Loading...
HomeMy WebLinkAboutWPO201800044 Review Comments WPO VSMP 2022-01-07�q off nig 401 McIntire Road, North Wing Charlottesville, VA 22902-4579 County of Albemarle Telephone: 434-296-5832 COMMUNITY DEVELOPMENT DEPARTMENT WWW.ALBEMARLE.ORG �tBGIN�P' VSMP Permit Plan Review Project title: ABC Block I Mass Grading — Major Amendment for Multifamily (CV title: Royal Fem — VSMP) Project file number: WPO2018-00044. Amendment #2 Plan preparer: Keane Rucker, Shimp Engineering [ keanegshimp-en ing eering.com ] Owner or rep.: Fifth Street Forest, LLC / 250 W. Main St. Suite 201, Charlottesville, VA 22902 Kyle.redmger(a,)9mai1.com Plan received date: 7 Dec 2022 Date of comments: 7 Jan 2022 Reviewer: John Anderson, PE County Code section 17-410 and Virginia Code §62.1-44.15:34 requires the VSMP authority to act on any VSMP permit by issuing a project approval or denial. This project is denied for reasons listed below. The VSMP application content requirements can be found in County Code section 17-401. A. Stormwater Pollution Prevention Plan (SWPPP) The SWPPP content requirements can be found in County Code section 17-405. A SWPPP must contain (1) a PPP, (2) an ESCP, (3) a SWMP, and (4) any TMDL measures necessary. 1. Replace on -site SWPPP, WP0201800044 Amendment #1, with SWPPP submitted with Amendment #2 Application, once items at item 2., below, are addressed. 2. Also: a. Please revise Registration statement at p. of SWPPP/.PDF to indicate Application type is Modification with acreage increase as this registration will be used to notify DEQ to increase Estimated Area to be disturbed from current 4.50 Ac. to 5.40 Ac. (VAR10P436). Note: DEQ will send request for payment of state permit fee to operator email listed at Sec. 1, B. b. Revise SWPPP cover to reference Amendment #2. B. Pollution Prevention Plan (PPP) —No request for revision to PPP Exhibit The PPP content requirements can be found in County Code section 17-404. C. Stormwater Management Plan (SWMP) VSMP Regulation 9VAC25-870-108 requires the VSMP authority to approve or disapprove a SWMP. This plan is disapproved for reasons listed below. The stormwater management plan content requirements can be found in County Code section 17-403. 1. Application Fee: $1,700 fee was received 12/14/2021. Fee for land disturbance 5 and less than 10 acres is $2,004.08. Please submit $304.08 balance at earliest convenience. 2. C5: Show discontinuous curb (curb cut) at Str. A4 if this structure is to receive parking lot runoff. 3. C6: Wherever storm runoff concentrates against curbing, provide and label CG-6. 4. CT a. Detail 8: Provide linework and labeVs to indicate connection with BMP-1. b. Show building roof leader collection system connection with MH structures in storm drain profiles at Str. C 1A, D2, B2B, E2, etc. Provide leader line collection INV IN at MH structures to aid construction and inspection. Engineering Review Comments Page 2 of 3 c. Provide trash rack detail (weir plat orifices). d. Provide step access for MH Str. A4. e. Check 9.45' A4 detail vertical dimension, may need to revise to 8.45'. f. Show Str. El to BMP-1 connection (use labels /linework). 5. Provide SWM facility easements. Easements must be reviewed, approved and recorded prior to Amendment #2 approval. 6. C17: Provide sheet title (ex.: Pre -development ground cover) to indicate sheet depicts pre -development (existing) land cover since turf with limited forest approximates Amendment # 1 post -developed condition. 7. C20: Str. CIA spread appears excessive, recommend increase inlet throat length. 8. Calculations Ax 2-3: Please submit exception request with $272 exception review fee. Copy narrative from Calc. packet (p. 2-3) to separate exception request letter. Recommend refer to RGA design firm request, 23 Apr 2021, as an example, when requesting exception to 3.0" minimum orifice size. Use 1-year storm event (not QL5, Q2, Q10) for purpose of comparing various orifice DIAs with applicable Ql m.. EB, and please especially note proposed Q 1 p�,_d,PA2 0.70cfs; orifice DIA=3.0"), state that 3.0" provides 92% of target EBE-generated reduction, and last, please specify orifice diameter size otherwise required to meet EBE. Engineering will likely not object to request, but exception request entails separate review /approval. 9. Revise Calc. packet cover to reference Amendment #2. 