HomeMy WebLinkAboutSUB201800177 Correspondence 2019-11-25Patricia "Paty" Saternye
From: Ernest Beasley<ebeasley@hydrogeoenvironmental.com>
Sent: Monday, November 25, 2019 10:45 AM
To: John Anderson
Cc: Emily Cox; Christopher Perez; Patricia Saternye
Subject: Re: SUB201900176 - Property of Bella Signature Homes LLC, Final Plat - GWA study [
Engineering review comments ]
CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open
attachments unless you are sure the content is safe.
Thanks - I will be in a meeting from 11:00 until about noon so please wait until early afternoon to call me.
Thanks again,
Bubba Beasley, CPG
Geologist
c: (404) 219-6676
www.HvdroGeoEnvironmental.com
❑"
On Mon, Nov 25, 2019 at 10:41 AM John Anderson <]anderson2@albemarle.org> wrote:
Ernest,
Thanks for your call a few moments ago. I said I would call, and will, but want to reprint review item 5, and ask for well
test regime (response) to address this item.
I believe developer and Albemarle alike will benefit from actual on -site /site -specific groundwater (well test) data.
Albemarle needs sense of assurance rip Or t0 final plat approval to shield county and future property owner needs.
Item 5
5. Report assessment of well drilling and testing, spatial variability of well yields, the relative lack of yield
data within 1,000' radius of the parcel, requires test well results:
a. Engineering recommends HydroGeo Environmental coordinate with Applicant, select a test drill
location coincident with the proposed well site location evaluated (for reasons HydroGeo should
outline for Engineering) to have low if not lowest potential well yield, and provide well test results
in accord with VDH well test protocol. Should this test well yield at least 3 gpm, Engineering will
approve the Tier III Groundwater Assessment. The only VDH available data within 1,000 of the
parcel to be subdivided yields 2eom, which is insufficient for VDH permitting purposes.
Additional site -specific data is required to advance the final subdivision plat.
b. Alternative to item 5.a.: If proposed location rated least likely to yield 3 gpm does not yield 3 gpm,
Applicant should test a second of the five well sites for this 5-lot subdivision (ref. report /sketch —
Attachment A), and may choose a proposed well site evaluated most favorable, perform well test,
and average the two well test values. If this approach does not yield an average > 3 gpm, then
Applicant may persuade Albemarle that each of the proposed subdivided lots has reasonable
chance of encountering subsurface flow sufficient to support required 3 gpm, but this would seem
doubtful. Water budget calculations have little to do with peril faced by property owners unable to
establish a well supply that yields 3 gpm. Yields are influenced by chance, and additional site -
specific information is required prior to Tier III GW Assessment Report approval.
I will call in 20 -30 minutes, and appreciate your patience, and expertise.
Thank you
best, J. Anderson 434.296-5832 -x3069
From: John Anderson
Sent: Monday, November 25, 2019 10:00 AM
To: Ernest Beasley<ebeaslev@hvdrogeoenvironmental.com>
Cc: Emily Cox <ecox2@albemarle.org>; Christopher Perez <cperez@albemarle.org>; Patricia Saternye
<psaternye@ al bema rle.org>
Subject: SUB201900176 - Property of Bella Signature Homes LLC, Final Plat - GWA study [ Engineering review
comments I
Ernest,
Thanks for speaking with me, moments ago. I regret I did not ensure review comment reached you, sooner —it's my
fault. Thanks for your patience. Please call if any questions.
best, J. Anderson 434.296-5832 -x3069
John Anderson, PE, Civil Engineer II • (434) 296-5832 -X3o69
Community Development Dept. I Engineering Division
County of Albemarle 1401 McIntire Road
Charlottesville, Virginia 22902-4596
Patricia "Paty" Saternye
From: John Anderson
Sent: Monday, November 25, 2019 10:41 AM
To: Ernest Beasley
Cc: Emily Cox; Christopher Perez•, Patricia Saternye
Subject: RE: SUB201900176 - Property of Bella Signature Homes LLC, Final Plat - GWA study [
Engineering review comments ]
Ernest,
Thanks for your call a few moments ago. I said I would call, and will, but want to reprint review item 5, and ask for well
test regime (response) to address this item.
I believe developer and Albemarle alike will benefit from actual on -site /site -specific groundwater (well test) data.
Albemarle needs sense of assurance rip or to final plat approval to shield county and future property owner needs.
Item 5
5. Report assessment of well drilling and testing, spatial variability of well yields, the relative lack of yield
data within 1,000' radius of the parcel, requires test well results:
a. Engineering recommends HydroGeo Environmental coordinate with Applicant, select a test drill
location coincident with the proposed well site location evaluated (for reasons HydroGeo should
outline for Engineering) to have low if not lowest potential well yield, and provide well test results
in accord with VDH well test protocol. Should this test well yield at least 3 gpm, Engineering will
approve the Tier III Groundwater Assessment. The only VDH available data within 1,000 of the
parcel to be subdivided yields 2eom, which is insufficient for VDH permitting purposes.
Additional site -specific data is required to advance the final subdivision plat.
b. Alternative to item 5.a.: If proposed location rated least likely to yield 3 gpm does not yield 3 gpm,
Applicant should test a second of the five well sites for this 5-lot subdivision (ref. report /sketch —
Attachment A), and may choose a proposed well site evaluated most favorable, perform well test,
and average the two well test values. If this approach does not yield an average > 3 gpm, then
Applicant may persuade Albemarle that each of the proposed subdivided lots has reasonable
chance of encountering subsurface flow sufficient to support required 3 gpm, but this would seem
doubtful. Water budget calculations have little to do with peril faced by property owners unable to
establish a well supply that yields 3 gpm. Yields are influenced by chance, and additional site -
specific information is required prior to Tier III GW Assessment Report approval.
I will call in 20 -30 minutes, and appreciate your patience, and expertise.
Thank you
best, J. Anderson 434.296-5832 -x3069
From: John Anderson
Sent: Monday, November 25, 2019 10:00 AM
To: Ernest Beasley <ebeasley@hydrogeoenvironmental.com>
Cc: Emily Cox <ecox2@albemarle.org>; Christopher Perez <cperez@albemarle.org>; Patricia Saternye
<psaternye@a I bemarle.org>
Subject: SUB201900176 - Property of Bella Signature Homes LLC, Final Plat - GWA study [ Engineering review comments
Emest,
Thanks for speaking with me, moments ago. I regret I did not ensure review comment reached you, sooner —it's my
fault. Thanks for your patience. Please call if any questions.
best, J. Anderson 434.296-5832 -x3069
John Anderson, PE, Civil Engineer II • (434) 296-5832 -R3o69
Community Development Dept. I Engineering Division
County of Albemarle 1401 McIntire Road
Charlottesville, Virginia 22902-4596
Patricia "Paty" Saternye
From: John Anderson
Sent: Monday, November 25, 2019 10:00 AM
To: Ernest Beasley
Cc: Emily Cox; Christopher Perez; Patricia Saternye
Subject: SUB201900176 - Property of Bella Signature Homes LLC, Final Plat - GWA study [
Engineering review comments ]
Attachments: SUB201800177 Bella Signature GWA 030719.pdf
Ernest,
Thanks for speaking with me, moments ago. I regret I did not ensure review comment reached you, sooner —it's my
fault. Thanks for your patience. Please call if any questions.
best, J. Anderson 434.296-5832 -x3069
John Anderson, PE, Civil Engineer II • (434) 296-5832 -x3o69
Community Development Dept. I Engineering Division
County of Albemarle 1401 McIntire Road
Charlottesville, Virginia 22902-4596
Patricia "Paty" Saternye
From: Patricia Saternye
Sent: Monday, November 25, 2019 9:08 AM
To: John Anderson
Subject: FW: Tier 3 Groundwater Assessment for Bella Signature Homes (SUB2018-177 -
Preliminary Plat)
Attachments: SUB2018-177 Approval with Conditions 12-21-2018c.pdf
John,
I'm still digging, but it appears they provided you with a 2nd submission of the Tier 3 Groundwater Assessment after the
comments for the Preliminary Site Plan.
Please see the email below.
That makes me think they got at least the 1'set of comments on the Groundwater Study.
In looking at the string of emails below, it appears to me that after the 1' draft of the Groundwater Study was reviewed
by you (and the preliminary plat was approved) they chose to resubmit the Groundwater Study a 2"d time even though
they had not yet submitted a Final Plat.
Could that be what is causing some of the confusion?
Question: Could you clarify for me if you wanted me to check if I had sent them the comments on the V submission of
the Groundwater Study (with the preliminary plat) or the 2nd submission of the Groundwater Study (between the
preliminary plat approval and final plat submission)?
That might help me know what time frame to look in.
Thanks,
Paty Saternye
Senior Planner
Community Development
o
,
U�
Albemarle County
401 McIntire Road
Charlottesville, VA 22902
434-296-5832 ext.3250
psaternye@albemarle.org
www.albemarle.org
From: Patricia Saternye <psaternye@albemarle.org>
Sent: Thursday, January 31, 2019 12:58 PM
To: John Anderson <janderson2@albemarle.org>
Subject: RE: Tier 3 Groundwater Assessment for Bella Signature Homes (SUB2018-177 - Preliminary Plat)
My comment #1 (attached) states that they were supposed to submit the draft study prior to the preliminary plat
approval, that they did, and to see your comments the draft report that was submitted.
So, if they did it correctly, what is attached should be the revised and final version of the study that is supposed to be
submitted with the final plat.
Thanks,
Paty Saternye
Senior Planner
Community Development
o
,
U�
Albemarle County
401 McIntire Road
Charlottesville, VA 22902
434-296-5832 ext.3250
psaternve@albemarle.ore
www.albemarle.ora
From: John Anderson
Sent: Thursday, January 31, 2019 12:53 PM
To: Patricia Saternye <psaternve@albemarle.org>
Subject: RE: Tier 3 Groundwater Assessment for Bella Signature Homes
thanks
From: Patricia Saternye
Sent: Thursday, January 31, 2019 12:52 PM
To: John Anderson <janderson2@albemarle.ore>
Subject: RE: Tier 3 Groundwater Assessment for Bella Signature Homes
John,
I would have to look back at the comments, but if the preliminary is approved it might not be necessary to review the
Tier III until the final plat is submitted.
I'll try to look at that later today or tomorrow morning.
Thanks,
Paty Saternye
Senior Planner
Community Development
Albemarle County
401 McIntire Road
Charlottesville, VA 22902
434-296-5832 ext.3250
psaternve@albemarle.ore
www.albemarle.org
From: John Anderson
Sent: Thursday, January 31, 2019 12:44 PM
To: Patricia Saternye <psaternve@albemarle.ore>
Cc: Ernest Beasley<ebeaslev@hvdroaeoenvironmental.com>
Subject: RE: Tier 3 Groundwater Assessment for Bella Signature Homes
Paty,
No, a single fee is sufficient. I will review the digital Tier III report as soon as possible, and have added a task under
preliminary subdivision plat —thanks, Paty.
Mr. Beasley,
The report is logged /in my review queue. I will review as soon as possible and withdraw request for an application
related to GW assessment —thanks for sending.
-best,
J. Anderson 434.296-5832 -x3069
From: Patricia Saternye
Sent: Thursday, January 31, 2019 12:36 PM
To: John Anderson <janderson2@albemarle.ore>
Subject: RE: Tier 3 Groundwater Assessment for Bella Signature Homes
John,
It appears on County View that the Fee for the Tier III Groundwater Study, for the approved SUB2018-177 Properties of
Bella Signature Homes PRELIMINARY Plat, has been previously paid.
Unless there is a new/different fee at the Final Plat stage, on top of the one at the Preliminary, he may not owe it.
I'm not sure if there is a second fee, but I don't think there is... maybe we should ask Matt.
I have not received the final plat submission yet...
Thanks,
Paty Saternye
Senior Planner
Community Development
Albemarle County
401 McIntire Road
Charlottesville, VA 22902
434-296-5832 ext.3250
psaternve@albemarle.ore
www.albemarle.org
From: John Anderson
Sent: Thursday, January 31, 2019 12:29 PM
To: Ernest Beasley <ebeaslev@hydrogeoenvironmental.com>
Cc: Patricia Saternye <psaternye@albemarle.org>
Subject: RE: Tier 3 Groundwater Assessment for Bella Signature Homes
(Paty, please advise —thanks )
Thanks for your email, Mr. Beasley.
