report EPR Page 1 HCM 2010 TWSC 2: Rio Road & Putt Putt Place 04/21/2017 Intersection Int Delay, s/veh 3.8 EBL EBT Lane Configurations Ij ++ ++ K Vi if Traffic Vol, veh/h 188 1163 1299 120 55 175 Future Vol, veh/h 188 1163 1299 120 55 175 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None None - None Storage Length 350 - 170 0 100 Veh in Median Storage, # - 0 0 - 0 - Grade, % - 0 0 - 0 - Peak Hour Factor 95 95 95 95 95 95 Heavy Vehicles, % 1 0 1 0 0 1 Mvmt Flow 198 1224 1367 126 58 184 Major/Minor Majorl Major2 AL Minor2 Conflicting Flow All 1367 0 0 2375 684 Stage 1 - - - 1367 - Stage 2 - 1008 - Critical Hdwy 4.12 6.8 6.92 Critical Hdwy Stg 1 - 5.8 - Critical Hdwy Stg 2 - 5.8 - Follow-up Hdwy 2.21 3.5 3.31 Pot Cap-1 Maneuver 504 — 30 393 Stage 1 - 206 - Stage 2 - 318 - Platoon blocked, % Mov Cap-1 Maneuver 504 —18 393 Mov Cap-2 Maneuver - 99 - Stage 1 206 Stage 2 193 Approach EB _ WB HCM Control Delay, s 2.3 0 36.6 HCM LOS E Ftinor Lane/Major Mvmt EBL EBT WBT WBR SBLn1 SBLn2 Capacity (veh/h) 504 99 393 HCM Lane V/C Ratio 0.393 0.585 0.469 HCM Control Delay (s) 16.7 83.2 22 HCM Lane LOS C F C HCM 95th %tile Q(veh) 1.9 2.8 2.4 Wes -: Volume exceeds capacity $: Delay exceeds 300s +: Computation Not Defined ': All major volume in platoon Rio Road —Arden 2020 Build PM Synchro 9 Report EPR Page 2 HCM Signalized Intersection Capacity Analysis 3: Old Brook Drive & Rio Road 04/21/2017 Movement i EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Vi + U IN + T+ +' K Traffic Volume (vph) 102 1199 25 20 1298 105 14 1 12 43 2 82 Future Volume (vph) 102 1199 25 20 1298 105 14 1 12 43 2 82 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Total Lost time (s) 6.0 6.0 6.0 6.0 6.0 6.0 6.0 Lane Util. Factor 1.00 0.95 1.00 0.95 1.00 1.00 1.00 Frt 1.00 1.00 1.00 0.99 0.94 1.00 0.85 Flt Protected 0.95 1.00 0.95 1.00 0.97 0.95 1.00 Satd. Flow (prot) 1805 3599 1805 3534 1740 1813 1599 Flt Permitted 0.11 1.00 0.12 1.00 0.85 0.71 1.00 Satd. Flow (perm) 201 3599 225 3534 1526 1356 1599 Peak -hour factor, PHF 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 Adj. Flow (vph) 109 1276 27 21 1381 112 15 1 13 46 2 87 RTOR Reduction (vph) 0 1 0 0 3 0 0 11 0 0 0 73 Lane Group Flow (vph) 109 1302 0 21 1490 0 0 18 0 0 48 14 Heavy Vehicles (%) 0% 0% 0% 0% 1% 1% 0% 0% 0% 0% 0% 1% Turn Type pm+pt NA pm+pt NA Perm NA Perm NA Perm Protected Phases 1 6 5 2 4 8 Permitted Phases 6 2 4 8 8 Actuated Green, G (s) 62.6 55.2 71.0 59.4 15.8 15.8 15.8 Effective Green, g (s) 62.6 55.2 71.0 59.4 15.8 15.8 15.8 Actuated g/C Ratio 0.62 0.55 0.71 0.59 0.16 0.16 0.16 Clearance Time (s) 6.0 6.0 6.0 6.0 6.0 6.0 6.0 Vehicle Extension (s) 2.5 5.0 2.5 5.0 5.0 2.5 2.5 Lane Grp Cap (vph) 243 1974 340 2086 239 212 251 v/s Ratio Prot c0.03 0.36 0.01 c0.42 v/s Ratio Perm 0.25 0.04 0.01 c0.04 0.01 v/c Ratio 0.45 0.66 0.06 0.71 0.08 0.23 0.05 Uniform Delay, dl 11.1 16.1 8.0 14.6 36.2 37.1 36.0 Progression Factor 1.00 1.00 0.43 0.25 1.00 1.00 1.00 Incremental Delay, d2 1.0 1.1 0.0 1.1 0.3 0.4 0.1 Delay (s) 12.1 17.1 3.5 4.8 36.5 37.5 36.1 Level of Service B B A A D D D Approach Delay (s) 16.7 4.8 36.5 36.6 Approach LOS B A D D Intersection Summary HCM 2000 Control Delay 11.9 HCM 2000 Level of Service B HCM 2000 Volume to Capacity ratio 0.60 Actuated Cycle Length (s) 100.6 Sum of lost time (s) 18.0 Intersection Capacity Utilization 68.1% ICU Level of Service C Analysis Period (min) 15 c Critical Lane Group Rio Road -Arden 2020 Build PM Synchro 9 Report EPR Page 3 HCM Signalized Intersection Capacity Analysis 4: Hillsdala Drive/Northfield Road & Rio Road 04/21/2017 Movement EBL EBT EBR WBL WBT WBR NBL NBT S S Lane Configurations Vi + U IN + T+ if Traffic Volume (vph) 16 1167 64 182 1310 14 97 31 297 25 18 13 Future Volume (vph) 16 1167 64 182 1310 14 97 31 297 25 18 13 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Total Lost time (s) 6.0 6.0 6.0 6.0 6.0 6.0 6.0 Lane Util. Factor 1.00 0.95 1.00 0.95 1.00 1.00 1.00 Frt 1.00 0.99 1.00 1.00 1.00 0.85 0.97 Flt Protected 0.95 1.00 0.95 1.00 0.96 1.00 0.98 Satd. Flow (prot) 1805 3582 1770 3566 1738 1599 1736 Flt Permitted 0.12 1.00 0.11 1.00 0.76 1.00 0.81 Satd. Flow (perm) 232 3582 211 3566 1366 1599 1442 Peak -hour factor, PHF 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 Adj. Flow (vph) 17 1255 69 196 1409 15 104 33 319 27 19 14 RTOR Reduction (vph) 0 3 0 0 0 0 0 0 269 0 10 0 Lane Group Flow (vph) 17 1321 0 196 1424 0 0 137 50 0 50 0 Heavy Vehicles (%) 0% 0% 0% 2% 1% 7% 7% 0% 1% 4% 0% 8% Turn Type pm+pt NA pm+pt NA Perm NA Perm Perm NA Protected Phases 1 6 5 2 4 8 Permitted Phases 6 2 4 4 8 Actuated Green, G (s) 62.6 55.2 71.0 59.4 15.8 15.8 15.8 Effective Green, g (s) 62.6 55.2 71.0 59.4 15.8 15.8 15.8 Actuated g/C Ratio 0.62 0.55 0.71 0.59 0.16 0.16 0.16 Clearance Time (s) 6.0 6.0 6.0 6.0 6.0 6.0 6.0 Vehicle Extension (s) 2.5 5.0 2.5 5.0 5.0 5.0 2.5 Lane Grp Cap (vph) 260 1965 328 2105 214 251 226 v/s Ratio Prot 0.00 0.37 c0.07 c0.40 v/s Ratio Perm 0.04 0.35 c0.10 0.03 0.03 v/c Ratio 0.07 0.67 0.60 0.68 0.64 0.20 0.22 Uniform Delay, dl 9.2 16.2 12.2 14.0 39.7 36.9 37.0 Progression Factor 0.32 0.17 1.00 1.00 1.00 1.00 1.00 Incremental Delay, d2 0.1 0.9 2.4 1.1 8.6 0.8 0.4 Delay (s) 3.0 3.6 14.6 15.2 48.4 37.7 37.4 Level of Service A A B B D D D Approach Delay (s) 3.6 15.1 40.9 37.4 Approach LOS A B D D Intersection Summary HCM 2000 Control Delay 14.4 HCM 2000 Level of Service B HCM 2000 Volume to Capacity ratio 0.69 Actuated Cycle Length (s) 100.6 Sum of lost time (s) 18.0 Intersection Capacity Utilization 72.7% ICU Level of Service C Analysis Period (min) 15 c Critical Lane Group Rio Road -Arden 2020 Build PM Synchro 9 Report EPR Page 4 EPRPc EPR, P,C. "ENGINEERING & PLANNING RESOURCES" 637 BERKMAR CIRCLE, CHARLOTTESVILLE, VA 22901 Appendix H 2020 Build SimTraffic Printouts Queuing and Blocking Report 2020 Build AM 04/21/2017 Intersection: 1: Mall Drive/Albemarle Square & Rio Road Movement EB EB EB WB WB WB WB NB NB SB SB Directions Served L T T L T T R L T L TR Maximum Queue (ft) 71 278 233 56 326 351 130 69 24 117 86 Average Queue (ft) 24 94 56 15 89 101 21 13 1 39 23 95th Queue (ft) 55 213 156 41 228 248 83 46 12 88 57 