10. Plan proposes 1.64 lb. nutrient credit purchase. Purchase is not required for plan approval, but nutrient credit purchase is required prior to commencing land disturbance unique to Amendment #2. D. Erosion and Sediment Control Plan (ESCP) Virginia Code §62.1-44.15:55 requires the VESCP authority to approve or disapprove an ESCP. This plan is disapproved for reasons listed, below. The erosion control plan content requirements can be found in County Code section 17-402. 1. C2 a. Label Country Green Road, Old Lynchburg Road, and Mountainwood Road. b. Provide deed bk.-pg. ref. to RW for public roads listed at item a. above. 2. C5: Please label outfall protection dimensions at Str. F 1: L x W x D. 3. C 11: Paragraph with four itemized work activities (1. 4.) under Project Description appears to reflect WPO201800044 Amendment 1 activities, rather than apartment construction, update work activities, as needed. 4. C 13: Show parking lot inlet protection (IP) in phase 2. C 11 sequence indicates curbing acts as diversion, once curbing is installed in phase 2. 5. C15: a. Increase volume of STl, similar to increased volume under Amendment # 1, given proximity to 07600-00-00-046C1 (Mountainwood Properties) and relative likelihood of off -site impact if Vol. provided is barely > minimum Volume required. b. Provide sediment trap design data for Phase 1, trap 2. Volumes differ, elevations differ. Process After approval, plans will have to be bonded. [An ESC plan bond amount is posted, but amount will be evaluated to determine if amount is sufficient to cover Amendment #2 ESC measures. Further, SWM plan bond is required.] The bonding process is begun by submitting a bond estimate request form and fee to the Department of Community Development. One of the plan reviewers will prepare estimates and check parcel and easement information based on the approved plans. The County's Management Analyst will prepare bond agreement forms, which will have to be completed by the owner and submitted along with cash, certificates or sureties for the amounts specified. The agreements will have to be approved and signed by the County Attorney and County Engineer. This may take 2-4 weeks to obtain all the correct signatures and forms. Engineering Review Comments Page 3 of 3 A Stormwater Management Facility Maintenance Agreement will also have to be completed and recorded. The County's Management Analyst or other staff will prepare the forms and check for ownership and signature information. The completed forms will have to be submitted along with court recording fees. (This project proposes nutrient credit purchase (01.64 lbs.) and requires SWM facility /SWM facility access easements. This project requires exception request approval from EBE requirement to allow Min. 3.0" DIA orifice.) After bonding and agreements are complete, county staff will revise project information in a DEQ database for state application processing (revise data for VAR10P436, increase Ac. from 4.50 to 5.40 Ac.). DEQ will review the application information based on local V SMP authority approval. At this time, the DEQ portion of the application fees will have to be paid directly to the state. For fastest processing, this is done electronically with the emails provided on the application. DEQ should notify applicants with instructions on how to pay fees. When DEQ approves the application, they will issue a permit coverage letter (may issue a revised permit coverage letter). This should be copied to the county. After DEQ coverage is issued, via the coverage letter, the County can hold a pre -construction conference. Applicants must complete the request for a pre -construction conference form, and pay the remainder of the application fee. (Although land disturbance has occurred with WPO201800044 Amendment #1, given scope of change from Amendment #1 to Amendment #2, a (virtual) preconstruction meeting to discuss ESC-SWM design is warranted.) The form identifies the contractor and responsible land disturber, and the fee remaining to be paid. This will be checked by county staff, and upon approval, a pre -construction conference will be scheduled with the County inspector. At the pre -construction conference, should everything proceed satisfactorily, approval to proceed with work (grading, ESC measures, improvements, and SWM facilities shown with Amendment #2) may begin. County forms can be found on the county website forms center under Engineering Applications: httos: //www.albemarle. ore/government/community-develonment/aooly-for/engineering-auol ications WPO2018-00044 Amendment 2-ABC block I Mass grade Mal Amend For Multi -Family 010722