Loading...
HomeMy WebLinkAboutSDP200800113 Action Letter 2008-08-04ov �ta�r �l- � Ittca•v` COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 DATE: August 4 ". 2008 Todd Philipp Dominion Development Resources LLC Charlottesville, VA, 22911. RE: SDP- 2008 -00113 Hollvmead Toren Center Area Al - Final. Dear Sir'Madam, The Site Review Committee has reviewed the development proposal referenced above. Preliminary comments for the following divisions of the Department of Community Development and other agencies, as applicable, are attached: Albemarle County Division of Zoning & Current Development (Planner) Albemarle County Division of Zoning & Current Devclopment (Engineer) Albemarle County Division of Planning (Principle Planner ARB) Albemarle County Division of Planning (Principle Planner Development Areas) Albemarle County Division of Inspections (Building Official) Virginia Department of Transportation (VDOT). Albemarle County Service Authority (.ACSA). Albemarle Countv Fire and Rescue. Albemarle County Geographic and Data Services (GDS) Comments reflect information available at the time the development proposal was reviewed, and should not be considered final. However, the Site Revicw Committee has attempted to identify all issues that could affect approval of the proposed project. Please make the revisions that have been identified as necessary for preliminary approval by the Site Review Committee. Ifyou choose not to make the requested revisions, please submit in writing justification for not incorporating such revisions. Submit eight (8) full size copies and one (1) 11" x 17" copy to the Department of Community Development including responses to each of the attached comments of the Site Review Committee by %londav August 18th 2009. Failure to submit this information by this date will result in suspension of the review schedule. Revicw will resume when revisions are submitted along with a reinstatement fee of 565. Please contact are at your earliest convenience if you have questions or require additional information. Sincerely. Gerald Gatobn, Senior Planner County of Albemarle Department of Community Development Current Development 401 McIntire Road Charlottesville, VA 22902 -4546 Phone: (434)296 -5832 Ext 3385 Fax: (434)972-4126 0 County of Albemarle Department of Community Development Memorandum To: Todd Philipp From: Gerald Cratobu- Senior Planner Division: Zoning and Current Development Date: July 31, 2008 Subject: SDP2008 -40113 Iloll}nnead Town Center Area A I The County of Albemarle Division of Zoning and Current Development will grant or recommend approval of the final site plan referred to above once the following comments have been addressed: [Each comment is preceded by the applicable reference, which is to the Subdivision/Zoning Ordinances unless otherwise specified.] [ACC section 32.5,61 A) The Final Prior to Preliminary Site Plan shall contain the following information. • Zoning proffers and bonus factors applicable to the site including any /all special use permit conditions: Show ZMA 2005 -015 and SP2005 -27 on the site plan. i.e. ZMA and SP numbers. proffers and conditions that apply to this area (AI) must be on the site plan. • Yard and building separation requirements. Consider a boundary line adjustment to bring all the development under one parcel The site plan shows bo g alb the development. S) Written schedules or data as necessary to demonstrate that the site can accommodate the proposed use, including: • Maximum number of employees. (Indicate on the site plan the proposed number of emgloyeesl. • Schedule of parking including maximum amount required and amount provided; Office parking formula used instead of Retail. (Section 412 of ACC 1. The parking calculation on the siteplan uses the formula provided for office space. The development is mostly retail with the exception being the bank (building K1. Retail building formula based on square footage should be used for the retail buildings. 