Link Distance (ft) 579 579 892 892 293 293 321 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) 340 340 130 100 Storage Blk Time (%) 0 0 4 0 2 0 Queuing Penalty (veh) 0 0 4 1 1 0 Intersection: 2: Rio Road & Putt Putt Place Movement EB WB WB WB SB SB Directions Served L T T R L R Maximum Queue (ft) 144 13 6 26 499 100 Average Queue (ft) 49 0 0 1 255 83 95th Queue (ft) 104 6 5 10 583 129 Link Distance (ft) 1338 1338 523 Upstream Blk Time (%) 22 Queuing Penalty (veh) 0 Storage Bay Dist (ft) 350 170 100 Storage Blk Time (%) 44 8 Queuing Penalty (veh) 74 7 Intersection: 3: Old Brook Drive & Rio Road Movement EB EB EB WB WB WB NB SB SB Directions Served L T TR L T TR LTR LT R Maximum Queue (ft) 104 197 222 45 112 126 65 216 75 Average Queue (ft) 31 90 109 5 45 50 21 86 49 95th Queue (ft) 69 163 190 24 90 97 53 173 90 Link Distance (ft) 1338 1338 154 154 417 562 Upstream Blk Time (%) 0 0 Queuing Penalty (veh) 0 0 Storage Bay Dist (ft) 200 65 75 Storage Blk Time (%) 0 0 0 3 14 1 Queuing Penalty (veh) 0 0 1 0 14 1 Intersection: 4: Hillsdala Drive/Northfield Road & Rio Road Movement EB EB EB WB WB WB NB NB SB Directions Served L T TR L T TR LT R LTR Maximum Queue (ft) 51 134 132 178 274 243 134 91 172 Average Queue (ft) 10 63 66 84 110 96 55 40 80 95th Queue (ft) 35 112 111 154 205 186 109 74 141 Link Distance (ft) 154 154 817 817 538 524 Upstream Blk Time (%) 0 0 Queuing Penalty (veh) 0 0 Storage Bay Dist (ft) 55 180 150 Storage Blk Time (%) 0 16 0 1 0 Queuing Penalty (veh) 0 2 2 2 0 Network Summary Network wide Queuing Penalty: 109 Rio Road —Arden SirnTraffic Report EPR Page 1 Queuing and Blocking Report 2020 Build PM 04/21/2017 Intersection: 1: Mall Drive/Albemarle Square & Rio Road Movement EB EB EB EB WB WB WB WB NB NB NB SB Directions Served L T T R L T T R L T R L Maximum Queue (ft) 340 550 492 16 339 587 591 130 138 82 9 336 Average Queue (ft) 93 310 258 0 90 324 343 72 60 26 0 193 95th Queue (ft) 264 483 432 7 257 542 558 163 115 63 8 331 Link Distance (ft) 579 579 579 892 892 293 293 321 Upstream Blk Time (%) 0 0 3 Queuing Penalty (veh) 0 0 0 Storage Bay Dist (ft) 340 340 130 200 Storage Blk Time (%) 0 6 0 8 30 1 34 Queuing Penalty (veh) 0 6 1 8 52 4 50 Intersection: 1: Mall Drive/Albemarle Square & Rio Road Movement SB Directions Served TR Maximum Queue (ft) 100 Average Queue (ft) 80 95th Queue (ft) 129 Link Distance (ft) Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) 100 Storage Blk Time (%) 3 Queuing Penalty (veh) 5 Intersection: 2: Rio Road & Putt Putt Place Movement EB WB WB WB SB SB Directions Served L T T R L R Maximum Queue (ft) 241 4 5 28 511 100 Average Queue (ft) 93 0 0 4 196 76 95th Queue (ft) 180 3 4 19 501 126 Link Distance (ft) 1338 1338 523 Upstream Blk Time (%) 10 Queuing Penalty (veh) 0 Storage Bay Dist (ft) 350 170 100 Storage Blk Time (%) 33 11 Queuing Penalty (veh) 57 6 Intersection: 3: Old Brook Drive & Rio Road Movement EB EB EB WB WB WB NB SB SB Directions Served L T TR L T TR LTR LT R Maximum Queue (ft) 199 397 411 55 134 144 62 93 72 Average Queue (ft) 75 173 190 13 65 73 18 26 32 95th Queue (ft) 167 331 346 38 118 127 46 65 65 Link Distance (ft) 1338 1338 154 154 417 562 Upstream Blk Time (%) 0 0 Queuing Penalty (veh) 1 2 Storage Bay Dist (ft) 200 65 75 Storage Blk Time (%) 0 4 0 10 1 0 Queuing Penalty (veh) 0 4 1 2 1 0 Rio Road —Arden SirnTraffic Report EPR Page 1 Queuing and Blocking Report 2020 Build PM Intersection: 4: Hillsdala Drive/Northfield Road & Rio Road Movement EB EB EB WB WB WB NB NB SB 04/21/2017 Directions Served L T TR L T TR LT R LTR Maximum Queue (ft) 48 105 101 180 307 303 150 330 101 Average Queue (ft) 13 49 43 89 157 160 91 124 38 95th Queue (ft) 39 92 87 167 266 272 160 239 79 Link Distance (ft) 154 154 817 817 538 524 Upstream Blk Time (%) 0 Queuing Penalty (veh) 0 Storage Bay Dist (ft) 55 180 150 Storage Blk Time (%) 0 14 0 4 1 4 Queuing Penalty (veh) 3 2 1 7 4 6 Network Summary Network wide Queuing Penalty: 222 Rio Road —Arden SirnTraffic Report EPR Page 2 EPRPc EPR, P,C. "ENGINEERING & PLANNING RESOURCES" 637 BERKMAR CIRCLE, CHARLOTTESVILLE, VA 22901 Appendix I Signal Warrant Analysis Memo Epj�PCPR, P,C. "ENGINEERING & PLANNING RESOURCES" 637 BERKMAR CIRCLE, CHARLOTTESVILLE, VA 22901 MEMORANDUM TO: SCOTT COLLINS, P.E. FROM: BILL WUENSCH, P.E., PTOE ORGANIZATION: DATE: APRIL 7, 2017 PHONE NUMBER: SENDER'S REFERENCE NUMBER: RE: ARDEN PHASE I TRAFFIC ANALYSIS YOUR REFERENCE NUMBER: ......................................................................................................................................................................................................................................................................_..............................................................................................................................................................................................................................., ❑ URGENT X FOR YOUR USE ❑ PLEASE COMMENT ❑ PLEASE REPLY ❑ PLEASE RECYCLE 1. Introduction The purpose of this analysis is to examine the impact of the proposed Arden Development Phase 1 on the intersection of Rio Road and Putt Putt Place in Albemarle County, Virginia. The proposed development will consist of 150 apartment units, a hotel with 120 beds, and a 50,000 square feet self -storage facility and will be complete in 2020. The figures on the right illustrate the vicinity and the location of the proposed Arden Development. This memo includes signal warrant, level of service, and queueing analyses at the intersection of Rio Road and Putt Putt Place. 2. Traffic Volumes Existing Traffic Volumes Twelve-hour traffic counts at the intersection of Rio Road and Putt; Putt Place were performed on Wednesday, March 15, 2017 (a typical ''- weekday while schools were in session and no special events occurred). The morning and afternoon peak hour traffic volumes are summarized below in Table 1 and the traffic count sheets are included in Appendix A. Table 12017 Existine Peak Hour Traffic Volumes Morning Peak Hour Afternoon Peak Hour Rio EBL 54 114 Rio EBT 816 1129 Rio WBT 1067 1261 Rio WEIR 24 80 Putt Putt SBL 57 26 Putt Putt SBR 103 121 The hourly traffic volumes are summarized below in Table 2. 