Loading...
HomeMy WebLinkAboutWPO202100064 Plan - VSMP 2021-12-23VIRGINIA VSMP PLAN IN REFERENCE TO WPO 2021m00064 -� FOR IDS TAVERN to ALBEMARLE COUNTY, VIRGINIA LINEAGE JOB #19066 INDEX OF SHEETS Al DESCRIPTION SHEET NO. TITLE SHEET ...... C-01 NOT USED .................. C-02 EXISTING CONDITIONS C-03 NOT USED C-03 A OVERALL SITE PLAN C-04 NOTUSED .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. C-04 A NOTUSED .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. C-04 B NOTUSED . . . . . . . . . . . . . . . . . . . . . . . . . . . . . C-04 C NOT USED ....................... C-04 D GRADING / E&SC PLAN ................................................................................................... . . C-05 E&SC NARRATIVE . C-05 A E&SC NARRATIVE, PROPOSED OVERLAND FLOW, DRAINAGE AREA, & VRRM SITE TAB . . C-05 B CONSTRUCTION DETAILS C-06 HANDICAP PARKING LAYOUT & CONSTRUCTION DETAILS C-06 A CONSTRUCTION DETAILS .............................................. ..... ..... ..... ................ ..... .... C-06 B NOT USED ... .. .. .. .. .. C-07 GENERAL PROPERTY INFORMATION PROPOSED USE: BUILDING ADDITION FOR 3100 S.F. OF OFFICE SPACE. 9 ADDITIONAL PARKING SPACES. OWNER: IVY ROAD RE LLC. 1. TAX MAP : 059000000015A0 2. ZONING: a. PROPERTY IS SPLIT -ZONE C-1 COMMERCIAL AND RA RURAL AREA b. PROPERTY IS LOCATED WITHIN THE ENTRANCE CORRIDOR OVERLAY DISTRICT c. PROPERTY IS SUBJECT TO PROFFERS PER ZMA198400026 d. PROPERTY HAS CRITICAL STEEP SLOPES 3. MAGISTERIAL DISTRICT: SAMUEL MILLER DISTRICT 4. WATERSHED: SOUTH FORK RIVANNA WATER SUPPLY WATERSHED 5. THE PROPERTY IS NOT LOCATED WITHIN THE ACSA JURISDICTIONAL AREA AND DOES NOT HAVE ACCESS TO PUBLIC WATER/SEWER. 6. DATUM REFERENCE: BENCHMARK AXLE - 1534.90' PROPERTY INFORMATION FOR TMP 59-15A1 OWNER: IVY ROAD RE LLC. 1. TAX MAP : 059000000015A1 2. DB REFERENCE: 5123/91 DESIGNER: LINEAGE ARCHITECTS, P.C. ATTN: JON GARBER P.O. BOX 991 98 LEE HIGHWAY VERONA, VIRGINIA 24482 PHONE: (540) 248-3771 DEVELOPER: 704 CAPITAL, LLC SITE VICINITY MAP (SCALE 1:2000) PER SECTION 10. DELEGATION OF AUTHORITY OF THE SWPPP, JEFF TESTERMAN IS THE CERTIFIED LAND DISTURBER FOR THIS PROJECT. Z 516NATURE PANEL: APPROVAL DATE DEPARTMENT OF COMMUNITY DEVELOPMENT: PLANNING & ZONING ENGINEERING INSPECTIONS ARCHITECTURAL REVIEW BOARD DEPARTMENT OF FIRE AND RESCUE ALBEMARLE COUNTRY SERVICE AUTHORITY VIRGINIA DEPARTMENT OF TRANSPORTATION HEALTH DEPARTMENT FIRM INFO: Lineage Architects, P.C. P.O. Box 991 98 Lee Highway Verona, VA 24482 Phone: (540) 248-3771 Fax: (540)248-1628 Email: info@lineagearch.com ENGINEER NAME/SEAL: ARCHITECT NAME/SEAL: a a� I I CO. COMMENTS 1 12-16-211 NO. I REVISIONASSUE I DATE JOB NUMBER: 19066 DATE: OCTOBER 1, 2021 DRAWN BY: JMT APPROVED BY: JFG DRAWING DESCRIPTION: TITLE SHEET DRAWING NUMBER: C-01 r / a \ 34" TULIP POPLAR \ JN3i , I IVY ROAD v US ROUTE 250 s DEMOLISH AND REMOVE CRAPE MYRTLE x3 \ \ _ 80.001 R.O.W. \ DOGWOOD x2 ` ' \w Oo \ \ DOGWOOD r �° GAO��/ \ ARBORVITAE SCREEN o , T+ �&}a '_ + % PSF -- p N- _ — -------------- 8" EVERGREEN MAGNOLIA \1 L�\\\+,I\ APPROX. LOCATION _C '�j----------- + __� SEPTIC LINE TYP. 3 b/,(, �oq 140 TM 59-16A o�,,I,` SEPTIC LIDO —�; — =o� IVY HILL GARDENS, LLC DEMOLISH AND REMOVE 1 \\,�� CLEANOU MIXED DECIDUOUS BED I P '0 . 14" WILLOW OAK \ R77.35' DB 5002/71 �+ DEMOLISH AND REMOVII 1 \ f \F Fy v N / DECIDUOUS MAGNOLI T , `II\� I ti7 DEMOLISH AND REMOVE " RURAL AREA DEMOLISHAND x, X \\\I I &I,` $ DEMOLISH AND REMOVE REMOVE BIRCH SHRUBS X4 1 "\\w MULTI -FAMILY RESIDENTIAL /I' \ ©EMOLISHANDREMOVE r POWERPOLE2 + "�`} Y +, \\ .\y1 P y 111 DEMOLISH AND REm&E 1' DOGWO D x3 +° 1z + ��} "t?e DEMOLISH AND REMOVE �� 3 \\ CONCRETE PATH + �i J2 + j FENCE x2 + &I,c Y DEMOLISH AND REMOVE� \ r+\YcI / i\ + f/ OVERHEAD ELECTRIC LI 2 t, l _ M f' + ;j� ° �Oc�syo 6�0, DECIDUOUS MAGNOLIA DEMOLISH AND REMOVE ABANDON EXISTING SEPTIC / WOOD PATH EDGE LINE PAST NEW C/0 + &Ir` =' \�\I +`�iIT�� +`. / \ GRAVEL DRIVEWAY + IT �\ 3846.50 SF x + Z' ' \fit ONE STORY HOUSE / DEMOLISH AND REMOVE / c\ DOOR 527.91' , '1 / + ARBORVITAE SCREEN+�&I 1303 SF ROSE OF SHARON A DOGWOOD X DEMOLISH AND REMOVE ---- �,+ I, ¢� / BRICK PATH — 3 HEMLOCK ROW �j+n\' /. U / ( + s gIP 9 +'&1 / • U / / 1 DEMOLISH AND REMOVE DEMOLI.�FI A1tlD REMOVE GENERAL NOTES: 1. CURRENT FIELD SURVEY RECORDED BY LINEAGE ARCHITECTS, PC ON OCTOBER 28, 2019 AND JULY 7, 2021. 2. BULK TOPOGRAPHY SHOT IN FIELD BY LINEAGE ARCHITECTS, PC (SEE NOTE 1). SEPTIC TOPOGRAPHY BASED ON COUNTY GIs. 3. THE SITE IS DETERMINED TO BE LOCATED WITHIN THE IVY CREEK RESERVOIR WATERSHED. 4. THE SITE IS SPLIT -ZONED C1 COMMERCIAL AND RA RURAL AREA. 5. THE SITE IS LOCATED IN FEMA FLOODPLAIN ZONE X; THE SITE IS DETERMINED To BE OUTSIDE THE 100 YEAR FLOOD PLAIN. FIRM MAP NUMBER: 510 03C 0265 D. EFFECTIVE DATE: FEB. 4, 2005 6. NO STRUCTURE, EITHER EXISTING OR PROPOSED, EXCEEDS 65 FEET IN HEIGHT PER SECTION 21.4 of THE ALBEMARLE COUNTY ZONING CODE. 6. BENCHMARKS AND ELEVATIONS ARE RELATIVE To VIRGINIA NORTH \ ZONE 4501. 7. ALL PLANT MATERIAL IS UNDER 6" CALIPER UNLESS OTHERWISE r •� ,4W°jsT NOTED. 8. ALL TREES NOT EXPLICITLY SHOWN FOR DEMOLITION SHALL BE P SE VE . 9. ALL DEMOLISHED MATERIAL IS To BE REMOVED TO LANDFILL. \\ \ \ z 525.00 \ \ EASEMENTS OF RECORD: (EASEMENTS AS KNOWN OR DISCLOSED, NO TITLE REPORT FURNISHED, ADDITIONAL EASEMENTS OR UTILITIES MAY OR MAY NOT EXIST.) UTILITY POLE \ \ VIRGINIA ELECTRIC AND POWER COMPANY EASEMENTS: 20" WILLOW OAK ' ........ DB 307/183 POLE LINE EASEMENT PARALLEL TO RT. 250, NO WIDTH GIVEN. \ -NOT PLOTTED DB 316/562 POLE LINE EASEMENT PERPENDICULAR TO RT. 250, NO WIDTH `\\u + f L`_ v� REDCEDAR + \ GIVEN. -NOT PLOTTED / FLAG POLE+ \ m ` .�.\ BRICK r`'� + j'� •_�•. . .' 1 I O/ I 2 STORY HISTORIC TAVERN \ 'I ' �'j 7 \ \ \ T J�IJi+'GIP`/ •�• PATIO , Q 11 1 t, DEMOLISH AND REMOVE N , ROOFTOP 551.7' / ,// ,.I>�+'�, \ / ' � Z o LAURELS \ \ ELECTRIC EASEMENT RESERVATIONS: v+i BRICKRETAINI WALL ��/ ; 612SF Eck y�// V o� \u+I���' MAX HEIGHh\2.00 0/ ✓ \s r&tc �" '" `// \ �'4* DB 263/230 RESERVATION FOR AN EASEMENT FOR POWERLINE CROSSING /c �" v .. i POND 1 li / '', H � + ' '`. BE AXLEflhbSRIG I / \\ ,1 1 �. / I �\\ 1 STORY BLDG - ' ' /I- ' \ • . • . • . • . • . • . • . • . \ PROPERTY. No WIDTH GIVEN. LOCATION NOT SPECIFIED, NOT �l DEMOLISH AND REMOVE ELEVATION 'ip,P� \\ '`I ' DOOR 525.8'`DEMOLISH AND �'r \ 53490' • • • • • • • \ ; DEMOLISH ANDREMOVE ROOFTOP542.9' " REMOVEDOGWOOD DOGWOOD PLOTTABLE. EXISTING PATIO \ 23osF �j, / ; ;' + \ Opop \ DB 263/440 RESERVATION FOR AN EASEMENT FOR POWERLINE CROSSING s / DEMOLISH AND REMOVE EXISTING PORCH / 1 STORY HOUSE / / ( �q2 ' \ /'o�T PjY PROPERTY. No WIDTH GIVEN. LOCATION NOT SPECIFIED, NOT PLOTTABLE. \ PER ARCHITECTURAL PLANS FF 526.94' a'\ RIDGELINE 538.25' � WOODED SLOPE <�-- '— 1724sF / \ pia' 7F + 0 F f ' ' ' ' ' ���� - -- \ • • • • • ' VIRGINIA TELEPHONE AND TELEGRAPH EASEMENTS: 3 %NX.QF DECIDUOUS < . =�_� / q Ga ; ; . . . . . y 5 \ / ! : + TM 59-15AT-. D AND�tlERGREEN / . 7STONE RETAINING WALL /�� �� \ 1 �i� = /__ I CRAPEMYRTLE x3 I I DB 338/415 POLE LINE EASEMENT 10' IN WIDTH CENTERED ON WIRES AS R DEMOLISH AND REMOVE \ / �� / IVY ROAD RE LLC ., ' CRITICAL SLOPES MAX HEIGHT: 3.00' �'...... ........ �• -� POWER POLE -' UTI TY POLE ;\_ ` _ �� /� r r'1 DOGWOOD I ... ...... CONSTRUCTED. NO LOCATION SPECIFIED. NOT PLOTTED. `_-- 5 / ;- _ sLDG o`1 DB 5123/91 ................ DB 338/424 POLE LINE EASEMENT, 20' IN WIDTH CENTERED ON WIRES AS 0 �`i' • • • • •CONSTRUCTED. N LOCATION PE SPECIFIED. NOT PLOTTED. ---------- ;; =j.. ///j.