HomeMy WebLinkAboutZMA200700022 Staff Report 2008-03-20COUNTY OF ALBEMARLE
PLANNING STAFF REPORT SUMMARY
Project Name: ZMA 07 -22 Innovative
Staff: Claudette Grant
Construction
Planning Commission Public Hearing:
Board of Supervisors Public Hearing: April 9,
March 11, 2008
2008
Owners: Woolen Mills Self Storage, LLC
Applicant: Innovative Construction Concepts,
Inc.
Acreage: 0.977 acres
Rezone: HC, Highway Commercial to LI, Light
Industrial.
TMP: Tax Map 90, Parcel 35C
By -right use: HC, Highway Commercial with
proffers
Location: 1811 Avon Street Extended (Route
742) across from Reynovia Dr. (See
Attachments A and B)
Magisterial District: Scottsville
Proffers: Yes
Proposal: The applicant proposes to use the
Requested # of Dwelling Units: 0
existing building on site for a contractor's office
and storage yard.
DA (Development Area): Neighborhood 4
Comp. Plan Designation: Industrial Service
Character of Property: Property fronts on Avon
Use of Surrounding Properties: The
Street Extended. The site is developed with a
Southside Church of God and Dixon Trash
one -story building, three (3) out buildings, and
Disposal are adjacent to Innovative
an outdoor storage area. There is a gentle
Construction. The surrounding properties to the
incline onto the property towards the building at
south of Innovative Construction are primarily
which point the property levels off. The property
light industry type uses. The Lake Reynovia
then slopes down to the rear of the site.
residential subdivision is located across the
street.
Factors Favorable:
Factors Unfavorable:
1. The proposal makes the property more
1. The proffers are in need of technical and
consistent with the Comprehensive Plan.
substantive language revisions.
2. The rezoning forms a logical extension of
2. The existing well and septic system are
the LI district from the adjacent property.
proposed to remain because of the cost
3. There are no proposed changes to the
for connections to public water and
site.
sewer.
4. The rezoning to light industrial zoning will
accommodate a small business which is
an identified need in the County.
RECOMMENDATION: Provided that the technical and substantive provisions to the proffers are
completed prior to the Board of Supervisor's meeting, staff recommends approval of ZMA 2007-
022, Innovative Construction, inclusive of revised proffers. Staff also recommends approval of the
waiver request to Section 26.10.3 to allow the fence described in the proffer to be constructed in
the buffer.
Innovative Construction
PC Public Hearing 3/11/08
STAFF PERSON:
PLANNING COMMISSION:
BOARD OF SUPERVISORS:
Claudette Grant
March 11, 2008
April 9, 2008
ZMA 2007- 022 Innovative Construction
Request for approval of Modification of Section 26.10.3 regarding installation of a fence in the required
buffer.
PETITION
PROPOSAL: Rezone .977 acres from HC - Highway Commercial zoning district which allows
commercial and service uses; and residential use by special use permit (15 units /acre) to LI - Light
Industrial zoning district which allows industrial, office, and limited commercial uses (no residential use)
for contractor's office and storage yard.
PROFFERS: Yes
EXISTING COMPREHENSIVE PLAN LAND USE /DENSITY: Industrial Service - warehousing, light
industry, heavy industry, heavy industry, research, office uses, regional scale research, limited
production and marketing activities, supporting commercial, lodging and conference facilities, and
residential (6.01 -34 units /acre) in Neighborhood 4.
ENTRANCE CORRIDOR: Yes
LOCATION: 1811 Avon Street Extended (Route 742) across from Reynovia Dr.
TAX MAP /PARCEL: 90/35C
MAGISTERIAL DISTRICT: Scottsville
CHARACTER OF THE AREA
The site is developed with a one story building, three (3) outbuildings and an outdoor storage area.
There are a few trees on the site, most of which form a buffer at the north and rear sides of the site.
The front portion of the site gently slopes up a hill toward the building and the site slopes down toward
the rear of the site. Southside Church of God, Dixon Trash Disposal and some residential uses are
adjacent to Innovative Construction. The Lake Reynovia residential subdivision is located across the
street from the site and many of the uses located towards the south of Innovative Construction are
industrial.
SPECIFICS OF THE PROPOSAL
This site is located at 1811 Avon Street Extended (Route 742) across from Reynovia Dr., which is the
access to the Lake Reynovia residential subdivision. (See Attachments A & B) The property is currently
approved for machinery and equipment sale, service and rental. However, the applicant would like to
purchase the property and use it for a contractor's office and storage yard, which is permitted by -right in
the LI, Light Industrial zoning district and requires a special use permit in the HC, Highway Commercial
zoning district. The current proffers for this property restrict the HC to machinery and equipment sales,
service, and rental; and uses in HC zone that are permitted under C -1 as they may be established
under C -1 regulations. A contractor's office and storage yard is not a permitted use in the C -1 district.
The applicant plans to use the property as -is with no physical changes to the buildings or site, outside
of what the County may require.
