HomeMy WebLinkAboutZMA202100001 Review Comments Zoning Map Amendment 2021-12-21COMMONWEALTH of VIRGINIA
DEPARTMENT OF TRANSPORTATION
Stephen C. Brich, P.E. 1401 East Broad Street (804) 7862701
Commissioner Richmond, Virginia 23219 Fax: (804) 7862940
December 21, 2021
County of Albemarle
Department of Community Development
401 McIntire Road
Charlottesville, VA 22902
Attn: Andy Reitelbach
Re: Willow Glen — Rezoning Amendment
ZMA-2021-00001
Review #3
Dear Mr. Reitelbach:
The Department of Transportation, Charlottesville Residency Transportation and Land Use
Section, has reviewed the above referenced plan as submitted by Edwards designStudio, dated 25
March 2021, revised October 18, 2021, and offers the following comments: Please note the
previous comments will still need to be addressed through the site plan submission.
1. Under the 2025 Build condition, the overall delay at the intersection of Dickerson and
Towncenter Drive is anticipated to increase by 99 seconds during the PM peak hour. The
only recommendation RKA offers is to extend the WB right -turn lane at the subject
intersection, which will result to no reduction in delay at this location under the 2025 Build
condition.
2. RKA analyzes two (2) potential alternatives (a traffic signal and a roundabout) to help
improve LOS at the aforementioned intersection. They run signal warrants 1, 2, and 3 but
TE does not believe that warrant 3 would apply to this location, hence the signal
would likely not be warranted. According to Section 4C.04 (Paragraph 02) of the
MUTCD, Warrant 3 shall be applied only in unusual cases, such as office complexes,
manufacturing plants, industrial complexes, or high -occupancy vehicle facilities that
attract or discharge large numbers of vehicles over a short time. There will need to be a
discussion on the potential for a roundabout or other alternative intersection types here at
this location (possibly using VJUST as a preliminary tool).
3. Both of the left turn lane warrants for the entrances appear to be met. The graph on F-64
should be viewed as appropriate for entrances with 0-5% left turns
4. Right turn tapers will be required at both entrances. It is agreed that neither entrance is
likely to meet the full right turn lane warrant, however there is still a fair amount of right
turning traffic at each entrance.
5. The Department is not in favor of the proffered round -a -bout funds.
a. The proffer indicates the Developer will provide right-of-way from his own land,
plus 10% of construction costs, both of which will revert back to the Developer
after 10 years if the round -a -bout is not constructed. Without strong support from
VirginiaDOT.org
WE KEEP VIRGINIA MOVING
the County and introduction into SMARTScale Round 5, this timeline is unlikely
to be met.
b. The estimated cost of constructing a round -a -bout is $4-5 million, inflated to 2030.
The total estimated cost of a round -a -bout, including preliminary engineering and
right-of-way acquisition, is $5-6 million, inflated to 2030.
c. Construction of a round -a -bout at this location would require a larger inscribed
radius, and more deflection on Towncenter Dr and Dickerson Rd, requiring much
more right-of-way than is shown in the proffer, to include some from the subject -
property.
Please provide two copies of the revised plan along with a comment response letter. If further
information is desired, please contact Doug McAvoy at 540-718-6113.
A VDOT Land Use Permit will be required prior to any work within the right-of-way. The
owner/developer must contact the Charlottesville Residency Transportation and Land Use
Section at (434) 422-9399 for information pertaining to this process.
Sincerely,
Doug McAvoy Jr., P.E.
Area Land Use Engineer
Charlottesville Residency
VirginiaDOT.org