1 Epj�PCPR, P,C. "ENGINEERING & PLANNING RESOURCES" 637 BERKMAR CIRCLE, CHARLOTTESVILLE, VA 22901 Table 2 2017 Existine Hourly Traffic Volumes 7AM 8AM 9AM 10AM 11AM 12PM 1PM 2PM 3PM 4PM I 5PM 6PM Rio EBL 33 54 50 61 83 106 90 84 114 122 112 92 Rio EBT 668 758 634 643 748 814 819 902 896 1023 1118 947 Rio WET 889 978 819 837 886 944 884 906 1064 1157 1272 845 Rio WEIR 23 28 41 42 43 55 44 58 72 76 84 52 Putt Putt SBL 52 49 54 30 45 40 47 47 46 59 23 47 Putt Putt SBR 85 87 77 73 94 107 89 98 95 118 111 62 2020 No Build Traffic Volumes To determine the 2020 traffic volumes a 0.5% annual growth rate was applied to the traffic volumes on Rio Road. This rate is less than the 1.0% rate agreed upon with VDOT staff in a pre-scoping meeting. This lower rate was used as it is a more conservative estimate of future traffic conditions. Tables 3 and 4 summarize the 2020 no build peak hour and hourly traffic volumes based on this growth rate. Table 3 2020 No Build Peak Hour Traffic Volumes Morning Peak Hour Afternoon Peak Hour Rio EBL 54 114 Rio EBT 828 1146 Rio WBT 1083 1280 Rio WEIR 24 80 Putt Putt SBL 57 26 Putt Putt SBR 103 121 Table 4 2020 No Build Hourly Traffic Volumes 7AM 8AM 9AM 10AM 11AM 12PM 1PM 2PM 3PM 4PM 5PM 6PM Rio EBL 33 54 50 61 83 106 90 84 114 122 112 92 Rio EBT 678 769 644 653 759 826 831 916 910 1038 1135 961 Rio WBT 902 993 831 850 899 958 897 920 1080 1174 1291 858 Rio WBR 23 28 41 42 43 55 44 58 72 76 84 52 Putt Putt SBL 52 49 54 30 45 40 47 47 46 59 23 47 Putt Putt SBR 85 87 77 73 94 107 89 98 95 118 111 62 Trip Generation The Institute of Transportation Engineers (ITE) Trip Generation Manual 9th Edition was used to estimate the daily and peak hour trips generated by the proposed development. Table 5 contains the land use descriptions, ITE land use codes, sizes, and anticipated trips. Per VDOT traffic study guidelines, no internal capture or pass -by rate was assumed. Table 5 Daily and Peak Hour Trip Generation Item LU code Unit Qty Daily AM PM in out total in out total Apartments 220 du 150 1033 15 62 77 65 35 100 Hotel 310 or 120 1070 46 34 80 42 42 84 Self -storage 151 ksf 50 125 4 3 7 7 6 13 totals 2228 65 99 164 114 83 197 The above trips generated by the proposed Arden Phase 1 were distributed at the intersection of Rio Road and Putt Putt Place assuming that 65% travel to/from the west and 35% to/from the east. This distribution is based on the traffic counts and was agreed upon with VDOT staff at the pre-scoping meeting. Table 6 summarizes the peak hour trip assignment based on this distribution. 2 Epl�PCPR, P,C. "ENGINEERING & PLANNING RESOURCES" 637 BERKMAR CIRCLE, CHARLOTTESVILLE, VA 22901 Table 6 Peak Hour Trip Assignment Morning Peak Hour Afternoon Peak Hour Rio EBL 42 74 Rio EBT 0 0 Rio WBT 0 0 Rio WEIR 23 40 Putt Putt SBL 35 29 Putt Putt SBR 64 54 To determine the hourly trips generated over the 12-hour period analyzed for the signal warrant, the existing hourly volumes entering and exiting Putt Putt Place were compared to the afternoon peak hour traffic volumes entering and exiting Putt Putt Place. The ratios resulting from this comparison are shown in Table 7. Table 8 summarizes the hourly trips generated by the proposed project based on these ratios applied to the afternoon peak hour trip generation shown in Table 5. Table 7 Ratios of the Existing Hourly Trips versus the Afternoon Peak Hour Trips 7AM 8AM 9AM 10AM 11AM 12PM 1PM 2PM 313M 4PM 5PM 6PM % of Peak Hour 1 64% 72% 61% 62% 70% 76% 72% 77% 84% 94% 100% 75% Table 8 Hourly Trip Generation 7AM 8AM 9AM 10AM 11AM 12PM 1PM 2PM 3PM 4PM 5PM 6PM Rio EBL 47 53 45 46 52 56 53 57 62 70 74 56 Rio EBT 0 0 0 0 0 0 0 0 0 0 0 0 Rio WBT 0 0 0 0 0 0 0 0 0 0 0 0 Rio WBR 26 29 24 25 28 30 29 31 34 38 40 30 Putt Putt SBL 19 21 18 18 20 22 21 22 24 27 29 22 Putt Putt SBR 35 39 33 33 38 41 39 42 45 51 54 41 2020 Build Traffic Volumes The peak hour site trips summarized in Table 6 and the hourly site trips summarized in Table 8 were added to the 2020 no build peak hour and hourly traffic volumes summarized in Tables 3 and 4, resulting the 2020 build peak hour and hourly traffic volumes shown in Tables 9 and 10. Table 9 2020 Build Peak Hour Traffic Volumes Morning Peak Hour Afternoon Peak Hour Rio EBL 96 188 Rio EBT 828 1146 Rio WBT 1083 1280 Rio WEIR 47 120 Putt Putt SBL 92 55 Putt Putt SBR 167 175 Table 10 2020 Build Hourly Traffic Volumes 7AM 8AM 9AM LOAM 11AM 12PM 1PM 2PM 3PM 4PM 5PM 6PM Rio EBL 80 107 95 107 135 162 143 141 176 192 186 148 Rio EBT 678 769 644 653 759 826 831 916 910 1038 1135 961 Rio WBT 902 993 831 850 899 958 897 920 1080 1174 1291 858 Rio WEIR 49 57 65 67 71 85 73 89 106 114 124 82 Putt Putt SBL 71 70 72 48 65 62 68 69 70 86 52 69 Putt Putt SBR 120 126 110 106 132 148 128 140 140 169 165 103 Epj�PCPR, P,C. "ENGINEERING & PLANNING RESOURCES" 637 BERKMAR CIRCLE, CHARLOTTESVILLE, VA 22901 3. Signal Warrant Analysis The Traffic Signal Warrant Analysis forms, per the Federal Highway Administration's Manual of Uniform Traffic Control Devices (MUTCD), were examined for the intersection of Rio Road and Putt Putt Place for existing 2017 and future 2020 build conditions. The MUTCD provides nine warrants for examining the potential need for traffic signal. In this analysis, Warrant 1 (Eight -Hour Vehicular volume), Warrant 2 (Four -Hour Vehicular Volume), Warrant 3 (Peak Hour), and Warrant 7 (Crash Experience) were considered applicable. Two approaches were analyzed for each time period and are explained below. • Approach 1— both the left turn and right turn volumes from Putt Putt Place are considered. • Approach 2 — only the left turn volumes from Putt Putt Place are considered. Existing Signal Warrant The existing 2017 hourly traffic volumes in Table 2 were applied to the signal warrants for the two alternatives above. The signal warrant forms for Alternative 1 are included in Appendix B and the results are shown below in Table 11. Table 112017 Existing Approach 1 Signal Warrant Analvsis Results Warrant Result 1. Eight Hour Vehicular Volume Met a. Condition A — Minimum Vehicular Volume Not