�...... -. g / �i. \ IRON PIN 5 Y DEMOLISH AND REMOVE EXISTING HOUSE ; `tip \ LAND USI �J ASSIGNED ELEVATION / PER ARCHITECTURAL PLANS �\ ;, �// I I \ 1 N \ 15z3.3r WATERLINE EASEMENT: r y f -- /-- __ _ . /. DEMOLISH AND REMOVE 31" WHITE PINE , ' j ' OVERHEAD ELECTRIC LINE ' ,� % \ DB 357/219 RIGHTS TO A WELL AND WATERLINE, IN EXCHANGE FOR A . . . . . . . . . . . �SOp % 6 `�% , , , , , , , , , , '.' ' UTILITY POLE / x +' - ---- RELEASE TO RIGHTS TO A SPRING. //./././.�.. CRITICAL SLOPES / �I \ . .may! . . . . . . . . . . . I—__yl�—'.—r- .�.\,[. +II 1 .�. o ... . . .............. . . . . � " `' �I \ CRAPEMYRTLEx2 ACCESS EASEMENT: _�—=- 55p�0 \/j/j \ �I \ \ DB 263/440 A 20' WIDTH EASEMENT FFOR ACCESS, OVER THE "OLD D.S. .• ``` \ ``/'``�� / \/`\ \ \\\�� \\`\ ` + \ \\ , ``\\\ `` / ���' •' •' BLACK WALNUT `� 1 L'` II BLACK WALNUTx3 \ ROAD",SHOWN HEREON ON THE WESTERN SIDE OF THE PROPERTY. \ DB 4491/396 A SHARED DRIVEWAY EASEMENT SHOWN HEREON. --------------- \` \Ile AREA OF RESTRICTED USE: __ DB 263/230 AREA DEFINED To BE KEPT FREE OF BUILDING OR PENS of \\ ', ` j = ', '1 ! I�Z g� \ \ ANY KIND; TO BE USED ONLY FOR GARDENS AND PASTURE (EXCEPTING FOR HOGS OR GOATS SHOWN HEREON. ',f���`.0 � `' 'I - ---,, ,I `1.•`�• .� . 1 ,�o O s \\' --------- \ \ _525.00' ) �\ HOUSE - .11 n — TM 59-15A �, I. .. 1, i �I Yny \`------- ` ' IVY ROAD RE, LLC `��� .. / \ i.,., .. I , .1 =' . . . . . . . . . . . * �. .1 ; . • `� .I .I ,.i ., .I ., I ; I -' WELL HOUSE RURAL AREA / C1 COM_ME—KtC L ....... A :. �,��... ......`,1..1..�.:;.,,.;;II;L.. ;,!,I!I II + Inst201800013717 - ,' ti:, i,',',',' '','';,',;,';{ 'I!I ;• .JAPANESEMAPLEx2 T FEMA Flood Zone X 51003CO265D 2/4105 � n�.�b .1 .. i . • ; ^' I ' , I ;I IiI li GRAVEL DRIVEWAY `. _____---- Samuel Miller Magisterial District �e�/ , ;;;Il,j ' I '� 1-________ WOODED SLOPECONC BLDG PAD / o I MIX OF DECIDUOUS j AND EVERGREEN � I C ---------------- T TM 59-15B �/ iI N87.08'33"W86.82' HALLAM ROTH DB 4263/729 /`, TM 59-15 RURAL AREA JERRY D BENINATE SINGLE FAMILY RESIDENTIAL / DB 1654/396 v RURALAREA RESIDENTIAL -MOBILE HOME o, a VEIinCALSCALE: 1'-2V 8 W 51d i10 G1GHI lME AT3g HEIGHT 510 i35 5]6 i32 TLIf✓EAT].5'I,EIGY{wo 01oN Ro° 5]2 sn i28 Eq GQAOE 529 i44 524 5A y $ 53 � SIGHT DISTANCE PROFILE AT IVY ROAD SCALE: 1 "=200' EXISTING CONDITIONS AND DEMOLITION PLAN SCALE: 1 "= 20' 20 GRAPHIC SCALE 10 20 40 ( IN FEET ) 1 inch = 20 ft. 80 W z `,Z, W pUCi `4 FIRM INFO: Lineage Architects, P.C. P.O. Box 991 98 Lee Highway Verona, VA 24482 Phone: (540)248-3771 Fax: (540)248-1628 Email: info@lineagearch.com ENGINEER NAME/SEAL: ARCHITECT NAME/SEAL: a 5 a U r d 0a C� H U t` I CO. COMMENTS 12-16-21 NO. REVISIONASSUE DATE JOB NUMBER: 19066 DATE: OCTOBER 1, 2021 DRAWN BY: JMT APPROVED BY: JFG DRAWING DESCRIPTION: EXISTING CONDITIONS AND DEMOLITION PLAN DRAWING NUMBER: C-03 4E I 20 PARKING CALCULATIONS TABLE AS PER 18-4.12.6 OFFICES, BUSINESS, ADMINISTRATIVE AND PROFESSIONAL (INCLUDING MEDICAL OFFICES BUT NOT DENTAL CLINICS) REQUIREMENT: 1 SPACE 1200 SF OF GROSS COMMERCIAL OFFICE SPACE WHERE GROSS COMMERCIAL OFFICE SPACE= 80% OF THE NET SF OF THE BUILDING FOOTPRINT OR AT THE REQUEST OF THE APPLICANT, THE ACTUAL NET OFFICE FLOOR AREA AS SHOWN ON FLOOR PLANS SUBMITTED BY THE APPLICANT, DELINEATING THE ACTUAL NET OFFICE FLOOR AREA, WHICH PLANS SHALL BE BINDING AS TO THE MAXIMUM NET FLOOR AREA USED. NET SF OF OFFICES ONLY: 2,396 sf T = 11.95 = 12 zoo TOTAL SPACES REQUIRED = 12 (INCLUDING 1 H/C) TOTAL SPACES PROVIDED = 12 (INCLUDING 1 H/C) CO CO / \ m I.ZI / F / INSTALL FLAGPOLE \ INSTALL PVC / ELECTRIC CON DUIT G 2' PVC CONDUIT m \ I INSTALL STEEL EDGING ALONG - ] DRIVE AND PARKING 10 GRAVEL DRIVE PE7i'0 fi L1/C YARD INLET TO COLLECT //l��n�n////^������^�^ O 6328.50 SF OUTPUT FROM ROOF AND INSTALL STEPPING STONES \ ODOO FOUNDATION E, 4"Y OF �� STRUCTURE, 4'YARD HANDICAP PARKING AND ACCESS AISLE '```���� INLET TO 90' ELBOW SEE DETAIL I/C-06A 1\ R3.00 INSTALL BRICK PAVERS GRADE: 524.15 1.50 PER DETAIL 3/C-06 INV. OUT: 520.77 INSTALL ADA COMPLIANT GRAVEL GRID ix 580.70 SF PER DETAIL 2/C-06 2 y� _ c�l�l�/ EXISTING 1 STORY _00 _ HOUSE ayQ�� 1303 SF . 70.E ] lte .00 / \ W FEE 527.91 ] �o `f�L / 'RESERVED OWNER . 8.00 (L�� PARKING' SIGN / INSTALL SCREENING FENCE .Q5X / \ 5 SEE DETAILS 1 AND 2/ C-04 A dc6.00-- �K(l/ \` EXISTING BRICK INSTALL BRICK PAVERS HVAC e \ \ PATIO PER DETAIL 3IC-06 R2.00 EXISTING 2 STORY �O. RJ4 HISTORIC TAVERN 1612 SF FFE 526.94 ADA ACCESSIBLE PATH ^A 13 ` EMERGENCYACCESS � 4.0 PROPOSED DISTANCE m8Z00' (� PROPOSED �VCo 1 SiORY ADDITION2 STORY z85 SF ADDDIISON FFE 526.60 KOI POND TO REMAININ-GROUND PROPANE TANK , FEE 526.83 . / YARD INLET TO COLLECT Igo h \ (AT REAR OUTPUT FROM ROOF AND ENTRANCE) / FOUNDATION DRAINS \ 1�� y�y DES41 EXISTING STONE RETAINING WALL. REMAIN MAX HEIGHT 3.00' / OF STRUCTURE. 1� AND LANDSCAPING- 8"BRONZE NYLOPLAST DROP -IN GRATE TO _ 8" NYLOPLAST TEE / r CRITICAL SLOPES �� T/ / TOP: 526.05 INV. OUT.524.55 / fi EXISTING c EXISTING BIRDCAGE, TO REMAIN 45' ELBOW / L n / LOG (INSTALL 8' PVC STORM PIPE (/\ 1250' 45' ELL BOWOW / 1'PVC CONDUIT PVC CONDUIT /\ \ CRITICAL SLOPES GRAPHIC SCALE 10 20 40 ( IN FEET ) 1 inch = 20 ft. 80 Z i // 04 2' PVC CONDUIT R25.00- /r INSTALL4"PVC STORM PIPE \� \ R2.50 brr\ ' (FROM PATIO r FASTING G I STORR1 ` \ BLDG 22350 SF HVAC / FEE: 8] ELEC�41 HVAC Y\ / r 8' PVC°Qp PIPE END ^6. INV. OUT: 520.z� �O\ 2' PVC CONDUIT SHARED DRIVEWAY ACCESSEASEMENT \ (SEE SHEET C-03 A) N!E\ND\LWO 1 /`/ INSTALL STEEL EDGING ALONG DRIVE AND PARKING INSTALL STEPPING PIPE END INV. OUT: 522.85 INSTALL SCREENING FENCE SEE DETAILS 1 AND 2l C-04 A / PIPE END INV. OUT: 524.25 / INSTALL 4" PVC STORM PIPE 22.00' @ 1.8% INSTALL 4' PVC YARD INLET INSTALL 4'PVC YARD INLET T04'PVCTEE TO 90°ELBOW I TOP: 525.65 TOP: 525.45 \ INV. IN: 524.48 LINV. OUT: 524.65 INV. OUT: 524.48 EMERGENCY ACCESS DISTANCE - 112.00' 2' PVC CONDUIT \ INSTALL KNOX BOX CONTRACTORS TO COORDINATE WITH ONE ANOTHER / OVERALL SITE PLAN SGALE: 1" 20' GENERAL NOTES: / `a 1. ALL RADII = 5' UNLESS NOTED OTHERWISE. W 2. ARCHITECTURAL BUILDING DIMENSIONS SUPERSEDE BUILDING DIMENSIONS AS SHOWN ON THIS PLAN. 3. PAVEMENT AT ALL ENTRANCES SHALL MATCH THE EXISTING CROSS SECTION OF ROUTE 250. h 4. THERE WILL BE NO CHANGE IN THE EXISTING POINT OF INGRESS TO, OR EGRESS FROM, THE SITE. 9 5. THE MAXIMUM IMPERVIOUS SURFACE AREA ONSITE IS 3100 SF(0.07 ACRES). W 6. PROPOSED SITE USE IS COMMERCIAL OFFICE ONLY. THERE WILL BE NO RETAIL USE, EITHER GIFT, CRAFT, ANTIQUE SHOP, OR OTHERWISE. TOTAL ACREAGE OF PROPOSED USE = 0.06 ACRES W TOTAL NUMBER OF EMPLOYEES = 4 • 7. NO SITE LIGHTING IS PROPOSED FOR PARKING AREAS.j 8. THERE ARE NO ADDITIONAL EASEMENTS PROPOSED FOR THE SITE. W 9. VISIBILITY OF ALL MECHANICAL EQUIPMENT FROM THE ENTRANCE CORRIDOR SHALL BE F1 ELIMINATED. 