Loading...
HomeMy WebLinkAboutARB202100027 Plan - Approved 2021-09-03C1 COVER SUBMISSION: 2020.05.26 [INITIAL SDP] REVISION: 2021.01.21 [FINAL SDP] 2021.02.22 [ARB] 2021.04.13 [ACSA] 2021.05.10 [ARB] 2021.05.18 [FINAL SDP] 19.006 FINAL SITE DEVELOPMENT PLAN ALBEMARLE COUNTY, VIRGINIA 912 E. HIGH ST. CHARLOTTESVILLE VA, 22902 FILE NO. 999 RIO ROAD 434.227.5140 JUSTIN@SHIMP-ENGINEERING.COM IMAGE PROVIDED BY GOOGLE MAPS SITE 999 RIO ROAD FINAL SITE DEVELOPMENT PLAN TAX MAP 61, PARCEL 154B ALBEMARLE COUNTY, VIRGINIA VICINITY MAP SCALE : 1"=500'LEGEND EXISTING NEW DESCRIPTION Boundary & topographic survey provided by: Meridian Planning Group, LLC, March 20, 2019. PROPOSED Area % Building 14,128 SF 16.9% Pavement 23,902 SF 28.6% Sidewalk 9,784 SF 11.7% Open space 35,734 SF 42.8 % Total= 83,548 SF (1.918 ac.) C1 COVER C2 EXISTING CONDITIONS C3 SITE PLAN C4 UTILITY PLAN C5 OFF-SITE SEWER CONNECTION C6 UTILITY PROFILES C7 GRADING PLAN C8 AMENITY & LANDSCAPE PLAN C9 SITE, VDOT & ACSA DETAILS C10 SITE, VDOT & ACSA DETAILS C11 ACSA DETAILS C12 SITE DETAILS C13 MAINTENANCE OF TRAFFIC SHEET INDEX OWNER Windmill Ventures LLC 535 Foxdale Lane Charlottesville, VA 22903 ZONING NMD - Neighborhood Model District ZMA201900001 approved on March 4, 2020 The Code of Development associated with ZMA20190001 (revised January 29, 2020) establishes design guidelines, specific regulations, and block characteristics for the development of this property Overlays: Entrance Corridor, Airport Impact Area Initial site plan SDP202000045 approved on 7/22/2020 MAGISTERIAL DISTRICT Rio SOURCE OF TITLE DB 4505 PG 218 SOURCE OF BOUNDARY AND TOPOGRAPHY FLOODZONE RESERVOIR WATERSHED This site is within the Meadow Creek Watershed. This site is not within a watershed of a public water supply. BENCHMARK Datum for topography is NAVD 88 Visually verified by Shimp Engineering Staff on 12/23/2020 GENERAL CONSTRUCTION NOTES 1. Prior to any construction within any existing right-of-way, including connection to any existing road, a permit shall be obtained from the Virginia Department of Transit (VDOT). This plan as drawn may not accurately reflect the requirements of the permit.Where any discrepancies occur the requirements of the permit shall govern. 2. All materials and construction methods shall conform to the current specifications and standards of VDOT unless otherwise noted. 3. Erosion and siltation control measures shall be provided in accordance with the approved erosion control plan and shall be installed prior to any clearing, grading or other construction. 4. All slopes and disturbed areas are to be fertilized, seeded and mulched. 5. The maximum allowable slope is 2:1 (horizontal:vertical). Where reasonably obtainable, lesser slopes of 3:1 or better are to be acheived. 6. Paved, rip-rap or stabilization mat lined ditch may be required when in the opinion of the County Engineer or designee it is deemed necessary in order to stabilize a drainage channel. 7. All traffic control signs shall conform with the Virginia Manual for Uniform Traffic Control Devices. 8. Unless otherwise noted all concrete pipe shall be reinforced concrete pipe - Class III. 9. All excavation for underground pipe installation must comply with OSHA Standards for the Construction Industry (29 CFR Part 1926). 