Met b. Condition B — Interruption of Continuous Traffic Met 2. Four Hour Vehicular Volume Met 3. Peak Hour Met 4. Pedestrian Not Applicable 5. School Crossing Not Applicable 6. Coordinated Signal System Not Applicable 7. Crash Experience Not Met 8. Roadway Network Not Applicable 9. Intersection Near a Grade Crossing Not Applicable The signal warrant forms for Approach 2 are included in Appendix C and the results are shown below in Table 12. Table 12 2017 Existing Approach 2 Signal Warrant Analvsis Results Warrant Result 1. Eight Hour Vehicular Volume Not Met a. Condition A — Minimum Vehicular Volume Not Met b. Condition B — Interruption of Continuous Traffic 80% Met 2. Four Hour Vehicular Volume Not Met 3. Peak Hour Not Met 4. Pedestrian Not Applicable 5. School Crossing Not Applicable 6. Coordinated Signal System Not Applicable 7. Crash Experience Not Met 8. Roadway Network Not Applicable 9. Intersection Near a Grade Crossing Not Applicable 4 EPR, P,C. "ENGINEERING & PLANNING RESOURCES" EPRpc 637 BERKMAR CIRCLE, CHARLOTTESVILLE, VA 22901 Typically Approach 2 is considered the more conservative method for evaluating the need for a traffic signal and is supported by the guidance within the MUTCD. Based on the existing conditions and Approach 2, a traffic signal is not warranted at the intersection of Rio Road and Putt Putt Place. However, considering the number of crashes (12) that occurred at the intersection within a 12-month period, further consideration should be given to safety improvements. 2020 Build Signal Warrant The 2020 build hourly traffic volumes in Table 10 were used to examine the 2020 build signal warrant with the two approaches listed above. The signal warrant forms for Approach 1 are included in Appendix D and the results are shown below in Table 13. Table 13 2020 Build Anoroach 1 Sienal Warrant Analvsis Results Warrant Result 1. Eight Hour Vehicular Volume Met a. Condition A — Minimum Vehicular Volume 80% Met b. Condition B — Interruption of Continuous Traffic Met 2. Four Hour Vehicular Volume Met 3. Peak Hour Met 4. Pedestrian Not Applicable 5. School Crossing Not Applicable 6. Coordinated Signal System Not Applicable 7. Crash Experience Not Met 8. Roadway Network Not Applicable 9. Intersection Near a Grade Crossing Not Applicable The signal warrant forms for Approach 2 are included in Appendix E and the results are shown below in Table 14. Table 14 2020 Build Approach 2 Sienal Warrant Analvsis Results Warrant Result 1. Eight Hour Vehicular Volume Met a. Condition A — Minimum Vehicular Volume 80% Met b. Condition B — Interruption of Continuous Traffic 80% Met 2. Four Hour Vehicular Volume Met 3. Peak Hour Not Met 4. Pedestrian Not Applicable 5. School Crossing Not Applicable 6. Coordinated Signal System Not Applicable 7. Crash Experience Not Met 8. Roadway Network Not Applicable 9. Intersection Near a Grade Crossing Not Applicable Based on the signal warrant analyses for either approach, a traffic signal will be warranted in the future at Rio Road and Putt Putt Place. 5 Epj�PCPR, P,C. "ENGINEERING & PLANNING RESOURCES" 637 BERKMAR CIRCLE, CHARLOTTESVILLE, VA 22901 4. Traffic Operations Analysis Synchro and SimTraffic (version 9.1) were used to analyze the traffic operations at the intersection of Rio Road and Putt Putt Place. Existing (2017), 2020 no build, 2020 build, and 2020 build with a traffic signal at the intersection were analyzed. The resulting levels of service, delay, and queues for each scenario are summarized in Tables 15-18, and included in Appendix F (Synchro results) and Appendix G (SimTraffic results). Table 15 2017 Existine Traffic Operations Summary Approach Movement Existing AM Existing PM LOS Delay Queue LOS Delay Queue EBL B 13 81 B 13.9 119 Rio EB EBT A 0 2 A 0 0 WBT A 0 11 A 0 0 Rio WB WBR A 0 9 A 0 25 SBL E 41.8 439 E 40.3 435 Putt Putt SE; SBR C 16.9 100 C 17.9 100 Overall A 2.3 A 1.8 Table 16 2020 No Build Traffic Operations Summary Approach Movement Existing AM Existing PM LOS Delay Queue LOS Delay Queue EBL B 13.2 99 B 14.2 129 Rio EB EBT A 0 0 A 0 0 WET A 0 11 A 0 0 Rio WB WBR A 0 2 A 0 23 SBL E 42.9 437 E 41.3 505 Putt Putt SB SBR C 17.2 100 C 18.2 100 Overall A 2.3 A 1.8 Table 17 2020 Build Traffic Operations Summary Approach Movement Existing AM Existing PM LOS Delay Queue LOS Delay Queue EBL B 14.2 126 C 16.4 238 Rio EB EBT A 0 0 A 0 118 WET A 0 16 A 0 4 Rio WE; WBR A 0 22 A 0 29 SBL F 81.6 j 579 j F 78.9 544 Putt Putt SE; SBR C 21.1 100 C 21.5 100 Overall A 5.4 A 3.8 Table 18 2020 Build With Sienal Traffic Operations Summary Approach Movement Existing AM Existing PM LOS Delay Queue LOS Delay Queue EBL A 8.9 102 B 11.2 130 Rio EB EBT A 4.5 125 A 4.5 153 WBT B 12.8 222 B 12.8 284 Rio WB WEIR A 7.3 72 A 7.4 169 SBL B 18.2 149 B 19.4 121 Putt Putt SE; SBR C 22.5 99 C 24.8 98 Overall B 10.5 B 10.1 Note: For the SBL, the model reports very long queues that are not observed in the field. This is likely the result of the traffic model not giving full credit to any platooning that may be occurring with westbound traffic as a result of 6 EPR, P,C. "ENGINEERING & PLANNING RESOURCES" EPRpc 637 BERKMAR CIRCLE, CHARLOTTESVILLE, VA 22901 the upstream signal. This could also reflect that people are accepting gaps in traffic that are less than the default value in the traffic model. The issue with gap acceptance is likely a contributor to the relatively high number of crashes occurring at the intersection. As shown in Tables 15 and 16, the intersection currently operates at overall LOS A and all movements operate at LOS C or better with the exception of the southbound left turn movement which operates at LOS E. This is expected to continue in 2020. The queues for the southbound left turn movement are also expected to be lengthy ranging from 435 feet to 50S feet. As shown in Table 17, with Arden Phase I in place, the intersection of Rio Road and Putt Putt Place will continue to operate at LOS A overall and all movements at LOS C or better with the exception of the southbound left turn on Putt Putt Place. This movement will degrade to LOS F for both peak periods and the queues will become longer. As shown in Table 18, with Arden Phase I and the installation of a traffic signal at Putt Putt Place the intersection will operate at overall LOS B and all movements will operate at LOS C or better. The queues on Putt Putt Place will be significantly reduced, however, the through movement queues on Rio Road will become longer but within a reasonable range. 