Loading...
HomeMy WebLinkAboutSUB200800084 Legacy Document 2008-09-16ZMA 94 -16 approved. 3 agreements exist that affect grading and street approvals. 1) No grading or clearing for street construction shall occur wihin any area until the final Stormwater Detention and drainage plans for subject subdrainage basin have been approved for concurrent construction. 2) No grading or construction on slopes 1/23/1995 of 25% or greater except as necessary for road construction as approved by the County Engineer. 3)Access may be provided through either the Franklin or Ashcroft development subject to approval of road design for roads in the affected development. Access connecting Franklin to Ashcroft may occur subject to approval of road design by Virginia Department of Transportation. 7/26/2005 SUB 2005 -91 is approved by the PC 6/13/2007 BOS approves SUB 06 -375 Ashcroft West subject to conditions (Approval letter incorrectly referee 8/2/2007 Health Department approval received 10/4/2007 ACSA approves Ashcroft West 3/11/2008 WPO 2007 -82 approved for Ashcroft West 3/13/2008 Application received for SUB 2008 -84 Ashcroft West Final 4/10/2008 Summer sends comments for SUB 2008 -84 7/17/2008 Revisions submitted for Ashcroft West (these partly addressed Summer's comments Ashcroft Phase III 3/19/1980 ZMA 80 -03 is approved. 5/2/2007 Preliminary Plat approved 4/29/2008 Extension granted to 5/2/2009 nces 06 -376)