1.The information and data shown or indicated with respect to the existing underground utilities at or contiguous to the site are based on information and data furnished to the owner and engineer by the owners of such underground facilities or others. The owner or engineer shall not be responsible for the accuracy or completeness of such information or data. The contractor shall have full responsibility for confirming the accuracy of the data, for locating all underground utilities, for coordination of the work with owners of such underground utilities during construction, for the safety and protection thereof and repairing any damage thereto resulting from the work. All of these conditions shall be met at no additional cost to the owner. The contractor shall contact "Miss Utilities" of Virginia at 1-800-552-7001 prior to the start of work. 2.When working adjacent to existing structures, poles, etc., the contractor shall use whatever methods that are necessary to protect structures from damage. Replacement of damaged structures shall be at the contractor's expense. 3.The contractor shall be responsible for protecting all existing site structures from damage and coordinating work so that the owner can make necessary arrangements to modify/protect existing structures from damages. 4.The contractor shall be responsible for notifying all utility owners, adjacent land owners whose property may be impacted and the Virginia Department of Transportation prior to completing any off-site work. 5.Contractor shall notify and coordinate all work involving existing utilities with utility owners, at least 72 hours prior to the start of construction. 6.Contractor shall immediately report any discrepancies between existing conditions and contract documents to the owner and engineer. 7.Contractor shall submit for the approval of the owner submittals of all specified materials listed in the plans, to include shop drawings, manufacturer's specifications and laboratory reports. the owner's approval of submittals will be general and will not relieve the the contractor from the responsibility of adherence to the contract and for any error that may exist. 8.All bare areas shall be scarified, limed, fertilized, seeded and mulched. 9.All trees, saplings, brush, etc. shall be removed from within the right of way and the drainage easements. 10.Visibility of all mechanical equipment from the Entrance Corridor shall be eliminated. 11.Retaining walls require separate building permits. 12.All water service lines, sanitary laterals, and sprinkler lines must be visually inspected by the Albemarle County Building Department from the main to the structure. 13.Accessible parking spaces, access aisles, and accessible route shall be installed in accordance with ICC ANSI A117.1-09. 14.Where the flood level rims of plumbing fixtures are below the elevation of the manhole cover of the next upstream manhole in the public sewer, the fixtures shall be protected by a backwater valve installed in the building drain, branch of the building drain or horizontal branch serving such fixtures. Plumbing fixtures having flood level rims above the elevation of the PDQKROHFRYHURIWKHQH[WXSVWUHDPPDQKROHLQWKHSXEOLFVHZHUVKDOOQRWGLVFKDUJHWKURXJKDEDFNZDWHUYDOYH´ 15.All roof drains shall discharge in a manner not to cause a public nuisance and not over sidewalks. 