10. ALL ROOF DRAINS SHALL DISCHARGE IN A MANNER NOT TO CAUSE PUBLIC NUISANCE AND NOT OVER SIDEWALKS. a 04 11. ALL ACCESSIBLE PARKING SPACES AND ACCESS ISLES SHALL CONFORM WITH ADA DESIGN STANDARDS FOR ACCESSIBILITY. CROSS SLOPES OF ACCESSIBLE PARKING SPACES AND ADJACENT ACCESS ISLES SHALL NOT EXCEED 1:48. ACCESS ISLES SHALL FIRM INFO: BE AT THE SAME LEVEL AS THE PARKING SPACES THEY SERVE. Lineage Architects, P.C. 12. ORDINANCE 18-4.12.13(C): LOADING SPACE. THE LOW LEVEL OF ON -SITE STAFF AS WELL 91 P.O. Box 98 Lee Highway AS THE INTENDED USE OF THE OFFICE AS A SPACE FOR MANAGING LOCAL ASSETS Verona, VA 24482 WILL NOT GENERATE THE SIZE OR QUANTITY OF DELIVERIES TO THE BUILDING SUCH THAT A LOADING SPACE WOULD BE NECESSARY. THESE FACTS, IN COMBINATION WITH Phone: (540) 248-1621 THE OWNER'S INTENTION TO MAINTAIN THE HISTORIC CHARACTER OF THE SITE, LEAD Email: info@lineagearch.com TO THE REQUEST THAT THE LOADING SPACE REQUIREMENT BE WAIVED VIA 18-4.12.13(F). ENGINEER NAME/SEAL: 1 - T 14. PER NOTE 9/ C-03, ALL DEMOLISHED MATERIAL IS TO BE REMOVED TO LANDFILL. FIRE FIGHTING INFORMATION: 1. AVAILABLE FLOW AT HYDRANT NO. 12796 = 2796 GPM 2. NEEDED FIRE FLOW = 1500 GPM a. F = 1.5 WOOD FRAME b. A = 2842 SF ARCHITECT NAME/SEAL: c. C =1439 GPM =1500 GPM d. 0 = 0.85 (C-2 OFFICE) e. X = 0.12 f. P = 0.0 WEEKLY TRIP CALCULATIONS: NOTE: INTENDED SITE USE IS LOW VOLUME COMMERCIAL PER APPENDIX F OF THE VIRGINIA DEPARTMENT OF TRANSPORTATION ROAD DESIGN MANUAL. IS Tavern Summary of Trip Generation Calculation For 4 Employees of General Office Building June 09, 2020 Average Standard Adjustment Driveway Rate Deviation Factor Volume Avg. Weekday 2-Way Volume 3.32 2.16 1.00 13 7-9 AM Peak Hour Enter 0.42 0.00 1.00 2 7-9 AM Peak Hour Exit 0.06 0.00 1.00 0 7-9 AM Peak Hour Total 0.48 0.71 1.00 2 4-6 PM Peak Hour Enter 0.08 0.00 4-6 PM Peak Hour Exit 0.38 0.00 4-6 PM Peak Hour Total 0.46 0.70 1.00 1.00 1.00 0 2 2 Q, , W Saturday 2-Way Volume 0.54 0.80 1.00 2 Saturday Peak Hour Enter 0.05 0.00 Saturday Peak Hour Exit 0.04 0.00 Saturday Peak Hour Total 0.09 0.31 1.00 1.00 1.00 0 0 0 fF'N-L.j1 F I--l1 `^ 1 Note: A zero indicates no data available. Source: Institute of Transportation Engineers Trip Generation, 7th Edition, 2003. r V TRIP GENERATION BY MICROTRANS rW-1 0 a I mod. Imo. Summary of Trip Generation Calculation For 1.73 Th.Gr.Sq.Ft. of General Office Building June 17, 2020 V [x1 a F \/ WWz O v t` Average Standard Adjustment Driveway Rate Deviation Factor Volume Avg. Weekday 2-Way Volume 11.01 6.13 1.00 19 7-9 AM Peak Hour Enter 1.36 0.00 1.00 2 7-9 AM Peak Hour Exit 0.19 0.00 1.00 0 7-9 AM Peak Hour Total 1.55 1.39 1.00 3 4-6 PM Peak Hour Enter 0.25 0.00 1.00 0 4-6 PM Peak Hour Exit 1.24 0.00 1.00 2 4-6 PM Peak Hour Total 1.49 1.37 1.00 3 Saturday 2-Way Volume 2.37 2.08 1.00 4 1 CO. COMMENTS 12-16-21 Saturday Peak Hour Enter 0.22 0.00 Saturday Peak Hour Exit 0.19 0.00 1.00 1.00 0 D NO. REVISIONASSUE DATE Saturday Peak Hour Total 0.41 0.68 1.00 1 JOB NUMBER: 19066 Note: A zero indicates no data available. DATE: OCTOBER 1, 2021 Source: Institute of Transportation Engineers Trip Generation, 7th Edition, 2003. TRIP GENERATION BY MICROTRANS DRAWN BY: JMT AVERAGE DIRECTION OF TRIPS APPROVED BY: JFG DIRECTIONAL FACTOR FOR US 250 FROM DICK WOODS RD. TO US 29 :.689 DRAWING DESCRIPTION: AVERAGE DAILY DRIVEWAY VOLUME: 19+13 = 32+2 = 16 OVERALL SITE PLAN DRIVEWAY VOLUME x DIRECTIONAL FACTOR: 16 x .689 = 11 DRAWING NUMBER: EAST -BOUND DAILY TRIPS : 11 WEST -BOUND DAILY TRIPS: 5 C-0`7 TABLE 3.39-A ADHESIVES USED FOR DUST CONTROL Water Application Dilution Type of Rate Adhesive (Adhesive: Water) Nossle Gallons/Acre Anionic 7:1 Coarse Spray 1,200 Asphalt Emulsion Latex Emulsion 12.5:1 Fine Spray 235 Resin in Water 4:1 Fine Spray 300 Acrylic Emulsion 7:1 Coarse Spray 450 (Non -Traffic) Acrylic Emulsion 3.5:1 Coarse Spray 350 (Traffic) Source: Va. DSWC GENERAL NOTES: GENERAL EROSION AND SEDIMENT CONTROL NOTES \ 1. ALL WHEEL WASH WATER TO DRAIN TO WASH WATER TRAP. TOP ES-1: UNLESS OTHERWISE INDICATED, ALL VEGETATIVE AND STRUCTURAL EROSION AND SEDIMENT W IVY ROAD ELEVATION OF TRAP TO BE APPROX. 523.00', BOTTOM ELEVATION CONTROL PRACTICES WILL BE CONSTRUCTED AND MAINTAINED ACCORDING TO MINIMUM STANDARDS AND U S ROUTE 250 `TQ BE APPROX. 522.00 SPECIFICATIONS OF THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK AND VIRGINIA REGULATIONS VR 625-02-00 EROSION AND SEDIMENT CONTROL REGULATIONS (4VAC50-30). 80.00rR.O.W. 2. SF F\TSSP:2173.00 • 3. CONTRACTOR HAS INDICATED THAT ON SITE FUEL WILL NOT BE REQUIRE ES-2: THE PLAN -APPROVING AUTHORITY MUST BE NOTIFIED ONE WEEK PRIOR TO THE PRE -CONSTRUCTION W CONFERENCE, ONE WEEK PRIOR TO THE COMMENCEMENT OF LAND DISTURBING ACTIVITY, AND ONE WEEK W PRIOR TO THE FINAL INSPECTION. THE NAME OF THE RESPONSIBLE LAND DISTURBER MUST BE PROVIDED TO Z THE PLAN -APPROVING AUTHORITY PRIOR TO ACTUAL ENGAGEMENT IN THE LAND -DISTURBING ACTIVITY rrF.�r SHOWN ON THE APPROVED PLAN. IF THE NAME IS NOT PROVIDED PRIOR TO ENGAGING IN THE W LAND -DISTURBING ACTIVITY, THE PLAN'S APPROVAL WILL BE REVOKED. W ES-3: ALL EROSION AND SEDIMENT CONTROL MEASURES ARE TO BE PLACED PRIOR TO OR AS SOON AS THE FIRST STEP IN CLEARING. WM I+ \\\ `, ES-4: PRIOR TO COMMENCING LAND DISTURBING ACTIVITIES IN AREAS OTHER THAN INDICATED ON THESE \ PLANS (INCLUDING, BUT NOT LIMITED TO OFF SITE BORROW OR WASTED AREAS), THE CONTRACTOR SHALL SUBMIT A SUPPLEMENTARY EROSION CONTROL PLAN TO THE OWNER FOR REVIEW AND APPROVAL BY THE VRTA-a OHN PLAN APPROVING AUTHORITY. -ell 525 \ \ \ \x\x�x� - f ' , CE :'\�,1. 525.00 \ ES-5: THE CONTRACTOR IS RESPONSIBLE FOR INSTALLATION OF ANY ADDITIONAL EROSION CONTROL FIRM INFO: ` DIJMPSTER 523 ±�,x\ ' � � MEASURES NECESSARYTO PREVENT EROSION AND SEDIMENTATION AS DETERMINED BY THE PLAN / Lineage Architects, P.C. \ APPROVING AUTHORITY. g 91 CONCI4F�TE WASH -OUT BY 524 SF P.O. Box Tf� ACF I`VIRONMENTAL \ \ /; = '' J 98 Lee High way Verona VA 24482 �� \ ES-6: ALL DISTURBED AREAS ARE TO DRAIN TO APPROVED SEDIMENT CONTROL MEASURES AT ALL TIMES 526 1 \ SYNTHETIC CONSTRUCTION ENTRANCE - EXISTINGI STORY I \ MU \ WASH -WATER TRAP, TRACKOUT CONTROL MATS BY FODS, DURING LAND DISTURBING ACTIVITIES AND DURING SITE DEVELOPMENT UNTIL FINAL STABILIZATION IS Phone: (540) 248-3771 HOUSE I 1 I \ SEE NOTE 1 ; OR EQUIVALENT -SEE DETAIL 04l C-06 A �� ACHIEVED, AFTER WHICH, UPON APPROVAL OF THE PLAN APPROVING AUTHORITY, THE CONTROLS SHALL BE Fax: (540) 248-1628 QQQ� 303SF O \ REMOVED. TRAPPED SEDIMENT AND THE DISTURBED SOIL AREAS RESULTING FROM THE REMOVAL OFA Email: info@lineageazch.com FFE627.91 j PS \ DC( -rpy,' / \ \ TEMPORARY MEASURES SHALL BE PERMANENTLY STABILIZED TO PREVENT FURTHER EROSION AND �b \ Q A SEDIMENTATION. ENGINEER NAME/SEAL: 523 UNNAMED TRIBUTARY - \ OF IVY CREEK \ EXISTING 2STORY \ \ ES-7: DURING DEWATERING OPERATIONS, WATER WILL BE PUMPED INTO AN APPROVED FILTERING DEVICE. / O \ HISTORIC TAVERN IN,e 1612 SF IP ` \ OF \\ FFE 626.94 /SF }� /:// LIMITS OF DISTRUBANCE v O / ES-8: THE CONTRACTOR SHALL INSPECT ALL EROSION CONTROL MEASURES AT LEAST EVERY 2 WEEKS AND _ \ ; MU PRovosED (FRO cnno r TOTAL DISTURBED AREA IMMEDIATELY AFTER EACH RUNOFF -PRODUCING RAINFALL EVENT. ANY NECESSARY REPAIRS OR CLEANUP TO r , I 1 PROPOSED 1STORV MOM + Q EXISTING 1 STORY - REAR ENIRAN v \ �� O TO 2STORY sessF e Dc=24,833.35 SQ FT=0.57 AC. MAINTAIN THE EFFECTIVENESS OF THE EROSION CONTROL DEVICES SHALL BE MADE IMMEDIATELY. LIMITS OF DISTURBANCE o D ADDITION FFE526.60 swsF M v , PS 979 SF FFE:525.6] v O FFE REAR ENTRANCE O , / I I 526 ER AND LANDSCAPING. O CRITICAL SLOPES > i / — �Q�__- �� -?�_ - — — 526 ` `\\ \ 1 �'� �� LIMITS OF DISTURBANCE I / \ \ \ ```�`` `\526 `i `; `` ``` \ CRITICAL SLOPES/ 13AREA DOWNSLOPE / V _ _ —' OF SEPTIC DRAIN FIELD, UPSLOPE OF CRITICAL SLOPES. \ \ ' ��--L- _ _�--___``___` \ `�// `//.//\� '` !