APPLICANT'S JUSTIFICATION FOR THE REQUEST
The applicant proposes to utilize the existing buildings and site for a contractor's office and storage
yard. As previously mentioned in this report, the proffer for this property restricts the proposed use,
making a rezoning or special use permit necessary in order to use the property for a contractor's office
and storage yard. This site represents the only Highway Commercial district in the surrounding area.
The applicant preferred to request a rezoning to extend the Light Industrial district to this property rather
than request both a rezoning for a proffer change and a special use permit with this rezoning.
PLANNING AND ZONING HISTORY
Innovative Construction
PC Public Hearing 3/11/08
1. ZMA 82 -05 J. V. Webster — On May 19, 1982, the Board of Supervisors voted to approve the
rezoning request of approximately 1 acre from R -1 Residential to HC Highway Commercial with
proffers. (See Attachment C)
2. SDP 82 -025 J.V. Farm Equipment - This site plan followed the rezoning request.
3. The following three (3) variances occurred: VA 82 -010 was approved on March 17, 1982 for road
frontage, VA 82 -063 was approved on October 13, 1982 for sign setback, and VA 84 -007 was
approved with conditions on January 30 1984 for setback.
No additional detail is available on the variances at this time.
NONCONFORMITY WITH THE ZONING
This use is non - conforming based on minimum yard requirements as follows: Section 26.10.2 of the
Zoning Ordinance states "Adjacent to residential districts: No portion of any structure, excluding signs,
shall be located closer than fifty (50) feet to any rural areas or residential district and no off - street
parking space shall be closer than thirty (30) feet to any rural areas or residential district. For the heavy
industry (HI) district, no portion of any structure, excluding signs, shall be located closer than one
hundred (100) feet to any rural areas or residential district and no off - street parking shall be closer than
thirty (30) feet to any rural areas or residential district." The current use is nonconforming due the
proximity of the structure and off - street parking to the adjacent residential district.
The Zoning staff has reviewed this situation and is okay with the existing non - conformity of the property
as well as the fact that the non - conformity will remain with this rezoning application because the use is
a pre- existing use and it is not changing. Staff notes that the setbacks between uses and districts in the
Development Areas are under consideration for reductions through the zoning amendment process.
The Commission expects to see staff proposed setback changes after completing work on the zero lot
line amendment.
CONFORMITY WITH THE COMPREHENSIVE PLAN
The Land Use Plan shows this area as Industrial Service and the applicant is requesting rezoning to an
industrial district.
The Economic Development Policy in the Comprehensive Plan provides the following objectives that
are consistent with a development like Innovative Construction. Objective II states "Plan for land and
infrastructure to accommodate future business and industrial growth. Objective V states "Provide local
business development opportunities." The Board of Supervisors in their recent work to update the
Economic Development Policy has supported at a recent work session prioritizing an increase in LI
zoning.
Neighborhood Model Analysis is not applicable for this project since it is an existing development and
does not propose re- development.
STAFF COMMENT
Relationship between the application and the purpose and intent of the requested zoning
district: The purpose and intent of the LI district is to permit industries, offices and limited commercial
uses which are compatible with and do not detract from surrounding districts. This proposed LI is .977
acres. Section 27.3 of the Zoning Ordinance states "the minimum area required for establishment of an
LI district shall be five (5) acres. Unless otherwise provided in section 26.2, there shall be no minimum
area requirements for additions to an established LI district, provided such area to be added adjoins
and forms a logical addition to the existing LI district." In this circumstance, staff feels it is appropriate
and logical to add this property to the adjacent existing LI district.
Innovative Construction
PC Public Hearing 3/11/08
Public need and justification for the change: The County's Comprehensive Plan supports
development in the designated development area. As previously mentioned in this report the Board of
Supervisors supports prioritizing an increase in Light Industrial zoning. The rezoning request will permit
the property and proposed use to be consistent with the Comprehensive Plan.
Impact on Environmental, Cultural, and Historic Resources: The applicant does not propose
changes to the site or existing building; therefore, there are no environmental impacts anticipated.
There are no cultural or historic resources associated with this site.
Anticipated impact on public facilities and services
Streets: VDOT had previously been concerned with the dimensions of the entrance to the site not
being adequate; however, VDOT has been working with the applicant and this issue has been resolved.
(See Attachment E) The development will generate an additional 16 trips per day on Avon Street
Extended, which provides primary access to the site. A majority of the employees for this business are
the field crew who work primarily in the field and typically do not come to the office. Staff and VDOT
agree that the traffic impact will be minimal.
Water and Sewer: This site is currently served by a well and septic field. In the Development Areas
public water and sewer are expected to serve all development. An inspection report from Intrastate
Pest Control, verifies that there is no leakage or seepage in the drain field. (See Attachment F) Contour
Construction has estimated the cost to connect water and sewer to public lines at $28,250.00. (See
Attachment G) Albemarle County Service Authority (ACSA) has quoted connection fees of $5,670.00
for water and $6,320.00 for sewer. Contour Construction, which conducted an on -site inspection, also
states that gravity sewer is not currently an option for this site. Contour's estimate does not include
bonds, rock excavation, engineering, meters, or electrical service to a grinder pump and lift station.