Please submit a subdivision application (with fee) with print copy of Tier III report to get into review queues. Since this is
a subdivision application, I rely on Paty for guidance. It appears a 548 fee is required with Application (image, below:
pg. 3 /Application)
Groundwater Review /•ices
❑ Tier 2 Ground"aier ReN iew = S355 (Required for all plats proposing lots less than 21 acre!
J Tier 3 GroundN%alcr Re%icw = S548 (Required for all plats proposing lots where at least 3 1.
acres or less)
U Tier 4 Groundwater Review = S1,183
Link to Application:
http://www.albemarle.or Lupload/itnagestfonns_center/departments/Community Development/forms/applications/Subdiv
ision Plat & Cheeklist.odf
I look forward to receiving a print copy of the Tier 3 report, once submitted with Application. Thanks again
-best,
J. Anderson 434.296-5832 -x3069
From: Ernest Beasley <ebeaslev@hydrogeoenvironmental.com>
Sent: Thursday, January 31, 2019 12:08 PM
To: John Anderson <ianderson2@albemarle.org>
Cc: Luke Kitelinger <Kitelingerl@yahoo.com>; Bryan Chambers<chamberslandsurveying@yahoo.com>; Kathryn Bryant
<Kathryn@hydrogeoenvironmental.com>;1P Ligush<ipligush@hydrogeoenvironmental.com>
Subject: Tier 3 Groundwater Assessment for Bella Signature Homes
Mr. Anderson,
Please see the attached Tier 3 Groundwater Assessment HydroGeo has completed on behalf of Bella
Signature Homes, LLC for Albemarle Parcel #45-59M.
Don't hesitate to reach out to me with any questions or comments.
Many thanks,
Bubba Beasley, MS, CPG
Geologist
c: (404) 219-6676
www.HvdroGeoEnvironmental.com
10
Patricia "Paty" Saternye
From: John Anderson
Sent: Friday, November 22, 2019 3:36 PM
To: Patricia Saternye
Subject: FW: Planning Application Review for SUB201800177 PROPERTY OF BELLA SIGNATURE
HOMES, LLC - PRELIMINARY. [ Tier III Groundwater Assessment -Engineering Review ]
Attachments: SUB201800177 Bella Signature GWA 030719.pdf
Hi, Paty, I received voicemail re. GWA, and wonder if Attached was shared with Applicant —this all goes back a
ways. Please let me know —thanks, Paty! Enjoy the weekend.
From: John Anderson
Sent: Thursday, March 7, 2019 11:05 AM
To: Patricia Saternye <psaternye@albemarle.org>
Subject: Planning Application Review for SUB201800177 PROPERTY OF BELLA SIGNATURE HOMES, LLC - PRELIMINARY. [
Tier III Groundwater Assessment -Engineering Review ]
The Review for the following application has been completed:
Application Number = SUB201800177
Reviewer = John Anderson
Review Status = Requested Changes
Completed Date = 03/07/2019
This email was sent from County View Production.
Paty,
Attached Engineering review comments of the Tier III Groundwater Assessment report is for now located with
preliminary plat (CV), but Engineering will upload to final plat (CV file #), once FPT received, and file # established for
FPT.
Please share with applicant at your convenience. Thanks
best, JA
x3069
Text of review comments:
Engineering review of Tier III GW Assessment report is complete.
SUB2018-00177
11
1. Tier III Groundwater Assessment: Albemarle County Parcel #45-59M for Bella Signature Homes, LLC, dated 1/29/19, is
comprehensive, but is not approved.
2. Findings detail efforts to obtain well data from VDH, but VDH, as of report date, has been non -responsive to FOIA request
for detailed well and septic records for parcels located up to 1000-feet beyond the property lines (ref. ACDSM, Sec.
2.D.l.a.l.d.). Table 1 (p. 5, report), Summary of Available Well Records, indicates the average yield of seventeen (17) well
records for wells located within a 0.5 mile radius of the property is 12.9 gpm. Sec. 7,0, Conclusions (p. 6, report) states,
"VDH regulations require a minimum yield of 3 gom for private residential water supply wells, while Sec. 6.0, Assessment of
Well Drilling and Testing, states, "Based on this study, the Site lies in an area capable ofproducing groundwater yield
sufficient to meet the demands of the proposed Site development; however, the actual yields of future onsite supply wells
cannot be known until the wells are drilled and properly tested." [Emphasis added.]
3. The only well listed in Table 1 located within one thousand feet of the parcel yields 2 gum. The Tier III report states,
"Standard practice for development of water supply wells involves drilling into water bearing zones in the fractured bedrock
and sealing off the overburden with a solid well casing. Thus, the ultimate performance of individual water wells in the Blue
Ridge Province typically depends on the borehole encountering sufficiently interconnected bedrock fractures. A dry hole
results if a well is drilled into bedrock with insufficient fracturing. Fracture occurrence and density depend on a number of
factors including specific location, rock type, and site -specific geologic conditions. Because groundwater occurs in discrete
fractured zones, it is not unusual to find variability in yields for wells in close proximity to each other. Because the regolith
provides groundwater storage, a thicker mantle of overburden usually suggests more favorable conditions for sustainable
long-term groundwater withdrawals." (p. 3, emphasis added).
4. Attachment D Water Budget Calculations for Tier III GW Assessment (Albemarle Co. Parcel #45-59M), rounding
difference: If use .0015 feet vs .00147 as average regional daily groundwater recharge value, this increases the post -
development groundwater surplus report value by a negligible amount (=2%). Attachment D projects 13244 god sumlus
(post -development). For comparison, a household of five is estimated to consume 500 gpd, and the proposed five additional
households in the watershed are included (subtracted) when calculating the 13,244 gpd surplus (if use .00147, surplus value
decreases slightly to=12,851 gpd). Attachment D calculations may assume 1,000' x 20' principal access /road, may
apportion 9,068 ft2 new impervious area per lot. Even allowing 100' x 12' stone or paved driveway allows 7,868 ft2 of
impervious roof, walk, etc., per lot, which is conservative. Attachment D appears reasonable and accurate, and is accepted.
5. Report assessment of well drilling and testing, spatial variability of well yields, the relative lack of yield data within 1,000'
radius of the parcel, requires test well results:
a. Engineering recommends HydroGeo Environmental coordinate with Applicant, select a test drill location coincident
with the proposed well site location evaluated (for reasons HydroGeo should outline for Engineering) to have low if
not lowest potential well yield, and provide well test results in accord with VDH well test protocol. Should this test
well yield at least 3 gpm, Engineering will approve the Tier III Groundwater Assessment. The only VDH available
data within 1,000 of the parcel to be subdivided yields 2gpm, which is insufficient for VDH permitting
purposes. Additional site -specific data is required to advance the final subdivision plat.
b. Alternative to item 5.a.: If proposed location rated least likely to yield 3 gpm does not yield 3 gpm, Applicant should
test a second of the five well sites for this 5-lot subdivision (ref. report /sketch —Attachment A), and may choose a
proposed well site evaluated most favorable, perform well test, and average the two well test values. If this
approach does not yield an average >_ 3 gpm, then Applicant may persuade Albemarle that each of the proposed
subdivided lots has reasonable chance of encountering subsurface flow sufficient to support required 3 gpm, but this
would seem doubtful. Water budget calculations have little to do with peril faced by property owners unable to
establish a well supply that yields 3 gpm. Yields are influenced by chance, and additional site -specific information
is required prior to Tier III GW Assessment Report approval.
6. Minor: Reduced -size plat /sketch scales are inaccurate. Include note that defines accurate scale, or revise plat sketches
included with report using hand -notation to indicate an accurate scale so that a reader may refer to scale, and acquire accurate
length or distance information from plats included with the report.
Please call Engineering at 434.296-5832 -0069 if any questions.
Thank you
12
Patricia "Paty" Saternye
From: Patricia Saternye
Sent: Thursday, November 7, 2019 3:44 PM
To: Christopher Perez
Subject: SUB2018-177 word docs for prelim approval with conditions
Attachments: CDP1_sub_PCS_Bella Homes - Prelim UPDATE 12-20-2018a.doc; CDP1_sub _PCS_Bella
Homes - Prelim UPDATE 12-20-2018a.doc
SUB2018-177 word docs for prelim approval with conditions
Paty Saternye
Senior Planner
Community Development
=4
V
.a�/Rcl�*I.
Albemarle County
401 McIntire Road
Charlottesville, VA 22902
434-296-5832 ext.3250
psaternve@albemarle.org
www.albemarle.org
13
Patricia "Paty" Saternye
From: Patricia Saternye
Sent: Monday, July 15, 2019 2:58 PM
To: Emily Cox
Subject: RE: Planning Application Review for SUB201900031 EARLYSVILLE SUBDIVISION - ROAD
PLANS.
Attachments: CDP2_sub_PCS_Earlysvilie Road Subdiv Road Plan 7-15-2019b.pdf; CDP2
_sub_PCS_Earlysville Road Subdiv Road Plan 7-15-2019b.doc
Emily,
Attached please see the planning comments for SUB201900031 EARLYSVILLE SUBDIVISION - ROAD PLANS.
Please let me know if you have any questions prior to sending them to the applicant.
I have not yet uploaded them to County View.
Thanks,
Paty Saternye
Senior Planner
Community Development
a ,
A
Albemarle County
401 McIntire Road
Charlottesville, VA 22902
434-296-5832 ext.3250
psaternve@albemarle.ore
www.albemarle.ora
From: Patricia Saternye
Sent: Tuesday, April 23, 2019 11:44 AM
To: Emily Cox <ecox2@albemarle.org>; Clint Shifflett <Clint.Shifflett@timmons.com>
Cc: kitelingerl@yahoo.com
Subject: RE: Planning Application Review for SUB201900031 EARLYSVILLE SUBDIVISION - ROAD PLANS.
Emily & Clint,
Attached please find the planning comments for SUB201900031 EARLYSVILLE SUBDIVISION - ROAD PLANS.
I apologize for these not being available when the other review comments went out late last week.
Thanks,
Paty Saternye
Senior Planner
Community Development
=4
a °� "
`��R41N��R
Albemarle County
14
401 McIntire Road
Charlottesville, VA 22902
434-296-5832 ext.3250
psaternve@albemarle.ore
www.albemarle.org
From: Emily Cox
Sent: Thursday, April 18, 2019 10:30 AM
To: Clint Shifflett <Clint.Shifflett@timmons.com>; kitelingerl@vahoo.com
Cc: Patricia Saternye <psaternve@albemarle.org>
Subject: Planning Application Review for SUB201900031 EARLYSVILLE SUBDIVISION - ROAD PLANS.
Clint —
See attached. Please note that this is still under review by planning as noted in the comment letter.
Let us know if you have any questions.
Thanks!
The Review for the following application has been completed:
Application Number = SUB201900031
Reviewer= Emily Cox
Review Status = Requested Changes
Completed Date = 04/18/2019
This email was sent from County View Production.
15
Patricia "Paty" Saternye
From: Patricia Saternye
Sent: Thursday, May 9, 2019 2:26 PM
To: Catherine Gayner
Cc: Clint Shifflett
Subject: RE: Earlysville Road Subdivision SBU2019-31 comments
Catherine,
Please clarify if your questions are forthe comments in the Road Plan (SUB2019-31) or the Preliminary Plat (SUB2018-
177).
Because of the context of your question I am assuming you are referring to the Road Plan comment numbers. Please
correct me if I'm wrong.
The preliminary plat is not normally submitted more than once. If you were supposed to resubmit the preliminary plat
you would have had to do so prior to its approval with conditions.
The preliminary was submitted more than once in this case because of the missing road stormwater management. The
first round of comments were on 11/13/18. The 2"' round of comments, which was also the "approval with conditions"
letter was sent on 12/20/18. In that approval with conditions letter where were comments/conditions that must be
addressed with the submission of the "final plat".
On that final plat submission you must show the easements and you create them.
