Loading...
HomeMy WebLinkAboutSDP200600061 Legacy Document 2008-06-12tL OF AL� ALBEMARLE COUNTY PLANNING STAFF REPORT SUMMARY Project Name: SDP 2006 -61 Northtown Center Staff: Bill Fritz Planning Commission Public Hearing: Board of Supervisors Hearing: June 17, 2008 Not applicable Owners: First Gold Leaf Land Trust Applicant: First Gold Leaf Land Trust Acreage: 15.9 Acres Rezone from: Not applicable Special Use Permit for: Not applicable TMP: Tax Map 45, Parcels 110, 110A, 111, 111A By -right use: Commercial Retail and 111B Location: The site is located east side of Seminole Trail (US Route 29 N.) immediately opposite Lowes and Kegler's and the Carrsbrook Subdivision Magisterial District: Rio Proffers /Conditions: None Requested # of Dwelling Lots: NA DA— X RA — Proposal: 83,990 gross square foot for retail Comp. Plan Designation: Community development Service in Neighborhood 2 Character of Property: Mixture of mature woods, Use of Surrounding Properties: Residential open area and scrub. A stream with associated critical slopes crosses the property. Factors Favorable: The plan has been revised to Factors Unfavorable: Not all conditions of substantially improve the layout and has received a the preliminary approval have received final number of approvals. approval. RECOMMENDATION: Staff recommends approval STAFF PERSON: William D. Fritz, AICP PLANNING COMMISSION: June 17, 2008 AGENDA TITLE: SDP 2006 -61 Northtown Center APPLICANT: First Gold Leaf Land Trust PROPERTY OWNER(S): First Gold Leaf Land Trust APPLICANT'S PROPOSAL: Construction of three buildings totaling 83,990 gross square foot for retail development COMPREHENSIVE PLAN: The Comprehensive Plan designates this property as Community Service in Neighborhood 2. REASON FOR PLANNING COMMISSION REVIEW: Typically final site plans are approved administratively. However, at the time of the Preliminary Site Plan approval, the Planning Commission required that the final site plan return to the Planning Commission for approval. PLANNING AND ZONING HISTORY: 1980 — Comprehensive Rezoning — The zoning designation of the property was changed from B -1, Business to its current designation of HC, Highway Commercial. 1988 — Application is made for a preliminary site plan to allow the construction of an automobile dealership (SDP 88 -54 Medlin Lincoln Mercury). This application was deferred indefinitely at the applicants request after the site review meeting. 1990 — Application is made for a gas station (SDP 90 -64 Heischman 29 North Mobile Station). This application was withdrawn prior to any action to approve or deny the site plan. 1991 — Application was made for a special use permit and site plan to allow an automobile dealership (SP 91 -57 First Gold Leaf Land Trust and SDP 91 -102 Carrsbrook Auto Preliminary Site Plan). At its meeting on December 9, 1992 the Board of Supervisors denied the special use permit for outdoor storage and display in the Entrance Corridor. The site plan was denied as a result of the denial of the special use permit. 1994 — Application was made for an 111,464 square foot retail center (SDP 94 -006 Carrsbrook Retail Center Preliminary Site Plan). This plan was approved by the Planning Commission on July 19, 1994. This application included an approval for activity on critical slopes and other modifications. The Planning Commission action was appealed to the Board of Supervisors. The Board reaffirmed the Commission's action at its meeting on August 3, 1994. The applicant did not submit the necessary final site plans as required by the Ordinance and the approval of the preliminary plan expired. 2000 — Application was made for a 151,785 square foot retail center (SDP 00 -81 North Town Center). This application was withdrawn by the applicant prior to any action. 2000 Application was made for a 130,184 square foot retail store (SDP 00 -119 Home Depot at North Town Center Preliminary Site Plan). This application was denied by the Planning Commission at its 2 meeting on November 28, 2000. This denial included a denial of a modification for activity on critical slopes and other modifications (reduction in number of loading spaces, buffer disturbance). The Commission's action was appealed to the Board of Supervisors. The Board reaffirmed the Commissions action at its meeting on February 7, 2001. 