5. Findings and Conclusions Based on the analyses performed, the principal findings and conclusions follow: • Based on existing traffic conditions a traffic signal is not warranted. However, considering the number of crashes (12) that occurred at the intersection within a 12-month period, further consideration should be given to safety improvements. • Based on 2020 conditions with Arden Phase I, a traffic signal is warranted at the intersection of Putt Putt Place with Rio Road. Installation of a traffic signal at the intersection of Rio Road with Putt Putt Place would improve the queuing and levels of service for the Putt Putt Place southbound left turn movement while the intersection would operate at overall LOS B and LOS C or better for all movements. End of Memorandum Epj�PCPR, P,C. "ENGINEERING & PLANNING RESOURCES" 637 BERKMAR CIRCLE, CHARLOTTESVILLE, VA 22901 Tables Table 1 2017 Existing Peak Hour Traffic Volumes Table 2 2017 Existing Hourly Traffic Volumes Table 3 2020 No Build Peak Hour Traffic Volumes Table 4 2020 No Build Hourly Traffic Volumes Table 5 Daily and Peak Hour Trip Generation Table 6 Peak Hour Trip Assignment Table 7 Ratio of Existing Hourly Trips versus Afternoon Peak Hour Trips Table 8 Hourly Trip Generation Table 9 2020 Build Peak Hour Traffic Volumes Table 10 2020 Build Hourly Traffic Volumes Table 11 2017 Existing Alternative 1 Signal Warrant Analysis Results Table 12 2017 Existing Alternative 2 Signal Warrant Analysis Results Table 13 2020 Build Alternative 1 Signal Warrant Analysis Results Table 14 2020 Build Alternative 2 Signal Warrant Analysis Results Table 15 2017 Existing Traffic Operations Summary Table 16 2020 No Build Traffic Operations Summary Table 17 2020 Build Traffic Operations Summary Table 18 2020 Build With Signal Traffic Operations Summary Appendices Appendix A Traffic Count Sheets Appendix B Existing Approach 1 Signal Warrant Forms Appendix C Existing Approach 2 Signal Warrant Forms Appendix D 2020 Build Approach 1 Signal Warrant Forms Appendix E 2020 Build Approach 2 Signal Warrant Forms Appendix F Synchro Analysis Reports Appendix G SimTraffic Analysis Reports 8 EPRpc EPR, P,C. "ENGINEERING & PLANNING RESOURCES" 637 BERKMAR CIRCLE, CHARLOTTESVILLE, VA 22901 Appendix J 2020 Build Synchro Printouts (Putt Putt Place Signalized) HCM 2010 Signalized Intersection Summary 1: Mall Drive/Albemarle Square & Rio Road 04/21/2017 Moveme EBL EBT EBR WBL WBT WBR NBL NBT I NBR Lane Configurations Vi ++ K IN ++ ?F Vi + if IN Traffic Volume (veh/h) 46 931 13 26 1202 91 8 1 6 37 5 29 Future Volume (veh/h) 46 931 13 26 1202 91 8 1 6 37 5 29 Number 1 6 16 5 2 12 7 4 14 3 8 18 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Adj Sat Flow, veh/hlln 1863 1863 1545 1900 1881 1900 1520 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 49 1001 0 28 1292 15 9 1 0 40 5 6 Adj No. of Lanes 1 2 1 1 2 1 1 1 1 1 1 0 Peak Hour Factor 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 Percent Heavy Veh, % 2 2 23 0 1 0 25 0 0 0 0 0 Cap, veh/h 351 2362 876 444 2337 1056 33 44 37 111 49 58 Arrive On Green 0.06 0.67 0.00 0.05 0.65 0.65 0.02 0.02 0.00 0.06 0.06 0.06 Sat Flow, veh/h 1774 3539 1313 1810 3574 1615 1448 1900 1615 1810 788 945 Grp Volume(v), veh/h 49 1001 0 28 1292 15 9 1 0 40 0 11 Grp Sat Flow(s),veh/h/In 1774 1770 1313 1810 1787 1615 1448 1900 1615 1810 0 1733 Q Serve(g_s), s 1.1 18.4 0.0 0.7 27.4 0.5 0.9 0.1 0.0 3.0 0.0 0.8 Cycle Q Clear(g_c), s 1.1 18.4 0.0 0.7 27.4 0.5 0.9 0.1 0.0 3.0 0.0 0.8 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.55 Lane Grp Cap(c), veh/h 351 2362 876 444 2337 1056 33 44 37 111 0 107 V/C Ratio(X) 0.14 0.42 0.00 0.06 0.55 0.01 0.27 0.02 0.00 0.36 0.00 0.10 Avail Cap(c_a),veh/h 398 2362 876 503 2337 1056 233 305 260 207 0 198 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 0.00 0.79 0.79 0.79 1.00 1.00 0.00 1.00 0.00 1.00 Uniform Delay (d), s/veh 8.9 10.8 0.0 7.4 13.1 8.5 67.2 66.9 0.0 63.0 0.0 62.0 Incr Delay (d2), s/veh 0.3 0.6 0.0 0.1 0.7 0.0 6.0 0.3 0.0 2.8 0.0 0.6 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/In 0.6 9.1 0.0 0.3 13.7 0.2 0.4 0.0 0.0 1.6 0.0 0.4 LnGrp Delay(d),s/veh 9.2 11.4 0.0 7.4 13.9 8.5 73.3 67.1 0.0 65.8 0.0 62.6 LnGrp LOS A B A B A E E E E Approach Vol, veh/h 1050 1335 10 51 Approach Delay, s/veh 11.3 13.7 72.7 65.1 Approach LOS B B E E er Assigned Phs 1 2 4 5 6 8 Phs Duration (G+Y+Rc), s 16.3 99.3 9.7 14.4 101.2 14.6 Change Period (Y+Rc), s 7.8 7.8 6.5 7.8 7.8 6.0 Max Green Setting (Gmax), s 12.2 61.2 22.5 11.2 62.2 16.0 Max Q Clear Time (g_c+I1), s 3.1 29.4 2.9 2.7 20.4 5.0 Green Ext Time (p-c), s 0.1 28.7 0.0 0.0 36.8 0.1 Intersection Summary HCM 2010 Ctrl Delay 14.0 HCM 2010 LOS B Rio Road -Arden 2020 Build AM (with Mitigation) Synchro 9 Report EPR Page 1 HCM 2010 Signalized Intersection Summary 2: Rio Road & Putt Putt Place 04/21/2017 Moveme WBT WBR I SBL SBR Lane Configurations Vi ++ ++ if IN K Traffic Volume (veh/h) 96 841 1099 47 92 167 Future Volume (veh/h) 96 841 1099 47 92 167 Number 1 6 2 12 3 18 Initial Q (Qb), veh 0 0 0 0 0 0 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 Adj Sat Flow, veh/hlln 1712 1845 1863 1681 1827 1792 Adj Flow Rate, veh/h 104 914 1195 22 100 58 Adj No. of Lanes 1 2 2 1 1 1 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, % 11 3 2 13 4 6 Cap, veh/h 365 2367 1684 680 176 154 Arrive On Green 0.09 0.68 0.48 0.48 0.10 0.10 Sat Flow, veh/h 1630 3597 3632 1429 1740 1524 Grp Volume(v), veh/h 104 914 1195 22 100 58 Grp Sat Flow(s),veh/h/In 1630 1752 1770 1429 1740 1524 Q Serve(g_s), s 1.5 6.1 14.4 0.4 2.9 1.9 Cycle Q Clear(g_c), s 1.5 6.1 14.4 0.4 2.9 1.9 Prop In Lane 1.00 1.00 1.00 1.00 Lane Grp Cap(c), veh/h 365 2367 1684 680 176 154 V/C Ratio(X) 0.28 0.39 0.71 0.03 0.57 0.38 Avail Cap(c_a), veh/h 404 2610 1845 745 259 227 