16.Buildings or structures built before January 1, 1985 must have an asbestos survey performed in order to apply for a demolition permit. Asbestos removal permits are required if positive for such from Albemarle County and VDOLI. Contact VDOLI for their additional requirements and permits for demolition projects and 540-562-3580x131. GENERAL NOTES PLAN PREPARATION Shimp Engineering, P.C. 912 East High Street Charlottesville, VA 22902 (434) 227-5140 EXISTING Area % Building 3,939 SF 4.7% Pavement 2,348 SF 2.8% Sidewalk 0 SF 0% Open Space 77,261 SF 92.5% Total= 83,548 SF (1.918 ac.) EXISTING USE Vacant Land PROPOSED USE Residential, Gross residential density: 13 du/ac Lots 1-7: Multifamily, 2 units/building, 14 units total Lots 8-13: Attached single-family, 6 units total Lots 14-18: Single-family detached, 5 units total LAND USE SCHEDULE According to FEMA Flood Insurance Rate Map, effective date February 4, 2005 (Community Panel 51003C0279D), this property is not located within a Zone AE 100-year floodplain. SIGNS All signs and pavement shall conform with the latest edition of the MUTCD Guidelines. A sign permit must be issued in accordance with the Albemarle County Sign Regulations prior to placement of any signs on-site. Contractor shall provide handicap signs as shown on plan. WATER & SANITARY SERVICES Site is served by ACSA public water and sewer. PARKING SCHEDULE ITE Trip Generation Block 1 (Mixed Use) Multifamily units: 1 bedroom, 1.5 spaces per unit, 14 units total = 21 spaces required = 21 spaces provided Block 2 (Residential) Multifamily units (Single-Family Attached): 2 or more bedrooms, 2 spaces per unit, 6 units total = 12 spaces required = 12 spaces provided Single family detached: 2 spaces per unit, 5 units total = 10 spaces required = 10 spaces provided Total of 43 spaces required, maximum of 20% provided, 52 spaces provided Parking for all uses are located within the open space parcel. Designated parking spaces are established with a shared parking agreement, DB _ PG _ GENERAL WATER & SEWER NOTES 1. Work shall be subject to inspection by Albemarle County Service Authority inspectors. The Contractor will be responsible for notifying the proper service authority officials at the start of the work. 2. The location of existing utilities across the line of the proposed work are not necessarily shown on the plans and where shown, are only approximately correct. The contractors shall on his own initiative locate all underground lines and structures as necessary. 3. All materials and construction shall comply with the current edition of the general water and sewer construction specifications as adopted by the Albemarle County Service Authority. 4. Datum for all elevations shown in National Geodetic Survey. 5.The contractor shall be responsible for notifying "MISS UTILITY" (1-800-552-7001). 6.All water and sewer pipes shall have a minimum of 3.5 feet of cover measured from the top of pipe, over the centerline of pipe. This includes all fire hydrant lines, service laterals and water lines, etc. 7. All water and sewer appurtenances are to be located outside of roadside ditches. 