2005 (October 18, 2005) — Preliminary Site plan for 199,800 gross square foot retail development is approved by the Planning Commission. A special use permit, SP 2004 -24, to allow a drive thru window for a bank is subsequently approved by the Board of Supervisors. DISCUSSION: Staff review of this project has been limited to insuring that the submitted plans meets the requirements for final site plan content, as required by Section 32.5.6 of the Zoning Ordinance and the conditions of approval as set out in the Planning Commissions action of October 18, 2005. The conditions of approval are included as Attachment C. Staff has reviewed each of the conditions of approval to determine if they have been met. Below staff has included the conditions of approval with comment on how each condition has been met. (Staff comments are in italics) The critical slopes waiver for Northtown Center was approved based on the finding that the strict application of the requirements of Section 4.2. would not forward the purposes of the chapter that otherwise serve the public health, safety or welfare, or that alternatives proposed by the developer would satisfy those purposes at least to an equivalent degree, subject to the following conditions: In addition to all other erosion and sediment control measures that may be required by the Water Protection Ordinance, the applicant shall provide erosion and sediment control measures to assure, to the satisfaction of the Program Authority, that it is providing high levels of effectiveness in controlling sediment during construction. These measures shall include, but not be limited to: a. A construction schedule that minimizes the duration of disturbance (e.g., phasing of the erosion and sediment control plan). This condition has been met. The applicant has proposed to complete construction within 6 months of receiving a grading permit. b. Using high efficiency sediment basins designed to include the use of flocculants. This condition has been conceptually met on the condition that the use offlocculants is clarified and used during all phases of construction. The applicant has proposed conditions for flocculants in Phase A. High efficiency basins have been shown on the plan. c. Matting exposed slopes as determined appropriate by the Program Authority. This condition has been conceptually met on the condition that the spray -on application proposed in place of matting be applied immediately upon reaching final grade to any slope of 3:1 or steeper, and should the application be ineffective in the opinion of the county erosion control inspector, matting shall be immediately applied The applicant has proposed "Flexterra Growth Medium, " or an approved equivalent to be applied to all slopes within 4 days of reaching final grade. d. The contractor shall have a Responsible Land Disturber ( "RLD "), on the site throughout the period during which the site is under construction. The "RLD" shall maintain a daily erosion and sediment control inspection log demonstrating that erosion and sediment control measures are being closely monitored and deficiencies are being quickly repaired. The "RLD" shall assure that all control measures are being maintained in optimal condition. The log shall be made available for inspection by the Program Authority at any time during regular business hours. The applicant has proposed to have a Responsible Land Disturber to maintain a daily ESC log to be available to the Program Authority during regular business hours. This condition has been met. e. If determined to be necessary by the Program Authority, the surety required by Albemarle County Code Section 17 -207 shall include an amount determined by the Program Authority to be reasonably necessary to take corrective action to repair or restore downstream properties damaged during construction by runoff or sediment. This condition has been met, subject to the posting of a bond in the amount is $303, 750 for the necessary improvements as listed in the County's Northtown Center Adequate Channel Analysis of 4 Jan 2008. This bond must be posted prior to the issuance of the erosion control permit. 2. In addition to all other storm water management requirements that may be required by the Water Protection Ordinance: a. The stormwater management plan shall include additional measures determined by the Program Authority to be necessary in order to capture, to the maximum extent practical, the runoff from the site, both during and after construction. This condition has been met. The applicant has proposed to treat runoff twice with Stormwater Management facilities. Impervious Areas will either drain to raingardens and then to a biofilter facility, or will drain to a biofilter facility and then to an underground water quality facility b. The stormwater management plan shall include measures to prevent, to the fullest extent possible, damaging conditions to downstream properties and receiving waterways from occurring as a result of the development of the site, both during and after construction. The applicant has proposed to improve the channel downstream of the site on the following tax map parcels if the owners of the parcels will grant the applicant an easement. If all the owners do not grant the applicant easements or permission to make the improvements within 2 years of the first Certificate of Occupancy on Site, the applicant proposes to be no longer required to make the offsite improvements. The applicant also proposes to not be required to make the offsite improvements if State or Federal Permits cannot be obtained. TMP 045COOIOP00900 2929 BROOKMERE CT MCKENZIE, DYLAN SEAN TMP 045COOIOP00800 2931 BROOKMERE CT PODOLSKI, MARTIN M OR ELLEN N TMP 045BIOIOA00700 3209 CLARKS LANE SHIRLEY,, E SHANNON G TRUSTEE OF THE TMP 045BIOIOA00400 121 INDIAN SPRINGS RD