'Refer to the approved application plan and the ACC section 4.12 for guidance} • Parallel spaces shown next to building A on the application plan must be shown on this site plan. [Refer to the application plan for ZMA2005 -151 • Maximum amount of impervious cover on the site • If a landscape plans required, maximum amount of paved parking and vehicular circulation areas. [Section 32 of ACC}: Indicate on re C2 the maximum amount of paved parking and vehicular circulation areas for the entire site. C) if phasing is planned, phase Tines and proposed timing of development. • Is there a proposed timing of development for future phase 2? Proffer 411 requires that there be additional publ, is space constructed as a plaza area identified as "Plaza Amenity" on the application plan, of no less than 5000 square feet for the purpose of public gathering and passive outdoor recreation. [Refer to ZMA2005 -15 proffer #11 for further details]. D) • [Refer to ACC Section 4.21 Show on an existing conditions Page with all areas of the site where existing slopes are twenty -five (25) percent or greater. E) Existing landscape features as described in section 32.7.9.4.c. Please include onlin the site plan an existing conditions image that shows the existing features (pre - development}. [Refer to ACC section 32.79.4.cj F) The name and location of all watercourses and other bodies of water adjacent to or on the site. Indicate on the site plan the name of the water -Cc ) adjacent to the site. N) Location and dimensions of all existing and proposed improvements including: Sidewalks: Sidewalks and pedestrian crossings shown on the application plan are not shown on the site plan. A sidewalk needs to be shown beriveen building A and C along xrith the corresponding cross walk. A sidewalk also needs to be shown on the north eastern most corner of the site plan by the parking area adjacent on Plan sheet A21 Loading and service areas together with the proposed paving material types far all walks, parking lots and driveways; and signs. [ACC Section 4.12.13 Loading Areas]: ,Indicate on the site plan the loading area and truck route as shown on the application plan. Dumpster locations for all buildings that are {4000) gross square feet or mare. Buildings A. D, and E do not have dumpster locations. O) All areas intended to be dedicated or reserved for public use. ZMA2005 -15 Proffer Number 8. Indicate on the site plan land to be dedicated as Greenwaytto Albemarle County. The land to be dedicated as areenwav should be identified on the site plan as "Greenwav Area dedication to Albemarle County ". This shall include all flood fain area along Powel Creek. This shall be in fee simple and a minimum of4.5 acres.[Refer to approved application plan sheet A2, and ZiMA2005 -15 proffer #81 Q) Where deemed appropriate by the agent due to the intensity of development, estimated traffic generation figures for the site based upon current Virginia Department of Transportation rates. ZMA 2005 -15 proffer number 5 Intersection analvsis must be addressed with this site plan i.e. first site plan for the project. [Refer to ZMA 2005 -15 proffer #5 for more details]. 1. LightingiPhotometric Plan A) Make sure light fixture locations do not conflict with utilities and landscaping. B) All light fixtures with 3,000 or more lumcns must be full cut off. Provide cut sheets with detailed evidence that the fixtures are full cut off. C) One label A fixture, and one label B2 fixture are missing, or show the location (plan is huge) I may have missed them when counting. D) Add the standard lighting note to the lighting plan. (Each outdoor luminaire equil ped with a lamp that emits 3,000 or more initial lumens shall be a full cutoff luminaire. The spillover of liehtine from luminaires onto public roads and property in the residential or rural areas zoning districts shall not exceed one-half footcandle. "] Landscape Plan A) Acer rubrum "Karpiek" is not on the plant list showing total canopy area. Let me know where you found the 397 total canopy (SF) for this particular tree. 13) QP Quercus phellos Willow Oak: I counted 107 of these on the site plan. I may have not seen the one missing (plan is quite large) so please make sure they are 108 Willow Oaks and indicate where they are located on the site plan.. C) LIT Langestromia indiea Tuskegee: has various symbols that so not match. Please use one symbol that will make it easy to locate this tree on the site plan. There are more than 25 trees with the LIT symbol. D) PXI Prunus x incamp Okame Cherry should have a height of at least 6' -7' to use the 99 (SF) total canopy area shown on the canopy calculation. (refer to the approved plant canopy calculations list found on the Albemarle County Site) E) LAF Foster Holly: Has the same symbol as PO Serbian Spruce. Consider using a different symbol for the foster holly. I could only count 10 foster hollies; this may be because several other plants share almost the same symbol on the site plan. Please indicate where the rest of the eight 8 foster Holly's are located. F) PLOL Prunus Laurocerasus Otto Luyken: I counted 248 of these tress on the site plan. Please show where the missing 33 are located on the site plan in case I missed them when counting. G) CT Cryptomeria japonica Yoshino: 1 counted 19, 13 missing, or show their location. H) PO Picea omorika Counted 