8. Valves on deadend lines shall be rodded to provided adequate restraint for the valve during a future extension of the line. 9. Trees are not permitted in the ACSA easement. 10. The contractor shall be responsible to comply with the no-lead regulation regarding brass fittings effective January 4, 2014 (Senate Bill 3874 which amends the Safe Drinking Water Act). 11. All public water and sewer facilities shall be dedicated to the Albemarle County Service Authority. 12. Backflow prevention is required for all connections to the water main. SETBACKS Block 1 (Mixed Use) FRONT MINIMUM: 3' FRONT MAXIMUM: 50' SIDE MINIMUM: None SIDE MAXIMUM: 10' REAR MINIMUM: None REAR MAXIMUM: None Block 2 (Residential) FRONT MINIMUM: 5' FRONT MAXIMUM: 40' SIDE MINIMUM: 3' SIDE MAXIMUM: 15' REAR MINIMUM: 10' REAR MAXIMUM: None BOUNDARIES BENCHMARK SITE PROPERTY LINE ADJACENT PROPERTY LINE BUILDING SETBACK PARKING SETBACK SITE TEXT PARKING COUNT TOPOGRAPHY INDEX CONTOUR INTERVAL CONTOUR SPOT ELEVATION TOP OF CURB ELEVATION TOP OF WALL ELEVATION BOTTOM OF WALL ELEVATION STREAM STREAM BUFFER 100 YEAR FLOODPLAIN BUILDING BUILDING RETAINING WALL STAIRS EDGE OF PAVEMENT ROAD CENTERLINE FRONT OF CURB BACK OF CURB CG-12 TRUNCATED DOME SIDEWALK BIKE PARKING HANDICAP ACCESSIBLE AISLE HANDICAP PARKING MATERIAL CONCRETE RIPRAP ASPHALT EC-2 MATTING EC-3 MATTING WETLAND TREELINE FENCE UTILITY UTILITY POLE GUY WIRE OVERHEAD UTILITY UNDERGROUND UTILITY STORM STORM MANHOLE DROP INLET STORM SEWER ROOF DRAIN SANITARY SANITARY MANHOLE SANITARY SEWER MAIN SANITARY SEWER LATERAL WATER WATER LINE WATER METER WATER METER VAULT FIRE HYDRANT FIRE DEPARTMENT CONNECTION GAS GAS LINE EASEMENTS CONSTRUCTION GRADING ACCESS SIGHT DISTANCE UTILITY STORMWATER FACILITY MAINTENANCE STORMWATER ACCESS DRAINAGE SANITARY WATERLINE GASLINE RD S W RD S W XX OHUOHU UGUUGU 1010 GAS GAS BUILDING HEIGHT Per approved ZMA201900001, maximum building height in Block 1 and 2 is 35'. All non-residential uses shall be limited to one (1) story, or twenty-five (25) feet. SDP202100009 RIO ROAD E Total estimated flow is 3,526 gpm. Ten-pound drop for a Q20 could not be achieved at the time of hydrant flow test. ISO needed fire flow is 1,500 gpm. FIRE FLOW Recreational area shall comply with conditions of approved ZMA20190001. Block 1 and 2 shall provide amenity area no less than 20% of the total block area. Section 4.16 of the Albemarle County Zoning Ordinance shall apply to all recreational facilities. Block 1: 8,364 SF required, 8,518 SF provided. Block 2: 8,276 SF required, 10,082 SF provided. RECREATION Per approved ZMA201900001, setbacks are provided as follows: AM PM Daily TotalUse Description ITE Qty In Out Total In Out Total Single Family Detached 210 5 2 6 8 4 2 6 66 AM PM Daily TotalUse Description ITE Qty In Out Total In Out Total Multifamily (Low-Rise)220 20 2 8 10 9 5 14 110 DEVELOPER 999 Rio Road Development, LLC 912 East High Street Charlottesville, VA 22902 (434) 218-0513 NOTES PER APPROVED ZMA201900001 1.Development of TMP 61-154B shall follow the approved Code of Development as part of ZMA201900001. 2.Section 4.16 of the Albemarle County Zoning Ordinance shall apply to all recreational facilities. 3.Signange shall be provided to prohibit vehicular traffic on private street in Block 2, except for emergency vehicles; or, bollards shall be installed. 