Loading...
HomeMy WebLinkAboutSP200000070 Approval - County 2001-06-20 of ALik, COUNTY OF ALBEMARLE Department of Planning&Community Development 401 Mclntire Road, Room 218 Charlottesville, Virginia 22902-4596 (804)296-5823 Fax(804)972-4012 July 16, 2001 Mike Fenner The Cox Company 220 East High St Charlottesville, VA 22902 RE: ZMA-00-10 Avemore; SP-00-69 Avemore an P-00-70 Avemore Tax Map 78B, Parcels 2A, 2B, 4B, 3-1 and 4-1 an ax ap , cel 581 LETTER OF CORRECTION (Corrected Tax Map and Parcel Number) Dear Mr Fenner The Albemarle County Board of Supervisors, at its meeting on June 20, 2001, unanimously approved the above-noted petitions Please note that this approval is subject to the following. • ZMA-00-10 Avemore -Approved subject to proffers dated 6/19/01 and signed by Robert A Hauser, President (copy attached). • SP-00-69 Avemore -Approved subject to the following condition 1 The professional office uses shall be limited, in combination with the retail stores and shops uses allowed in SP-00-70, to not exceed 20,000 square feet • SP-00-70 Avemore-Approved subject to the following conditions. 1 For the purposes of this Special Use Permit, retail stores and shops shall be defined as the commercial uses listed below: a The following retail sales and service establishments 1 Antique, gift, jewelry, notion and craft shops, 2 Clothing, apparel and show shops, 3. Department store, 4 Drug store, pharmacy, 5 Florist, 6 Food and grocery stores, including such specialty shops as bakery, candy, milk dispensary, and wine and cheese shops, 7 Furniture and home appliances (sales and service), 8. Hardware store, 9. Musical instruments, 10. Newsstands, magazines, pipe and tobacco shops, 11 Optical goods, y Page 2 July 16, 2001 12. Photographic goods, 13. Visual and audio appliances, 14. Sporting goods, and 15 Retail nurseries and greenhouses, b The following services and public establishments. 1. barber, beauty shops, 2 Churches, cemeteries, 3. Funeral homes, 4 Health spas, 5. Indoor theaters, 6 Laundries, dry cleaners, 7. Libraries, museums, 8 Nurseries, day care centers (reference 5.1.06), 9. Eating establishments, 10 Tailor, seamstress, 11 Medical center, 12 Indoor athletic facilities (added 9/15/93), and, 13 Farmers' market(reference 5.1 36, added 10/11/95) In the event that the use, structure or activity for which this special use permit is issued shall not be commenced within eighteen (18) months after the issuance of such permit, the same shall be deemed abandoned and the authority granted thereunder shall thereupon terminate. For purposes of this section, the term "commenced" shall be construed to include the commencement of construction of any structure necessary to the use of such permit within two (2) years from the date of the issuance thereof which is thereafter completed within one (1) year. Before beginning this use, you must obtain a zoning clearance from the Zoning Department. Before the Zoning Department will issue a clearance, you must comply with the conditions in this letter. For further information, please call Jan Sprinkle at 296-5875. If you should have any questions or comments regarding the above-noted action, please do not hesitate to contact me. Sincer y eivi V. Wayne Cilimbe Director of Planning & Communi Develo► ent VWC/jcf Cc. Amelia McCulley Jack Kelsey Tex Weaver Steve Allshouse Bob Ball, VDOT Janice Farrar From: Bill Fritz Sent: Wednesday, July 11, 2001 2:00 PM To: Wayne Cilimberg; Janice Farrar Cc: Sharon Bridges Subject: If you scroll down you will see what the issue is. If you have questions let me know. William D. Fritz,AICP Development Process Manager (804) 296-5832 Fax(804) 972-4126 Original Message From: Greg Kamptner Sent: Wednesday,July 11,2001 1.31 PM To: Sharon Bridges, Bill Fritz Subject: Issue a corrected approval letter that contains the omitted info--the approval letter merely reflects in writing the official action that the Board took The omission does not jeopardize the validity of the Board's action Greg Kamptner Assistant County Attorney County of Albemarle gkamptne@albemarle org Original Message From: Sharon Bridges Sent: Wednesday, July 11,2001 12:08 PM To: Bill Fritz, Greg Kamptner Subject: RE.SP 2001-04 Rainbow House Sharon Y. Bridges Office Associate III County of Albemarle 804-296-5832 "A leader is a dealer in hope " Napoleon (1769-1821),Emperor of France • Original Message From: Bill Fritz Sent: Wednesday,July 11,2001 10.57 