` ,,``\``I-,` I1 11 , IN, rIN IN I I I PROPOSED SEPTIC DRAIN FIELD ` WITH 100%RESERVE. IN T ------ �_�\ \ 1 � � li 'I III{�; ; '; I I II 2------------- _ \ MITS OF DISTURBANCE chi, I tt 51 IN i tt 535.00 > T v GRAPHIC SCALE U 20 0 10 20 40 S C ( IN FEET ) r 1 inch = 20 ft. 80 j, \ m T LIMITS OF DISTURBANCE ---------------- ------------ ;= — ' x� . `I SF 'INN {/* S U x PS TO TP RAIN GAUGE AT CO ER \ STORAGE C NTAINER N, GRADING/E&SC PLAN SCALE: 1 "= 20' ES-9: THE CONTRACTOR IS RESPONSIBLE FOR THE DAILY REMOVAL OF SEDIMENT THAT HAS BEEN TRANSPORTED ONTO A PAVED OR PUBLIC ROAD SURFACE. ES-10: SEEDING OPERATIONS SHALL BE INITIATED WITHIN 7 DAYS AFTER REACHING FINAL GRADE OR UPON ARCHITECT NAME/SEAL: SUSPENSION OF GRADING OPERATIONS FOR AN ANTICIPATED DURATION OF GREATER THAN 30 DAYS OR UPON COMPLETION OF GRADING OPERATIONS FOR A SPECIFIC AREA. ES-11: THE CONTRACTOR SHALL BE RESPONSIBLE FOR PREVENTING SURFACE AND AIR MOVEMENT OF DUST \ FROM EXPOSED SOILS WHICH MAY PRESENT HEALTH HAZARDS, TRAFFIC SAFETY PROBLEMS, OR HARM ANIMAL OR PLANT LIFE. LEGEND ES-12: A VSMP IS REQUIRED FOR PROJECTS DISTURBING 2,500 SQUARE FEET OR GREATER IN A DESIGNATED CHESAPEAKE BAY PRESERVATION AREA (CBPA) OR 10,000 SQUARE FEET OR GREATER OUTSIDE THE CBPA. FOR MORE INFORMATION VISIT THE VIRGINIA STORMWATER MANAGEMENT PROGRAM PERMITTING WEB PAGE TITLE SYMBOL AT: http://www.deq.virginia.gov/Programs/Water/StormwaterManagement.aspx N0. KEY 3.02 TEMPORARY SYNTHETIC CONSTRUCTION ENTRANCE 3.05 SILT FENCE 3 07 STORM DRAIN INLET PROTECTION 3 08 CULVERT INLET PROTECTION 3.30 TOPSOIL STOCKPILE TSSP TSSP 3.30 TOPSOILING 3.31 TEMPORARY SEEDING 3.32 PERMANENT SEEDING 3.35 MULCHING TABLE 3.35-A ORGANIC MULCH MATERIALS AND APPLICATION RATES RATES Per Acre Per 1000 sq. ft. Mulches Notes Free from weeds and Straw or Hay 1 - 2 tons (Minimum 2 tons 70 - 90 Ibs. coarse matter. Must be for winter cover) anchored. Spread with mulch blower or by hand. Do not use as mulch for Fiber Mulch Minimum 1500lbs. 35 Ibs. winter cover or during hot, dry periods. Apply as slurry. Cut or shredded in 4-6" lengths. Air-dried. Do not Corn Stalks 4 - 6 tons 185 - 275 Ibs. use in fine turf areas. Apply with mulch blower or by hand. Free of coarse matter. Air-dried. Treat with 12lbs Wood Chips 4 - 6 tons 185 - 275 Ibs. nitrogen per ton. Do not use in fine turf areas. Apply with mulch blower, chip handler, or by hand. Free of coarse matter. Bark Chips or Air-dried. Do not use in fine Shredded Bark 50 - 70 cu. yds. 1 - 2 cu. yds. turf areas. Apply with mulch blower, chip handler, or by hand. * When fiber mulch is the only available mulch during periods when straw should be used, apply at a minimum rate of 2000 Ibs. / ac. or 45 Ibs. / 1000 sq. ft. Source: Va. DSWC a a U w a O V L v 1 CO. COMMENTS 12-16-21 NO. REVISIONASSUE DATE JOB NUMBER: 19066 DATE: OCTOBER 1, 2021 DRAWN BY: JMT APPROVED BY: JFG DRAWING DESCRIPTION: GRADING/E&SC PLAN DRAWING NUMBER: C-05 i �I F Erosion and Sediment Control Narrative I FOR 'I DS Tavern al =I Date: September 15, 2021 s i vl Lineage Project No. 19066 at IPREPARED BY: TI LINEAGE ARCHITECTS, P. C nl 98 LEE HIGHWAY PO Box 991 VERONA. VA 24482 s v 1 v `s s g CONSTRUCTION SEQUENCING NOTES: The following construction sequence shall be utilized to ensure that the proper erosion and v sediment control practices are in place and fully operational prior to upslope land disturbance. Although not listed in the steps below, construction road stabilization and dust control measures shall be held in force at all times, during all phases. v 1 -Install silt fencing and any other perimeter controls deemed necessary by County inspector. 2 2 -Arrange pre -construction conference with Owner's rep, Builder, County E&SC Inspector and v Engineer prior to commencing any land disturbing activities. 3-Install construction entrance and inlet protections. 4 - Rough grade the site. Extra topsoil may be placed on the temporary stockpile as necessary 5 -Upon receiving certification of stabilized surfaces, remove all measures. All measures shall pe removea from the upslope areas moving down the slope. All non-hardscaped or non -built areas shall be treated according to the following section prior to project completion. GRASS ESTABLISHMENT v 1. Topsoilinq - 3.30 Topsoil shall be stripped from areas to be graded and stockpiled for future use on the site. The Erosion and Sediment Control Administrator shall approve stockpile locations. Stockpiles shall be temporarily seeded and protected with silt fence. When the topsoil is v spread over the graded areas, it shall be placed in 2-4 inch compacted lifts. Topsoil hauled offsite shall be disposed of in an approved area as directed by the Erosion and _�I Sediment Control Administrator. S 2. Temporary Seeding - 3.31 The topsoil stockpiles and all areas to be rough graded during the course of the project i shall be immediately seeded with temporary vegetation upon completion of grading s operations. The appropriate seed mixture will be dependent upon the time of year it is to be sown. Seeding information is given below. The Erosion and Sediment Control Administrator must approve any deviation from these mixtures. s NOTE: Stabilization measures shall be applied to earthen structures such as dams, dikes, diversions, and sediment basin embankments immediately after construction of the said structure. 3. Permanent Seeding - 3.32 I Permanent seeding shall be completed within seven days from achieving final grade of the site. 4. Mulching - 3.35 v Areas that have been permanently seeded shall be mulched immediately following seeding. It is the Contractor's responsibility to take steps that the permanent seeding establishes successfully. Organic mulches are preferred -chemical mulches will be accepted following Owner's approval. 5 This narrative describes the erosion and sediment control measures to be emplaced for the renovation of an existing house previously containing an antique shop to office use, associated parking improvements, and landscaping upgrades at IDS Tavern located east of Ivy along US Route 250 in Albemarle County, VA. PROJECT DESCRIPTION The project consists of grading and site work necessary to prepare an area for an addition to the existing building, an upgraded parking lot, and landscaping improvements. The lot is owned by Ivy Road RE, LLC., and currently is a well -maintained grass area with associated walks and a gravel parking area. Total disturbed area associated with this project is approximately 0.57 acres with all treated by use of silt fence. An increase in impervious surface of approximately 0.05 acres is anticipated. Please note that the new addition and patio on the rear of the structure have slightly less square footage of impervious surface than the existing condition. The project should complete in May of 2022. EXISTING SITE CONDITIONS Vegetative Cover - The site is currently a well maintained grass area with a gravel parking lot. Note that undisturbed areas on the rear slopes have heavy forest. Topography - The site drains to an unnamed tributary of Ivy Creek. ADJACENT PROPERTIES To the east a residential lot owned by Ivy Road RE, LLC. To the north is US Route 250. To the west is a residential property. To the south is a forested area. Sheet C-03 of the accompanying plan set provides additional information on the adjoiners. There are no known environmentally sensitive areas within the project. A Tier III groundwater study has been performed for this area. The study concludes that this development will have no adverse effects on groundwater. A copy is attached. Any necessary offsite waste or borrow areas must be approved by the Albemarle County E&SC Administrator prior to their use. SOILS "83, Colvard Fine Sandy Loam, 0 to 2 percent slopes, occasionally flooded" as reported in the Soil Survey