Road Plan Review
401 McIntire Road, North Wing
Charlottesville, VA 22902-4579
Telephone: 434-296-5832
WWW.ALBEMARLE.ORG
State Route 643 - Polo grounds Road
Phase II Plan Amendment
SUB2020700117 - amendment 2 (amendment 1 was
withdrawn)
Collins Engineering [scott@collins-engineering.com]
Riverbend Development [alan@riverbenddev.com]
29 April 2021
20 July 2021
05 Nov. 2021
21 June 2021
01 Sept. 2021
29 Dec. 2021
Emily Cox
We have reviewed the above referenced plans and have the following comments:
Engineering (Emily Cox)
1. Provide copies of approval for work in the streams and floodplain. Rev. 1: Comment not
addressed. Rev. 2: Comment not addressed.
2. Please reference the approved WPO plan showing the E&S and SWM for this proposed work.
Rev. 1: WP0201800013 amendment 2 must be approved before this plan can be approved.
Rev. 2: Comment not addressed.
3. Cross section on sheet 9 shows the proposed 10 ft asphalt trail within the right-of-way, but the
plan view does not agree. Please clarify. Rev. 1: Comment addressed.
4. [Cover sheet] Please update the topography. It should at least be field verified within the past
year. Rev. 1: Comment addressed.
5. Please show and label the Greenway on all applicable sheets. Rev. 1: Comment addressed.
6. Please show proposed street name sign locations. Rev. 1: Comment addressed.
7. Please show the landscaping plan, which includes the Polo Grounds Buffer per the Code of
Development. Rev. 1: Comment addressed.
8. Please show any applicable sight distance lines and profiles. Rev. 1: Comment addressed.
9. Please show ADT and pavement designs. Rev. 1: Comment addressed.
Planning (Cameron Langille)
1. See attached comment letter dated 06/17/21. Rev. 1: See attached approval letter. Rev. 2: No
objection.
VDOT (Adam Moore)
1. See attached comment letter dated 06/10/21. Rev. 1: See attached comment letter dated July
30, 2021. Rev. 1: No objections per letter dated 11/18/21.
Engineering Review Comments
Page 2 of 2
Fire Rescue (Howard Logamarsino)
1. Fire Rescue has no objections to the amendments as long as a required entrance/exit is not
impacted for another submittal or approval Rev. 1:No objection.
ACSA (Richard Nelson)
1. Still under review per email dated 6/21/21. Rev. 1: Still under review. Have not received an
approval letter or email. Rev. 2: Still under review. Have not received an approval letter or
email.
GIS (Elise Keiwra)
1. No objection. Rev. 1: No objection.
ARB (Margaret Maliszewski)
1. No objection. Rev. 1: No objection.
Engineering plan review staff are available from 2-4 PM on Thursdays, should you require a meeting to
discuss this review.
If you have any questions or concerns, please contact me either by email (ecox2@albemarle.org) or by
phone at 434-296-5832 ext. 3565.
Sincerely,
Emily Cox, PE
Civil Engineer 11