Loading...
HomeMy WebLinkAboutSDP200500142 Action Letter 2008-09-24$, � ALp� R'h County of Albemarle Department of Community Development August 18, 2005 Johnny Drumheller B. Aubrey Huffman and Associates 193 Riverbend Drive, Suite 2 Charlottesville VA 22906 RE: [SDP 2005 -061: Commonwealth- Greenbrier Center] Dear Mr. Drumheller: The Planning Commission granted approval of your request for the following waivers: Waiver of Section 4.2.3.2 of the Zoning Ordinance to allow disturbance of critical slopes. The Department of Planning and Community Development hereby grants administrative approval to the above - referenced site plan. The approval of the preliminary site plan is valid for (1) one year in accordance with Zoning Ordinance Section 32.4.3.1. Therefore, the preliminary approval shall expire August 18, 2006. If the preliminary site plan approval expires, a new application must be filed and processed. Please address all of the requirements and conditions listed below and submit eight (8) tentative plan copies to the Department of Planning and Community Development. This letter must be submitted with the tentative plans, as a checklist, to document that you have addressed all requirements or conditions, or the tentative plan will be denied. A submission and review schedule is attached for your information. The Erosion and Sediment Control Plan and the BMP Stormwater Management Plan, with the associated applications and fees, may also be submitted with the eight (8) tentative Plans. Failure to do so will result in a separate application to be filed with the Engineering Department at a later date. After the initial tentative plan submittal, each department /agency will contact you to discuss any remaining conditions. After all aforementioned department /agencies have granted a tentative approval, you may submit the final mylars (2 sets), one blueprint copy, final site plan application, final site plan fee, and a copy of all written tentative approvals to the Department of Planning and Community Development by 5:00 p.m. on any Monday. Assuming that the final site plan mylars reflect all tentative approvals, signing of the plans will occur four days later {Thursdays). The final site plan will be subject to all final site plan requirements (Zoning Ordinance Section 32.6), in addition to the following conditions. The Planning Department shall not accept submittal of the final site plan for signature until tentative approvals for the following conditions have been obtained. The final site plan shall not be signed until the following conditions are met: A. Engineering Department approval to include: 1. Construction of the retaining wall will result in encroachment of tax map 61W, parcel 03 -3A Please provide a letter of intent to grant a temporary grading easement from the owners of tax map 61 W, parcel 03 -3A. (DSM, 1102). 2. An arrangement must be made with Albemarle County, General Services Department for work that must take place in Peyton Basin to construct the retaining wall and provide erosion and sediment control for the site. The applicant is currently working with the County on this requirement. 3. Please show the existing fiber optic cable that transects the north end of the parcel. B. Albemarle County Service Authority Approval to include: Preliminary Approval granted. Please contact me at your earliest convenience if you have any questions or require additional information. Sincerely, David E. Pennock, AICP Senior Planner dpennock@albemarle.org Attachments: Procedure for Final Site Plan Review Tentative Plan Submission Schedule Copy: Steve Melton Kenny Thacker John Shepherd Gary Whelan PC Approval. doc