Loading...
HomeMy WebLinkAboutWPO200800038 Correspondence 2008-06-23Page 1 of 3 Philip Custer From: Philip Custer Sent: Monday, June 23, 2008 11:56 AM To: 'Justin Mallory' Cc: dmarch @wwassociates.net; Glenn Brooks; Amy Pflaum; L.J. Lopez; Elaine Echols Subject: RE: Westhall V preliminary plat Justin, I've gone over all of the Westhall V SWM information with Glenn. Current development engineering review's requirements remain unchanged. The existing farm pond must serve as a stormwater quality facility, in addition to detention, to be equivalent to what was approved on the rezoning plan. The farm pond must have a volume of 3 x the WQv (with a forebay) in order to achieve a 40% RR. The forebay can be included in the pond if the necessary volume is not available in the trailhead park. Thanks, Phil 296 -5832 x3072 From: Justin Mallory [mailto:jmallory @stonehaus.net] Sent: Monday, June 16, 2008 10:38 AM To: Philip Custer Cc: dmarch @wwassociates.net; Glenn Brooks; Amy Pflaum; L.J. Lopez Subject: RE: Westhall V preliminary plat Hi Phil, Please let me know how any discussions with Glenn may go. They will be critical to our engineers being able to appropriately respond to the first round of comments. Not being familiar with the discussions myself, it seems that since Allan Cced various individuals, including Glenn, on his email dated 10/1/07 and that we didn't hear anything to the contrary that everyone was in agreement and supported Allan's email through their non - response. This topic was not discussed during the most recent variation, so we proceeded accordingly with prior direction that had been given relating to quantity only. Justin Justin Mallory Assistant Development Manager ST N E HAUS www.stonehaus.net Direct: 434 - 951 -0971 Mobile: 434 - 962 -3262 2421 Ivy Road Charlottesville, VA 22903 From: Philip Custer [mailto:pcuster @albemarle.org] Sent: Monday, June 09, 2008 10:51 AM To: Justin Mallory Cc: dmarch @wwassociates.net; Glenn Brooks; Amy Pflaum 6/23/2008 Page 2 of 3 Subject: RE: Westhall V preliminary plat Thanks Justin. I'll put this email into the current WPO file. Do you have anything from Glenn regarding this issue? I'll need to discuss it with him further before a decision can be made regarding whether SWM quality should be provided for in the large pond. He's out on vacation this week, so I hope to meet with him sometime next week. In the meantime, please forward any other emails discussing this issue. Email correspondence during the latest variation should be the most important. Thanks, Phil From: Justin Mallory [mailto:jmallory @stonehaus.net] Sent: Monday, June 09, 2008 10:41 AM To: Philip Custer Cc: dmarch @wwassociates.net Subject: FW: Westhall V preliminary plat Hi Philip, See the email below from Allan Schuck discussing the detention only feature of the forebay /energy dissipater in Open Space Parcel A. Let me know if you have any questions. Thanks, Justin Justin Mallory ASST C Development a§ er %M"t SOOM &Guff FLGCW 0 www.stonehaus.net Direct: 434 - 951 -0971 Mobile: 434 - 962 -3262 2421 Ivy Road Charlottesville, VA 22903 From: Allan Schuck [mailto:aschuck @albemarle.org] Sent: Monday, October 01, 2007 10:26 AM To: Doug March; L.J. Lopez; psaternye @wwassociates.net Cc: John Shepherd; Patrick Lawrence; Tamara Ambler; Elaine Echols; Glenn Brooks Subject: Westhall V preliminary plat Good Morning: Engineering met with WW Associates last Thursday to discuss the Westhall V SWM plan. I have reviewed the ZMA plan and the conceptual SWM plan. The SWM facility proposed in the middle of the project needs to be designed for detention only. The SWM quality can be accounted for with the Lickinghole Basin fee which will be computed by staff and paid by the applicant before the final SWM plans can be approved. The biofilter shown along Adele Street needs to be designed for both SWM detention and quality. This facility needs to be located within the outer 50 feet of the stream buffer. The Lickinghole Basin fee will also be required for this drainage area as well. 6/23/2008 Page 3 of 3 Thanks, Allan Schuck 6/23/2008