4.Notwithstanding anything herein to the contrary, all non-residential uses shall be limited in height to one (1) story, or twenty-five (25) feet. Such uses shall also be limited to a building footprint of six thousand (6,000) square feet. 5.Porches, eaves and awnings shall be considered part of the structure and shall not extend closer to the street than the required setbacks. 6.Minimum building separation shall be required per Section 4.11 of the Zoning Ordinance. 7.Any primary residential structures in Block 1 shall face Belvedere Boulevard. 8.The applicable setbacks for Block 2 shall be measured from the edge of Amenity Area D. 9.Pursuant to Section 32.7.9.7, the parking areas along the northern and southeastern boundaries of the subject property are required to be screened. In addition to Section 32.7.9.7(b), see the Code of Development for appropriate screening options. 10.Dumpsters and Dumpster Pads on the Property shall be screened pursuant to Section 4.12.19. 11.The Applicant shall be required to provide onsite treatment of 25% of the required stormwater treatment. Such techniques of treatment shall include pervious pavers, micro bioretention, or other approved measures. 12.15% of the total residential dwelling units within the project shall be Affordable Dwelling Units (the "15% Affordable Housing Requirement"). The 15% Affordable Housing Requirement may be met through a variety of housing types, including but not limited to, for-sale units or rental units. APPROVED SPECIAL EXCEPTIONS The private street authorization for amenity-oriented lots in Block 2 was approved by the Planning Commision on January 14, 2020. In addition to the private street authorization, the following special exceptions were additionally approved by the Planning Commission on January 14, 2020: curb & gutter, sidewalk, and planting strip for the private street in Block 2. approved 9/3/2021 mmm C2 EXISTING CONDITIONS SUBMISSION: 2020.05.26 [INITIAL SDP] REVISION: 2021.01.21 [FINAL SDP] 2021.02.22 [ARB] 2021.04.13 [ACSA] 2021.05.10 [ARB] 2021.05.18 [FINAL SDP] 19.006 FINAL SITE DEVELOPMENT PLAN ALBEMARLE COUNTY, VIRGINIA 912 E. HIGH ST. CHARLOTTESVILLE VA, 22902 FILE NO. 999 RIO ROAD 434.227.5140 JUSTIN@SHIMP-ENGINEERING.COM C3 SITE PLAN SUBMISSION: 2020.05.26 [INITIAL SDP] REVISION: 2021.01.21 [FINAL SDP] 2021.02.22 [ARB] 2021.04.13 [ACSA] 2021.05.10 [ARB] 2021.05.18 [FINAL SDP] 19.006 FINAL SITE DEVELOPMENT PLAN ALBEMARLE COUNTY, VIRGINIA 912 E. HIGH ST. CHARLOTTESVILLE VA, 22902 FILE NO. 999 RIO ROAD 434.227.5140 JUSTIN@SHIMP-ENGINEERING.COM WSWSWSWSWSWSWSWSWSWSWSWSWSWSWSWSWSWSWSWSWSWSWSWSWSWSWSC4 UTILITY PLAN SUBMISSION: 2020.05.26 [INITIAL SDP] REVISION: 2021.01.21 [FINAL SDP] 2021.02.22 [ARB] 2021.04.13 [ACSA] 2021.05.10 [ARB] 2021.05.18 [FINAL SDP] 19.006 FINAL SITE DEVELOPMENT PLAN ALBEMARLE COUNTY, VIRGINIA 912 E. HIGH ST. CHARLOTTESVILLE VA, 22902 FILE NO. 999 RIO ROAD 434.227.5140 JUSTIN@SHIMP-ENGINEERING.COM MATCHLINE C5 PRIVATE STREET ROW C5 OFF-SITE SEWER CONNECTION SUBMISSION: 2020.05.26 [INITIAL SDP] REVISION: 2021.01.21 [FINAL SDP] 2021.02.22 [ARB] 2021.04.13 [ACSA] 2021.05.10 [ARB] 2021.05.18 [FINAL SDP] 19.006 FINAL SITE DEVELOPMENT PLAN ALBEMARLE COUNTY, VIRGINIA 912 E. HIGH ST. CHARLOTTESVILLE VA, 