47, 6 missing, or show their location. D XV Iasminum nud{fiorum Winter Jamine: None found. Missing or please show their location. Please contact Gerald Gatobu at the Division of Zoning and Current Development at 296 -5832 ext. 3385 for further information. (0-I"t"", County of Albemarle Department of Community Development Memorandum To: Gerald Gatobu, Current Development Project Planner From: Phil Custer, Current Development engineering review Date: 05 August 2008 Subject: flolivuleadTowncenter A I (SDP-2008-00113) The final site plan for I foilvanead fowncenter Al has been reviewed. The following comments are provided: 1. The applicant will need an approved WPO plan before the final site plan is approved. At this time, a WPO application has not yet been received. The applicant should prepare the WPO plan to meet all conditions listed in ZMA proffer f47. I An analvsis of the intersection ofConnor's Drive and Towncenter Drive needs to be submitted with this site plan. (ZMA proffer 75) 3. A public transportation stop needs to be shown in this site plan meeting the requirements specified in the approved rezoning plan. (ZMA proffer 43) 4. The location and grading of the greenway trail need to be shown in this site plan, with particular attention paid to the crossing of Meeting St. 5. A sidewalk Southwest of Building A is required. The ZMA showed a sidewalk in a curbed island that was removed with this latest submittal. 6. A modification to the parking space standard needs to be approved by Zoning to allow for the diamond - shaped tree island. 7. The site plan needs to be scaled, signed, and dated by a licensed professional. [18- 32.6.1 ] S. Please provide the date of the topography on the plan, [18-352.6.6] 9. Show the two benchmarks on the plan. [DM] 10. The stream buffer is not shown on the plan. The label is on the plan, but not the buffer line. [17 -317] 11. Please specify which walls require a safety rail. [DIM] 11 Guardrail is required on top of wall adjacent to a parking or travel area. [13- 32.7.2] 13. Drainage casements are only needed on storm pipes carrying water from another parcel or public ROW. 14. Show all SWM and access casements on this site plan. Current Development Engineering Review Comments Page 2 of 4 15. All drainage easements should be sized according to the formula specified in the design manual. For example, the drainage easement along Route 29 is well undersized. [DM] 16, No trees or structures are allowed within drainage easements. [DM] 17. All entrances must be labeled with a VDOT designation. [18-4.12.17] 18. The southeastern entrance does not have a landing that is less than 4% for the first 4011. [18- 4.12.17] 19, Please show the necessary sight distance lines on the site plan and provide any sight easements if needed. [DM] 20, VDOT approval is required. At this time, VDOT approval has not yet been received. 21. Please label all turn and taper lanes adjacent to site entrances. 22. The County Code requires that all internal site entrances keep 100ft sight distance. There appears to be sight distance issues behind Building A, around the bank drive-thru, and from the entrances onto Connor's Drive near sanitary manhole K. [18-4.12.15] 21. It appears that CG-6 is provided on the plan but not labeled. [DM] 24. The durripster behind building J needs to be moved or realigned. Considering the length of garbage track, it appears this clumpster is inaccessible as drawn. [DM] 25. Parking areas exceed 5% grade in some places. For instance, the areas are round inlet 4 and 81 are over 5%. Please check the remainder of the site for similar issues. [18- 4.12.15] 26. The sidewalk northeast of Building 0 needs to be widened to 6ft or bumper blocks need to be placed in the parking spaces. The sidewalk is measured as 5,5ft wide. [I8- 4.1216] 27, Behind Building J. there appears to be a low spot in the pavement without a drainage structure. Please correct so that there is no standing water on site. 28. The trash compactors behind building A will require a concrete pad. [DM] 29. Drainage cannot run across, through, or backwater in dumpster areas. It appears that this occurs at the dumpsters northwest of building B, adjacent to inlet 63, and near inlet 42A Please correct. [ 18-4.12.19] 30, Are the three separate parcels to remain or will the parcels be combined' If the parcels are to remain then the following will be required: Connor*s Drive needs to be designed as a private road with a profile: access easements shown on all sidewalks and travelway aisles: parking will need to work for each separate parcel unless parking agreements are signed between property owners: drainage easements should be placed on the pipes carrying water from upstream properties VDO FROW. One property line travels through 3 different buildings. A boundary line adjustment should be submitted or permission needs to be given from the Current Development Engineering Review Comments Page 3 of 4 building official before the plan is approved. 