Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
WPO200700103 Bond Estimates 2008-06-30
BOND ESTIMATE - EROSION CONTROL Spreadsheet last revised:12 -5 -01 PROJECT NAME: Avon Park II PROJECT NUMBER: WPO200700103 DATE OF ESTIMATE: May 06 2008 ESTIMATE BY: Jonathan Sharp BASED ON: LF WATER ITEM DESCRIPTION UNIT QUANTITY UNIT COST ITEM TOTAL SEED, FERTILIZE, MULCH ACRE 4.5 1500 6750 SILT FENCE LF 800 5 4000 SAFETY FENCE LF 400 3 1200 TREE PROTECTION LF 1360 3 4080 STORMWATER CONVEYANCE CHANNE LF 240 6 1440 DIVERSION DIKE LF 1120 3 3360 TEMPORARY SLOPE DRAIN LF 0 20 0 SEDIMENT TRAP 1 ACRES 0 1000 0 SEDIMENT BASIN 1 ACRES 6 1000 6000 RISER EA 1 1000 1000 ES -1 & EC -1 EA 1 400 400 15' CONCRETE PIPE LF 103 25 2575 CULVERT INLET PROTECTION EA 1 500 500 INLET PROTECTION EA 16 200 3200 OUTLET PROTECTION EA 3 200 600 EC -2 & 3 DITCH PROTECTION LF 80 10 800 RIP -RAP LF 45 55 2475 BLANKET /MATTING STABILIZATION SQ.YD. 4000 10.5 42000 CHECK DAMS SQ.YD. 0 30 0 PAVED CONSTRUCTION ENTRANCE EA 1 2000 2000_ SUBTOTAL 82380.00 CONTINGENCY & ADMINISTRATION LS 25% 20595.00 TOTAL 102975.00 BOND AMOUNT REQUIRED 103000