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 7.9 3.8 11.1 7.5 23.0 22.6 Incr Delay (d2), s/veh 0.4 0.1 1.2 0.0 2.9 1.5 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/In 0.7 3.0 7.2 0.2 1.6 0.9 LnGrp Delay(d),s/veh 8.3 3.9 12.3 7.5 25.9 24.1 LnGrp LOS A A B A C C Approach Vol, veh/h 1018 1217 158 Approach Delay, s/veh 4.4 12.2 25.2 Approach LOS A B C er 1 2EIIII17 5 6 7 8 Assigned Phs 1 2 6 8 Phs Duration (G+Y+Rc), s 10.7 31.6 42.3 11.4 Change Period (Y+Rc), s 6.0 6.0 6.0 6.0 Max Green Setting (Gmax), s 6.0 28.0 40.0 8.0 Max Q Clear Time (g_c+I1), s 3.5 16.4 8.1 4.9 Green Ext Time (p-c), s 0.0 9.2 19.4 0.1 Intersection Summary HCM 2010 Ctrl Delay 9.7 HCM 2010 LOS A Rio Road -Arden 2020 Build AM (with Mitigation) Synchro 9 Report EPR Page 2 HCM Signalized Intersection Capacity Analysis 3: Old Brook Drive & Rio Road 04/21/2017 Movement EBL EQ)♦EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Vi + U IN + T+ +' K Traffic Volume (vph) 54 763 14 7 1122 46 20 0 17 126 0 99 Future Volume (vph) 54 763 14 7 1122 46 20 0 17 126 0 99 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Total Lost time (s) 6.0 6.0 6.0 6.0 6.0 6.0 6.0 Lane Util. Factor 1.00 0.95 1.00 0.95 1.00 1.00 1.00 Frt 1.00 1.00 1.00 0.99 0.94 1.00 0.85 Flt Protected 0.95 1.00 0.95 1.00 0.97 0.95 1.00 Satd. Flow (prot) 1770 3561 1583 3555 1737 1787 1599 Flt Permitted 0.19 1.00 0.25 1.00 0.78 0.73 1.00 Satd. Flow (perm) 351 3561 415 3555 1394 1375 1599 Peak -hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Adj. Flow (vph) 59 829 15 8 1220 50 22 0 18 137 0 108 RTOR Reduction (vph) 0 1 0 0 2 0 0 34 0 0 0 93 Lane Group Flow (vph) 59 843 0 8 1268 0 0 6 0 0 137 15 Heavy Vehicles (%) 2% 1% 7% 14% 1% 0% 0% 0% 0% 1% 0% 1% Turn Type pm+pt NA pm+pt NA Perm NA Perm NA Perm Protected Phases 1 6 5 2 4 8 Permitted Phases 6 2 4 8 8 Actuated Green, G (s) 56.9 52.1 71.4 60.6 13.9 13.9 13.9 Effective Green, g (s) 56.9 52.1 71.4 60.6 13.9 13.9 13.9 Actuated g/C Ratio 0.58 0.54 0.73 0.62 0.14 0.14 0.14 Clearance Time (s) 6.0 6.0 6.0 6.0 6.0 6.0 6.0 Vehicle Extension (s) 2.5 5.0 2.5 5.0 5.0 2.5 2.5 Lane Grp Cap (vph) 275 1906 464 2214 199 196 228 v/s Ratio Prot c0.01 0.24 0.00 c0.36 v/s Ratio Perm 0.11 0.01 0.00 c0.10 0.01 v/c Ratio 0.21 0.44 0.02 0.57 0.03 0.70 0.07 Uniform Delay, dl 9.0 13.8 4.6 10.8 35.9 39.7 36.1 Progression Factor 1.00 1.00 0.45 0.27 1.00 1.00 1.00 Incremental Delay, d2 0.3 0.3 0.0 0.5 0.1 9.6 0.1 Delay (s) 9.3 14.1 2.1 3.4 36.0 49.3 36.2 Level of Service A B A A D D D Approach Delay (s) 13.8 3.4 36.0 43.5 Approach LOS B A D D Intersection Summary HCM 2000 Control Delay 11.7 HCM 2000 Level of Service B HCM 2000 Volume to Capacity ratio 0.57 Actuated Cycle Length (s) 97.3 Sum of lost time (s) 18.0 Intersection Capacity Utilization 64.0% ICU Level of Service B Analysis Period (min) 15 c Critical Lane Group Rio Road -Arden 2020 Build AM (with Mitigation) Synchro 9 Report EPR Page 3 HCM Signalized Intersection Capacity Analysis 4: Hillsdala Drive/Northfield Road & Rio Road 04/21/2017 Movement EBL EBT EBR WBL WBT WBR NBL NBT SBT SBR Lane Configurations Vi + U IN + T+ if Traffic Volume (vph) 11 792 83 229 1095 4 60 10 102 51 71 22 Future Volume (vph) 11 792 83 229 1095 4 60 10 102 51 71 22 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Total Lost time (s) 6.0 6.0 6.0 6.0 6.0 6.0 6.0 Lane Util. Factor 1.00 0.95 1.00 0.95 1.00 1.00 1.00 Frt 1.00 0.99 1.00 1.00 1.00 0.85 0.98 Flt Protected 0.95 1.00 0.95 1.00 0.96 1.00 0.98 Satd. Flow (prot) 1805 3455 1719 3573 1615 1495 1814 Flt Permitted 0.21 1.00 0.21 1.00 0.58 1.00 0.85 Satd. Flow (perm) 404 3455 381 3573 980 1495 1574 Peak -hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Adj. Flow (vph) 12 861 90 249 1190 4 65 11 111 55 77 24 RTOR Reduction (vph) 0 7 0 0 0 0 0 0 95 0 6 0 Lane Group Flow (vph) 12 944 0 249 1194 0 0 76 16 0 150 0 Heavy Vehicles (%) 0% 3% 3% 5% 1 % 0% 15% 0% 8% 0% 0% 5% Turn Type pm+pt NA pm+pt NA Perm NA Perm Perm NA Protected Phases 1 6 5 2 4 8 Permitted Phases 6 2 4 4 8 Actuated Green, G (s) 56.9 52.1 71.4 60.6 13.9 13.9 13.9 Effective Green, g (s) 56.9 52.1 71.4 60.6 13.9 13.9 13.9 Actuated g/C Ratio 0.58 0.54 0.73 0.62 0.14 0.14 0.14 Clearance Time (s) 6.0 6.0 6.0 6.0 6.0 6.0 6.0 Vehicle Extension (s) 2.5 5.0 2.5 5.0 5.0 5.0 2.5 Lane Grp Cap (vph) 305 1850 462 2225 140 213 224 v/s Ratio Prot 0.00 0.27 c0.07 c0.33 v/s Ratio Perm 0.02 c0.32 0.08 0.01 c0.10 v/c Ratio 0.04 0.51 0.54 0.54 0.54 0.07 0.67 Uniform Delay, dl 8.6 14.4 6.9 10.4 38.7 36.1 39.5 Progression Factor 0.49 0.45 1.00 1.00 1.00 1.00 1.00 Incremental Delay, d2 0.0 0.4 0.9 0.5 7.4 0.3 6.7 Delay (s) 4.2 7.0 7.8 10.9 46.1 36.4 46.2 Level of Service A A A B D D D Approach Delay (s) 7.0 10.3 40.4 46.2 Approach LOS A B D D Intersection Summary = - HCM 2000 Control Delay 13.2 HCM 2000 Level of Service B HCM 2000 Volume to Capacity ratio 0.58 Actuated Cycle Length (s) 97.3 Sum of lost time (s) 18.0 Intersection Capacity Utilization 66.8% ICU Level of Service C Analysis Period (min) 15 c Critical Lane Group Rio Road -Arden 2020 Build AM (with Mitigation) Synchro 9 Report EPR Page 4 HCM 2010 Signalized Intersection Summary 1: Mall Drive/Albemarle Square & Rio Road 04/21/2017 Movem( PF EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL I SBT SBR Lane Configurations Vi ++ K IN ++ ?F Vi + if IN Traffic Volume (veh/h) 96 1156 60 96 1281 174 70 24 64 181 16 132 Future Volume (veh/h) 96 1156 60 96 1281 174 70 24 64 181 16 132 Number 1 6 16 5 2 12 7 4 14 3 8 18 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Adj Sat Flow, veh/hlln 1900 1881 1900 1900 1881 1900 1881 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 101 1217 0 101 1348 102 74 25 0 191 17 30 Adj No. of Lanes 1 2 1 1 2 1 1 1 1 1 1 0 Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 Percent Heavy Veh, % 0 1 0 0 1 0 1 0 0 0 0 0 Cap, veh/h 279 1948 880 323 1948 880 125 133 113 207 71 125 Arrive On Green 0.07 0.55 0.00 0.07 0.55 0.55 0.07 0.07 0.00 0.11 0.11 0.11 Sat Flow, veh/h 1810 3574 1615 1810 3574 1615 1792 1900 1615 1810 618 1090 Grp Volume(v), veh/h 101 1217 0 101 1348 102 74 25 0 191 0 47 Grp Sat Flow(s),veh/h/In 1810 1787 1615 1810 1787 1615 1792 1900 1615 