HomeMy WebLinkAboutWPO200700103 Bond Estimates 2008-06-30 (3)WATER PROTECTION ORDINANCE -- STORMWATER MANAGEMENT BOND
Bioretention $6.40 per cubic foot of treatment area
Dry ED Pond 8.16 * V ^0.78, where V = storage volume up to crest of emergency spillway in cL
Plantings
trees (1 ") $250 each planted
trees (2 ") $350 each planted
shrubs $65 each planted
herbacious $3 each planted
underdrain stone (57s) $10.50 per ton Luck Stone = 102 Ibs /cf = $14.58/cy & 1.4 tons /cy
stone delivery $45 per load
4" PVC pipe $1.35 per linear foot
6" PVC pipe $2.50 per linear foot
sand /soil delivered $20 per cubic yard
Filterra
6X6 6,100
4X6 5,500
6X12 12,100
Stream Restoration
Rock Toe Revetment $75 per linear foot
Coir Roll $61 per linear foot
Cross Vanes /Rock Weir $90 per cubic yard of rock OR $50 per ton of rock
Other See Table 3.3 of the DRAFT Virginia Stream Restoration Design Manual (DCR
ibic feet
?003)
PROJECT NAME:
Pounding Brook Golf Course
FILE #:
2137
DATE APPROVED:
Maintenance Building Basin
Type of Facility
silt trap retrofit
Item
Unit
Amount
Unit Cost
Subtotal
bioretention construction
wq treatment
volume in cf
0
$6.40
$0
trees (1 ")
planted
0
$250.00
$0
trees (2 ")
planted
0
$350.00
$0
shrubs
planted
0
$85.00
$0
underdrain stone
ton
1
$10.50
$11
stone delivery
load
1
$50.00
$50
filter fabric
square yard
4
$10.00
$40
sand /soil mixture
cubic yard
59
$10.00
$590
EC -1 outlet protection
each
2
$200.00
$400
time & materials
contributing acre
0.66
$1,000.00
$657
SUBTOTAL
$1,748
Parking Lot Basin
Type of Facility
basin retrofit
Item
Unit
Amount
Unit Cost
Subtotal
bioretention construction
wq treatment
volume in cf
0
$6.40
$0
trees (1 ")
planted
0
$250.00
$0
trees (2 ")
planted
0
$350.00
$0
shrubs
planted
0
$85.00
$0
underdrain stone
ton
0
$10.50
$0
stone delivery
load
0
$50.00
$0
filter fabric
square yard
0
$10.00
$0
sand /soil mixture
cubic yard
509
$10.00
$5,090
EC -1 outlet protection
each
2
$200.00
$400
class 1 rip -rap
square yard
18
$55.00
$990
time & materials
contributing acre
9.21
$1,000.00
$9,210
SUBTOTAL
$15,690
Mitigation Plan Plantings and Streambanks
Type of Facility
planting & bank stabilization
Item
Unit
Amount
Unit Cost
Subtotal
bioretention construction
wq treatment
volume in cf
0
$6.40
$0
trees & shrubs
planted
777
$100.00
$77,700
wetland plants
planted
7000
$2.00
$14,000
stream stabilization
linear foot
250
$50.00
$12,500
underdrain stone
ton
0
$10.50
$0
stone delivery
load
0
$50.00
$0
filter fabric
square yard
0
$10.00
$0
sand /soil mixture
cubic yard
0
$5.00
$0
EC -1 outlet protection
each
0
$200.00
$0
class 1 rip -rap
square yard
0
$55.00
$0
time & materials
contributing acre
0.00
$1,000.00
$0
SUBTOTAL
$104,200
SUB - SUBTOTAL
$121,638
15% Contingency
18,246
TOTAL
$139,883
PROJECT NAME:
Avon Park II
FILE #:
WPO200700103
DATE APPROVED:
BMP Type
Item
Unit
Amount
Unit Cost
Subtotal
site clearing
acre
0.44
$7,100.00
$3,129.48
bioretention construction
wq treatment
volume in cf
2542
$6.40
$16,269
sand /soil mixture
cubic yard
226
$20.00
$4,522
underdrain stone
cubic yard
136
$17.00
$2,306
underdrain pipe, 6" PVC
linear foot
170
$2.70
$459
ES -1 End Section
each
1
$200.00
$200
EC -1 outlet protection
each
1
$200.00
$200
class 1 rip -rap
square yard
12
$55.00
$642
48" concrete riser structure
each
1
$1,000.00
$1,000
Concrete pipe
linear foot
103.00
$25.00
$2,575
ES -1 End Section
each
1
$200.00
$200
EC -1 outlet protection
each
1
$200.00
$200
trees ball /burlap
planted
7
$350.00
$2,450
shrubs ball /burlap
planted
45
$100.00
$4,500
time & materials
contributing acre
6.00
$1,000.00
$6,000
SUBTOTAL
$44,652
25% Contingency
$11,163
TOTAL
1 $55,816
ROUNDED TOTAL
1 $56,000
MINIMUM TOTAL AFTER REDUCTION
1 $11,200