for Albemarle County. The soil for Colvard is observed to be hydrologic soil group "A" and the drainage class is "well -drained". The soil is observed to have a minimum depth to bedrock of 80 inches, with permeability ranging from 1.98 in/hour to 5.95 in/hour, while the water storage capacity is "moderate". The soil discussion above is based on reports available from the NRCS Websurvey 2 PERMANENT STABILIZATION Permanent stabilization shall be applied to denuded areas immediately after final grade is achieved on any portion of the site. Temporary soil stabilization shall be applied within seven days to denuded areas that may not be at final grade but will remain undisturbed for more than 14 days. Permanent stabilization shall be applied to areas left dormant for more than one year. Seeding shall be conducted in accordance with the latest edition of the Virginia Erosion and Sediment Control Handbook. Permanently seeded areas shall be protected during establishment with straw mulch. Hydro -seeding also requires straw mulch protection. Seeding and fertilization shall be in accordance with the following specifications: TEMPORARY SEEDING PLANTING DATES SPECIES RATE IN LBS. PER ACRE 50-100 lba/acre Sept. 01 -Feb. 15 -Annual ryegrass (Lolium Multi-Florum) 50% -Cereal inter Rye Secale Cereale 50% 50-100 lbs/acre Feb. 16 -Apr. 30 -Annual ryegrass lium Multi-Florum 100% 50 lbs/acre May 01-Aug. 31 1 -German Millet Setaria Italics 100% PERMANENT SEEDING REQUIRED CARE LEVEL SPECIES (COMMERCIAL OR RATE IN LBS. PER ACRE RESIDENTIAL) 200 - 250 lbs/acre Minimum -Kentucky 31 or Turf -Type Tall Fescue 90-100% -Improved Perennial Regrass 0-10% -Kentucky Bluegrass 0-10% 125 lbs/acre High -Minimum of 3, Maximum of 5 Varieties of Bluegrass from approved list for use in Vir inia 150 lbs/acre General Slope, 3:1 or less -Kentucky 31 Fescue 85% -Red Top Grass 3% -Seasonal Nurse Crop** 12% General Slope, Greater than 3:1 150 lbs/acre -Kentucky 31 Fescue 70% -Red Top Grass 3% -Seasonal Nurse Crop** 13% -Crownvetch**** 14% **Seasonal nurse crop to be selected according to time of year when sowing will occur. Seed will have short germination period for weed and erosion control. ***Weeping Lovegrass may also be included in any slope or low -maintenance mixture during warmer seeding periods. Add 10-20 lbs/acre in mixes. M W 3, Silt Fence Barriers - 3.05 (4 CRITICAL EROSION AREAS Silt fence barriers shall be installed at locations shown on the Erosion and Sediment M Control Plan to filter sediment -laden runoff and decrease the velocity of sheet flows and • No areas are expected to exceed the E&S capacities of typical standards of care. low -to -moderate level channel flows. Wire reinforced silt fences are required. 4e� EROSION AND SEDIMENT CONTROL MEASURES AND STRUCTURAL PRACTICES 3, Culvert Inlet Protection -3.08 W Culvert Inlets prevent sediment from entering and being transferred by culvert and z Unless otherwise noted, the structural and vegetative practices shall be constructed and associated drainage system prior to permanent stabilization of a disturbed project area. ��II��II�� � y maintained according to the Minimum Standards of the Virginia Erosion and Sediment Control Culvert and associated drainage system is to be made operational prior to permanent Law, Regulations and Certification Regulations and Specifications outlined in the latest edition stabilization of the disturbed drainage area. The structure shall be inspected after each Z of the Virginia Erosion and Sediment Control Handbook. rain and repaired as needed. When clogged voids are causing ponding, aggregate shall W be cleaned. Sediment shall be removed when accumulated to half of the depth of the • The following summaries are for quick reference only and do not preclude any requirements or structure. Removal shall only occur after permanent stabilization of the upslope area. cJJ standards listed in the Virginia Erosion and Sediment Control Handbook. Also, other measures U not specifically listed here or on the construction plans may be required to keep the site within 4. Dust Control - 3.39 W regulatory compliance during construction. The need for such items may not be evident until The contractor shall take measures to reduce the surface and air movement of dust, the beginning of construction. The County representative will determine the need for additional which may present health hazards, traffic safety problems or harm animal and plant life H erosion and sediment control measures. during land disturbing and construction activities. Spray of water may be used if desired. Apply water until disturbed soil is damp, but not wet, and repeat as necessary. If U 1. Temporary Construction Entrance - 3.02 adhesives are used, follow the chart on sheet C-05 A. One temporary construction entrance shall be constructed as shown on the Erosion and Sediment Control Plan. The entrance shall be maintained in a condition that prevents tracking or flow of mud onto public rights -of -way. This may require periodic top dressing E&SC CONTROL METHODS FIRM INFO: with additional stone or washing and reworking of existing stones as conditions demand and repair and/or clean -out of any structures used to trap sediment. All materials spilled, The following guidelines shall be utilized in the planning of construction: Lineage Architects, P.C. dropped, washed or tracked from vehicles onto roadways or into storm drains must be P.O. Box 991 removed immediately. During wet weather conditions, construction vehicle drivers will 1. The silt fence shall be constructed as a first step in the land disturbing activity and shall be 98 Lee Highway be required to wash their wheels prior to entering the highway. During the washing functional before up slope land is disturbed. Verona, VA 24482 process, the contractor shall ensure that the runoff created by the washing process is Phone: (540) 248-3771 passed through one of the sediment removing devices such as a section of silt fence. 2. Construction shall be sequenced so that grading operations can begin and end as quickly as Fax: (540) 248-1628 Water for washing operations shall be hauled to the site. The use of water trucks to possible. Email: info@lineagearch.com remove materials dropped, washed or tracked onto the roadways will not be permitted under any circumstances. 3. Temporary seeding and other stabilization shall follow immediately after the site is stripped ENGINEER NAME/SEAL: of topsoil if it is determined that final grading will not begin within 14 days. 2. Construction Road Stabilization - 3.03 4. The excavator shall be responsible for the installation and maintenance of all Erosion and Construction road stabilization requires the placement of stone immediately after grading Sediment Control practices in full accordance with applicable local and State regulations, of any access or construction road. This shall serve to reduce the possibility of erosion whether or not such regulations are listed in this Narrative or shown on the Plan. and rutting while supporting construction traffic. Temporary stabilization shall be at least 14' in width. Drainage ditches shall be constructed as necessary, and shall be protected NOTE: by silt fence where appropriate. If necessary, consult the Engineer for additional design The contractor shall install sediment trapping measures as the first step in construction. to appropriately manage sediment -laden runoff. The minimum stone applied shall be 6" Once in