If you choose, the storm (both road drainage & facilities) easement can be submitted separately.
However, 1) the separate easement plat in that case must be approved before the final plat can be approved. 2) Most
people include the easements in the final subdivision plat to save a step, and therefore a bit of time and money.
In reference to the road plan showing the metes and bounds it is my understanding that is part of the required
information. However, if you need me to ask others to confirm that please let me know.
It is my understanding that road plans show everything that is required to create the road.
Once that is approved by engineering, then the matching information also needs to be included in the final plat where
the ROW will actually be created.
Thanks,
Paty Saternye
Senior Planner
Community Development
V�
��Rbl
Albemarle County
401 McIntire Road
Charlottesville, VA 22902
434-296-5832 ext.3250
psaternye@albemarle.ore
www.albemarle.org
From: Catherine Gayner <Catherine.Gayner@timmons.com>
Sent: Thursday, May 09, 2019 1:47 PM
16
To: Patricia Saternye <psaternye@albemarle.org>
Cc: Clint Shifflett <Clint.Shifflett@timmons.com>
Subject: Earlysville Road Subdivision SBU2019-31 comments
Hi Paty,
I have a couple questions pertaining to your comments for the Earlysville Subdivision Road plan.
Pertaining to comment #4, could you please confirm that these easements need to be recorded in a final
subdivision/easement plat and that the approved preliminary plat does not need to be revised?
Pertaining to comment #7, the boundary, ROW, and easement metes and bounds will be provided in the final plat to be
recorded. Is it necessary for us to put these in the road plan? We have been referencing the approved Woodlawn
Subdivision Road Plan (SUB201600066), which did not have boundary, ROW, and easement metes and bounds.
Thank you,
Catherine Gayner
Project Engineer
TIMMONS GROUP I www.timmons.com
608 Preston Avenue Suite 200 1 Charlottesville, VA 22903
Office: 434.295.5624 Mobile: 757.615.1408
catheri ne. a ayner(cDti mmo ns. com
Your Vision Achieved Through Ours
To send me files greater than 20MB click here.
17
Patricia "Paty" Saternye
From: Catherine Gayner <Catherine.Gayner@timmons.com>
Sent: Thursday, May 9, 2019 1:47 PM
To: Patricia Saternye
Cc: Clint Shifflett
Subject: Earlysville Road Subdivision SBU2019-31 comments
Hi Paty
I have a couple questions pertaining to your comments for the Earlysville Subdivision Road plan.
Pertaining to comment #4, could you please confirm that these easements need to be recorded in a final
subdivision/easement plat and that the approved preliminary plat does not need to be revised?
Pertaining to comment #7, the boundary, ROW, and easement metes and bounds will be provided in the final plat to be
recorded. Is it necessary for us to put these in the road plan? We have been referencing the approved Woodlawn
Subdivision Road Plan (SUB201600066), which did not have boundary, ROW, and easement metes and bounds.
Thank you,
Catherine Gayner
Project Engineer
TIMMONS GROUP I www.timmons.com
608 Preston Avenue I Suite 200 1 Charlottesville, VA 22903
Office: 434.295.5624 1 Mobile: 757.615.1408
catherine.oaynerna.timmons.com
Your Vision Achieved Through Ours
To send me files greater than 20MB click here.
18
Patricia "Paty" Saternye
From: Cisco Unity Connection Messaging System <unityconnection@cobm-
cucxnpub.albemarle.org>
Sent: Wednesday, May 1, 2019 11:36 AM
To: psaternye@cobm-cucxnpub.albemarle.org
Subject: Message from VIRGINIA CALL (94349603085)
Attachments: VoiceMessage.wav
Categories: ViewMail
19
Patricia "Paty" Saternye
From: Patricia Saternye
Sent: Monday, April 29, 2019 9:41 AM
To: Jeffrey Baker
Subject: FW: Planning Application Review for SUB201900031 EARLYSVILLE SUBDIVISION - ROAD
PLANS.
Jeff,
The subdivision plat that has already been reviewed for the property is SUB201800177 PROPERTY OF BELLA SIGNATURE
HOMES, LLC— PRELIMINARY.
That is only a "preliminary". The final plat has not been submitted or approved.
The road plan reference it below.
The key is that he does not have the subdivision approved yet.
It is my understanding that he wants to build one by -right residence on the current lot as is. However, he want to
ensure he does not do anything that will jeopardize his future (in process) subdivision of the other 4 lots.
So he would have to come up with a residence location that can meeting both existing and future requirements.
I have mentioned some possible red flags below to him. I cannot guarantee that we will successfully avoid causing
future problems with the future division.
Thanks,
Paty Saternye
Senior Planner
Community Development
Albemarle County
401 McIntire Road
Charlottesville, VA 22902
434-296-5832 ext.3250
psaternve@albemarle.ore
www.albemarle.org
From: Patricia Saternye
Sent: Wednesday, April 24, 2019 2:56 PM
To: kitelingerl@yahoo.com
Cc: Jeffrey Baker <jbaker@albemarle.org>
Subject: RE: Planning Application Review for SUB201900031 EARLYSVILLE SUBDIVISION - ROAD PLANS.
Mr. Kitelinger,
I've double checked and Jeff Baker (ibaker@albemarle.orx) is the correct person to help you with your current question
of building one residence on your current parcel.
So, I have copied him on this email.
Any questions you have about getting a building permit and building one residence on the existing parcel please
forward to him.
20
Four things I just wanted to broach in reference to our discussion a few minutes ago:
1. As we talked about, only the preliminary subdivision plat has been approved. What is currently under review is
the Road Plan. The final subdivision plat has yet to have been submitted for the first review. So, please know
that process is still in the future.
2. Since the final subdivision plat has not been submitted, reviewed and approved any building you do at this time
- prior to the subdivision of the parcel into 5 lots, as you voiced concern about in our conversation, could
possibly cause problems with the approval of the final subdivision plat. You could do your best to make sure
that any house you build now would meet all of the requirements under the current single lot and meet all of
the requirements of the future subdivision. However, until the final plat is actually approved I can not tell you
that what you submitted in the preliminary plat will be the final configuration of the 5 lot subdivision, or that
there may or may not be modifications to the proposed public road that could impact things.
3. With that being said, it is up to you whether to take that risk or not. I would say if the building is approved prior
to the final plat being approved then the existing house location, driveway, or other improvements will need to
be shown on the final plat so that we can ensure that all regulations are met.
4. One thing in reference to changes I already know will need to take place on the final subdivision plat, because of
what was shown on the road plan, is that your proposed public street is now shown at being wider than was
shown on the preliminary subdivision plat. Because of this there is some chance that once we get to the final
subdivision plat the additional width of right of way could drop one or more lots down to below 2 acres
minimum. If this happens the proposed lot lines may need to shift. Until that street right of way width is
finalized and approved by all concerned, and the lot sized revised (if necessary) to ensure that the lots all meet
the minimum lot standards, there is some chance it could impact where the residences will need to be located.
Thanks,
Paty Saternye
Senior Planner
Community Development
4A i
? pI
•� Vr
Albemarle County
401 McIntire Road
Charlottesville, VA 22902
434-296-5832 ext.3250
psaternye@albemarle.org
www.albemarle.org
From: Patricia Saternye
Sent: Tuesday, April 23, 2019 11:44 AM
To: Emily Cox <ecox2@albemarle.org>; Clint Shifflett <Clint.Shifflett@timmons.com>
Cc: kitelingerl@yahoo.com
Subject: RE: Planning Application Review for SUB201900031 EARLYSVILLE SUBDIVISION - ROAD PLANS.
Emily & Clint,
Attached please find the planning comments for SUB201900031 EARLYSVILLE SUBDIVISION - ROAD PLANS.
I apologize for these not being available when the other review comments went out late last week.
Thanks,
Paty Saternye
Senior Planner
Community Development
21
Albemarle County
401 McIntire Road
Charlottesville, VA 22902
434-296-5832 ext.3250
psaternve@albemarle.ore
www.albemarle.org
From: Emily Cox
Sent: Thursday, April 18, 2019 10:30 AM
To: Clint Shifflett <Clint.Shifflett@timmons.com>; kitelingerl@vahoo.com
Cc: Patricia Saternye <psaternve@albemarle.org>
Subject: Planning Application Review for SUB201900031 EARLYSVILLE SUBDIVISION - ROAD PLANS.
Clint —
See attached. Please note that this is still under review by planning as noted in the comment letter.
Let us know if you have any questions.
Thanks!
The Review for the following application has been completed:
Application Number = SUB201900031
Reviewer= Emily Cox
Review Status = Requested Changes
Completed Date = 04/18/2019
This email was sent from County View Production.
22
Patricia "Paty" Saternye
From: Jeffrey Baker
Sent: Monday, April 29, 2019 9:32 AM
To: Patricia Saternye
Subject: FW: Earlysville
Hey Paty,
Is this the one you prepped me on? What's the application number for his subdivision?
Jeff
From: luke kitelinger <kiteIingerl@yahoo.com>
Sent: Friday, April 26, 2019 8:07 PM
To: Jeffrey Baker <jbaker@albemarle.org>
Subject: Re: Earlysville
Jeff Good Evening
I planning on subdividing the property into 5 lots. With that doing said I would like to build on one of the lots. I have talked
to Patty about this and she forward me to you. Should be a big deal check wanted to check. Thanks Luke
On Thursday, April 25, 2019 1:10 PM, Jeffrey Baker <Ibakerna.albemarle.org> wrote:
Luke,
Perhaps I can take a shot at assisting you over the phone or by e-mail first? Can you provide me with
an address or Parcel number and let me know what you plan on doing? Or is there an existing permit
we have in our system? The reason I suggest this is that there may be questions I am unable to
answer that I would forward to others.
Thanks,
Jeff P. Baker
Building Permit Planner
Albemarle County
Department of Community Development
401 McIntire Road
Charlottesville, VA 22902
434-296-5832 x 3024
0baker(a-)albemarle.org
From: luke kitelinger <kitelinger1(a)_yahoo.com>
Sent: Thursday, April 25, 2019 12:54 PM
To: Jeffrey Baker <ibaker(Walbemarle.orp
Subject: Earlysville
23
Jeff Good afternoon I have 18 acres on Earlysville rd and would like to talk to you about a building permit. Could you
please let me know when would be a good time to come in and see you. Thanks Luke Kitelinger
24
Patricia "Paty" Saternye
From: Cisco Unity Connection Messaging System <unityconnection@cobm-
cucxnpub.albemarle.org>
Sent: Wednesday, April 24, 2019 11:25 AM
To: psaternye@cobm-cucxnpub.albemarle.org
Subject: Message from VIRGINIA CALL (94349603085)
Attachments: VoiceMessage.wav
Categories: ViewMail
25
Patricia "Paty" Saternye
From: John Anderson
Sent: Thursday, March 7, 2019 11A2 AM
To: Patricia Saternye
Subject: RE: Planning Application Review for SUB201800177 PROPERTY OF BELLA SIGNATURE
HOMES, LLC - PRELIMINARY. [ Tier III Groundwater Assessment -Engineering Review ]
You're welcome, and yes, located there, as well
From: Patricia Saternye
Sent: Thursday, March 07, 2019 11:23 AM
To: John Anderson <janderson2@albemarle.org>
Subject: RE: Planning Application Review for SUB201800177 PROPERTY OF BELLA SIGNATURE HOMES, LLC -
PRELIMINARY. [ Tier III Groundwater Assessment -Engineering Review ]
John,
Thanks �.
And I think what we discussed is once we have the Final Plat project number that it will be located there as well, right?
Thanks,
Paty Saternye
Senior Planner
Community Development
� of
;4
U
,`��R41M�*•
Albemarle County
401 McIntire Road
Charlottesville, VA 22902
434-296-5832 ext.3250
psaternve@albemarle.ore
www.albemarle.ora
From: John Anderson
Sent: Thursday, March 07, 2019 11:05 AM
To: Patricia Saternye <psaternve@albemarle.ore>
Subject: Planning Application Review for SUB201800177 PROPERTY OF BELLA SIGNATURE HOMES, LLC - PRELIMINARY. [
Tier III Groundwater Assessment -Engineering Review ]
The Review for the following application has been completed:
Application Number = SUB201800177
Reviewer = John Anderson
Review Status = Requested Changes
Completed Date = 03/07/2019
26
This email was sent from County View Production.