Furthermore, easements do not currently exist to permit the necessary crossing of two neighboring
parcels. Staff believes that at present, the cost of over $40,000 to connect to municipal water and
sewer is prohibitive for the applicant. Staff suggests the applicant revise proffers that state the applicant
will connect to public water and sewer within one year after each of these services becomes available.
Staff also suggests the applicant proffer the drawing showing existing improvements and proposed
storage areas and uses in order to provide assurance that future development of the site is not done in
a manner that intensifies impacts on the existing water and sewer.
Schools: This type of development would not generate students.
Fire, Rescue, Police: The Monticello Fire - Rescue station has been constructed off of Mill Creek Drive
Extended and provides service to this site. Monticello station meets response time standards.
Albemarle County 5th Street Office Building contains the County's Police Department, although the
police patrol all areas of the County. Current policy for police service recommends an average
response time of 10 minutes for all Development Areas.
Stormwater Management: As there are no physical changes proposed for this site, the County Engineer
only recommends stormwater management be provided if the Planning Commission or Board of
Supervisors would like to see more provided on this site than would otherwise be required by the
ordinance.
Anticipated impact on nearby and surrounding properties
The contractor's office and storage yard are very much in keeping with some of the existing
surrounding properties, which are comprised of trash disposal, roof and construction businesses. Since
the site will remain as -is, staff anticipates very little impact, if any on nearby and surrounding properties.
ARCHITECTURAL REVIEW BOARD COMMENT
This project was reviewed by the ARB staff. In summary, staff requested the addition of a screening
Innovative Construction
PC Public Hearing 3/11/08
fence that would screen the front of the site. The applicant has provided the screening fence by way of
a proffer, which is satisfactory to the ARB staff.
PROFFERS
Proffers are provided as Attachment F. They are described as follows:
Proffer 1. The applicant has agreed to proffer certain permitted uses of the property and /or uses
authorized by special use permit. This proffer describes the uses allowed and not allowed on this
property. Staff believes this proffer is appropriate.
Proffer 2. The applicant agrees to limit the use of the Contractor's equipment storage yard to specific
areas delineated on the plan provided with the rezoning and further limited by certain height
restrictions. (See Attachment D)
Proffer 3. The applicant agrees to construct a screening fence as described in the proffer and location
delineated on the plan provided with the rezoning. (See Attachment D)
Additional Proffer Needs
While Staff believes the existing proffers are substantively acceptable, they are still in need of technical
and language revisions and additional proffers are needed to address the water and sewer concerns.
Staff believes additional proffers should be added that address the future connection of public water
and sewer at whatever point these utilities become available along Avon Street Extended in front of the
subject site or within a public easement adjacent to the subject property. As previously mentioned the
plan and uses should also be proffered.
WAIVERS
The applicant has requested a waiver of Section 26.10.3 to allow installation of a fence in the required
buffer from a residential district. (See Attachment 1) Granting this waiver would permit the fence, which
is recommended by the Design Planner for the Entrance Corridor.
Section 26.10.3 of the Zoning Ordinance states: "Buffer zone adjacent to residential and rural
areas districts: No construction activity including grading or clearing of vegetation shall occur
closer than thirty (30) feet to any residential or rural areas district. Screening shall be provided
as required in section 32.7.9. (Amended 9 -9 -92) Except, the commission may waive this
requirement in a particular case where it has been demonstrated that grading or clearing is
necessary or would result in an improved site design, provided that:
Staff recommends approval of the waiver request to Section 26.10.3.
SUMMARY
Staff has identified the following factors, which are favorable to this rezoning request:
1. The proposal makes the property more consistent with the Comprehensive Plan.
2. The rezoning forms a logical extension of the LI district from the adjacent property.
3. There are no proposed changes to the site.
4. The rezoning to light industrial zoning will accommodate a small business which is an
identified need in the County.
Staff has identified the following factors, which are unfavorable to this rezoning request:
1. The proffers are in need of technical and substantive language revisions.
2. The existing well and septic system are proposed to remain because of the cost for
connections to public water and sewer.
Innovative Construction
PC Public Hearing 3/11/08
RECOMMENDATION
Provided that the technical and substantive provisions to the proffers are completed prior to the Board
of Supervisor's meeting, staff recommends approval of ZMA 2007 -022, Innovative Construction,
inclusive of revised proffers. Staff also recommends approval of the waiver request to Section 26.10.3
to allow the fence described in the proffer to be constructed in the buffer.
ATTACHMENTS
ATTACHMENT A
— Tax Map
ATTACHMENT B
— Location Map
ATTACHMENT C
— Letter from Stuart L. Richard, dated May 20, 1982
ATTACHMENT D
— The J.V. Webster Property Plat, dated April 25, 2005
ATTACHMENT E
— Electronic Mail from Joel Denunzio, dated March 4, 2008
ATTACHMENT F
— Letter from Intrastate Pest Control Co. Inc., dated January 25, 2008
ATTACHMENT G
— Proposal from Contour Construction, L.L. C., dated January 25, 2008
ATTACHMENT H
— Proffers, dated January 25, 2008
ATTACHMENT I —
Letter from Catherine Womack, dated February 19, 2008
Innovative Construction