HomeMy WebLinkAboutSUB202100180 Correspondence 2021-11-22From: Ben Hol[
To: William White
Subject: RE: SUB2021-180 Kennedy BLA
Date: Monday, November 22, 2021 12:25:00 PM
Hi William, the note looks good. Just update the revision date and it's ready for signature.
Please submit at least 3 copies of the signature plat. Our intake office is open to the public on
Monday, Wednesday and Friday. Thanks!
Ben Holt, AICP
Senior Planner
Albemarle County
434-296-5832 ext. 3443
From: William White <will@foresightpc.com>
Sent: Monday, November 22, 20219:55 AM
To: Ben Holt <bholt@albemarle.org>
Subject: Re: SUB2021-180 Kennedy BLA
CAUTION: This message originated outside the County of Albemarle email system. DO NOT
CLICK on links or open attachments unless you are sure the content is safe.
Understood, please see attached.
Thank you,
WW
434-207-8107
On Mon, Nov 22, 2021 at 9:10 AM Ben Holt <bholt(@albemarle.ore> wrote:
Hi William, I confirmed that with only 1 development right, 10L may not be further divided.
Dividing would require at least 1 transferrable development right for the new parcel.
Language should read:
Revised Parcel 66-10L is assigned 1 development right and may not be further divided. When
used, the development right shall be within its December 1980 boundaries.
Revised Parcel 66-10J1 is assigned 2 development rights and may be further divided. When used
the development rights shall be within their December 1980 boundaries.
Ben Holt, AICP
Senior Planner
Albemarle County
434-296-5832 ext. 3443
From: William White <will(a)foresiahtnc.com>
Sent: Friday, November 19, 2021 3:22 PM
To: Ben Holt <bholt(@albemarle.ore>
Subject: Re: SUB2021-180 Kennedy BLA
CAUTION: This message originated outside the County of Albemarle email system. DO
NOT CLICK on links or open attachments unless you are sure the content is safe.
Hi Ben,
I will update the plat with the updated note. Before I send you the updated plat I just wanted to
check the language for 66-10L. Is it correct to say that it may be further divided?
Thank you,
WW
434-207-8107
On Fri, Nov 19, 2021 at 12:58 PM Ben Holt <bholtPalbemarle.ore> wrote:
William, Parcel 10L will have 1 development right and parcel 10.11 will have 2 DR. To add a DR
from 10.11 to 10L would require a min 2 acre transfer of land. Determined by the transferred
portion rather than the new cumulative total of the parcel.
Currently, the note should read:
Revised Parcel 66-10L is assigned 1 development right and may be further divided. When used,
the development right shall be within its December 1980 boundaries.
Revised Parcel 66-10J1 is assigned 2 development rights and may be further divided. When
used the development rights shall be within their December 1980 boundaries.
Ben Holt, AICP
Senior Planner
Albemarle County
434-296-5832 ext. 3443
From: William White <willPforesiRhtoc.com>
Sent: Thursday, November 18, 20214:15 PM
To: Ben Holt <bholt2Dalbemarle.ore>
Subject: Re: SUB2021-180 Kennedy BLA
This message originated outside the County of Albemarle email system. DO
NOT CLICK on links or open attachments unless you are sure the content is safe.
Please see attached.
I split the total of 4 rights between the two parcels, giving each 2 rights, let me know if this isn't
in accordance with zoning.
I also added a revision date.
Thank you,
WW
434-207-8107
On Thu, Nov 18, 2021 at 3:54 PM Ben Holt <bholt2Dalbemarle.ore> wrote:
Yes, once you edit the note about development rights. Email me the revised plat first.
Ben Holt, AICP
Senior Planner
Albemarle County
434-296-5832 ext. 3443
From: William White <willPforesightnc.com>
Sent: Thursday, November 18, 2021 3:48 PM
To: Ben Holt <bholtCcDalbemarle.org>
Subject: Re: SUB2021-180 Kennedy BLA
CAUTION: This message originated outside the County of Albemarle email system.
DO NOT CLICK on links or open attachments unless you are sure the content is safe.
Good deal, I appreciate that. Are you ready for signatures?
Thank you,
WW
434-207-8107
On Thu, Nov 18, 2021 at 3:45 PM Ben Holt <bholtkaalbemarle.ore> wrote:
Thanks William, that is the only comment or edit I had. Nice work on the plat— made my
job easy on this one.
Ben Holt, AICP
Senior Planner
Albemarle County
434-296-5832 ext. 3443
From: William White <will(aa7foresightoc.com>
Sent: Thursday, November 18, 2021 3:30 PM
To: Ben Holt <bholt(a albemarle.ore>
Subject: Re: SUB2021-180 Kennedy BLA
CAUTION: This message originated outside the County of Albemarle email system.
DO NOT CLICK on links or open attachments unless you are sure the content is
safe.
Good Afternoon,
That's a mistake on my part. The only information I'm aware of is that the property existed
prior to the 1980 development rights assignment, like you said. I will update the note.
Please let me know if you have any other questions or comments.
Thank you,
William W White, SIT
Foresight Survey, PC
912 E High Street, Suite C
Charlottesville, VA 22902
www.foresightoc.com
434-207-8107
On Thu, Nov 18, 2021 at 2:36 PM Ben Holt <bholt(ZDalbemarle.org> wrote:
I Hi William,
I'm doing the review for this BLA. Overall the plats look good. My only question relates
to the development rights.
I looked at some of the property records online, but I couldn't find anything that
specified 5 development rights to each of the parcels. It looks like the parcels have not
changed since the mid 70s, so I'd assume that the 1980 development rights assignment
would have been 3 for the larger parcel and 1 for the smaller parcel. Let me know if you
found something suggesting otherwise.
Ben Holt, AICP
Senior Planner
Albemarle County
434-296-5832 ext. 3443