Paty,
Attached Engineering review comments of the Tier III Groundwater Assessment report is for now located with
preliminary plat (CV), but Engineering will upload to final plat (CV file #), once FPT received, and file # established for
FPT.
Please share with applicant at your convenience. Thanks
best, JA
0 1.5
Text of review comments:
Engineering review of Tier III GW Assessment report is complete.
SUB2018-00177
1. Tier III Groundwater Assessment: Albemarle County Parcel #45-59M for Bella Signature Homes. LLC. dated 1/29/19, is
comprehensive, but is not approved.
2. Findings detail efforts to obtain well data from VDH, but VDH, as of report date, has been non -responsive to FOIA request
for detailed well and septic records for parcels located up to 1000-feet beyond the property lines (ref. ACDSM, Sec.
2.D.l.a.l.d.). Table 1 (p. 5, report), Summary of Available Well Records, indicates the average yield of seventeen (17) well
records for wells located within a 0.5 mile radius of the property is 12.9 gpm. See. 7.0, Conclusions (p. 6, report) states,
"VDH regulations require a minimum yield of 3 gpm for private residential water supply wells, while Sec. 6.0, Assessment of
Well Drilling and Testing, states, "Based on this study, the Site lies in an area capable ofproducing groundwater yield
sufficient to meet the demands of the proposed Site development; however, the actual yields of future onsite supply wells
cannot be known until the wells are drilled and properly tested" [Emphasis added.]
3. The only well listed in Table 1 located within one thousand feet of the parcel yields 2 91)m. The Tier III report states,
"Standard practice for development of water supply wells involves drilling into water bearing zones in the fractured bedrock
and sealing off the overburden with a solid well casing. Thus, the ultimate performance of individual water wells in the Blue
Ridge Province typically depends on the borehole encountering sufficiently interconnected bedrock fractures. A dry hole
results if a well is drilled into bedrock with insufficient fracturing. Fracture occurrence and density depend on a number of
factors including specific location, rock type, and site -specific geologic conditions. Because groundwater occurs in discrete
fractured zones, it is not unusual to find variability in yields for wells in close proximity to each other. Because the regolith
provides groundwater storage, a thicker mantle of overburden usually suggests more favorable conditions for sustainable
long-term groundwater withdrawals." (p. 3, emphasis added).
4. Attachment D Water Budget Calculations for Tier III GW Assessment (Albemarle Co. Parcel #45-59M), rounding
difference: If use .0015 feet vs .00147 as average regional daily groundwater recharge value, this increases the post -
development groundwater surplus report value by a negligible amount (=2%). Attachment D projects 13244 and sumlus
(post -development). For comparison, a household of five is estimated to consume 500 gpd, and the proposed five additional
households in the watershed are included (subtracted) when calculating the 13,244 gpd surplus (if use .00147, surplus value
decreases slightly to=12,851 gpd). Attachment D calculations may assume 1,000' x 20' principal access /road, may
apportion 9,068 ft2 new impervious area per lot. Even allowing 100' x 12' stone or paved driveway allows 7,868 ftZ of
impervious roof, walk, etc., per lot, which is conservative. Attachment D appears reasonable and accurate, and is accepted.
5. Report assessment of well drilling and testing, spatial variability of well yields, the relative lack of yield data within 1,000'
radius of the parcel, requires test well results:
a. Engineering recommends HydroGeo Environmental coordinate with Applicant, select a test drill location coincident
with the proposed well site location evaluated (for reasons HydroGeo should outline for Engineering) to have low if
not lowest potential well yield, and provide well test results in accord with VDH well test protocol. Should this test
well yield at least 3 gpm, Engineering will approve the Tier III Groundwater Assessment. The only VDH available
27
data within 1,000 of the parcel to be subdivided yields 2gpm, which is insufficient for VDH permitting
purposes. Additional site -specific data is required to advance the final subdivision plat.
b. Alternative to item 5.a.: If proposed location rated least likely to yield 3 gpm does not yield 3 gpm, Applicant should
test a second of the five well sites for this 5-lot subdivision (ref. report /sketch —Attachment A), and may choose a
proposed well site evaluated most favorable, perform well test, and average the two well test values. If this
approach does not yield an average >_ 3 gpm, then Applicant may persuade Albemarle that each of the proposed
subdivided lots has reasonable chance of encountering subsurface flow sufficient to support required 3 gpm, but this
would seem doubtful. Water budget calculations have little to do with peril faced by property owners unable to
establish a well supply that yields 3 gpm. Yields are influenced by chance, and additional site -specific information
is required prior to Tier III GW Assessment Report approval.
6. Minor: Reduced -size plat /sketch scales are inaccurate. Include note that defines accurate scale, or revise plat sketches
included with report using hand -notation to indicate an accurate scale so that a reader may refer to scale, and acquire accurate
length or distance information from plats included with the report.
Please call Engineering at 434.296-5832 -0069 if any questions.
Thank you
28
Patricia "Paty" Saternye
From: Patricia Saternye
Sent: Thursday, March 7, 2019 11:23 AM
To: John Anderson
Subject: RE: Planning Application Review for SUB201800177 PROPERTY OF BELLA SIGNATURE
HOMES, LLC - PRELIMINARY. [ Tier III Groundwater Assessment -Engineering Review ]
John,
Thanks Q.
And I think what we discussed is once we have the Final Plat project number that it will be located there as well, right?
Thanks,
Paty Saternye
Senior Planner
Community Development
a °� "
=4
:a tn*I
Albemarle County
401 McIntire Road
Charlottesville, VA 22902
434-296-5832 ext.3250
psaternve@albemarle.ore
www.albemarle.org
From: John Anderson
Sent: Thursday, March 07, 2019 11:05 AM
To: Patricia Saternye <psaternye@albemarle.org>
Subject: Planning Application Review for SUB201800177 PROPERTY OF BELLA SIGNATURE HOMES, LLC - PRELIMINARY. [
Tier III Groundwater Assessment -Engineering Review ]
The Review for the following application has been completed:
Application Number = SUB201800177
Reviewer = John Anderson
Review Status = Requested Changes
Completed Date = 03/07/2019
This email was sent from County View Production.
Paty,
Attached Engineering review comments of the Tier III Groundwater Assessment report is for now located with
preliminary plat (CV), but Engineering will upload to final plat (CV file #), once FPT received, and file # established for
FPT.
Please share with applicant at your convenience. Thanks
29
best, JA
x3069
Text of review comments:
Engineering review of Tier III GW Assessment report is complete.
SUB2018-00177
1. Tier III Groundwater Assessment: Albemarle County Parcel #45-59M for Bella Signature Homes, LLC, dated 1/29/19, is
comprehensive, but is not approved.
2. Findings detail efforts to obtain well data from VDH, but VDH, as of report date, has been non -responsive to FOIA request
for detailed well and septic records for parcels located up to 1000-feet beyond the property lines (ref. ACDSM, Sec.
2.D.l.a.l.d.). Table 1 (p. 5, report), Summary of Available Well Records, indicates the average yield of seventeen (17) well
records for wells located within a 0.5 mile radius of the property is 12.9 gpm. Sec. 7.0, Conclusions (p. 6, report) states,
"VDH regulations require a minimum yield of 3 gum for private residential water supply wells, while Sec. 6.0, Assessment of
Well Drilling and Testing, states, "Based on this study, the Site lies in an area capable ofproducing groundwater yield
sufficient to meet the demands of the proposed Site development; however, the actual yields of future onsite supply wells
cannot be known until the wells are drilled and properly tested." [Emphasis added.]
3. The only well listed in Table 1 located within one thousand feet of the parcel yields 2 gum. The Tier III report states,
"Standard practice for development of water supply wells involves drilling into water bearing zones in the fractured bedrock
and sealing off the overburden with a solid well casing. Thus, the ultimate performance of individual water wells in the Blue
Ridge Province typically depends on the borehole encountering sufficiently interconnected bedrock fractures. A dry hole
results if a well is drilled into bedrock with insufficient fracturing. Fracture occurrence and density depend on a number of
factors including specific location, rock type, and site -specific geologic conditions. Because groundwater occurs in discrete
fractured zones, it is not unusual to find variability in yields for wells in close proximity to each other. Because the regolith
provides groundwater storage, a thicker mantle of overburden usually suggests more favorable conditions for sustainable
long-term groundwater withdrawals." (p. 3, emphasis added).
4. Attachment D Water Budget Calculations for Tier III GW Assessment (Albemarle Co. Parcel #45-59M), rounding
difference: If use .0015 feet vs .00147 as average regional daily groundwater recharge value, this increases the post -
development groundwater surplus report value by a negligible amount (-2%). Attachment D projects 13244 god sumlus
(post -development). For comparison, a household of five is estimated to consume 500 gpd, and the proposed five additional
households in the watershed are included (subtracted) when calculating the 13,244 gpd surplus (if use .00147, surplus value
decreases slightly to-12,851 gpd). Attachment D calculations may assume 1,000' x 20' principal access /road, may
apportion 9,068 ft2 new impervious area per lot. Even allowing 100' x 12' stone or paved driveway allows 7,868 ft2 of
impervious roof, walk, etc., per lot, which is conservative. Attachment D appears reasonable and accurate, and is accepted.
5. Report assessment of well drilling and testing, spatial variability of well yields, the relative lack of yield data within 1,000'
radius of the parcel, requires test well results:
a. Engineering recommends HydroGeo Environmental coordinate with Applicant, select a test drill location coincident
with the proposed well site location evaluated (for reasons HydroGeo should outline for Engineering) to have low if
not lowest potential well yield, and provide well test results in accord with VDH well test protocol. Should this test
well yield at least 3 gpm, Engineering will approve the Tier III Groundwater Assessment. The only VDH available
data within 1,000 of the parcel to be subdivided yields 2gpm, which is insufficient for VDH permitting
purposes. Additional site -specific data is required to advance the final subdivision plat.
b. Alternative to item 5.a.: If proposed location rated least likely to yield 3 gpm does not yield 3 gpm, Applicant should
test a second of the five well sites for this 5-lot subdivision (ref. report /sketch —Attachment A), and may choose a
proposed well site evaluated most favorable, perform well test, and average the two well test values. If this
approach does not yield an average >_ 3 gpm, then Applicant may persuade Albemarle that each of the proposed
subdivided lots has reasonable chance of encountering subsurface flow sufficient to support required 3 gpm, but this
would seem doubtful. Water budget calculations have little to do with peril faced by property owners unable to
establish a well supply that yields 3 gpm. Yields are influenced by chance, and additional site -specific information
is required prior to Tier III GW Assessment Report approval.
30
6. Minor: Reduced -size plat /sketch scales are inaccurate. Include note that defines accurate scale, or revise plat sketches
included with report using hand -notation to indicate an accurate scale so that a reader may refer to scale, and acquire accurate
length or distance information from plats included with the report.
Please call Engineering at 434.296-5832 -0069 if any questions.
Thank you
31
Patricia "Paty" Saternye
From: Patricia Saternye
Sent: Thursday, March 7, 2019 11:23 AM
To: John Anderson
Subject: RE: Planning Application Review for SUB201800177 PROPERTY OF BELLA SIGNATURE
HOMES, LLC - PRELIMINARY. [ Tier III Groundwater Assessment -Engineering Review ]
John,
Thanks Q.
And I think what we discussed is once we have the Final Plat project number that it will be located there as well, right?
Thanks,
Paty Saternye
Senior Planner
Community Development
a °� "
=4
:a tn*I
Albemarle County
401 McIntire Road
Charlottesville, VA 22902
434-296-5832 ext.3250
psaternve@albemarle.ore
www.albemarle.org
From: John Anderson
Sent: Thursday, March 07, 2019 11:05 AM
To: Patricia Saternye <psaternye@albemarle.org>
Subject: Planning Application Review for SUB201800177 PROPERTY OF BELLA SIGNATURE HOMES, LLC - PRELIMINARY. [
Tier III Groundwater Assessment -Engineering Review ]
The Review for the following application has been completed:
Application Number = SUB201800177
Reviewer = John Anderson
Review Status = Requested Changes
Completed Date = 03/07/2019
This email was sent from County View Production.