AM 1 ofA F COUNTY OF ALBEMARLE Department of Planning& Community Development 401 McIntire Road, Room 218 Charlottesville, Virginia 22902-4596 (804) 296- 5823 Fax(804)972-4012 July 9, 2001 Mike Fenner The Cox Company 220 East High St Charlottesville. VA 22902 RE ZMA-00-10 Avemore, SP-00-69 Avemore and SP-00-70 Avemore Tax Map 78B. Parcels 2A, 2B, 4B, 3-1 and 4-1 Dear Mr Fenner The Albemarle County Board of Supervisors, at its meeting on June 20, 2001, unanimously approved the above-noted petitions. Please note that this approval is subject to the following. • ZMA-00-10 Avemore -Approved subject to proffers dated 6/19/01 and signed by Robert A Hauser. President (copy attached) • SP-00-69 Avemore - Approved subject to the following condition 1 The professional office uses shall be limited, in combination with the retail stores and shops uses allowed in SP-00-70, to not exceed 20,000 square feet. • SP-00-70 Avemore-Approved subject to the following conditions. 1 For the purposes of this Special Use Permit, retail stores and shops shall be defined as the commercial uses listed below. a The following retail sales and service establishments 1 Antique, gift, jewelry, notion and craft shops, 2. Clothing, apparel and show shops, 3 Department store, 4 Drug store, pharmacy, 5. Florist, 6. Food and grocery stores, including such specialty shops as bakery, candy, milk dispensary, and wine and cheese shops, 7 Furniture and home appliances (sales and service), 8. Hardware store, 9 Musical instruments, 10 Newsstands, magazines, pipe and tobacco shops, 11 Optical goods, Page 2 July 9, 2001 12. Photographic goods, 13. Visual and audio appliances, 14 Sporting goods, and 15 Retail nurseries and greenhouses, b. The following services and public establishments. 1 barber, beauty shops, 2. Churches, cemeteries, 3 Funeral homes, 4. Health spas, 5. Indoor theaters, 6 Laundries, dry cleaners, 7 Libraries, museums, 8 Nurseries, day care centers (reference 5 1 06), 9 Eating establishments, 10 Tailor, seamstress, 11 Medical center, 12. Indoor athletic facilities (added 9/15/93), and, 13. Farmers' market (reference 5.1 36, added 10/11/95) In the event that the use, structure or activity for which this special use permit is issued shall not be commenced within eighteen (18) months after the issuance of such permit, the same shall be deemed abandoned and the authority granted thereunder shall thereupon terminate For purposes of this section, the term "commenced" shall be construed to include the commencement of construction of any structure necessary to the use of such permit within two (2) years from the date of the issuance thereof which is thereafter completed within one (1) year. Before beginning this use, you must obtain a zoning clearance from the Zoning Department. Before the Zoning Department will issue a clearance, you must comply with the conditions in this letter For further information, please call Jan Sprinkle at 296-5875 If you should have any questions or comments regarding the above-noted action, please do not hesitate to contact me. Sincerely, 0. V. Wayne Ci berg Director of P anning & Corn nity De elopment VWC/jcf Cc Amelia McCulley Jack Kelsey Tex Weaver Steve Allshouse Bob Ball, VDOT Original Proffer Amended Proffer (Amendment PROFFER FORM Date: June 19, 2001 Z A :00-l0 Tax Map and Parcel Number(s):TM73,Parcel 581, and TM 78 B, Parcels IA, 2B, 4B, 3-1. and 4-1 27.46 Acres to be rezoned from R-10 to R-15 Pursuant to Section 33.3 of the Albemarle County Zoning Ordinance, the owner, or its duly authorized agent,hereby voluntarily proffers the conditions listed below which shall be applied to the property, if rezoned. These conditions are proffered as a part of the requested rezoning and it is agreed that: (1) the rezoning itself gives rise to the need for the conditions;and (2) such conditions have a reasonable relation to the rezoning request. (1)See attached"Avemore Proffers" A through K, on pages 1-4. Signatures of All Owners Printed Names of Owners Date -43a17-A Ce": cL ?Aclk �RUU� T*K. 99L,., • T - —41% 41,Q;%4•S . <o- - ¢as - i£A. , (-• ram+ ,, 114S G _ , p P . I, P . S�i���diyL 6 //2,/ / � j A vemore Proffers The applicant's objective with this development is to provide a compact, high-density residential development with a variety of housing types and environmental and developmental amenities. Facilities for appropriate and complementary professional and retail services will be