HomeMy WebLinkAboutSP200700061 Approval - County Special Use Permit 2008-05-30•
COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road, Room 227
Charlottesville, Virginia 22902 -4596
Phone (434) 296 -5832 Fax (434) 972 -4012
May 30, 2008
Chris Dyer, Principal, Western Albemarle High School
5941 Rockfish Gap Turnpike
Crozet/VA 22932
RE: SP200700061 Western Albemarle High School Rowing Club Dock
Tax Map 57, Parcel 4
Dear Mr. Dyer:
On May 14, 2008, the Albemarle County Board of Supervisors took action on SP #2007 - 00061,
Western Albemarle High School Rowing Club Dock to allow a public boat dock on the Beaver
Creek Reservoir on Tax Map 57, Parcel 4 in the Whitehall District. This special use permit was
approved based on the following conditions:
1. There shall be no removal of vegetation or earth disturbance within the two hundred
(200) -foot stream buffer associated with the installation of the boat dock. The stream
buffer is measured from the edge of the floodplain, which is approximated to be
Elevation 545 (North American Vertical Datum of 1988);
2. There shall be no other structures, such as decking or stairs, constructed in the two
hundred (200) -foot stream buffer;
3. There shall be a memorandum of understanding or agreement between the Albemarle
County Parks and Recreation Department and the Albemarle County School Board that
addresses public use of the boat dock; and
4. A stable and pervious pedestrian access reviewed and approved by the Director of the
Department of Parks and Recreation shall be constructed and maintained from the
closest paved parking area to the new boat dock.
Please be advised that although the Albemarle County Board of Supervisors took action
on the project noted above, no uses on the property as approved above may lawfully
begin until all applicable approvals have been received and conditions have been met.
This includes:
• compliance with conditions of the SPECIAL USE PERMIT;
• approval of and compliance with a SITE PLAN; and
• approval of a ZONING COMPLIANCE CLEARANCE.
In the event that the use, structure or activity for which this special use permit is issued is not
commenced within twenty -four (24) months from the date of Board approval, it shall be deemed
abandoned and the permit terminated. The term "commenced" means "construction of any
structure necessary to the use of the permit."
If you have questions or comments regarding the above -noted action, please do not hesitate to
contact Sherri Proctor at 296 -5832.
Sincerely, _
V. Waynd ilimberg
Director of Planning
Cc: Sue Friedman, Chair, Albemarle County School Board
401 McIntire Road, Room 345
Charlottesville, Va 22902
County Of Albemarle C/O Finance Administration Rm 149
401 Mcintire Road
Charlottesville, Va 22902
Email Copy: Tex Weaver; Chuck Proctor; Sherri Proctor; Stewart Wright
File
Lr�2C;1�1�
COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road, North Wing
Charlottesville, Virginia 22902 -4596
Phone (434) 296 -5832 Fax (434) 972 -4012
April 25, 2008
Chris Dyer, Principal, Western Albemarle High School
5941 Rockfish Gap Turnpike
Crozet/VA 22932
RE: SP200700061 Western Albemarle High School Rowing Club Dock
Tax Map 57, Parcel 4
Dear Mr. Dyer:
The Albemarle County Planning Commission, at its meeting on April 8, 2008, recommended approval of
the above -noted petition to the Board of Supervisors, by a vote of 6:0.
Please note that this approval is subject to the following conditions:
1. There shall be no removal of vegetation or earth disturbance within the 200 -foot stream buffer associated
with the installation of the boat dock. The stream buffer is measured from the edge of the floodplain,
which is approximated to be Elevation 545 (North American Vertical Datum of 1988).
2. There shall be no other structures, such as decking or stairs, constructed in the 200 -foot stream buffer.
3. There shall be a memorandum of understanding or agreement between the Albemarle County Parks and
Recreation Department and the Albemarle County School Board that addresses public use of the boat
dock.
4. A stable and pervious pedestrian access reviewed and approved by the Director of the Department of
Parks and Recreation shall be constructed and maintained from the closest paved parking area to the
new boat dock.
Please be advised that the Albemarle County Board of Supervisors will review this petition and receive
public comment at their meeting on May 14, 2008.
If you should have any questions or comments regarding the above noted action, please do not hesitate to
contact me at (434) 296 -5832.
Sincerely,
Tamara Ambler
Natural Resource Manager
Planning Division
TA/SM
Cc: Sue Friedman, Chair, Albemarle County School Board
401 McIntire Road, Room 345
Charlottesville, Va 22902
County Of Albemarle C/O Finance Administration Rm 149
401 Mcintire Road
Charlottesville, Va 22902
POLICY
SUBMISSION OF MATERIALS
FOR ZONING APPLICATIONS
It is the Board's preference that a public hearing should not be advertised until all of the final materials
for a zoning application have been received by the County and are available for public review. To achieve this
preference, applicants should provide final plans, final codes of development, final proffers, and any other
documents deemed necessary by the Director of Community Development, to the County no later than two days
prior to the County's deadline for submitting the public hearing advertisement to the newspaper. Staff will advise
applicants of this date by including it in annual schedules for applications and by providing each applicant a
minimum of two weeks advance notice of the deadline.
If the applicant does not submit the required materials by this date, the public hearing shall not be
advertised unless the applicant demonstrates to the satisfaction of the Director of Community Development that
good cause exists for the public hearing to be advertised. If not advertised, a new public hearing date will be
scheduled. If the public hearing is held without final materials being available for review throughout the
advertisement period due to a late submittal of documents, or because substantial revisions or amendments are
made to the submitted materials after the public hearing has been advertised, it will be the policy of the Board to
either defer action and schedule a second public hearing that provides this opportunity to the public or to deny the
application, unless the Board finds that the deferral would not be in the public interest or not forward the purposes
of this policy.
Final signed proffers shall be submitted to the County no later than nine days prior to the date of the
advertised public hearing. This policy is not intended to prevent changes made in proffers at the public hearing
resulting from comments received from the public or from Board members at the public hearing.
This Zoning Policy will be included in the Board's Rules of Procedure for adoption each year, so that the
policy can be re- examined annually.