Paty,
Attached Engineering review comments of the Tier III Groundwater Assessment report is for now located with
preliminary plat (CV), but Engineering will upload to final plat (CV file #), once FPT received, and file # established for
FPT.
Please share with applicant at your convenience. Thanks
32
best, JA
x3069
Text of review comments:
Engineering review of Tier III GW Assessment report is complete.
SUB2018-00177
1. Tier III Groundwater Assessment: Albemarle County Parcel #45-59M for Bella Signature Homes, LLC, dated 1/29/19, is
comprehensive, but is not approved.
2. Findings detail efforts to obtain well data from VDH, but VDH, as of report date, has been non -responsive to FOIA request
for detailed well and septic records for parcels located up to 1000-feet beyond the property lines (ref. ACDSM, Sec.
2.D.l.a.l.d.). Table 1 (p. 5, report), Summary of Available Well Records, indicates the average yield of seventeen (17) well
records for wells located within a 0.5 mile radius of the property is 12.9 gpm. Sec. 7.0, Conclusions (p. 6, report) states,
"VDH regulations require a minimum yield of 3 gum for private residential water supply wells, while Sec. 6.0, Assessment of
Well Drilling and Testing, states, "Based on this study, the Site lies in an area capable ofproducing groundwater yield
sufficient to meet the demands of the proposed Site development; however, the actual yields of future onsite supply wells
cannot be known until the wells are drilled and properly tested." [Emphasis added.]
3. The only well listed in Table 1 located within one thousand feet of the parcel yields 2 gum. The Tier III report states,
"Standard practice for development of water supply wells involves drilling into water bearing zones in the fractured bedrock
and sealing off the overburden with a solid well casing. Thus, the ultimate performance of individual water wells in the Blue
Ridge Province typically depends on the borehole encountering sufficiently interconnected bedrock fractures. A dry hole
results if a well is drilled into bedrock with insufficient fracturing. Fracture occurrence and density depend on a number of
factors including specific location, rock type, and site -specific geologic conditions. Because groundwater occurs in discrete
fractured zones, it is not unusual to find variability in yields for wells in close proximity to each other. Because the regolith
provides groundwater storage, a thicker mantle of overburden usually suggests more favorable conditions for sustainable
long-term groundwater withdrawals." (p. 3, emphasis added).
4. Attachment D Water Budget Calculations for Tier III GW Assessment (Albemarle Co. Parcel #45-59M), rounding
difference: If use .0015 feet vs .00147 as average regional daily groundwater recharge value, this increases the post -
development groundwater surplus report value by a negligible amount (-2%). Attachment D projects 13244 god sumlus
(post -development). For comparison, a household of five is estimated to consume 500 gpd, and the proposed five additional
households in the watershed are included (subtracted) when calculating the 13,244 gpd surplus (if use .00147, surplus value
decreases slightly to-12,851 gpd). Attachment D calculations may assume 1,000' x 20' principal access /road, may
apportion 9,068 ft2 new impervious area per lot. Even allowing 100' x 12' stone or paved driveway allows 7,868 ft2 of
impervious roof, walk, etc., per lot, which is conservative. Attachment D appears reasonable and accurate, and is accepted.
5. Report assessment of well drilling and testing, spatial variability of well yields, the relative lack of yield data within 1,000'
radius of the parcel, requires test well results:
a. Engineering recommends HydroGeo Environmental coordinate with Applicant, select a test drill location coincident
with the proposed well site location evaluated (for reasons HydroGeo should outline for Engineering) to have low if
not lowest potential well yield, and provide well test results in accord with VDH well test protocol. Should this test
well yield at least 3 gpm, Engineering will approve the Tier III Groundwater Assessment. The only VDH available
data within 1,000 of the parcel to be subdivided yields 2gpm, which is insufficient for VDH permitting
purposes. Additional site -specific data is required to advance the final subdivision plat.
b. Alternative to item 5.a.: If proposed location rated least likely to yield 3 gpm does not yield 3 gpm, Applicant should
test a second of the five well sites for this 5-lot subdivision (ref. report /sketch —Attachment A), and may choose a
proposed well site evaluated most favorable, perform well test, and average the two well test values. If this
approach does not yield an average >_ 3 gpm, then Applicant may persuade Albemarle that each of the proposed
subdivided lots has reasonable chance of encountering subsurface flow sufficient to support required 3 gpm, but this
would seem doubtful. Water budget calculations have little to do with peril faced by property owners unable to
establish a well supply that yields 3 gpm. Yields are influenced by chance, and additional site -specific information
is required prior to Tier III GW Assessment Report approval.
33
6. Minor: Reduced -size plat /sketch scales are inaccurate. Include note that defines accurate scale, or revise plat sketches
included with report using hand -notation to indicate an accurate scale so that a reader may refer to scale, and acquire accurate
length or distance information from plats included with the report.
Please call Engineering at 434.296-5832 -0069 if any questions.
Thank you
34
Patricia "Paty" Saternye
From: John Anderson
Sent: Thursday, March 7, 2019 11:05 AM
To: Patricia Saternye
Subject: Planning Application Review for SUB201800177 PROPERTY OF BELLA SIGNATURE
HOMES, LLC - PRELIMINARY. [ Tier III Groundwater Assessment -Engineering Review ]
Attachments: SUB201800177 Bella Signature GWA 030719.pdf
The Review for the following application has been completed:
Application Number = SUB201800177
Reviewer = John Anderson
Review Status = Requested Changes
Completed Date = 03/07/2019
This email was sent from County View Production.
Paty,
Attached Engineering review comments of the Tier III Groundwater Assessment report is for now located with
preliminary plat (CV), but Engineering will upload to final plat (CV file #), once FPT received, and file # established for
FPT.
Please share with applicant at your convenience. Thanks
best, JA
x3069
Text of review comments:
Engineering review of Tier III GW Assessment report is complete.
SUB2018-00177
1. Tier III Groundwater Assessment: Albemarle County Parcel #45-59M for Bella Signature Homes, LLC, dated 1/29/19, is
comprehensive, but is not approved.
2. Findings detail efforts to obtain well data from VDH, but VDH, as of report date, has been non -responsive to FOIA request
for detailed well and septic records for parcels located up to 1000-feet beyond the property lines (ref. ACDSM, Sec.
2.D.l.a.l.d.). Table 1 (p. 5, report), Summary of Available Well Records, indicates the average yield of seventeen (17) well
records for wells located within a 0.5 mile radius of the property is 12.9 gpm. Sec. 7,0, Conclusions (p. 6, report) states,
"VDH regulations require a minimum yield of 3 gpm for private residential water supply wells, while Sec. 6.0, Assessment of
Well Drilling and Testing, states, "Based on this study, the Site lies in an area capable ofproducing groundwater yield
sufficient to meet the demands of the proposed Site development, however, the actual yields of future onsite supply wells
cannot be known until the wells are drilled and properly tested" [Emphasis added.]
3. The only well listed in Table 1 located within one thousand feet of the parcel yields 2 gom. The Tier III report states,
"Standard practice for development of water supply wells involves drilling into water bearing zones in the fractured bedrock
and sealing off the overburden with a solid well casing. Thus, the ultimate performance of individual water wells in the Blue
Ridge Province typically depends on the borehole encountering sufficiently interconnected bedrock fractures. A dry hole
results if a well is drilled into bedrock with insufficient fracturing. Fracture occurrence and density depend on a number of
35
factors including specific location, rock type, and site -specific geologic conditions. Because groundwater occurs in discrete
fractured zones, it is not unusual to find variability in yields for wells in close proximity to each other. Because the regolith
provides groundwater storage, a thicker mantle of overburden usually suggests more favorable conditions for sustainable
long-term groundwater withdrawals." (p. 3, emphasis added).
4. Attachment D Water Budget Calculations for Tier III GW Assessment (Albemarle Co. Parcel #45-59M), rounding
difference: If use .0015 feet vs .00147 as average regional daily groundwater recharge value, this increases the post -
development groundwater surplus report value by a negligible amount (-2%). Attachment D projects 13244 gpd surplus
(post -development). For comparison, a household of five is estimated to consume 500 gpd, and the proposed five additional
households in the watershed are included (subtracted) when calculating the 13,244 gpd surplus (if use .00147, surplus value
decreases slightly to-12,851 gpd). Attachment D calculations may assume 1,000' x 20' principal access /road, may
apportion 9,068 ft2 new impervious area per lot. Even allowing 100' x 12' stone or paved driveway allows 7,868 ftZ of
impervious roof, walk, etc., per lot, which is conservative. Attachment D appears reasonable and accurate, and is accepted.
5. Report assessment of well drilling and testing, spatial variability of well yields, the relative lack of yield data within 1,000'
radius of the parcel, requires test well results:
a. Engineering recommends HydroGeo Environmental coordinate with Applicant, select a test drill location coincident
with the proposed well site location evaluated (for reasons HydroGeo should outline for Engineering) to have low if
not lowest potential well yield, and provide well test results in accord with VDH well test protocol. Should this test
well yield at least 3 gpm, Engineering will approve the Tier III Groundwater Assessment. The only VDH available
data within 1,000 of the parcel to be subdivided yields 2apm, which is insufficient for VDH permitting
purposes. Additional site -specific data is required to advance the final subdivision plat.
b. Alternative to item 5.a.: If proposed location rated least likely to yield 3 gpm does not yield 3 gpm, Applicant should
test a second of the five well sites for this 5-lot subdivision (ref. report /sketch —Attachment A), and may choose a
proposed well site evaluated most favorable, perform well test, and average the two well test values. If this
approach does not yield an average >_ 3 gpm, then Applicant may persuade Albemarle that each of the proposed
subdivided lots has reasonable chance of encountering subsurface flow sufficient to support required 3 gpm, but this
would seem doubtful. Water budget calculations have little to do with peril faced by property owners unable to
establish a well supply that yields 3 gpm. Yields are influenced by chance, and additional site -specific information
is required prior to Tier III GW Assessment Report approval.
6. Minor: Reduced -size plat /sketch scales are inaccurate. Include note that defines accurate scale, or revise plat sketches
included with report using hand -notation to indicate an accurate scale so that a reader may refer to scale, and acquire accurate
length or distance information from plats included with the report.
Please call Engineering at 434.296-5832 -0069 if any questions.
Thank you
36
Patricia "Paty" Saternye
From: John Anderson
Sent: Thursday, March 7, 2019 11:05 AM
To: Patricia Saternye
Subject: Planning Application Review for SUB201800177 PROPERTY OF BELLA SIGNATURE
HOMES, LLC - PRELIMINARY. [ Tier III Groundwater Assessment -Engineering Review ]
Attachments: SUB201800177 Bella Signature GWA 030719.pdf
The Review for the following application has been completed:
Application Number = SUB201800177
Reviewer = John Anderson
Review Status = Requested Changes
Completed Date = 03/07/2019
This email was sent from County View Production.
Paty,
Attached Engineering review comments of the Tier III Groundwater Assessment report is for now located with
preliminary plat (CV), but Engineering will upload to final plat (CV file #), once FPT received, and file # established for
FPT.
Please share with applicant at your convenience. Thanks
best, JA
x3069
Text of review comments:
Engineering review of Tier III GW Assessment report is complete.
SUB2018-00177
1. Tier III Groundwater Assessment: Albemarle County Parcel #45-59M for Bella Signature Homes, LLC, dated 1/29/19, is
comprehensive, but is not approved.
2. Findings detail efforts to obtain well data from VDH, but VDH, as of report date, has been non -responsive to FOIA request
for detailed well and septic records for parcels located up to 1000-feet beyond the property lines (ref. ACDSM, Sec.
2.D.l.a.l.d.). Table 1 (p. 5, report), Summary of Available Well Records, indicates the average yield of seventeen (17) well
records for wells located within a 0.5 mile radius of the property is 12.9 gpm. Sec. 7,0, Conclusions (p. 6, report) states,
"VDH regulations require a minimum yield of 3 gpm for private residential water supply wells, while Sec. 6.0, Assessment of
Well Drilling and Testing, states, "Based on this study, the Site lies in an area capable ofproducing groundwater yield
sufficient to meet the demands of the proposed Site development, however, the actual yields of future onsite supply wells
cannot be known until the wells are drilled and properly tested" [Emphasis added.]
