Loading...
HomeMy WebLinkAboutSP200700013 Legacy Document 2008-03-25From: John Shepherd Sent: Tuesday, March 25, 2008 12:22 PM To: Neale Craft Subject: SP -2007-13 Stony Point Fire Department Neale, You have asked if the following changes to the concept plan can be considered to be in general accord with the approved plan. 1. Rotate the proposed 26'x 46' storage building 90 degrees and increase the height from 12 feet to 16 feet. 2. Construct a retaining wall in the area to the rear of the existing building and next to the proposed storage building. 3. Install a propane tank behind the proposed storage building more than 15 feet from the side property line. I have consulted with Scott Clark, the Senior Planner who reviewed the special permit, Margaret Maliszewski, the Design Planner and Amelia McCulley, the Zoning Administrator. These changes can be approved provided that the proposed building meets 15 -foot side setback for primary structures in the VR district. The Design planner recommends that the propane tank be placed in a location that is not visible from Route 20. Please be aware that ARB approval will be required as a condition of site plan approval if the retaining wall, propane tank or building are visible from Route 20. I will place a copy of this e-mail and the sketch you provided in the SP file for reference. John Shepherd Manager of Zoning Administration (434) 296-5832 ext. 3023