1810 0 1708 Q Serve(g_s), s 3.2 32.9 0.0 3.2 38.6 4.3 5.6 1.7 0.0 14.6 0.0 3.5 Cycle Q Clear(g_c), s 3.2 32.9 0.0 3.2 38.6 4.3 5.6 1.7 0.0 14.6 0.0 3.5 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.64 Lane Grp Cap(c), veh/h 279 1948 880 323 1948 880 125 133 113 207 0 195 V/C Ratio(X) 0.36 0.62 0.00 0.31 0.69 0.12 0.59 0.19 0.00 0.92 0.00 0.24 Avail Cap(c_a),veh/h 310 1948 880 341 1948 880 288 305 260 207 0 195 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 0.00 0.61 0.61 0.61 1.00 1.00 0.00 1.00 0.00 1.00 Uniform Delay (d), s/veh 18.3 22.0 0.0 15.9 23.3 15.5 63.2 61.4 0.0 61.4 0.0 56.5 Incr Delay (d2), s/veh 1.1 1.5 0.0 0.5 1.2 0.2 6.2 1.0 0.0 42.2 0.0 0.9 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/In 1.7 16.6 0.0 1.6 19.2 1.9 3.0 1.0 0.0 9.7 0.0 1.7 LnGrp Delay(d),s/veh 19.4 23.5 0.0 16.4 24.5 15.6 69.3 62.3 0.0 103.6 0.0 57.4 LnGrp LOS B C B C B E E F E Approach Vol, veh/h 1318 1551 99 238 Approach Delay, s/veh 23.2 23.4 67.6 94.5 Approach LOS C C E F er 1E=8 - Assigned Phs 1 2 4 5 6 8 Phs Duration (G+Y+Rc), s 17.6 84.1 16.3 17.6 84.1 22.0 Change Period (Y+Rc), s 7.8 7.8 6.5 7.8 7.8 6.0 Max Green Setting (Gmax), s 12.2 61.2 22.5 11.2 62.2 16.0 Max Q Clear Time (g_c+l l ), s 5.2 40.6 7.6 5.2 34.9 16.6 Green Ext Time (p-c), s 0.2 19.9 0.3 0.2 26.0 0.0 Intersection Summary HCM 2010 Ctrl Delay 29.9 HCM 2010 LOS C Rio Road -Arden 2020 Build PM (with Mitigation) Synchro 9 Report EPR Page 1 HCM 2010 Signalized Intersection Summary 2: Rio Road & Putt Putt Place 04/21/2017 Moveme WBT WBR I SBL SBR Lane Configurations Vi ++ ++ if IN K Traffic Volume (veh/h) 188 1163 1299 120 55 175 Future Volume (veh/h) 188 1163 1299 120 55 175 Number 1 6 2 12 3 18 Initial Q (Qb), veh 0 0 0 0 0 0 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 Adj Sat Flow, veh/hlln 1881 1900 1881 1900 1900 1881 Adj Flow Rate, veh/h 198 1224 1367 65 58 63 Adj No. of Lanes 1 2 2 1 1 1 Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 Percent Heavy Veh, % 1 0 1 0 0 1 Cap, veh/h 374 2540 1788 808 161 142 Arrive On Green 0.10 0.70 0.50 0.50 0.09 0.09 Sat Flow, veh/h 1792 3705 3668 1615 1810 1599 Grp Volume(v), veh/h 198 1224 1367 65 58 63 Grp Sat Flow(s),veh/h/In 1792 1805 1787 1615 1810 1599 Q Serve(g_s), s 2.6 8.8 17.9 1.2 1.7 2.2 Cycle Q Clear(g_c), s 2.6 8.8 17.9 1.2 1.7 2.2 Prop In Lane 1.00 1.00 1.00 1.00 Lane Grp Cap(c), veh/h 374 2540 1788 808 161 142 V/C Ratio(X) 0.53 0.48 0.76 0.08 0.36 0.44 Avail Cap(c_a), veh/h 382 2622 1854 838 188 166 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 10.6 3.8 11.7 7.5 24.8 25.0 Incr Delay (d2), s/veh 1.3 0.1 1.9 0.0 1.4 2.2 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/In 1.8 4.3 9.2 0.6 0.9 1.0 LnGrp Delay(d),s/veh 11.9 4.0 13.6 7.6 26.2 27.1 LnGrp LOS B A B A C C Approach Vol, veh/h 1422 1432 121 Approach Delay, s/veh 5.1 13.3 26.7 Approach LOS A B C erEjF7 5 Assigned Phs 1 2 6 8 Phs Duration (G+Y+Rc), s 11.8 34.9 46.7 11.1 Change Period (Y+Rc), s 6.0 6.0 6.0 6.0 Max Green Setting (Gmax), s 6.0 30.0 42.0 6.0 Max Q Clear Time (g_c+l l ), s 4.6 19.9 10.8 4.2 Green Ext Time (p-c), s 0.1 9.0 23.8 0.0 Intersection Summary HCM 2010 Ctrl Delay 9.9 HCM 2010 LOS A Rio Road -Arden 2020 Build PM (with Mitigation) Synchro 9 Report EPR Page 2 HCM Signalized Intersection Capacity Analysis 3: Old Brook Drive & Rio Road 04/21/2017 Movement i EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBI Lane Configurations Vi + U IN + T+ +T K Traffic Volume (vph) 102 1199 25 20 1298 105 14 1 12 43 2 82 Future Volume (vph) 102 1199 25 20 1298 105 14 1 12 43 2 82 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Total Lost time (s) 6.0 6.0 6.0 6.0 6.0 6.0 6.0 Lane Util. Factor 1.00 0.95 1.00 0.95 1.00 1.00 1.00 Frt 1.00 1.00 1.00 0.99 0.94 1.00 0.85 Flt Protected 0.95 1.00 0.95 1.00 0.97 0.95 1.00 Satd. Flow (prot) 1805 3599 1805 3534 1740 1813 1599 Flt Permitted 0.11 1.00 0.12 1.00 0.85 0.71 1.00 Satd. Flow (perm) 201 3599 225 3534 1526 1356 1599 Peak -hour factor, PHF 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 Adj. Flow (vph) 109 1276 27 21 1381 112 15 1 13 46 2 87 RTOR Reduction (vph) 0 1 0 0 3 0 0 11 0 0 0 73 Lane Group Flow (vph) 109 1302 0 21 1490 0 0 18 0 0 48 14 Heavy Vehicles (%) 0% 0% 0% 0% 1% 1% 0% 0% 0% 0% 0% 1% Turn Type pm+pt NA pm+pt NA Perm NA Perm NA Perm Protected Phases 1 6 5 2 4 8 Permitted Phases 6 2 4 8 8 Actuated Green, G (s) 62.6 55.2 71.0 59.4 15.8 15.8 15.8 Effective Green, g (s) 62.6 55.2 71.0 59.4 15.8 15.8 15.8 Actuated g/C Ratio 0.62 0.55 0.71 0.59 0.16 0.16 0.16 Clearance Time (s) 6.0 6.0 6.0 6.0 6.0 6.0 6.0 Vehicle Extension (s) 2.5 5.0 2.5 5.0 5.0 2.5 2.5 Lane Grp Cap (vph) 243 1974 340 2086 239 212 251 v/s Ratio Prot c0.03 0.36 0.01 c0.42 v/s Ratio Perm 0.25 0.04 0.01 c0.04 0.01 v/c Ratio 0.45 0.66 0.06 0.71 0.08 0.23 0.05 Uniform Delay, dl 11.1 16.1 8.0 14.6 36.2 37.1 36.0 Progression Factor 1.00 1.00 0.43 0.25 1.00 1.00 1.00 Incremental Delay, d2 1.0 1.1 0.0 1.1 0.3 0.4 0.1 Delay (s) 12.1 17.1 3.5 4.8 36.5 37.5 36.1 Level of Service B B A A D D D Approach Delay (s) 16.7 4.8 36.5 36.6 Approach LOS B A D D Intersection Summary HCM 2000 Control Delay 11.9 HCM 2000 Level of Service B HCM 2000 Volume to Capacity ratio 0.60 Actuated Cycle Length (s) 100.6 Sum of lost time (s) 18.0 Intersection Capacity Utilization 68.1% ICU Level of Service C Analysis Period (min) 15 c Critical Lane Group Rio Road -Arden 2020 Build PM (with Mitigation) Synchro 9 Report EPR Page 3 HCM Signalized Intersection Capacity Analysis 4: Hillsdala Drive/Northfield Road & Rio Road 04/21/2017 Movement i EBL EBT EBR WBL WBT WBR NBL NBT NBI�IIIIIIIIIIIIIIIISBL S Lane Configurations Vi + U IN + T+ if Traffic Volume (vph) 16 1167 64 182 1310 14 97 31 297 25 18 13 Future Volume (vph) 16 1167 64 182 1310 14 97 31 297 25 18 13 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Total Lost time (s) 6.0 6.0 6.0 6.0 6.0 6.0 6.0 Lane Util. Factor 1.00 0.95 1.00 0.95 1.00 1.00 1.00 Frt 1.00 0.99 1.00 1.00 1.00 0.85 0.97 Flt Protected 0.95 1.00 0.95 1.00 0.96 1.00 0.98 Satd. Flow (prot) 1805 3582 1770 3566 1738 1599 1736 Flt Permitted 0.12 1.00 0.11 1.00 0.76 1.00 0.81 Satd. Flow (perm) 232 3582 211 