HomeMy WebLinkAboutSDP202100049 Correspondence 2021-12-17Andy Reitelbach
From: Scott Collins <scott@collins-engineering.com>
Sent: Friday, December 17, 2021 10:44 PM
To: Emily Cox; Andy Reitelbach
Cc: swinkjw@stanleymartin.com; Gregory P. O'Donnell
Subject: Avon Park II Final site plan SDP2021-00049
CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open
attachments unless you are sure the content is safe.
Andy, Emily -
We uploaded the final site plan for Avon Park II this afternoon, addressing the final comments. Below is a summary of
how the couple of remaining comments were addressed:
Final Site plan comments
1. Comment #2 — the LOR for the dog park in Avon Park has been approved. The dog park on Avon Park II has been
shifted down about V to keep it well outside of the access easement.
2. Comment #10—the plat for the construction and grading easements at Hathaway has been recorded and this
information has been added to the site plan on sheet 3.
3. Comment #12 —the site plan on sheet 3 labels and shows all the landscaping easements with DB/PG.
Comments under initial site plan
1. Comment #2 — easements have been recorded and DB/PG has been added.
2. Comment #6 — LOR has been approved for Avon Park development.
3. Comment #7 —the transition point between the 2 fences has been shown on the plans, sheet 3. This is at the
location of the property line corner of the adjacent properties.
Engineering Comments
1. Comment #3 —the comment has been resolved.
2. Comment #6 —the 4 yard/roof drains have been revised in size from 6" to 8".
Thank you.
Scott Collins