3. The only well listed in Table 1 located within one thousand feet of the parcel yields 2 gom. The Tier III report states,
"Standard practice for development of water supply wells involves drilling into water bearing zones in the fractured bedrock
and sealing off the overburden with a solid well casing. Thus, the ultimate performance of individual water wells in the Blue
Ridge Province typically depends on the borehole encountering sufficiently interconnected bedrock fractures. A dry hole
results if a well is drilled into bedrock with insufficient fracturing. Fracture occurrence and density depend on a number of
37
factors including specific location, rock type, and site -specific geologic conditions. Because groundwater occurs in discrete
fractured zones, it is not unusual to find variability in yields for wells in close proximity to each other. Because the regolith
provides groundwater storage, a thicker mantle of overburden usually suggests more favorable conditions for sustainable
long-term groundwater withdrawals." (p. 3, emphasis added).
4. Attachment D Water Budget Calculations for Tier III GW Assessment (Albemarle Co. Parcel #45-59M), rounding
difference: If use .0015 feet vs .00147 as average regional daily groundwater recharge value, this increases the post -
development groundwater surplus report value by a negligible amount (-2%). Attachment D projects 13244 gpd surplus
(post -development). For comparison, a household of five is estimated to consume 500 gpd, and the proposed five additional
households in the watershed are included (subtracted) when calculating the 13,244 gpd surplus (if use .00147, surplus value
decreases slightly to-12,851 gpd). Attachment D calculations may assume 1,000' x 20' principal access /road, may
apportion 9,068 ft2 new impervious area per lot. Even allowing 100' x 12' stone or paved driveway allows 7,868 ftZ of
impervious roof, walk, etc., per lot, which is conservative. Attachment D appears reasonable and accurate, and is accepted.
5. Report assessment of well drilling and testing, spatial variability of well yields, the relative lack of yield data within 1,000'
radius of the parcel, requires test well results:
a. Engineering recommends HydroGeo Environmental coordinate with Applicant, select a test drill location coincident
with the proposed well site location evaluated (for reasons HydroGeo should outline for Engineering) to have low if
not lowest potential well yield, and provide well test results in accord with VDH well test protocol. Should this test
well yield at least 3 gpm, Engineering will approve the Tier III Groundwater Assessment. The only VDH available
data within 1,000 of the parcel to be subdivided yields 2apm, which is insufficient for VDH permitting
purposes. Additional site -specific data is required to advance the final subdivision plat.
b. Alternative to item 5.a.: If proposed location rated least likely to yield 3 gpm does not yield 3 gpm, Applicant should
test a second of the five well sites for this 5-lot subdivision (ref. report /sketch —Attachment A), and may choose a
proposed well site evaluated most favorable, perform well test, and average the two well test values. If this
approach does not yield an average >_ 3 gpm, then Applicant may persuade Albemarle that each of the proposed
subdivided lots has reasonable chance of encountering subsurface flow sufficient to support required 3 gpm, but this
would seem doubtful. Water budget calculations have little to do with peril faced by property owners unable to
establish a well supply that yields 3 gpm. Yields are influenced by chance, and additional site -specific information
is required prior to Tier III GW Assessment Report approval.
6. Minor: Reduced -size plat /sketch scales are inaccurate. Include note that defines accurate scale, or revise plat sketches
included with report using hand -notation to indicate an accurate scale so that a reader may refer to scale, and acquire accurate
length or distance information from plats included with the report.
Please call Engineering at 434.296-5832 -0069 if any questions.
Thank you
38
Patricia "Paty" Saternye
From: John Anderson
Sent: Thursday, January 31, 2019 6:03 PM
To: Patricia Saternye
Subject: RE: Tier 3 Groundwater Assessment for Bella Signature Homes (SUB2018-177 -
Preliminary Plat)
Right, no, they didn't ask that I prioritize review. I don't mind entering comments under both numbers, and will be sure
to enter Engineering review of GW Tier III report with Final Plat, whenever submitted and SUB# assigned. Thanks —very
thoughtful, Paty
From: Patricia Saternye
Sent: Thursday, January 31, 2019 2:37 PM
To: John Anderson <janderson2@albemarle.org>
Subject: RE: Tier 3 Groundwater Assessment for Bella Signature Homes (SUB2018-177 - Preliminary Plat)
John,
It is up to you. The only two things I would say is that:
• There is no rush since it is supposed to be reviewed with the final plat. So unless you have availability I wouldn't
prioritize it (They didn't ask for it to be reviewed ASAP did they?
• Putting it in the Preliminary Plat folder could cause confusion later, unless you ultimately want to upload it
under both numbers.
Thanks,
Paty Saternye
Senior Planner
Community Development
Albemarle County
401 McIntire Road
Charlottesville, VA 22902
434-296-5832 ext.3250
psaternye@albemarle.ore
www.albemarle.ora
From: John Anderson
Sent: Thursday, January 31, 2019 1:26 PM
To: Patricia Saternye <psaternye@albemarle.ore>
Subject: RE: Tier 3 Groundwater Assessment for Bella Signature Homes (SUB2018-177 - Preliminary Plat)
Paty, thanks
39
I thought to review the Tier III report under preliminary plat since final plat not yet submitted, Tier III submitted, and to
try to keep track... a CV location to list review, more than anything else. Later, I can include ref. to location of review of
final Tier III report, under the final plat /SUB#. Does this make sense? Thoughts?
From: Patricia Saternye
Sent: Thursday, January 31, 2019 12:58 PM
To: John Anderson <landerson2@albemarle.ora>
Subject: RE: Tier 3 Groundwater Assessment for Bella Signature Homes (SUB2018-177 - Preliminary Plat)
My comment #1 (attached) states that they were supposed to submit the draft study prior to the preliminary plat
approval, that they did, and to see your comments the draft report that was submitted.
So, if they did it correctly, what is attached should be the revised and final version of the study that is supposed to be
submitted with the final plat.
Thanks,
Paty Saternye
Senior Planner
Community Development
Albemarle County
401 McIntire Road
Charlottesville, VA 22902
434-296-5832 ext.3250
psaternve@albemarle.ore
www.albemarle.org
From: John Anderson
Sent: Thursday, January 31, 2019 12:53 PM
To: Patricia Saternye <psaternve@albemarle.ora>
Subject: RE: Tier 3 Groundwater Assessment for Bella Signature Homes
thanks
From: Patricia Saternye
Sent: Thursday, January 31, 2019 12:52 PM
To: John Anderson <landerson2@albemarle.ora>
Subject: RE: Tier 3 Groundwater Assessment for Bella Signature Homes
John,
I would have to look back at the comments, but if the preliminary is approved it might not be necessary to review the
Tier III until the final plat is submitted.
I'll try to look at that later today or tomorrow morning.
Thanks,
0
Paty Saternye
Senior Planner
Community Development
4y OF
_ r
U f
yl
*I.
M
Albemarle County
401 McIntire Road
Charlottesville, VA 22902
434-296-5832 ext.3250
psaternye@albemarle.org
www.albemarle.org
From: John Anderson
Sent: Thursday, January 31, 2019 12:44 PM
To: Patricia Saternye <psaternve@albemarle.org>
Cc: Ernest Beasley<ebeasley@hydrogeoenvironmental.com>
Subject: RE: Tier 3 Groundwater Assessment for Bella Signature Homes
Paty,
No, a single fee is sufficient. I will review the digital Tier III report as soon as possible, and have added a task under
preliminary subdivision plat —thanks, Paty.
Mr. Beasley,
The report is logged /in my review queue. I will review as soon as possible and withdraw request for an application
related to GW assessment —thanks for sending.
-best,
J. Anderson 434.296-5832 -x3069
From: Patricia Saternye
Sent: Thursday, January 31, 2019 12:36 PM
To: John Anderson <janderson2@albemarle.org>
Subject: RE: Tier 3 Groundwater Assessment for Bella Signature Homes
John,
It appears on County View that the Fee for the Tier III Groundwater Study, for the approved SUB2018-177 Properties of
Bella Signature Homes PRELIMINARY Plat, has been previously paid.
Unless there is a new/different fee at the Final Plat stage, on top of the one at the Preliminary, he may not owe it.
I'm not sure if there is a second fee, but I don't think there is... maybe we should ask Matt.
I have not received the final plat submission yet...
Thanks,
Paty Saternye
Senior Planner
Community Development
41
Albemarle County
401 McIntire Road
Charlottesville, VA 22902
434-296-5832 ext.3250
psaternve@albemarle.org
www.albemarle.org
From: John Anderson
Sent: Thursday, January 31, 2019 12:29 PM
To: Ernest Beasley <ebeaslev@hvdrogeoenvironmental.com>
Cc: Patricia Saternye <psaternve@albemarle.org>
Subject: RE: Tier 3 Groundwater Assessment for Bella Signature Homes
(Paty, please advise —thanks )
Thanks for your email, Mr. Beasley.
Please submit a subdivision application (with fee) with print copy of Tier III report to get into review queues. Since this is
a subdivision application, I rely on Paty for guidance. It appears a 548 fee is required with Application (image, below:
pg. 3 /Application)
Groundwater Re►•ien, Fees
J 'Pier 2 Groundwater Res•ic,#% = $355 (Required for all plats proposing lots less than 21 acre,
J 'Pier 3 Groundwater Revietr = $948 (Required for all plats proposing lots where at least 3 1
acres or Icss)
J 'I'ier 4 Groundwater Review = $1,183
Link to Application:
http://www.albemarle.org/upload/itnagestforrns_center/departments/Commim4 Development/forms/applications/Subdiv
ision Plat & Checklist.odf
I look forward to receiving a print copy of the Tier 3 report, once submitted with Application. Thanks again
-best,
J. Anderson 434.296-5832 -x3069
From: Ernest Beasley <ebeaslev@hydrogeoenvironmental.com>
Sent: Thursday, January 31, 2019 12:08 PM
To: John Anderson <ianderson2@albemarle.org>
Cc: Luke Kitelinger <Kitelingerl@vahoo.com>; Bryan Chambers<chamberslandsurveying@vahoo.com>; Kathryn Bryant
<Kathryn@hydrogeoenvironmental.com>;1P Ligush<Ipligush@hydrogeoenvironmental.com>
Subject: Tier 3 Groundwater Assessment for Bella Signature Homes
42
Mr. Anderson,
Please see the attached Tier 3 Groundwater Assessment HydroGeo has completed on behalf of Bella
Signature Homes, LLC for Albemarle Parcel #45-59M.
Don't hesitate to reach out to me with any questions or comments.
Many thanks,
Bubba Beasley, MS, CPG
Geologist
c: (404) 219-6676
www.HvdroGeoEnvironmental.com
43
Patricia "Paty" Saternye
From: Patricia Saternye
Sent: Thursday, January 31, 2019 2:37 PM
To: John Anderson
Subject: RE: Tier 3 Groundwater Assessment for Bella Signature Homes (SUB2018-177 -
Preliminary Plat)
John,
It is up to you. The only two things I would say is that:
• There is no rush since it is supposed to be reviewed with the final plat. So unless you have availability I wouldn't
prioritize it (They didn't ask for it to be reviewed ASAP did they?
• Putting it in the Preliminary Plat folder could cause confusion later, unless you ultimately want to upload it
under both numbers.
Thanks,
Paty Saternye
Senior Planner
Community Development
4�
v
�`�/R41N��R�
Albemarle County
401 McIntire Road
Charlottesville, VA 22902
434-296-5832 ext.3250
psaternye@albemarle.ore
www.albemarle.or�
From: John Anderson
Sent: Thursday, January 31, 2019 1:26 PM
To: Patricia Saternye <psaternye@albemarle.org>
Subject: RE: Tier 3 Groundwater Assessment for Bella Signature Homes (SUB2018-177 - Preliminary Plat)
Paty, thanks
I thought to review the Tier III report under preliminary plat since final plat not yet submitted, Tier III submitted, and to
try to keep track... a CV location to list review, more than anything else. Later, I can include ref. to location of review of
final Tier III report, under the final plat /SUB#. Does this make sense? Thoughts?