KUHN, JOHN OR WENDYF 4 This condition has been conceptually met upon the condition that the applicant provides adequate grading, drainage, Erosion Control Plans, and necessary State and Federal permits for the site including proposed offsite stream improvements prior to final site plan approval. c. In order to allow the Program Authority to develop appropriate measures to satisfy paragraphs (a) and (b) of this condition, the applicant shall submit data demonstrating the peak flow of runoff from the site and the peak flow of runoff coming onto the site. [Albemarle County Codes Sections 17 -31, 17- 314(D)] County Engineering staff has provided an in depth analysis to the applicant of the peak flow of runoff from the site, and the applicant has provided an analysis showing the peak flow leaving the site. This condition has been met. Pre and post development peak flow rates have been calculated. 3. In the plan during construction the sequence of the storm water management addresses the switching over of the stream flow, if any; Conceptually, the final site plans meet condition 3. The applicant proposes to pump the stream around in areas of stream flow in order to work in the dry. However, prior to final site plan approval, the Erosion and Sediment Control Plans must be approved meeting all State and WPO requirements. Final approval will require particular attention to phasing of construction to insure that no areas remain unprotected between phases of construction. 4. In conjunction with the final site plan, sufficient landscaping and screening shall be provided to screen adjacent residential properties from areas of disturbed critical slopes; and Staff has met with the applicant and the abutting property owners. The proposed fencing and landscaping have been agreed to by the abutting property owners. Staff opinion is that this fencing will provide adequate screening and security. Additional, it will serve to stop windblown trash from entering the residential property. Staff opinion is that this condition has been met. 5. All of the other conditions recommended by staff. No other conditions have been recommended. This condition has been met. The final site plan will be subject to all final site plan requirements (Zoning Ordinance Section 32.6), in addition to the following conditions. The Planning Department shall not accept submittal of the final site plan for signature until tentative approvals for the following conditions have been obtained. The final site plan shall not be signed until the following conditions are met: 1. Architectural Review Board issuance of a Certificate of Appropriateness. The ARB has granted staff administrative approval of the Certificate of Appropriateness. (Attachment D). Staff opinion is that this is adequate action to allow the Planning Commission to conditional approve the final site plan. The final site plan will not be signed until the Certificate of Appropriateness has been issued. 2. Virginia Department of Transportation approval of entrance design, signal improvements, frontage and turn lane improvements as well as any associated road plans and drainage plans. All of VDOT's main concerns were addressed on Nov. 28`h, 2007. This condition has been met 3. Albemarle County Service Authority approval including approval of the design of the relocated sanitary sewer meeting ACSA standards with no portion located within storm water management facilities. The Albemarle County Service Authority has granted approval. This condition has been met. 4. Current Development Division approval of- a. Minimum sight distances within parking areas /travelways. This condition has been met. b. Design/location of curbed islands in the parking lot. This condition has been met. c. Stormwater BMP plans and calculations. This condition has been conceptually met. The final site plan cannot be signed prior to approval of the WPO plans. Outstanding issues include State and Federal permits, Stormwater Management Plan approval, and Erosion and Sediment Control Plan approval. d. Stream Valley design which is acceptable to the Architectural Review Board. Based on the plan reviewed by the Architectural Review Board at its meeting on October 3, 2005 and included as Attachment A marked WDF, 10/09/2005. This condition has been met. e. Approval of revised parking calculations to account for any parking lost by condition d, to include if necessary, a reduction in building space. This condition has been met. f Retaining wall designs for any walls of 4 feet or greater. This condtion has been met g. Landscape plan, to include a conservation plan for all trees proposed to remain. This condition has been met. h. Lighting plan. This condition has been met. i. Subdivision plat combining the parcels into a single parcel or realignment of existing parcel boundaries to result in lots meeting minimum requirements for building construction. This condition has been met. j. Necessary access, utility easements. This condition has been met. k. The 18' retaining wall on the northern side of the site cannot disturb the undisturbed buffer for a footing or reinforcing grid. The plan must be revised as necessary, or provide computations, details and construction methods to avoid disturbance of the buffer. This condition has been met for this phase of the project. 