Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
WPO200600050 Bond Estimates 2008-07-23
BOND ESTIMATE - EROSION CONTROL Spreadsheet last revised:12 -5 -01 PROJECT NAME: Northtown Center PROJECT NUMBER: WPO200600050 DATE OF ESTIMATE: July 23 2008 ESTIMATE BY: Jonathan Sharp BASED ON: LF WATER ITEM DESCRIPTION UNIT QUANTITY UNIT COST ITEM TOTAL SEED, FERTILIZE, MULCH ACRE 10 1500 15000 TREE PROTECTION LF 2800 3 8400 SILT FENCE LF 1000 5 5000 SAFETY FENCE LF 2000 3 6000 TEMPORARY FILL DIVERSION LF 0 3 0 DIVERSION DIKE LF 1200 3 3600 TEMPORARY SLOPE DRAIN LF 0 20 0 SEDIMENT TRAP 1 ACRES 2.5 1000 2500 SEDIMENT BASIN 1 ACRES 4.5 1000 4500 SEDIMENT BASIN 2 ACRES 12 1000 12000 CULVERT INLET PROTECTION EA 0 500 0 INLET PROTECTION EA 15 200 3000 OUTLET PROTECTION EA 3 200 600 EC -2 & 3 DITCH PROTECTION LF 0 10 0 RIP -RAP LF 100 55 5500 CHECK DAMS EA 0 200 0 PAVED CONSTRUCTION ENTRANCE EA 1 2000 2000 STREAM CROSSING EA 2 4000 8000 DOWNSTREAM IMPROVEMENTS: INSTALL CHANNEL EA 1 100000 100000 FILL IN SED TRAP /REMOVE CULVER' EA 1 13000 13000 ENGINEERING /PERMITTING EA 1 30000 30000 SUBTOTAL 219100.00 CONTINGENCY & ADMINISTRATION LS 25% 54775.00 TOTAL 273875.00 BOND AMOUNT REQUIRED 274000