Loading...
HomeMy WebLinkAboutWPO201600054 Checklist - Project Closeout (Administrative) 2021-12-08 WATER PROTECTION (CONSTRUCTION) FILE CLOSEOUT AT TIME OF COMPLETION (BOND RELEASE) IMAGING CENTER INSTRUCTIONS CHECKLIST The Inspector/Management Analyst is to complete this form ig • �� � � .� project p re ease; place the completed form in the WPO folder and forward to he'Ima fign completion t and/or bond LaserFiche. Once items have been placed in LaserFiche,Imaging �g Center for digital closeout into WPO# ���D QQ�c,� l;wg Center staff forward to Centralized Filing. PROJECT TITLE FULL,NAME INSPECTOR: FIN ACTION DATE:_ 1 CountyView— --- 0 Status/_s Date updated Hard copy—File Folder Closeout: -- `� All items listed shoal$be placed inproject folder,m'' reverse chronological order(latest on top), p Please check each item included in this folder. To indicate that an item is not a next to the check box. The Inspector/Management Analyst has the discretion to inc de anyi provide clarity to the file,please indicate that item on the"Other" pplic ble to this file,place an"N/A" lines provided. tem deemed necessary to Digital Closeout Instructions: Below each item please indicate if Ima ' Center is to scan the document; or,if the document is already in digital format,can be saved to LaserFiche, Please rovide the gm� (path/name)of the document in the space provided. digital location ❑ Preconstluction Meeting Form ❑ Scan aved location ❑ Grading Permit 0 Scan ❑ Saved location ❑ Inspection Reque ❑ Sc... ❑ Saved location ❑ Inspection R,sults(Include any inspection tickets,memos,photos,etc.) ❑ Scan 0 Saved location ❑ Bond R.duction/Bond Release Notices from Inspector to Management ri Scan 0 Saved location p Analyst ❑ Co.•ervation Checklist ❑ Scan ❑ Saved location ❑ As-built/Construction Plans ❑ Scan ❑ Saved location ther(Please explain) F / , ; �� ya Scan ❑ Saved locati + %%�/ r �� j- ❑ Other Plans - At the Inspector's discretion, copies of unapproved plans/plats may be lend clarity to the review at a later date. If such plans are included, the should be clearl unapproved and contain a note clarifying Y placed in the file if they ❑ Scan ring why it was included. — v marked as ❑ Saved location NOTES: WPO project folders will be accepted by the Imaging Center when the folio 1) Checklist is completed and included in folder; Ig items are complete: 2) Documents are Acco-fastened(except plats/plans),and in chronological orde 3) Documents are sufficiently identified as to which need to be scanned or saved to Lase Ficheents on top);If the above items are not complete,Imaging Center staff will circle the incomplete item a d return folder to the Co Engineer for corrective action. unty Draft 12-5-2013