1. Grading to the edge of the undisturbed wooded buffer on the sides of the site will likely cut tree root systems, damaging and eventually killing trees. On final plans, the grading should be moved back, or specific trees surveyed and marked on plans to ensure survivability of trees within the undisturbed buffer. This condition has been met. S. Fire Marshall approval. This condition has been met. 6 Building Official approval. This condition has been met. 7. The final site plan shall be subject to Planning Commission review. Under review by Planning Commission. SUMMARY AND RECOMMENDATION: Staff review has resulted in both favorable and unfavorable findings: Favorable factors: 1. The plan has been revised to substantially improve the layout and has received a number of approvals. Unfavorable factors: 1. Not all conditions of the preliminary approval have received final approval. All conditions have either been approved or conceptually approved. Therefore, staff can recommend approval of the site plan with conditions that must be met prior to signing the plan and the beginning of construction. RECOMMENDED CONDITIONS: The Site Review Committee shall not sign the final site plan until the following conditions have been met. Approval of an Erosion and Sediment Control plan to include: a. Comprehensive proposals to ensure adequate Erosion and Sediment Control measures remain effective during the transitions between phases of construction. b. More detailed information regarding the proposed flocculants, including application locations, installation and maintenance schedules as they relate to the construction phases, and manufacturers' specifications and details. 2. Issuance of a Certificate of Appropriateness from the Architectural Review Board. ATTACHMENTS: A. Site Plan B. Location/Detail Maps C. Planning Commission Action Letter dated October 28, 2005 D. ARB Action Letter r A a ATTACHMENT B \ In v fA ! � n Ln T r l /r µ 1 + Fi y m W w r r + i f1 y' r f t0 U �r ry b �µ rn ell W kk 1rn A uri n p vl N r� 4] "ALUP 46 fm vi D o + N O# G 4 A {f W µ µ M Ln r 4 N ou In 4AI R!QK P A fl rR +] 1+ yl p '# s �1 r f�% f1 7i A7-'� i W �NI f3.' r ul Ffl. D 4 J A { rl G ;00 O CR SR. x /171 4 i U' w+ V fir+ is �'� r. r 4>7 W fct It Ot pµ 't`_ 1111 ' A U 9L �` �7 + U + N A el A ,s,I cm � l7 � +�+ Q r AO 'Ll DO Ll s ATTACHMENT C of AL LIRGIt�t�' COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4012 October 28, 2005 Tim Miller Rivanna Engineering 1350 Stony Point Road Charlottesville, VA 22911 RE: SP 2004 -024 Northtown Center (Sign #8) and SDP 2004 -045 Northtown Center Tax Map 45, Parcels 110, 110A, 111, 111A and 111B Dear Mr. Miller: The Albemarle County Planning Commission, at its meeting on October 18, 2005, unanimously approved SDP 2004 -045 and unanimously recommended approval of SP 2004 -024 to the Board of Supervisors. Additionally, the Commission approved your motion for Modification of Section 4.2.3 to allow activity on critical slopes on SDP 2004 -024. Regarding SP- 2004 -024 (drive through associated with the bank): The Commission unanimously recommended approval of SP 2004 -024 to the Board of Supervisors. Please note that this approval is subject to the following conditions: 1. A by -pass lane, 16' minimum width shall be provided. Striping and lane widths must be shown on the final plan. Please be advised that the Albemarle County Board of Supervisors will review this petition and receive public comment at their meeting on November 9, 2005. Any new or additional information regarding your application must be submitted to the Clerk of the Board of Supervisors at least seven days prior to your scheduled hearing date. Regarding request for modification of Section 4.2.3 to allow activity on critical slopes: The critical slopes waiver for Northtown Center was approved based on the finding that the strict application of the requirements of Section 4.2. would not forward the purposes of the chapter that otherwise serve the public health, safety or welfare, or that alternatives proposed by the developer would satisfy those purposes at least to an equivalent degree, subject to the following conditions: In addition to all other erosion and sediment control measures that may be required by the Water Protection Ordinance, the applicant shall provide erosion and sediment control measures to assure, to the satisfaction of the Program Authority, that it is providing high levels of effectiveness in controlling sediment during construction. These measures shall include, but not be limited to: a. A construction schedule that minimizes the duration of disturbance (e.g., phasing of the erosion and sediment control plan). b. Using high efficiency sediment basins designed to include the use of flocculants. c. Matting exposed slopes as determined appropriate by the Program Authority. d. The