22902 FILE NO. 999 RIO ROAD 434.227.5140 JUSTIN@SHIMP-ENGINEERING.COM MATCHLINE C4 C6 UTILITY PROFILES SUBMISSION: 2020.05.26 [INITIAL SDP] REVISION: 2021.01.21 [FINAL SDP] 2021.02.22 [ARB] 2021.04.13 [ACSA] 2021.05.10 [ARB] 2021.05.18 [FINAL SDP] 19.006 FINAL SITE DEVELOPMENT PLAN ALBEMARLE COUNTY, VIRGINIA 912 E. HIGH ST. CHARLOTTESVILLE VA, 22902 FILE NO. 999 RIO ROAD 434.227.5140 JUSTIN@SHIMP-ENGINEERING.COM WSWSWSWSWSWSWSWSWSWSWSWSWSWSWSWSWSWSWSWSWSWSWSWSWSWSWSC7 GRADING PLAN SUBMISSION: 2020.05.26 [INITIAL SDP] REVISION: 2021.01.21 [FINAL SDP] 2021.02.22 [ARB] 2021.04.13 [ACSA] 2021.05.10 [ARB] 2021.05.18 [FINAL SDP] 19.006 FINAL SITE DEVELOPMENT PLAN ALBEMARLE COUNTY, VIRGINIA 912 E. HIGH ST. CHARLOTTESVILLE VA, 22902 FILE NO. 999 RIO ROAD 434.227.5140 JUSTIN@SHIMP-ENGINEERING.COM WSWSWSWSWSWSWSWSWSWSWSWSWSWSWSWSWSWSWSWSWSWSWSWSWSWSWS³´ ³´ C8 AMENITY & LANDSCAPE PLAN SUBMISSION: 2020.05.26 [INITIAL SDP] REVISION: 2021.01.21 [FINAL SDP] 2021.02.22 [ARB] 2021.04.13 [ACSA] 2021.05.10 [ARB] 2021.05.18 [FINAL SDP] 2021.06.28 [ARB] 19.006 FINAL SITE DEVELOPMENT PLAN ALBEMARLE COUNTY, VIRGINIA 912 E. HIGH ST. CHARLOTTESVILLE VA, 22902 JUSTIN M. SHIMP Lic. No. 45183 T FOR R E VI E W FILE NO. 999 RIO ROAD 434.227.5140 JUSTIN@SHIMP-ENGINEERING.COM C9 SITE, VDOT & ACSA DETAILS SUBMISSION: 2020.05.26 [INITIAL SDP] REVISION: 2021.01.21 [FINAL SDP] 2021.02.22 [ARB] 2021.04.13 [ACSA] 2021.05.10 [ARB] 2021.05.18 [FINAL SDP] 19.006 FINAL SITE DEVELOPMENT PLAN ALBEMARLE COUNTY, VIRGINIA 912 E. HIGH ST. CHARLOTTESVILLE VA, 22902 FILE NO. 999 RIO ROAD 434.227.5140 JUSTIN@SHIMP-ENGINEERING.COM C10 SITE, VDOT & ACSA DETAILS SUBMISSION: 2020.05.26 [INITIAL SDP] REVISION: 2021.01.21 [FINAL SDP] 2021.02.22 [ARB] 2021.04.13 [ACSA] 2021.05.10 [ARB] 2021.05.18 [FINAL SDP] 2021.06.28 [ARB] 19.006 FINAL SITE DEVELOPMENT PLAN ALBEMARLE COUNTY, VIRGINIA 912 E. HIGH ST. CHARLOTTESVILLE VA, 22902 JUSTIN M. SHIMP Lic. No. 45183 T FOR R E VI E W FILE NO. 999 RIO ROAD 434.227.5140 JUSTIN@SHIMP-ENGINEERING.COM 8' 3" 5" 5" 4X4 POST WIRE MESH TO BE INSTALLED BEHIND WOODEN SLATS 4X4 POST 18" 8' 31 2" 11 2" 18" 4X4 POST 4X4 POST NATURAL WOOD FINISH C11 ACSA DETAILS SUBMISSION: 2020.05.26 [INITIAL SDP] REVISION: 2021.01.21 [FINAL SDP] 2021.02.22 [ARB] 2021.04.13 [ACSA] 2021.05.10 [ARB] 2021.05.18 [FINAL SDP] 19.006 FINAL SITE DEVELOPMENT PLAN ALBEMARLE COUNTY, VIRGINIA 912 E. HIGH ST. CHARLOTTESVILLE VA, 22902 FILE NO. 999 RIO ROAD 434.227.5140 JUSTIN@SHIMP-ENGINEERING.COM C12 SITE DETAILS SUBMISSION: 2020.05.26 [INITIAL SDP] REVISION: 2021.01.21 [FINAL SDP] 2021.02.22 [ARB] 2021.04.13 [ACSA] 2021.05.10 [ARB] 2021.05.18 [FINAL SDP] 19.006 FINAL SITE DEVELOPMENT PLAN ALBEMARLE COUNTY, VIRGINIA 912 E. HIGH ST. CHARLOTTESVILLE VA, 22902 FILE NO. 999 RIO ROAD 434.227.5140 JUSTIN@SHIMP-ENGINEERING.COM C13 MAINTENANCE OF TRAFFIC SUBMISSION: 2020.05.26 [INITIAL SDP] REVISION: 2021.01.21 [FINAL SDP] 2021.02.22 [ARB] 2021.04.13 [ACSA] 2021.05.10 [ARB] 2021.05.18 [FINAL SDP] 19.006 FINAL SITE DEVELOPMENT PLAN ALBEMARLE COUNTY, VIRGINIA 912 E. HIGH ST. CHARLOTTESVILLE VA, 22902 FILE NO. 999 RIO ROAD 434.227.5140 JUSTIN@SHIMP-ENGINEERING.COM Maintenace of Traffic: TTC 20.2 & 23.2 to be used during entrance installation. TTC 4.2 to be used for multi-use path installation.