3566 1366 1599 1442 Peak -hour factor, PHF 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 Adj. Flow (vph) 17 1255 69 196 1409 15 104 33 319 27 19 14 RTOR Reduction (vph) 0 3 0 0 0 0 0 0 269 0 10 0 Lane Group Flow (vph) 17 1321 0 196 1424 0 0 137 50 0 50 0 Heavy Vehicles (%) 0% 0% 0% 2% 1% 7% 7% 0% 1% 4% 0% 8% Turn Type pm+pt NA pm+pt NA Perm NA Perm Perm NA Protected Phases 1 6 5 2 4 8 Permitted Phases 6 2 4 4 8 Actuated Green, G (s) 62.6 55.2 71.0 59.4 15.8 15.8 15.8 Effective Green, g (s) 62.6 55.2 71.0 59.4 15.8 15.8 15.8 Actuated g/C Ratio 0.62 0.55 0.71 0.59 0.16 0.16 0.16 Clearance Time (s) 6.0 6.0 6.0 6.0 6.0 6.0 6.0 Vehicle Extension (s) 2.5 5.0 2.5 5.0 5.0 5.0 2.5 Lane Grp Cap (vph) 260 1965 328 2105 214 251 226 v/s Ratio Prot 0.00 0.37 c0.07 c0.40 v/s Ratio Perm 0.04 0.35 c0.10 0.03 0.03 v/c Ratio 0.07 0.67 0.60 0.68 0.64 0.20 0.22 Uniform Delay, dl 9.2 16.2 12.2 14.0 39.7 36.9 37.0 Progression Factor 0.32 0.17 1.00 1.00 1.00 1.00 1.00 Incremental Delay, d2 0.1 0.9 2.4 1.1 8.6 0.8 0.4 Delay (s) 3.0 3.6 14.6 15.2 48.4 37.7 37.4 Level of Service A A B B D D D Approach Delay (s) 3.6 15.1 40.9 37.4 Approach LOS A B D D Intersection Summary E HCM 2000 Control Delay 14.4 HCM 2000 Level of Service B HCM 2000 Volume to Capacity ratio 0.69 Actuated Cycle Length (s) 100.6 Sum of lost time (s) 18.0 Intersection Capacity Utilization 72.7% ICU Level of Service C Analysis Period (min) 15 c Critical Lane Group Rio Road -Arden 2020 Build PM (with Mitigation) Synchro 9 Report EPR Page 4 EPRpc EPR, P,C. "ENGINEERING & PLANNING RESOURCES" 637 BERKMAR CIRCLE, CHARLOTTESVILLE, VA 22901 Appendix K 2020 Build SimTraffic Printouts (Putt Putt Place Signalized) Queuing and Blocking Report 2020 Build AM (with Mitigation) 04/21/2017 Intersection: 1: Mall Drive/Albemarle Square & Rio Road Movement EB EB EB WB WB WB WB NB NB SB SB Directions Served L T T L T T R L T L TR Maximum Queue (ft) 64 256 212 45 292 322 130 66 26 99 92 Average Queue (ft) 22 82 49 14 90 105 23 10 2 38 26 95th Queue (ft) 51 190 140 38 224 247 92 39 12 79 63 Link Distance (ft) 579 579 892 892 293 293 321 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) 340 340 130 100 Storage Blk Time (%) 0 0 5 0 1 0 Queuing Penalty (veh) 0 0 4 1 0 0 Intersection: 2: Rio Road & Putt Putt Place Movement EB EB EB WB WB WB SB SB Directions Served L T T T T R L R Maximum Queue (ft) 123 123 124 250 261 159 159 100 Average Queue (ft) 44 55 51 103 111 25 55 61 95th Queue (ft) 89 103 104 196 211 95 113 101 Link Distance (ft) 892 892 1338 1338 523 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) 350 170 100 Storage Blk Time (%) 2 0 1 1 Queuing Penalty (veh) 1 0 1 1 Intersection: 3: Old Brook Drive & Rio Road Movement EB EB EB WB WB WB NB SB SB Directions Served L T TR L T TR LTR LT R Maximum Queue (ft) 139 223 240 40 110 114 68 217 75 Average Queue (ft) 33 98 116 4 44 49 20 76 49 95th Queue (ft) 83 181 204 20 87 94 49 153 89 Link Distance (ft) 1338 1338 154 154 417 562 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) 200 65 75 Storage Blk Time (%) 0 0 0 2 11 1 Queuing Penalty (veh) 0 0 0 0 11 1 Intersection: 4: Hillsdala Drive/Northfield Road & Rio Road Movement EB EB EB WB WB WB NB NB SB Directions Served L T TR L T TR LT R LTR Maximum Queue (ft) 49 127 124 174 222 217 134 103 177 Average Queue (ft) 7 59 60 76 104 97 57 41 82 95th Queue (ft) 29 108 104 141 187 174 110 81 143 Link Distance (ft) 154 154 817 817 538 524 Upstream Blk Time (%) 0 0 Queuing Penalty (veh) 0 0 Storage Bay Dist (ft) 55 180 150 Storage Blk Time (%) 0 13 0 0 0 Queuing Penalty (veh) 0 1 1 1 0 Network Summary Network wide Queuing Penalty: 26 Rio Road —Arden SirnTraffic Report EPR Page 1 Queuing and Blocking Report 2020 Build PM (with Mitigation) 04/21/2017 Intersection: 1: Mall Drive/Albemarle Square & Rio Road Movement EB EB EB EB WB WB WB WB NB NB NB SB Directions Served L T T R L T T R L T R L Maximum Queue (ft) 340 562 480 64 340 597 610 130 148 81 10 336 Average Queue (ft) 88 308 252 2 92 317 338 68 63 26 0 192 95th Queue (ft) 248 476 408 54 255 544 567 159 120 64 9 337 Link Distance (ft) 579 579 579 892 892 293 293 321 Upstream Blk Time (%) 0 0 0 2 Queuing Penalty (veh) 0 0 0 0 Storage Bay Dist (ft) 340 340 130 200 Storage Blk Time (%) 0 5 0 7 29 0 33 Queuing Penalty (veh) 0 5 0 7 51 3 49 Intersection: 1: Mall Drive/Albemarle Square & Rio Road Movement SB Directions Served TR Maximum Queue (ft) 100 Average Queue (ft) 76 95th Queue (ft) 129 Link Distance (ft) Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) 100 Storage Blk Time (%) 3 Queuing Penalty (veh) 5 Intersection: 2: Rio Road & Putt Putt Place Movement EB EB EB WB WB WB SB SB Directions Served L T T T T R L R Maximum Queue (ft) 166 147 156 275 301 170 142 98 Average Queue (ft) 75 60 71 133 145 52 41 60 95th Queue (ft) 133 122 138 240 260 147 91 96 Link Distance (ft) 892 892 1338 1338 523 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) 350 170 100 Storage Blk Time (%) 4 0 0 2 Queuing Penalty (veh) 4 1 0 1 Intersection: 3: Old Brook Drive & Rio Road Movement EB EB EB WB WB WB NB SB SB Directions Served L T TR L T TR LTR LT R Maximum Queue (ft) 199 370 386 59 134 148 61 108 74 Average Queue (ft) 76 169 189 12 61 71 16 32 37 95th Queue (ft) 169 318 338 38 113 121 44 73 73 Link Distance (ft) 1338 1338 154 154 417 562 Upstream Blk Time (%) 0 0 Queuing Penalty (veh) 1 2 Storage Bay Dist (ft) 200 65 75 Storage Blk Time (%) 0 4 0 9 1 1 Queuing Penalty (veh) 0 4 1 2 1 0 Rio Road —Arden SirnTraffic Report EPR Page 1 Queuing and Blocking Report 2020 Build PM (with Mitigation) 04/21/2017 Intersection: 4: Hillsdala Drive/Northfield Road & Rio Road Movement EB EB EB WB WB WB NB NB SB Directions Served L T TR L T TR LT R LTR Maximum Queue (ft) 45 106 103 180 308 319 150 312 104 Average Queue (ft) 11 49 43 90 154 151 87 117 37 95th Queue (ft) 36 93 87 170 267 264 154 230 80 Link Distance (ft) 154 154 817 817 538 524 Upstream Blk Time (%) 0 Queuing Penalty (veh) 0 Storage Bay Dist (ft) 55 180 150 Storage Blk Time (%) 0 14 0 4 1 4 Queuing Penalty (veh) 2 2 2 7 2 6 Network Summary Network wide Queuing Penalty: 161 Rio Road —Arden SirnTraffic Report EPR Page 2