place, the contractor shall strip topsoil and begin grading operations. The of VDOT #1 Coarse Aggregate. At the Owner's discretion, this may remain in place to contractor shall ensure that at the end of each working day all erosion and sediment control serve as a base for final stone application. Periodic top dressing shall be performed as measures are in place and functioning properly. This will be strictly enforced. required. Roadside ditches and other drainage structures associated with the road shall These controls shall be in effect during the remaining development, which includes final be checked regularly to ensure that they do not become clogged with silt or other debris. grading, utility construction, and paving. ARCHITECT NAME/SEAL: 3 4 IfFlatpea is used, increase to 301bs/acre. All legume seed must be properly inoculated. other drainage structures should be checked regularly to ensure that they do not become clogged with silt or other debris. STORMWATER CONSIDERATIONS Maintenance for Silt Fence This project shall not create concentrated runoff. Downspouts will be collected by a buried 1. Silt fences shall be inspected immediately after each rainfall and at least daily during header and will be sent to the established drainage ditch. Water otherwise leaving the project prolonged rainfall. Any required repairs shall be made immediately. area will be sheet flow. For grading information, please see sheet C-05. This meets quantity 2. Close attention shall be paid to the repair of damaged silt fence resulting from end runs requirements per 9-VAC25-870-66.D. and undercutting. 3. Should the fabric on a silt fence decompose or become ineffective prior to the end of the This project disturbs approximately 0.57 acres with a drainage basin of 377 acres more or less. expected usable life and the barrier still be necessary, the fabric shall be replaced As this ratio is well below 1 %, the requirements for channel and flood protection criteria per 9- promptly. c VAC25-870-66.0 are met. 4. Sediment deposits should be removed after each storm event. They must be removed .wa when deposits reach approximately one-half the height of the barrier. .a Water quality requirements indicate a 0.14 pounds phosphorous offset is required. Owner 5. Any sediment deposits remaining in place after the silt fence is no longer required shall be a intends to purchase this on the third -party market. VRRM spreadsheet is attached. dressed to conform with the existing grade, prepared and seeded. MAINTENANCE Maintenance of Culvert Inlet Protection W a 1. The structure shall be inspected after each rain and repairs made as needed. x Q In general, all erosion and sediment control measures shall be checked daily and after each 2. Aggregate shall be replaced or cleaned when inspection reveals that clogged voids are > u (� rainfall. The following items shall be checked in particular: causing ponding problems which interfere with on -site construction. ¢ o a 3. Sediment shall be removed and the impoundment restored to its original dimensions when 1. The silt fences shall be checked daily for undermining, deterioration, and functioning ability. sediment has accumulated to one-half the design depth. Removed sediment shall be 17- U deposited in a suitable area and in such a manner that it will not erode and cause 2. All seeded areas shall be checked for adequate growth. If adequate growth is not evident, sedimentation problems. I--i a a O the area shall be re -seeded to prevent the soils from eroding. Additional mulching shall be 4. Temporary structures shall be removed when they have served their useful purpose, but w I--1 M U l� applied as necessary and appropriate. not before the upslope area has been permanently stabilized. 3. All temporary erosion and sediment control measures shall be removed only when authorized by the Erosion and Sediment Control Administrator. Maintenance During Topsoilinq Before topsoiling, establish needed erosion and sediment control practices such as diversions, 4. Trapped sediment and the disturbed soil areas resulting from the removal of the temporary grade stabilization structures, berms, dikes, level spreaders, waterways, sediment basins, etc. measures shall be permanently stabilized to prevent further erosion and sedimentation. These practices must be maintained during topsoiling. Grading: Previously established grades on the areas to be topsoiled shall be maintained 5. Long term maintenance of all E&SC associated items is the sole responsibility of the according to the approved plan. Owner. Liming: Where the pH of the subsoil is 6.0 or less, or the soil is composed of heavy clays, 1 CO. COMMENTS 12-16-21 agricultural limestone shall be spread in accordance with the soil test or the vegetative Maintenance for Construction for Temporary Stone Construction Entrance establishment practice being used. NO. REVISIONASSUE DATE The entrance shall be maintained in a condition which will prevent tracking or flow of mud onto Bonding: After the areas to be topsoiled have been brought to grade, and immediately proir to public rights -of -way. This may require periodic top dressing with additional stone or the washing dumping and spreading the topsoil, the subgrade shall be loosened by discing or scarifying to a JOB NUMBER: 19066 and reworking of the existing stone as conditions demand and repair and/or cleanout of any depth of at least 2 inches to ensure bonding of the topsoil and subsoil. structures used to trap sediment. All materials spilled, dropped, washed, or tracked from DATE: OCTOBER 1, 2021 vehicles onto roadways or into storm drains must be removed immediately. The use of water trucks to remove materials dropped, washed, or tracked onto roadways will not be permitted Maintenance of Temporary Seeding (Reseeding) DRAWN BY: JMT under any circumstances. Areas which fail to establish vegetative cover adequate to prevent rill erosion will be reseeded as soon as such areas are identified. Maintenance for Construction Road Stabilization APPROVED BY: JFG Both temporary and permanent roads and parking areas may require periodic top dressing with Maintenance of Permanent Seeding (New Seeding) new gravel. Seeded areas adjacent to the roads and parking areas should be checked In general, a stand of vegetation cannot be determined to be fully established until it has been DRAWING DESCRIPTION: periodically to ensure that a vigorous stand of vegetation is maintained. Roadside ditches and maintained for one year after planting. E&SC NARRATIVE 7 8 DRAWING NUMBER: C-05 A Irrigation: New seedings should be supplied with adequate moisture. Supply water as needed, especially late in the season, in abnormally hot or dry weather, or on adverse sites. Water application rates should be controlled to prevent excessive runoff. Inadequate amounts of water may be more harmful than no water. Re -seeding: Inspect seeded areas for failure and make necessary repairs and reseedings within the same season, if possible. a. If vegetative cover is inadequate to prevent rill erosion, over -seed and fertilize in accordance with soil test results. b. If a stand has less than 40% cover, re-evaluate choice of plant materials and quantities of lime and fertilizer. The soil must be tested to determine if acidity or nutrient imbalances are responsible. Re-establish the stand following seedbed preparation and seeding recommendations. Maintenance of Mulching All mulches and soil coverings should be inspected periodically (particularly after rainstorms) to check for erosion. Where erosion is observed in mulched areas, additional mulch should be applied. Nets and mats should be inspected after rainstorms for discoloration or failure. If washouts or breakage occur, re -install netting or matting as necessary after repairing damage to the slope or ditch. Inspections should take place up until grasses are firmly established. Where mulch is used in conjunction with ornamental plantings, inspect periodically throughout the year to determine if mulch is maintaining coverage of the soil surface: repair are needed. Maintenance of Dust Control 1. Permanent Vegetation- The application of permanent seeding and saving existing trees and large shrubs can help reduce soil and air movement from construction sites. 