Loading...
HomeMy WebLinkAboutWPO200800013 Bond Estimates 2008-06-11BOND ESTIMATE - EROSION CONTROL Spreadsheet last revised:12 -5 -01 PROJECT NAME: New House - Yoder PROJECT NUMBER: WPO200800013 DATE OF ESTIMATE: May 08 2008 ESTIMATE BY: Jonathan Sharp BASED ON: LF WATER ITEM DESCRIPTION UNIT QUANTITY UNIT COST ITEM TOTAL SEED, FERTILIZE, MULCH ACRE 1 1500 1500 SILT FENCE LF 500 5 2500 SAFETY FENCE LF 0 3 0 TEMPORARY FILL DIVERSION LF 0 3 0 DIVERSION DIKE LF 300 3 900 TEMPORARY SLOPE DRAIN LF 0 20 0 SEDIMENT TRAP 1 ACRES 0.5 1000 500 SEDIMENT BASIN 1 ACRES 0 1000 0 CULVERT INLET PROTECTION EA 2 500 1000 INLET PROTECTION EA 0 200 0 OUTLET PROTECTION EA 2 200 400 EC -2 & 3 DITCH PROTECTION LF 0 10 0 RIP -RAP LF 0 55 0 CHECK DAMS SQ.YD. 1 30 30 STONE CONSTRUCTION ENTRANCE EA 1 1000 1000 SUBTOTAL 7830.00 CONTINGENCY & ADMINISTRATION LS 25% 1957.50 TOTAL 9787.50 BOND AMOUNT REQUIRED 10000