31. Please show a stop sign from the site entrance onto Meeting St. 32. Please provide a street name sign at the intersection of Connor's Drive and Towncenter Dr. [DM] 33_ Please provide a traffic generation and distribution summary for the entire site. [DM] 34. Show where each asphalt pavement section should be constructed on site. [DM] 35. Please add to the dumpster pad and sidewalk details that the concrete is to be" 28 days or stronger ". [DM] 36. Please provide typical retaining wall details that include any necessary safety rail or guardrail. [DM] 37. Please provide details for pipe outlets at biofilters that use a retaining wall as an endwall. Drain profiles should be adjusted to match details, site plan_ Details will also be needed for retaining wall footers located directing over a storm drain pipe.[DM] 38. Please show access easements on the plan. 39. In the drainage profiles, please show a VDOT designation for each structure. [DM] 40. In the drainage profiles, please show the throat length for each curb inlet. [DM] 41. In the drainage profiles, please show the grate type for each drop inlet [DM] 42. VDOT standard IS -I is required on all structures where flow drops are 4ft or greater. This includes drop from the surface to the bottom of the manhole. [DM] 43. In the drainage profiles, please show end - sections or end -walls at the end of all storm sewer systems. [DM] 44. In the drainage profiles, please show the scour protection at the pipe outlets. This scour protection should match the computations. [DM] 4s. Please show structure 513 in the drainage profiles. 46. Please raise the elevation of the outlet pipes directing water into each bmfilter to minimize water backing up in the storm sewer system. 47. The invert of Inlet 30 is 3inches tower than the bed elevation. See previous comment. 48. Please include in this set the profile of the eastern storm sewer along Route 24. 49. Please accurately show the topography for pipe systems passing from or through biofilters and under /through retaining walls. [DM] Current Development F,nginccring Review Comments Page 4 of 4 50. Please provide storm pipe capacity calculations. [DM] 51. Spread calculations are not shown for all necessary inlets (92, 93, all curb cuts). All spreads should be below l Oft. [DM] 52. The curb inlet calculation table appears to be incorrect. Many of the slopes listed in the table for gutter slope and pavement cross -slope do not match up with the grading as shown. Half of the calculations do not include a gutter slope. Inlet 3 should be calculated as an inlet in a sump condition, but the spreads from both the left and the right side need to be computed. A full review of the curb inlet and spread calculations was not performed and additional comments may be given on the resubmittal. Please refer to chapter 9 of the V DOT Drainage Manual. 53. One hundred percent capture cannot be confirmed at the southeastern entrance because inlets 92 and 93 are not shown in the calculations. [DM] 54. Provide ditch computations for channels created in the parking lot to confirm that the spread is below loft. [DM] 55. Inlets 7 and 22 are located on grade and not in sump conditions. Engineering review is concerned that a considerable percentage of the design storor will bypass these inlets. 56. Provide outlet protection computations. [DM] 57. The grading and drainage area to the "curb cut at biofilter 4" does not appear to be correct. Please clarify. [DM] 5S. Please be sure to remove all temporary ESC pipes from the site plan. T)M] 59. Please show the work to extend the VDOT pipe at the southern entrance. A profile of this system should be provided. 60. Grading in the northern corner of the site, adjacent to the roundabout, must be minimized. All proposed grades in the parking lots, travelways, and roads surrounding the "Phase 2" area must tie into existing contours as quickly as possible using 3:1 contours. Also, the wall along Meeting St. should be reduced to the maximum extent possible and will need a determination from the Planning Department whether a variation will be needed for the new wall (in the place of Building N in the approved 7MA). Uuaity Service kuth6rity < TO: Gerald Gatobu FROM: Gary Whelan, Civil Engineer DATE: July 31, 2008 RE: Site Plan Technical Review for: Hollymead Towncenter-Area 1 -Final SDP200800113 TM 32-45, 42A. 44 The below checked items apply to this site. X 1. This site plan is within the Authority's jurisdictional area for: X A. Water and sewer B. Water only C. Water only to existing structure D. Limited service X 2. An 8 inch water line is located on site. X 3. Fire flow from, nearest public hydrant, located 200' distant from this site plan, is 2487 Gpm + at 20 psi residual. X 4. A 10 inch sewer line is located on site. 5. An Industrial Waste Ordinance survey form must be completed. X 6. No improvements or obstructions shall be placed within existing or future easements. 