located within the development. With design features such as sidewalks, a central green, a community clubhouse, walking trails and preservation of open space, the development is intended to be sensitive to the natural characteristics of the site and to the surrounding areas, to provide an improved level of amenities, and to promote economical and efficient land use and appropriate and harmonious physical development, in order to accomplish a design in keeping with the goals and objectives of the County's Comprehensive Plan. The development will be a premier residential community and will reflect the applicant's commitment to providing high quality and attractive architectural design. In connection with the applicant's rezoning application, the following proffers are made: A. The Conceptual Development Plan dated March 28. 2001. last revised May 10, 2001 (the "Plan'), attached hereto as Exhibit A, is proffered. All improvements shown on the Plan will be installed upon completion of all phases of construction. The character of the development will be in general accord with the form and character that is suggested by and is compatible with the proposed building elevations attached as the exhibits listed below. Modifications to the elevations shown on the attached exhibits which are either suggested by or required by the Albemarle County Architectural Review Board will be deemed to be in "general accord." Exhibit B '`Shops," dated 12-15-00 Exhibit C '`Apartments," dated 12-15-00 Exhibit D "Garages," dated 12-15-00 Exhibit E '`Townhomes," dated 12-15-00 Exhibit F '`Clubhouse," dated 12-15-00 B. Commercial buildings will have two (2) street facades (each with at least one street-level entrance), facing both Fontana Drive and the development. C. In satisfaction of the recreation facility requirements set forth in Section 4.16 of the County Zoning Ordinance and in order to better meet the needs of the residents of Avemore, the following amenities are proffered: (1) The Village Green will be surrounded by a hedge. Large variety trees, 2.5 inches in caliper or larger and of a species common to the area, will be located every 40 feet on center between the hedge and the travelway surrounding the Village Green. There will be access points to the Village Green at each of the four Page 1 of 4 r ,' corners, each of which will consist of one (1) gateway flanked by two (2) brick corners. The hedge will be at least 24" high at planting, and the gates and brick corners will be approximately 32" high. At least three (3) benches will be provided in the Village Green. The Village Green improvements will be built in conjunction with the construction of the townhouse section phase of the development. (2) In addition to the Village Green, outdoor recreation facilities will consist of at least three (3) tot lots to be placed in the approximate locations shown on the Plan [reference 4.16.2]. (3) The community clubhouse will contain an outdoor swimming pool, indoor fitness center, community room, business center, and leasing and management office for the development. At least two outdoor (2) picnic table and at least two (2) outdoor grills will be provided in the area adjacent to the creek behind the clubhouse. The Director of Planning may determine that substitutions of recreation facilities are in general accord with this proffer and in satisfaction of the minimum requirements of Section 4.16.2.1. D. The applicant agrees to participate in the development of a regional SWMUBMP facility in lieu of any requirement that it develop on-site SW'MUBN iP facilities for the Avemore development. (1) The regional SWM/BMP facility will be designed and sized to provide a standing_ pool with a water quality volume equal to approximately 92.100 cubic feet at the approximate location shown on the Plan. (2) The regional SWMiBNIP facility meeting the above design requirements shall fulfill the Avemore development's requirement for stormwater quantity and quality for all portions of the development draining to the facility. Any portion not draining to the facility will have to meet the stormwater quantity and quality requirements by means of a separate stormwater management plan. (3) The regional SWMJBMfP facility will be constructed by the applicant, at its initial expense, during the first phase of Avemore construction, and will be completed prior to the issuance of permits for additional phases. (4) The engineering