From: Patricia Saternye
Sent: Thursday, January 31, 2019 12:58 PM
To: John Anderson <janderson2@albemarle.ore>
Subject: RE: Tier 3 Groundwater Assessment for Bella Signature Homes (SUB2018-177 - Preliminary Plat)
M
My comment #1(attached) states that they were supposed to submit the draft study prior to the preliminary plat
approval, that they did, and to see your comments the draft report that was submitted.
So, if they did it correctly, what is attached should be the revised and final version of the study that is supposed to be
submitted with the final plat.
Thanks,
Paty Saternye
Senior Planner
Community Development
ri
Albemarle County
401 McIntire Road
Charlottesville, VA 22902
434-296-5832 ext.3250
psaternye@albemarle.org
www.albemarle.ors
From: John Anderson
Sent: Thursday, January 31, 2019 12:53 PM
To: Patricia Saternye <psaternve@albemarle.ore>
Subject: RE: Tier 3 Groundwater Assessment for Bella Signature Homes
thanks
From: Patricia Saternye
Sent: Thursday, January 31, 2019 12:52 PM
To: John Anderson <janderson2@albemarle.ora>
Subject: RE: Tier 3 Groundwater Assessment for Bella Signature Homes
John,
I would have to look back at the comments, but if the preliminary is approved it might not be necessary to review the
Tier III until the final plat is submitted.
I'll try to look at that later today or tomorrow morning.
Thanks,
Paty Saternye
Senior Planner
Community Development
Albemarle County
401 McIntire Road
Charlottesville, VA 22902
45
434-296-5832 ext.3250
psaternye@albemarle.org
www.albemarle.org
From: John Anderson
Sent: Thursday, January 31, 2019 12:44 PM
To: Patricia Saternye <psaternye@albemarle.org>
Cc: Ernest Beasley<ebeasley@hydrogeoenvironmental.com>
Subject: RE: Tier 3 Groundwater Assessment for Bella Signature Homes
Paty,
No, a single fee is sufficient. I will review the digital Tier III report as soon as possible, and have added a task under
preliminary subdivision plat —thanks, Paty.
Mr. Beasley,
The report is logged /in my review queue. I will review as soon as possible and withdraw request for an application
related to GW assessment —thanks for sending.
-best,
J. Anderson 434.296-5832 -x3069
From: Patricia Saternye
Sent: Thursday, January 31, 2019 12:36 PM
To: John Anderson <janderson2@albemarle.org>
Subject: RE: Tier 3 Groundwater Assessment for Bella Signature Homes
John,
It appears on County View that the Fee for the Tier III Groundwater Study, for the approved SUB2018-177 Properties of
Bella Signature Homes PRELIMINARY Plat, has been previously paid.
Unless there is a new/different fee at the Final Plat stage, on top of the one at the Preliminary, he may not owe it.
I'm not sure if there is a second fee, but I don't think there is... maybe we should ask Matt.
I have not received the final plat submission yet...
Thanks,
Paty Saternye
Senior Planner
Community Development
Albemarle County
401 McIntire Road
Charlottesville, VA 22902
434-296-5832 ext.3250
psaternye@albemarle.org
www.albemarle.org
M
From: John Anderson
Sent: Thursday, January 31, 2019 12:29 PM
To: Ernest Beasley <ebeaslev@hydrogeoenvironmental.com>
Cc: Patricia Saternye <psaternye@albemarle.org>
Subject: RE: Tier 3 Groundwater Assessment for Bella Signature Homes
(Paty, please advise —thanks )
Thanks for your email, Mr. Beasley.
Please submit a subdivision application (with fee) with print copy of Tier III report to get into review queues. Since this is
a subdivision application, I rely on Paty for guidance. It appears a 548 fee is required with Application (image, below:
pg. 3 /Application)
Grotrndiraler Review Fees
J Tier 2 Groundwater Review = $355 (Required for all plats proposing lots less than 21 acre!
J Tier 3 Groundwater Review = $548 (Required for all plats proposing lots where at least 31
acres or less)
0 Tier 4 Groundwater Review = $1,183
Link to Application:
http://www.albemarle.or Lupload/itnagestfonns_center/departments/Community Development/forms/applications/Subdiv
ision Plat & Cheeklist.odf
I look forward to receiving a print copy of the Tier 3 report, once submitted with Application. Thanks again
-best,
J. Anderson 434.296-5832 -x3069
From: Ernest Beasley <ebeaslev@hydrogeoenvironmental.com>
Sent: Thursday, January 31, 2019 12:08 PM
To: John Anderson <ianderson2@albemarle.org>
Cc: Luke Kitelinger <Kitelingerl@yahoo.com>; Bryan Chambers<chamberslandsurveying@yahoo.com>; Kathryn Bryant
<Kathryn@hydrogeoenvironmental.com>;1P Ligush<ipligush@hvdrogeoenvironmental.com>
Subject: Tier 3 Groundwater Assessment for Bella Signature Homes
Mr. Anderson,
Please see the attached Tier 3 Groundwater Assessment HydroGeo has completed on behalf of Bella
Signature Homes, LLC for Albemarle Parcel #45-59M.
Don't hesitate to reach out to me with any questions or comments.
Many thanks,
Bubba Beasley, MS, CPG
Geologist
c: (404) 219-6676
www.HvdroGeoEnvironmental.com
47
Patricia "Paty" Saternye
From: John Anderson
Sent: Thursday, January 31, 2019 1:26 PM
To: Patricia Saternye
Subject: RE: Tier 3 Groundwater Assessment for Bella Signature Homes (SUB2018-177 -
Preliminary Plat)
Paty, thanks
I thought to review the Tier III report under preliminary plat since final plat not yet submitted, Tier III submitted, and to
try to keep track... a CV location to list review, more than anything else. Later, I can include ref. to location of review of
final Tier III report, under the final plat /SUB#. Does this make sense? Thoughts?
From: Patricia Saternye
Sent: Thursday, January 31, 2019 12:58 PM
To: John Anderson <janderson2@albemarle.org>
Subject: RE: Tier 3 Groundwater Assessment for Bella Signature Homes (SUB2018-177 - Preliminary Plat)
My comment #1 (attached) states that they were supposed to submit the draft study prior to the preliminary plat
approval, that they did, and to see your comments the draft report that was submitted.
So, if they did it correctly, what is attached should be the revised and final version of the study that is supposed to be
submitted with the final plat.
Thanks,
Paty Saternye
Senior Planner
Community Development
4{ Ir
A
V
Albemarle County
401 McIntire Road
Charlottesville, VA 22902
434-296-5832 ext.3250
psaternve@albemarle.ore
www.albemarle.or�
From: John Anderson
Sent: Thursday, January 31, 2019 12:53 PM
To: Patricia Saternye <psaternye@albemarle.org>
Subject: RE: Tier 3 Groundwater Assessment for Bella Signature Homes
thanks
49
From: Patricia Saternye
Sent: Thursday, January 31, 2019 12:52 PM
To: John Anderson <landerson2@albemarle.org>
Subject: RE: Tier 3 Groundwater Assessment for Bella Signature Homes
John,
I would have to look back at the comments, but if the preliminary is approved it might not be necessary to review the
Tier III until the final plat is submitted.
I'll try to look at that later today or tomorrow morning.
Thanks,
Paty Saternye
Senior Planner
Community Development
ail 11 b�
A,
U !�
a��R4 A"
Albemarle County
401 McIntire Road
Charlottesville, VA 22902
434-296-5832 ext.3250
psaternye@albemarle.org
www.albemarle.org
From: John Anderson
Sent: Thursday, January 31, 2019 12:44 PM
To: Patricia Saternye <psaternve@albemarle.org>
Cc: Ernest Beasley<ebeasley@hydrogeoenvironmental.com>
Subject: RE: Tier 3 Groundwater Assessment for Bella Signature Homes
Paty,
No, a single fee is sufficient. I will review the digital Tier III report as soon as possible, and have added a task under
preliminary subdivision plat —thanks, Paty.
Mr. Beasley,
The report is logged /in my review queue. I will review as soon as possible and withdraw request for an application
related to GW assessment —thanks for sending.
-best,
J. Anderson 434.296-5832 -x3069
From: Patricia Saternye
Sent: Thursday, January 31, 2019 12:36 PM
To: John Anderson <janderson2@albemarle.org>
Subject: RE: Tier 3 Groundwater Assessment for Bella Signature Homes
50
John,
It appears on County View that the Fee for the Tier III Groundwater Study, for the approved SUB2018-177 Properties of
Bella Signature Homes PRELIMINARY Plat, has been previously paid.
Unless there is a new/different fee at the Final Plat stage, on top of the one at the Preliminary, he may not owe it.
I'm not sure if there is a second fee, but I don't think there is... maybe we should ask Matt.
I have not received the final plat submission yet...
Thanks,
Paty Saternye
Senior Planner
Community Development
4�Or
2
u
,`��R41M�*•
Albemarle County
401 McIntire Road
Charlottesville, VA 22902
434-296-5832 ext.3250
psaternve@albemarle.ore
www.albemarle.org
From: John Anderson
Sent: Thursday, January 31, 2019 12:29 PM
To: Ernest Beasley<ebeaslev@hvdroeeoenvironmental.com>
Cc: Patricia Saternye <psaternve@albemarle.org>
Subject: RE: Tier 3 Groundwater Assessment for Bella Signature Homes
(Paty, please advise —thanks )
Thanks for your email, Mr. Beasley.
Please submit a subdivision application (with fee) with print copy of Tier III report to get into review queues. Since this is
a subdivision application, I rely on Paty for guidance. It appears a 548 fee is required with Application (image, below:
pg. 3 /Application)
Groundwater Review Fees
J Tier 2 Groundwater Review = $355 (Required for all plats proposing lots less than 21 acre!
J Tier 3 Groundwater Review = $548 (Required for all plats proposing lots whereat least 31
acres or less)
J Tier 4 Groundwater Review = $1,183
Link to Application:
http://www.albemarle.or Lupload/itnagestfonns_center/departments/Commim4 Development/forms/applications/Subdiv
ision Plat & Checklist.odf
51
I look forward to receiving a print copy of the Tier 3 report, once submitted with Application. Thanks again
-best,
J. Anderson 434.296-5832 -0069
From: Ernest Beasley<ebeasley@hydrogeoenvironmentaLcom>
Sent: Thursday, January 31, 2019 12:08 PM
To: John Anderson <janderson2@albemarle.org>
Cc: Luke Kitelinger <Kitelinger1@yahoo.com>; Bryan Chambers <chamberslandsurveving@vahoo.com>; Kathryn Bryant
<Kathryn@hvdrogeoenvironmental.com>; JP Ligush<ipligush@hvdrogeoenvironmental.com>
Subject: Tier 3 Groundwater Assessment for Bella Signature Homes
Mr. Anderson,
Please see the attached Tier 3 Groundwater Assessment HydroGeo has completed on behalf of Bella
Signature Homes, LLC for Albemarle Parcel #45-59M.
Don't hesitate to reach out to me with any questions or comments.
Many thanks,
Bubba Beasley, MS, CPG
Geologist
c: (404) 219-6676
www.HvdroGeoEnvironmental.com
52
Patricia "Paty" Saternye
From: Patricia Saternye
Sent: Thursday, January 31, 2019 12:58 PM
To: John Anderson
Subject: RE: Tier 3 Groundwater Assessment for Bella Signature Homes (SUB2018-177 -
Preliminary Plat)
Attachments: SUB2018-177 Approval with Conditions 12-21-2018c.pdf
My comment #1(attached) states that they were supposed to submit the draft study prior to the preliminary plat
approval, that they did, and to see your comments the draft report that was submitted.
So, if they did it correctly, what is attached should be the revised and final version of the study that is supposed to be
submitted with the final plat.
Thanks,
Paty Saternye
Senior Planner
Community Development
pF
;4
U
'`��R41M�*I.