7. and plans are currently under review. 8. and plans have been received and approved. 9. No plans are required. X 10, Final water and sewer plans are required for our review and approval prior to granting tentative approval. 11. Final site plan may/may not be signed. 12. RWSA approval for water and"or sewer connections. 13. City of Charlottesville approval for sewer. Comments: Backflow prevention is required. Provide plumbing fixture count to size the meters. Show meter locations. A permanent sewer flow meter must be installed per agreement (attachment). The site plan does not show or incorrectly shows: meter locations water line size waterline locations sewer line size sewer line locations expected wastewater flows easements expected water demands 68 Spo nap Road - Gharlot sville - VA 22911 • Tel (434j 91-7-4511 • Fax f434 979-0698 �.. iiF AI.gFiY Ji COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 TO: Gerald Gatobu, Current Development Phil Custer, Current Development FROM: Elaine Echols, Planning RE: SDP200800113 — Hollymead Town Center Area A -1 DATE: August 1, 2008 I have reviewed the site plan referenced above and offer the following comments: 1. Parallel spaces in front of Kohl's are an important feature which must be provided. If the applicant wishes to remove the requirement for the spaces, the Zoning Administrator must first determine that they are features that can be varied. If such a determination is made, Planning can process the request; however, it is unlikely that the request would be granted since they were requested as part of the rezoning process and were important features 2. Sidewalks across the eastern most part of the site were shown on the Rt. 29 side of the buildings on the application plan. They are now shown on the other side of the building. The configuration of the sidewalks could be varied, if the Zoning Administrator agrees that this kind of variation is possible. Such a variation would likely be approved because sidewalks are provided on the western side of the buildings that create pedestrian connectivity across the front of the site. The applicant should just be aware of any pedestrian needs he might have for maintenance of the part of the building that faces Rt. 29. 3. Please consult with Bill Fritz and Zoning on whether or not the applicant can pursue final site plan approval without including the 5,000 square foot public plaza on the northwest corner of the site. it is Planning's preference to see this area built sooner rather than later since it is a key feature of the development. Application # SDP2OO80O113 Short Review Comments Project Name: Hollymead Towncenter -Area Al- Final Final — Non-residential — Commission Date Completed 08/0412008 Reviewer: Andrew Slack E911 Review Status: Requested Changes Reviews Comments THE APPLICANT SHOULD CONTACT THIS OFFICE WITH A LIST OF POTENTIAL ROAD NAMES FOR APPROVAL BY THIS OFFICE. Date Completed: Reviewer: Review Status: Reviews Comments: 07,2312008 Jay Schlothauer Inspections Requested Changes I on plans eateo duty 14, zuuo. all property lines that bisect buildings. B - Provide a curb cut at the building entrance. Bldg. C - Provide barrier -free parking spaces near the curb cut. Bldg. K - Relocate the barrier -free parking spaces to be near the curb cut, or vice versa. Bldgs. F, G, H and I - Provide barrier -free parking spaces, and curb cuts at the building entrances. Parallel barrier -free parking spaces must have a dedicated 5' wide (8' for van - accessible) adjacent unloading space that is not in a travelway, nor onto a sidewalk with a curb. Date Completed 07,'222008 Reviewer: Margaret Maliszewski ARB Review Status: Requested Changes Reviews Comments An ARB submittal is required for this proposal. ARB approval is required prior to final site plan approval. Applications, checklists, schedules and guidelines are available on line at www.albemarle.org. Date Completed: 07;3112008 Reviewer: Philip Custer Engineer Z &CD Review Status: Pending Reviews Comments Page: 1.00 County of Albemarle Printed On: Monday, August 04, 2008