contractor shall have a Responsible Land Disturber ( "RLD "), on the site throughout the period during which the site is under construction. The "RLD" shall maintain a daily erosion and sediment control inspection log demonstrating that erosion and sediment control measures are being closely monitored and deficiencies are being quickly repaired. The "RLD" shall assure that all control measures are being maintained in optimal condition. The log shall be made available for inspection by the Program Authority at any time during regular business hours. e. If determined to be necessary by the Program Authority, the surety required by Albemarle County Code Section 17 -207 shall include an amount determined by the Program Authority to be reasonably necessary to take corrective action to repair or restore downstream properties damaged during construction by runoff or sediment. 2. In addition to all other storm water management requirements that may be required by the Water Protection Ordinance: 3. The stormwater management plan shall include additional measures determined by the Program Authority to be necessary in order to capture, to the maximum extent practical, the runoff from the site, both during and after construction. 4. The stormwater management plan shall include measures to prevent, to the fullest extent possible, damaging conditions to downstream properties and receiving waterways from occurring as a result of the development of the site, both during and after construction. 5. In order to allow the Program Authority to develop appropriate measures to satisfy paragraphs (a) and (b) of this condition, the applicant shall submit data demonstrating the peak flow of runoff from the site and the peak flow of runoff coming onto the site. [Albemarle County Codes Sections 17 -31, 17- 314(D)] 6. In the plan during construction the sequence of the storm water management addresses the switching over of the stream flow, if any; 7. In conjunction with the final site plan, sufficient landscaping and screening shall be provided to screen adjacent residential properties from areas of disturbed critical slopes; and 8. All of the other conditions recommended by staff. Re ag rdina SDP - 2004 -045: The Commission, by a 5:1 vote, approved SDP - 2004 -045 with the following conditions recommended in the staff report; based on the other actions just taken and an additional condition that the final site plan come back for Planning Commission review. 10 The approval of the preliminary site plan is valid for (1) one year in accordance with Zoning Ordinance Section 32.4.3.1. Therefore, the preliminary approval shall expire October 18, 2005. If the preliminary site plan approval expires, a new application must be filed and processed. Please address all of the requirements and conditions listed below and submit eight (8) tentative plan copies to the Community Development Department. This letter must be submitted with the tentative plans, as a checklist, to document that you have addressed all requirements or conditions, or the tentative plan will be denied. The Erosion and Sediment Control Plan and the BMP Stormwater Management Plan, with the associated applications and fees, may also be submitted with the eight (8) tentative Plans. Failure to do so will result in a separate application to be filed with the County at a later date. After the initial tentative plan submittal, each department /agency will contact you to discuss any remaining conditions. After all aforementioned department /agencies have granted a tentative approval, you may submit the final mylars (2 sets), one blueprint copy, final site plan application, final site plan fee, and a copy of all written tentative approvals to the Community Development Department for signature. The final site plan will be subject to all final site plan requirements (Zoning Ordinance Section 32.6), in addition to the following conditions. The Planning Department shall not accept submittal of the final site plan for signature until tentative approvals for the following conditions have been obtained. The final site plan shall not be signed until the following conditions are met: 8. Architectural Review Board issuance of a Certificate of Appropriateness. 9. Virginia Department of Transportation approval of entrance design, signal improvements, frontage and turn lane improvements as well as any associated road plans and drainage plans. 10. Albemarle County Service Authority approval including approval of the design of the relocated sanitary sewer meeting ACSA standards with no portion located within storm water management facilities. 