2. Stone- Crushed stone or course gravel can be used as a permanent cover which will provide control of soil emissions. DEQ Vlrpinlp Runa77Reduetion Method Re- Development CompOanfe Spreadsheet - Version 3.0 02031 aMP Aammes ana spelrullans 00 miss dMt lai saaMaMr and SIMI.. pralaGNema: 0.S Tavem dm bryrml6 4R 9 ]5 Ml poll m ldnaar Devabpmart PrelettP No cawmatlMM 17 Site Information Post -Development Project (Treatment Volume and Wads) 0.57 Check: ;,WIY°F Enter Total DlsturlFed Area(aoes) 4 ns 1p]3 Sttlsa • WearpmledtP No landoewrareas enwredsolreCNyi pip lam I Tataldeparl adaaaanteredP Pre-ReOeeelo ment land Cover a rlsols skill Csalls Osolb nes. =10penk.mlemp-•nalrmliea, am ore •wenR (peral-datme amaramr 0.. 0.42 bMewmtae l•e•rlm p.]I o.ta O.m Port-Oevebpmem used Caw, lemal •kle Bke Csa4 DSdY Twls rmesyopmkemlemrsl-mdlemreM• o.ao am wa.asennlemel- alRunee, rem ror 0.3] 037 anM1nbmenwrleowl- 0.23 ai NBa CMdI OL pL OL OIL Aso Comments RuroRCceRkkMSIRvI Watl lb/ax/>.I O.Ot 0.90 COVER •a a• mtersumm . 2a emmunWon Imgmaysmrmaq-roalFmop maer smmurpnR meaeorlapmem er Ped wO.a.ax..lmp.m..• P.rO•e•bpa.mx.werp..bus P.mNo..elopmem FpmpVlpenspammmrlearsl PoIen/own Spam Om rwenUopen slam om r ranee Mlbrertl 0.00 Mea......ern 0.00 el•%Pored WNlerod Fermi %krtn %rent 0% 0% I. supeSallplolrleve•1 Mane,utparenrer A37 Meniaeaiurl Corcr 0.37 V/admea Nei reaUndemM1nq 0.15 Fespam Ro Oam on µMm•pap" 62% %Managetl iuR fine ._ %Mplappmal Impvtousolaropme InpeMaufawr mare, 023 RaOe+. Impervl.. on Cmei.... Xeebpervlour [over o05 mrmu Rrylmpervlausl 0.95 0.95 RNImceMnml 0.95 MIImxMousl 0.9s gtlmcernnug o55 %ImperNeu• 3m6 3. %ImarNous S- ',Lp Mue 3. iaYMbxr Uaml o60 0.55 0.L0 TaYIM1pa=r.Sk Mn nminu Mppabli 0.55 areas 0.39 gas RIW MDN9b lh a16 pepryeyy WS Treatment Volume and Nutrient Load Treatment Volume and Nutrient Load .nMexbpmwllmnmmd VWume m Doles Doles Mrel^painelm as . �ba xl om o.ozxe •wpgm6priwit rl..el. vwa. Marra o.aow e..re m a e o.ales remlarenlmm Pm#Nmebpmmeleml�eVWume Bf9 82 �Fmnal rest- Tmmem Velutme lace Meel See pxmOMbpmmt VMumelxMe gad 1]3 eax en,Valu 822 mimlee0m pre ReDee(laurd 1p katl 0WM 0.53 0.52 Fired - lappri epe TP bW O.fi3 P .as es.is m m bap tfll au paw• km�OeMa rappi mad P/m p]a PTasomml•mmapbea mr.•m Fee pee xm Mxomxlepmm�r war a.m .rat I.n.mnr a.ap Ymlln.W.dllbM p.emmnw•Ma xn(.P- @aMopmeplemper- anenemuewrappi 0.23 m mmample"rep. pmed arp..npm.amell 'aaalmaeacmer9.mmmp: pmpepalehpnentmmmrrrmNmmmrl memrrrp.er/rmaapoan mmmp.all.D.ar.prproy®abr../mae,elm.men nmd Radmbn W+rrw kd�M I Wnl 0.05 nbad Fel mbn eeemuapp Mew Impembua arse (16M1 o.09 smm<d rmm.mraprommata%wm pmmYnebpmemaveppe (mime oorevr darx•aaMawmmmR. mwam I.nplm rent mamam mmxMmam/m ram ulwmam mer. Rmrd m mx desehmrmlwlXmROU� r/a=M. Post-.- TP load Redurlion Required Ilb/yrl 0,]d Nitrogen Loads (Informational Purposes only) 'IroaoRe4velopmemaxewaa pmee0e lapmemnxluealbM) 3.ez o.a] Ill/ r Fnnual nalnlall moM1erl <3 e9a4 BkN [kY pSaY erpamel t.m rwmVOcea sore 0.02 003 o.w a.os iaM pM1ospM1orus lipl EMC 0.26 Men TYR 0.15 a20 0.22 0.25 ioml rvinapen (ml rMgmyy L86 ImpeMous[wer 09s 0.95 0.95 0.95 VRRM SITE TAB SGALE: NO SGALE GRAPHIC SCALE 30 a 15 30 60 ,ZQ DIRECTION OF PROPOSED FLOW SGALE: 1 "= 30' FIRM INFO Lineage Architects, P.C. P.O. Box 991 98 Lee Highway Verona, VA 24482 Phone: (540)248-3771 Fax: (540)248-1628 Email: info@lineagearch.com ENGINEER NAME/SEAL: ARCHITECT NAME/SEAL: DRAINAGE BASIN AREA SGALE: 1 "=500' I-� 5 U GENERAL NOTES: x � 1. ALL POST -DEVELOPED FLOW IS SHEET FLOW THAT MEETS THE REQUIREMENTS LISTED AT 9VAC25-870-66.D. 2. PER STORMWATER CONSIDERATIONS / C-05 A, WATER QUALITY REQUIREMENTS F � INDICATE A 0.14 POUNDS PHOSPHOROUS OFFSET IS REQUIRED. OWNER INTENDS o TO PURCHASE THIS ON THE THIRD -PARTY MARKET. J l� Al 1 CO. COMMENTS 12-16-21 NO. REVISION/ISSUE DATE JOB NUMBER: 19066 DATE: OCTOBER 1, 2021 DRAWN BY: JMT APPROVED BY: JFG DRAWING DESCRIPTION: E&SC NARRATIVE, PROPOSED OVERLAND FLOW, DRAINAGE AREA, &VRRM SITE TAB D •7 rr M A 1 ♦lt a ( IN FEET ) 1 inch = 30 ft. `ol of 4" #57 STONE SECURED wl GravelPave OR APPROVED EQUIVALENT 4" HEAVY STONE 12" RDC, COMPACTED wl SHEEP'S FOOT NOTE: THIS DETAIL SHALL NOT BE USED FOR STING SOIL COMPACTED TO ACCESSIBLE PARKING SPACES AND 95%EXISTING STD PROCTOR DENSITY THE AISLE BETWEEN THEM. REMOVE INCOMPETENT SOIL HEAVY DUTY GRAVEL DETAIL SCALE: NTS It 50mm (45.27") 575mm (22.63") I 575mm (22.637) GREENDRIVEWAY GD GRAVEL 60-40 C) A GREEN ALTERNATIVE FOR PAVING AND LANDSCAPING WEB: greendriveway.com Email: info@greendriveway.com GRAVEL GRID DETAIL SCALE: NTS CONSTRUCTION OF A SILT FENCE (WITH WIRE SUPPORT) 1. SET POSTS AND EXCAVATE A 4" x 4" TRENCH UPSLOPE ALONG THE LINE OF POSTS. I i I IV{I FLOW 3. ATTACH THE FILTER FARIC TO THE WIRE FENCE AND EXTEND IT INTO THE TRENCH. 2. STAPLE WIRE FENCING TO THE POSTS. 4. BACKFILL AND COMPACT THE EXACAVATED SOIL. FLOW EXTENSION OF FABRIC AND WIIRE INTO THE TRENCH. FILTER FABRIC WIRE SILT FENCE DETAIL SCALE: NTS STEEL EDGING GRAVEL DRIVE AND PARKING - APPROX. FLUSH WITH TOP OF EDGING GRADE NO MORE THAN 1/2" — BELOW TOP OF EDGING TURF TAPERED STEEL STAKES TO INTERIOR OF BED AREA NOTE: 1. STEEL EDGING TO BE 1/8"X4" (.120-.125" AVERAGE THICKNESS) OR EQUIVALENT. STEEL EDGING DETAIL 5GALE: NTS STANDARD ALUMINUM SIGN ALUMINUM "VAN-AGGESSIBLE" SIGN 2"X2" STL. TUBE, EXTEND 2'-0" INTO GONG. FILLED PIPE 6" DIA. STD. STL. PIPE FILLED WITH GONGI'R #6 BARS EACH WAY THRU PIPE HANDICAP PARKING SIGN SCALE: NTS d ., III III d° d II RESERVED PARKING O PENALTY $100-500 FINE PRECAST CONCRETE OR GUT STONE CURB BRICK PAVER 3 J" (80 MM) MIN THICKNESS 1' TO 1 �" (25 TO 40 MM) BEDDING SAND F6EROTEXTILE 12" (300 MM) WIDE, TURN UP AGAINST CURB COMPACTED A66RE6ATE BASE GEOTEXTILE AS REQUIRED TURN UP AT SIDES OF BASE �d ° d O„RO U n/ ° COMPACTED SOIL SUB6RADE COMPACTED A66RE6ATE OR COMPACTED BEDDING NOTE: 1. EDGE RESTRAINT SHOULD BE MINIMUM 6 IN. (150 MM) WIDE FOR STREET APPLICATIONS. 2. EDGE RESTRAINT MAY BE EVEN WITH TOP OF BRICK PAVERS. 3. THICKNESS OF AGGREGATE BASE WILL VARY WITH SUBGRADE CONDITIONS AND CLIMATE. COLDER CLIMATES MAY REQUIRE THICKER BASES. PAVER SECTION SCALE: NTS FIRM INFO: Lineage Architects, P.C. P.O. Box 991 98 Lee Highway Verona, VA 24482 Phone: (540)248-3771 Fax: (540)248-1628 Email: info@lineagearch.com ENGINEER NAME/SEAL: ARCHITECT NAME/SEAL: > w a w ti con a � o P. M U 1 CO. COMMENTS 12-16-21 NO. REVISION/ISSUE DATE JOB NUMBER: 19066 DATE: OCTOBER 1, 2021 DRAWN BY: JMT APPROVED BY: JFG DRAWING DESCRIPTION: CONSTRUCTION DETAILS DRAWING NUMBER: C-06 1p 00 $00 8 00 I 525.65' �1 3 I I I o , v I a , I v i 3 I I v � I � s � o I O 5;, ; F 525.90' 526.551 8 5 I = 527 I \� I 3 I I I I HANDICAP SIGN MOUNTED ON POST, 525.85' T DESIGN BY OTHER n I 11 S/ 84 , Op I I 1 ' yak J _ ' 1 ll 3 525.95' L--------- (TOP 51 AI/ITCC SOB 1. SLOPES IN PARKING SPACES SHALL NOT EXCEED 2%. v 2. SLOPE OF WALKWAY SHALL NOT EXCEED 5%. v 3. CROSS SLOPE OF WALKWAY SHALL NOT EXCEED 2%. 