design of the regional SWVI/BMP facility will be subject to final engineering and site plan approval by Albemarle County's Department of Engineering. The Department of Engineering will have the right to reduce the design parameters outlined in this Item D if hydrology characteristics, hydraulic Page 2 of 4 r engineering, geotechnical engineering or topographic conditions dictate a modified design. (5) The prover set forth in this Item D is contingent on the availability of contiguous of site property and the cooperation of the owners of such off-site property in providing the necessary dedication of such property for the purposes of construction and maintenance of the SWMBMP facility. The off-site land will be dedicated under terms satisfactory to the applicant and the County prior to issuance of a grading permit for Avemore. (6) In the event that the applicant determines that the regional S WMUBMP facility is not feasible under the terms and conditions outlined in this Item D, the applicant in its sole discretion shall have the right to construct on-site SWNUBMP improvements to satisfy County water quality and water quantity requirements. In such event, the proffers set forth in this Item D shall be null and void. E. Applicant will acquire sufficient right-of-way, as determined by the County of Albemarle Engineer, for a private, urban cross-section connector road that will be constructed to VDOT Mountainous Terrain Standards. Such right-of-way will commence at the round- aboutparking area at the northeastern corner of the development, in the general area shown on the Plan as "Reserved for Private Street Connection (24' Pavement Maximum)," and will terminate at Olympia Drive. This right-of-way will be platted prior to approval of a site plan for the Avemore development. In conjunction with the construction of the phase closest to the area shown on the Plan as "Reserved for Private Street Connection." the applicant will either construct the connector road or bond with the County for the construction of the connector road. This bond will be held until the completion of the connector road: provided. however, that if Olympia Drive is not extended to a point where the connector road can be completed within 15 years. the bond will be returned to the applicant, with interest. F. Upon construction or widening of Fontana Drive, the applicant will construct a four foot (4') wide, concrete sidewalk along Fontana Drive, between Avemore Boulevard and State Route 20. G. Internal walking paths will be five feet (5') wide and will be paved in asphalt. H. Prior to site plan approval for phase 1 of Avemore, the applicant will dedicate to public use an eight foot (8') wide right-of-way for the construction, maintenance and repair of a sidewalk across Wilton Lots 16A, 16B, 17-1, 17-2 and 17-3, along the common boundary of such lots with State Route 20. The applicant will provide sufficient right-of-way in the area between Wilton Farm Road and State Route 20 necessary to facilitate the construction of a second left-turn lane from Page 3 of 4 ,� Fontana Drive onto State Route 20, provided that such right-of-way will not create a zoning violation for any existing improvements along the path of such new right-of-way. This right-of-way will be provided at the time the Avemore road plan is approved by Albemarle County. J. The Open Space shown on the plan along the shared common boundary with lots 1 through 10, Fontana, Phase 1, will consist of(i) a forty foot (40') buffer which will not be disturbed during construction and (ii) a seventy foot (70') building set back. K. The applicant will contribute the lesser of(i) 50% of the cost of installing a traffic signal at the intersection of Fontana Drive and State Route 20 or (ii) $50.000. such sum to be applied only to the cost of installing such traffic signal. If the County obtains full funding for such traffic signal from other sources and the applicant is not required to contribute toward the cost of such signal, the applicant agrees that its contribution may be applied instead toward the portion of the Route 20 improvement project in the area between Fontana Drive and U.S. Route 250. Such payment will be made by the applicant at the later to occur of (x) the installation of such traffic signal (or installation of the Route 20 improvements. as the case may be) or (y) the issuance of the first building permit for the Avemore development. Page 4 of 4