11. Current Development Division approval of- a. Minimum sight distances within parking areas /travelways. b. Design/location of curbed islands in the parking lot. c. Stormwater BMP plans and calculations. d. Stream Valley design which is acceptable to the Architectural Review Board. Based on the plan reviewed by the Architectural Review Board at its meeting on October 3, 2005 and included as Attachment A marked WDF, 10/09/2005. e. Approval of revised parking calculations to account for any parking lost by condition d, to include if necessary, a reduction in building space. f. Retaining wall designs for any walls of 4 feet or greater. g. Landscape plan, to include a conservation plan for all trees proposed to remain. h. Lighting plan. i. Subdivision plat combining the parcels into a single parcel or realignment of existing parcel boundaries to result in lots meeting minimum requirements for building construction. j. Necessary access, utility easements. k. The 18' retaining wall on the northern side of the site cannot disturb the undisturbed buffer for a footing or reinforcing grid. The plan must be revised as necessary, or provide computations, details and construction methods to avoid disturbance of the buffer. 1. Grading to the edge of the undisturbed wooded buffer on the sides of the site will likely cut tree root systems, damaging and eventually killing trees. On final plans, the grading should be moved back, or specific trees surveyed and marked on plans to ensure survivability of trees within the undisturbed buffer. 12. Fire Marshall approval. 13. Building Official approval. 7. The final site plan shall be subject to Planning Commission review. 11 If you should have any questions or comments regarding the above noted action, please do not hesitate to contact me at (434) 296 -5832. Sincerely, William D. Fritz, AICP Chief of Current Development WDF /aer Cc: First Gold Leaf Land Trust, M Clifton McClure Etal Trustees P O Box 1333 Charlottesville, VA 22902 Ella Carey Amelia McCulley Jack Kelsey Steve Allshouse 12 ATTACHMENT D �� of A� �'IRG1I�l4` COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, North Wing Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4012 March 26, 2007 Janet Miller DDR 172 S. Pantops Drive Charlottesville, VA 22911 RE: ARB- 2007 -10: Northtown Center (Phase 1): Preliminary Review of an Amendment to a Site Development Plan Tax (Map 45, Parcels 110, 110A, 111, 111A and I I IB) Dear Ms. Miller: The Albemarle County Architectural Review Board reviewed the above noted item at its meeting on Monday, March 5, 2007. The Board by a vote of 3:1 approved the Certificate of Appropriateness for ARB- 2007 -010, Northtown Center (Phase 1), pending staff administrative approval of the following conditions: 1. Indicate on the site plan that the bridge facing material will be "cobble stone pattern" as approved with the last submittal. Clarify the plan to show how the bridge face, the box culvert and the proposed grading work together. The bridge wall shall be extended so that no guard rails are visible on either side. 2. Shift the LN and the ZS out of the waterline easement located north of Building B. 3. Include the limits of clearing and grading and the tree protection fencing notes on the grading plan and the E &S plan. Revise the plan to show a tree line to remain that is coordinated with the limits of clearing and grading in the vicinity of the central storm water facility. Provide an E &S plan for review. 4. Include the approved sign criteria on the architectural drawings. Choose specific shades of red, green and white for the face colors and submit the color names, numbers and samples for review. Also submit the information for the raceway color and revise the criteria on the drawings to indicate that trim caps and returns will be bronze. 5. Provide for review a detail of the wood fence intended for above the retaining walls. Include the detail in the site plan. 6. Recalculate the photometric plan using a maintenance factor of 1.0. Indicate in the luminaire schedule that the fixtures and poles are proposed with a dark bronze finish. 7. All approvals apply only to phase 1. Other phases may be submitted for review at a later date. 8. The elevation of building H shall be revised to show consideration of the proportions of the white cornice line as it relates to the red brick remainder of the building. This change can be reviewed by staff. 13 Please provide: 1. Two full sets of revised drawings addressing each of these conditions. Include updated ARB revision dates on each drawing. 2. A memo including detailed responses indicating how each condition has been satisfied. If changes other than those requested have been made, identify those changes in the memo also. Highlighting the changes in the drawing with "clouding" or by other means will facilitate review and approval. 3. The attached "Revised Application Submittal" form. This form must be returned with your revisions to ensure proper tracking and distribution. When staffs review of this information indicates that all conditions of approval have been met, a Certificate of Appropriateness may be issued. If you have any questions, please do not hesitate to contact me. Sincerely, Margaret Maliszewski Design Planner Planning Division MMM /aer Cc: United Land Corp PO Box 5548, Charlottesville, VA 22905 First Gold Leaf Land Trust, M Clifton Mcclure Etal Trustees P O Box 1333, Charlottesville, VA 22902 NBJ Architecture (Neil Bhatt) 11537B Nuckols Rd, Glen Allen, VA 23059 File 14