4. ALL SURFACE MATERIALS SHALL BE ADA COMPLIANT. HANDICAP PARKING LAYOUT SCALE; 1" = 5' 0801DI APPROx DRAIN AREA =19.30M IN APFROx MIGHT AM 08 0965 125 31 J 07.65 DIMENSIONSARE FOR REFERENCE ONLY ACTUAL DIMENSIONS MAV VPRV THIS PRINT DISCLOSES STEDO T MATTER IN MICH DIMENSIONSAREIN INCHES NYLORIAST HAS PROPRIETARY RIGHTS. THE RECFIPT GRATE HAS FORT DUTY RAENG OR POSSESSION OE THIS PRINT DOES NOT CONFER, QUALITY'. MATERIALS SHALL CONFORM TOASTM A536 GRADE 70,MN5 TRAHSFRLORUCEESETHEUSEOFTHEDESIGNOR PAINT'. CASTINGS ARE FURNISHED WITH A BLACK PANT PRINT O MYIHEREN REPRODUCTION FORMA ION OF IORMM TO OPENING MEETS REWIREMENTSOFA, TRRE OEORANnox SIZEREPTAINED aFANv OOR FEDERAL REGISTER PART III, DEPARTMENTOF ACT AS DEPARTMENT ACTICE.28 TIr ARTICLE HERERUN THUFncnIRE SUREi00THER5 FIN JUSTICE, 26 CFR PART J6. IS FOR£HEREER EEFOR SPECIFIC HENNYLOYSPECFIC VMIFER PERMISSION PERMISSION FRCM NYLC%AST mv�xmwxs, NYLOPLAST 8" DROP -IN GRATE SCALE: NTS 1INVERGNAAVE 911FGRG, GA ID51n NV� F.(TU))sszeaa ✓ FEN OF..LSA3UR N—myloPlaz4m<om 525.50' ADA COMPLIANT GRAVEL GRID BRICK PATHWAY WHEEL STOP, typ. 2 DESIGN BY OTHER THAUKUL INTRu mf GENERAL INFORMATION The FOOS Composite trackout control system is designed to be used as a temporary construction entrance which provides site access while minimizing sediment leaving the site. The top surface of the FODS mat is a geometric pattern formed in the shape of pyramids. The mats are unidirectional and are meant to have the staggered pyramids in the direction of travel. Individual mats are connected together with hardware to form various configurations to fit yourjobsite. Mat Size:12'(w) x 7(I) x 3 3/4" (t) (2 7/8" pyramid height) IF Truck -Load: 96-Mats Mat Weight: 430lbs Hardware boxes is contain within mats pallets Pallet Size: 8-Mats FEATURES 8 BENEFITS • Reusable O Extreme Durability AA�, o Increased Effectiveness at 0 Rapid Installation 8 Removal Reducing Site Trackout 0 Excavation not required 0 U/v Stable c Chemical Resistant 0 Highly Visible , Rock -less • Easy to Clean Reduces Waste • Economical IT Easy and efficient to LT 0 Recyclable / Reduces Waste transport from site -site 7YPIICAL INSTALLATION LAYOUTS Each site must be evaluated to determine the proper layout, width, and duration of the FOOS Trackout Control System (FTCS) based site conditions, entry and exit egress, traffic levels, site soil conditions, and ability to the maintain trackout system. Outlined below are a number of common layouts, the mats are unidirectional and due to the versatility of the mats design the FTCS can be engineered to fit the needs of any site: ROADWAY AOANIpY pAOYAY OBAmy OBAOIYOY .��. 1.........::.:..:>;I:::::::>::: 'i.n'�.Vv�'?'mil I �'•v'� FORS lx4 FODS 2x4 FC lx4T FODS lx5T FODS 1x7r 526.79FOOS I.I.C.I THE MUD STOPS HERE I GETFODS.COM I 1-844-200-3637 TRACKOUT CONTROL MAT BY FODS SGALE:NTS if—U. 1 91 10- SEE DRAWING NO. 7001-110-275 FOR ADS N-12 & HANCOR DUAL WALL BELL INFORMATION Q- SEE DRAWING NO. 7003-110-031 FOR WATERTIGHT SWAGE JOINT DETAIL 3 - DIMENSIONS ARE FOR REFERENCE ONLY ACTUAL DIMENSIONS MAY VARY 4 - DIMENSIONS ARE IN INCHES NYLOPLAST 8 x 8 TEE SGALE: NTS 1735 1 THIS PRINT DISCLOSES SUBJECT MATTER IN WHICH NYLOPLAST HAS PROPRIETARY RIGHTS. THE RECEIPT OR POSSESSION OF THIS PRINT DOES NOT CONFER, TRANSFER OR LICENSE THE USE OF THE DESIGN OR TECHNICAL INFORMATION SHOWN HEREIN REPRODUCTION OF THIS PRINT OR ANY INFORMATION CONTAINED HEREIN, OR MANUFACTURE OF ANY ARTICLE HEREFROM, FOR THE DISCLOSURE TO OTHERS IS FORBIDDEN, EXCEPT BY SPECIFIC WRITTEN PERMISSION FROM NYLOPLAST. 3130 VERONA AVE BUFORD, GA 30518 N to last PHN (770) 932.2443 FAX 770 932-2490 Y www.n to last-us.com Y P Albemarle County Design Standards Manual — Engineering01 "QN�TRllCTION'] ACC 3 SM, 2A RSPHAgIDI `TQ : € t ;COURSE -"- `'" F,-- - I- L: -S7.ONi-S� CDNSTRUQT q q':. L�XjgRFiAL��sF. �� I �' xs INc 12% :PAV€MEN.. '. 4.z MIS - 'YUST •XTEN[# T.UL CW>DTH: L_o F�1V£NT Q�I]NINCRES j#ND,£ RESS, 017£RA-..WN PLAN teF�Ir—r 17 +aw ], �O$(tN� DRAINA;I F •--Lse �.—. ._. - _j SECTION A —A _itltunnituliid2tei1,Tp1slii mshlu stbem tailed lath a owwullm L:ulcli 4i,Tp gC1{i [ utoffSEalt 'sttplAlynte x wean llbse with a dlaolete o d 1 < mL he Soy dxito-egttate 'c5t3Jat�t , 0� , Was i>tl eir twit be caured m IN I]1 qnF the eni a'� I VP o't•a!fafaeliL4'e 57� edm3entehallhelneF.eTcJ,j lternmoAst%C11aBt�, dieche� of iFatetcow�e� PAVED WASHL=RACK Pa e 8 of 23 SCALE: NTS W� W rTlz W U FIRM INFO: Lineage Architects, P.C. P.O. Box 991 98 Lee Highway Verona, VA 24482 Phone: (540)248-3771 Fax: (540)248-1628 Email: info@lineagearch.com ENGINEER NAME/SEAL: ARCHITECT NAME/SEAL: Q w > c� w � � o � w Q � U F O O F 1 z CID -, V `1 Z i n.a, F—I M U � 1 CO. COMMENTS 12-16-21 NO. REVISIONASSUE DATE JOB NUMBER: 19066 DATE: OCTOBER 1, 2021 DRAWN BY: JMT APPROVED BY: JFG DRAWING DESCRIPTION: HANDICAP PARKING LAYOUT & CONSTRUCTION DETAILS DRAWING NUMBER: C-06 A EL t v Economical Containment for Concrete Washout Folded Semi dimensions 48" x 8" x 5" . Portable solution for harmful industrial concrete sediment, paint, drywall mud, stucco and mortar. • UV resistant, 10 mil polyethylene. • Unfolds for simple and quick set up in seconds. . Compatible with mixer, pump trucks and wheel barrows. • Built-in tie -downs allow Berm to be secured to standard wooden pallets for easier handling and transport. • Dispose of after evaporation and job completion. SPECIFICATIONS: Dimension 48" x 48" x 14" (1,219mm x 1,219mm x 356mm Weight 5.0 Ibis (2kg) Containment Capacity 139 gal (526 L) CONCRETE WASHOUT BY ACF ENVIRONMENTAL SGAL6 NTS W. I Be sure to check your local and state regulations, which may be more stringent than the federal regulations, on which these instructions are based. WARNING: Always use the appropriate Personal Protective Equipment when handling concrete or concrete washout water. Options for use: The ACF Concrete Washout Berm can be used with or without a pallet (not included). The use of a pallet allows for easier handling when full. Step 1 Unpack the ACF Concrete Washout Berm and unfold it near the area where it will be used. Step 2 Straighten the support legs in each corner until they are vertical. This gives the ACF Concrete Berm its shape as well as some structural reinforcement. Step 3 If using a pallet, tie or attach the ACF Concrete Washout Berm down to the pallet using the grom- mets in each corner of the berm. Otherwise, if not using a pallet, the ACF Concrete Washout Berm can be staked down to hold it in place. Step 4 Place the ACF Concrete Washout Berm in a position to capture the concrete washout water from the equipment being cleaned (truck chute, pump, mixer, wheel barrow, etc.) Step 5 Allow the washout water to dry and evaporate in the ACF Concrete Washout Berm and dispose of the hardened concrete waste per governing regulations. LET'S GET IT DONE Al I1111NMI 11I "I Lineage Architects, P.C. P.O. Box 991 98 Lee Highway Verona, VA 24482 Phone: (540)248-3771 Fax: (540)248-1628 Email: info@lineagearch.com ENGINEER NAME/SEAL: ARCHITECT NAME/SEAL: CO. COMMENTS 1 12-16-21 REVISIONASSUE I DATE JOB NUMBER: 19066 DATE: OCTOBER 1, 2021 DRAWN BY: JMT APPROVED BY: JFG DRAWING DESCRIPTION: CONSTRUCTION DETAILS DRAWING NUMBER: C-06 B