Albemarle County
401 McIntire Road
Charlottesville, VA 22902
434-296-5832 ext.3250
psaternye@albemarle.org
www.albemarle.org
From: John Anderson
Sent: Thursday, January 31, 2019 12:53 PM
To: Patricia Saternye <psaternye@albemarle.org>
Subject: RE: Tier 3 Groundwater Assessment for Bella Signature Homes
thanks
From: Patricia Saternye
Sent: Thursday, January 31, 2019 12:52 PM
To: John Anderson <janderson2@albemarle.org>
Subject: RE: Tier 3 Groundwater Assessment for Bella Signature Homes
John,
I would have to look back at the comments, but if the preliminary is approved it might not be necessary to review the
Tier III until the final plat is submitted.
I'll try to look at that later today or tomorrow morning.
53
Thanks,
Paty Saternye
Senior Planner
Community Development
Ati
�I
Albemarle County
401 McIntire Road
Charlottesville, VA 22902
434-296-5832 ext.3250
psaternve@albemarle.ore
www.albemarle.or�
From: John Anderson
Sent: Thursday, January 31, 2019 12:44 PM
To: Patricia Saternye <psaternve@albemarle.ore>
Cc: Ernest Beasley<ebeaslev@hvdroaeoenvironmental.com>
Subject: RE: Tier 3 Groundwater Assessment for Bella Signature Homes
Paty,
No, a single fee is sufficient. I will review the digital Tier III report as soon as possible, and have added a task under
preliminary subdivision plat —thanks, Paty.
Mr. Beasley,
The report is logged /in my review queue. I will review as soon as possible and withdraw request for an application
related to GW assessment —thanks for sending.
-best,
J. Anderson 434.296-5832 -x3069
From: Patricia Saternye
Sent: Thursday, January 31, 2019 12:36 PM
To: John Anderson <landerson2@albemarle.ore>
Subject: RE: Tier 3 Groundwater Assessment for Bella Signature Homes
John,
It appears on County View that the Fee for the Tier III Groundwater Study, for the approved SUB2018-177 Properties of
Bella Signature Homes PRELIMINARY Plat, has been previously paid.
Unless there is a new/different fee at the Final Plat stage, on top of the one at the Preliminary, he may not owe it.
I'm not sure if there is a second fee, but I don't think there is... maybe we should ask Matt.
I have not received the final plat submission yet...
Thanks,
Paty Saternye
Senior Planner
Community Development
54
Albemarle County
401 McIntire Road
Charlottesville, VA 22902
434-296-5832 ext.3250
psaternve@albemarle.org
www.albemarle.org
From: John Anderson
Sent: Thursday, January 31, 2019 12:29 PM
To: Ernest Beasley <ebeaslev@hvdrogeoenvironmental.com>
Cc: Patricia Saternye <psaternve@albemarle.org>
Subject: RE: Tier 3 Groundwater Assessment for Bella Signature Homes
(Paty, please advise —thanks )
Thanks for your email, Mr. Beasley.
Please submit a subdivision application (with fee) with print copy of Tier III report to get into review queues. Since this is
a subdivision application, I rely on Paty for guidance. It appears a 548 fee is required with Application (image, below:
pg. 3 /Application)
Groundwater Review Fees
J Tier 2 Groundwater Review = $355 (Required for all plats proposing lots less than 21 acre!
J 'tier 3 Groundwater Review = $548 (Required for all plats proposing lots where at least 3 1
acres ur less)
J 'I'icr 4 (:ruun(Iw ater Review = $1,183
Link to Application:
http://www.albemarle.org/upload/itnagestforrns_center/departments/Commim4 Development/forms/applications/Subdiv
ision Plat & Checklist.odf
I look forward to receiving a print copy of the Tier 3 report, once submitted with Application. Thanks again
-best,
J. Anderson 434.296-5832 -x3069
From: Ernest Beasley <ebeaslev@hydrogeoenvironmental.com>
Sent: Thursday, January 31, 2019 12:08 PM
To: John Anderson <ianderson2@albemarle.org>
Cc: Luke Kitelinger <Kitelingerl@yahoo.com>; Bryan Chambers<chamberslandsurveying@vahoo.com>; Kathryn Bryant
<Kathryn@hydrogeoenvironmental.com>;1P Ligush<Ipligush@hydrogeoenvironmental.com>
Subject: Tier 3 Groundwater Assessment for Bella Signature Homes
55
Mr. Anderson,
Please see the attached Tier 3 Groundwater Assessment HydroGeo has completed on behalf of Bella
Signature Homes, LLC for Albemarle Parcel #45-59M.
Don't hesitate to reach out to me with any questions or comments.
Many thanks,
Bubba Beasley, MS, CPG
Geologist
c: (404) 219-6676
www.HvdroGeoEnvironmental.com
56
Patricia "Paty" Saternye
From: John Anderson
Sent: Thursday, January 31, 2019 12:53 PM
To: Patricia Saternye
Subject: RE: Tier 3 Groundwater Assessment for Bella Signature Homes
thanks
From: Patricia Saternye
Sent: Thursday, January 31, 2019 12:52 PM
To: John Anderson <janderson2@albemarle.org>
Subject: RE: Tier 3 Groundwater Assessment for Bella Signature Homes
John,
I would have to look back at the comments, but if the preliminary is approved it might not be necessary to review the
Tier III until the final plat is submitted.
I'll try to look at that later today or tomorrow morning.
Thanks,
Paty Saternye
Senior Planner
Community Development
cP*I
Albemarle County
401 McIntire Road
Charlottesville, VA 22902
434-296-5832 ext.3250
psaternye@albemarle.ore
www.albemarle.ora
From: John Anderson
Sent: Thursday, January 31, 2019 12:44 PM
To: Patricia Saternye <psaternye@albemarle.ore>
Cc: Ernest Beasley<ebeaslev@hvdroaeoenvironmental.com>
Subject: RE: Tier 3 Groundwater Assessment for Bella Signature Homes
Paty,
No, a single fee is sufficient. I will review the digital Tier III report as soon as possible, and have added a task under
preliminary subdivision plat —thanks, Paty.
Mr. Beasley,
57
The report is logged /in my review queue. I will review as soon as possible and withdraw request for an application
related to GW assessment —thanks for sending.
-best,
J. Anderson 434.296-5832 -x3069
From: Patricia Saternye
Sent: Thursday, January 31, 2019 12:36 PM
To: John Anderson <janderson2@albemarle.ore>
Subject: RE: Tier 3 Groundwater Assessment for Bella Signature Homes
John,
It appears on County View that the Fee for the Tier III Groundwater Study, for the approved SUB2018-177 Properties of
Bella Signature Homes PRELIMINARY Plat, has been previously paid.
Unless there is a new/different fee at the Final Plat stage, on top of the one at the Preliminary, he may not owe it.
I'm not sure if there is a second fee, but I don't think there is... maybe we should ask Matt.
I have not received the final plat submission yet...
Thanks,
Paty Saternye
Senior Planner
Community Development
Albemarle County
401 McIntire Road
Charlottesville, VA 22902
434-296-5832 ext.3250
psaternve@albemarle.ore
www.albemarle.or�
From: John Anderson
Sent: Thursday, January 31, 2019 12:29 PM
To: Ernest Beasley<ebeasley@hydroeeoenvironmental.com>
Cc: Patricia Saternye <psaternve@albemarle.org>
Subject: RE: Tier 3 Groundwater Assessment for Bella Signature Homes
(Paty, please advise —thanks )
Thanks for your email, Mr. Beasley.
Please submit a subdivision application (with fee) with print copy of Tier III report to get into review queues. Since this is
a subdivision application, I rely on Paty for guidance. It appears a 548 fee is required with Application (image, below:
pg. 3 /Application)
58
Groundwater Review Fees
J Tier 2 Groundwater Review = $355 (Required for all plats proposing lots less than 21 acre!
J Tier 3 Groundwater Review = $548 (Required for all plats proposing; lots whereat least 3 1
acres or less)
J Tier 4 Groundwater Review = $1,183
Link to Application:
http://www.albemarle.or Lupload/itnaeestfonns_center/departments/Community Development/forms/applications/Subdiv
ision Plat & Checklist.odf
I look forward to receiving a print copy of the Tier 3 report, once submitted with Application. Thanks again
-best,
I Anderson 434.296-5832 -x3069
From: Ernest Beasley<ebeaslev@hvdroaeoenvironmental.com>
Sent: Thursday, January 31, 2019 12:08 PM
To: John Anderson <landerson2@albemarle.org>
Cc: Luke Kitelinger <Kitelingerl@vahoo.com>; Bryan Chambers<chamberslandsurveying@yahoo.com>; Kathryn Bryant
<Kathryn@hydroseoenvironmental.com>;1P Ligush<Iplieush@hvdroaeoenvironmental.com>
Subject: Tier 3 Groundwater Assessment for Bella Signature Homes
Mr. Anderson,
Please see the attached Tier 3 Groundwater Assessment HydroGeo has completed on behalf of Bella
Signature Homes, LLC for Albemarle Parcel #45-59M.
Don't hesitate to reach out to me with any questions or comments.
Many thanks,
Bubba Beasley, MS, CPG
Geologist
c: (404) 219-6676
www.HvdroGeoEnvironmental.com
59
Patricia "Paty" Saternye
From: Patricia Saternye
Sent: Thursday, January 31, 2019 12:52 PM
To: John Anderson
Subject: RE: Tier 3 Groundwater Assessment for Bella Signature Homes
John,
I would have to look back at the comments, but if the preliminary is approved it might not be necessary to review the
Tier III until the final plat is submitted.
I'll try to look at that later today or tomorrow morning.
Thanks,
Paty Saternye
Senior Planner
Community Development
`��R41ir�4;
u i
R'
Albemarle County
401 McIntire Road
Charlottesville, VA 22902
434-296-5832 ext.3250
psaternve@albemarle.ore
www.albemarle.ors
From: John Anderson
Sent: Thursday, January 31, 2019 12:44 PM
To: Patricia Saternye <psaternye@albemarle.org>
Cc: Ernest Beasley <ebeasley@hydrogeoenvironmental.com>
Subject: RE: Tier 3 Groundwater Assessment for Bella Signature Homes
Paty,
No, a single fee is sufficient. I will review the digital Tier III report as soon as possible, and have added a task under
preliminary subdivision plat —thanks, Paty.
Mr. Beasley,
The report is logged /in my review queue. I will review as soon as possible and withdraw request for an application
related to GW assessment —thanks for sending.
-best,
J. Anderson 434.296-5832 -x3069
From: Patricia Saternye
Sent: Thursday, January 31, 2019 12:36 PM
60
To: John Anderson <landerson2@albemarle.ora>
Subject: RE: Tier 3 Groundwater Assessment for Bella Signature Homes
John,
It appears on County View that the Fee for the Tier III Groundwater Study, for the approved SUB2018-177 Properties of
Bella Signature Homes PRELIMINARY Plat, has been previously paid.
Unless there is a new/different fee at the Final Plat stage, on top of the one at the Preliminary, he may not owe it.
I'm not sure if there is a second fee, but I don't think there is... maybe we should ask Matt.
I have not received the final plat submission yet...
Thanks,
Paty Saternye
Senior Planner
Community Development
Albemarle County
401 McIntire Road
Charlottesville, VA 22902
434-296-5832 ext.3250
psaternve@albemarle.ore
www.albemarle.org
From: John Anderson
Sent: Thursday, January 31, 2019 12:29 PM
To: Ernest Beasley<ebeaslev@hydroaeoenvironmental.com>
Cc: Patricia Saternye <psaternve@albemarle.org>
Subject: RE: Tier 3 Groundwater Assessment for Bella Signature Homes
(Paty, please advise —thanks )
Thanks for your email, Mr. Beasley.
Please submit a subdivision application (with fee) with print copy of Tier III report to get into review queues. Since this is
a subdivision application, I rely on Paty for guidance. It appears a 548 fee is required with Application (image, below:
pg. 3 /Application)
Groundwater Review Fees
❑ Tier 2 Groundwater Review = $355 (Required for all plats proposing lots less than 21 acre!
❑ Tier 3 Groundwater Review = $548 (Required for all plats proposing lots whereat least 3 1
acres or less)
❑ Tier 4 Groundwater Review = $1,183
61