HomeMy WebLinkAboutSUB202100183 Review Comments Final Plat 2022-01-07County of Albemarle
i Community Development Department - Department
Memorandum
To: Kris Winters, kwinters(@roudabush.com; Joe Simpson, simpson(a@riverbenddev.com
Date: January 7, 2022
Re: SUB202100183 Galaxie Farm Final Subdivision Plat - Review Comments
Cameron Langille
Principal Planner, Planning
blangille@albemarle.org
Telephone: (434) 296-5832 ext. 3432
The County of Albemarle Planning Division will grant or recommend approval of the plat referenced above once
the following comments have been addressed: [Each comment is preceded by the applicable reference, which is
to the Subdivision/Zoning Ordinances unless otherwise specified.]
Comments from Site Review Committee (SRC) Conditional Approval Letter (dated September 3, 2021) for
Galaxie Farm Preliminary Plat (SUB202100125) and Initial Site Plan (SDP202100059) applications:
1. 32.5.2 (c); 14-303 (F) and ZMA2018000121 Please provide block/phase lines on the plan that correspond with the
block network shown in the Galaxie Farm ZMA. The total number of units proposed in each block must not
exceed the maximum units specified by the block table on Sheet 7 of the ZMA201800012 Application Plan. Unless
the applicant can demonstrate the number of units proposed in each block is consistent with the maximum
permitted by the Application Plan, a Special Exception must be approved by the Board of Supervisors (BOS) to
allow more units in specific blocks. Based on what staff can surmise from the current drawings, the following
blocks propose more units than what is approved per the Application Plan:
a. Block 1: 12 dwelling units allowed, but 14 are proposed. First submittal: Comment stands, as block lines
are not shown. If any block proposes units in excess of what is allowed through the ZMA, a special
exception is needed.
b. Block 4: 11 dwelling units allowed, but 13 are proposed. First submittal: Comment stands, as block lines
are not shown. If any block proposes units in excess of what is allowed through the ZMA, a special
exception is needed.
c. Block 5: 11 dwelling units allowed, but 13 are proposed. First submittal: Comment stands, as block lines
are not shown. If any block proposes units in excess of what is allowed through the ZMA, a special
exception is needed.
2. [ZMA201800012] The proposed layout of streets and lots within Blocks 2, 3, and 8 differ from the approved
Application Plan of ZMA201800012. Specific items to be addressed are as follows:
a. Road E (identified as Vera Rubin Place on the plat/plans) is not located in the same area west of the Block
7 Open Space as shown on the Application Plan. The Application Plan showed the Road E private street in
that location so that amenity -oriented lots could be provided in Block 2 that would front on the private
street and face the Block 7 amenity area. In order to provide Road E (Vera Rubin Place) as shown on the
preliminary plat/initial site plan, the road either needs to be a public road meeting all applicable
VDOT/County public road standards, or a private street authorization request must be approved by the
Planning Commission. If the applicant chooses to pursue the road as a private street, please submit a
written request for authorization of the private street under Section 14-233, and include all supplemental
information required to evaluate the request as specified in Section 14-234. The applicable fee for this
request is $823.68 and the request may be filed with the road plan application. First submittal: Vera Rubin
Place is still proposed to be a public street. A private street authorization request was not submitted with
the final plat or road plan application as specified by this comment. Please submit the necessary fee and
justification materials with the next submittal.
b. The private street authorization for Road E was granted through the ZMA so that the private street would
only connect to Road C (Mary Jackson Court) and not connect to Road A.1 (Galaxie Farm Lane). However,
the preliminary plat and initial site plan show Vera Rubin Drive (Road E) now connecting to both Galaxie
Farm Lane (Road A.1) and Mary Jackson Court (Road Q. Moving the private road as proposed will need
WWW.ALBEMARLE.ORG
401 McIntire Road, North Wing, I Charlottesville, VA 22902-4579
approval of a Special Exception application by the Board of Supervisors prior to approval of the road plans,
final site plan and final plat. First submittal: Comment addressed. Curbing has been added to the north
end of Vera Rubin Drive.
c. Block 8 open space area is located east (or in front of) the residential units in Block 3, but the Application
Plan shows Block 8 located to the west of Block 3. Moving the location of Block 8 as proposed will
require approval of a Special Exception application by the Board of Supervisors prior to approval of the
road plans, final site plan and final plat. First submittal: Comment stands, special exception application has
not been submitted.
d. Please be aware that is the Board of Supervisors does not approve the Special Exception and or private
street authorization request, the final site plan and final plat will need to comply with the requirements of
the ZMA201800012 Application Plan. First submittal: Comment stands pending resolution of comments
#2a and #2c above.
3. [General Comment] As of September 3, 2021, Engineering Division review is not yet complete. Road plans, final
site plan, and final plat must demonstrate compliance with all applicable Engineering Division comments.
Engineering staff have informed Planning Division staff that comments will be provided directly to the applicant in
the next 1-3 business days. First submittal: See attached Engineering Division comments below. All Engineering
comments must be addressed prior to final plat approval.
4. [32.7.9.7; 14-419] Lots 1-4 are double frontage lots. Please label the 20' landscape screening buffer at the rear of
these lots on all applicable drawings.
a. [14-303 (G)] Is the buffer intended to be subdivided off as a separate piece of land that will be owned and
maintained by the HOA? Or will this be a private landscaping easement within each lot? First submittal:
Road plans (SUB202300179) currently under review show a 20' private landscaping easement within the
lots. Please show the easement on the plat and specify who will own/maintain it.
b. [14-302 (A)(4)] and 14-317] If private easement, an instrument evidencing maintenance of all landscaping
within the 20' buffer easement will need to be provided with the final plat. First submittal: Comment
stands.
c. [14-302 (A)(4)] If private easement, please revise the callouts so that it states that it is a "private 20'
landscaping easement" on the final site plan and final plat. First submittal: Comment stands.
5. [32.5.2 (a); 14-302(B)(8)] Please clearly show and label all required setbacks on lots on Sheets 3-5. This includes
garage setbacks as described in the footnotes on Sheet 7 of the ZMA Application Plan. First submittal: Comment
addressed.
a. It appears that incorrect front setbacks are drawn on lots 15-27 and 54-59. First submittal: Comment
addressed.
6. [32.5.2 (o); 14-303(D) and ZMA201800012] Please provide a block acreage table that states the acreage of each
block and the number of units proposed consistent with the table on Sheet 7 of the Application Plan. First
submittal: Comment stands. block acreage and unit counts are not provided. Staff suggests Drovidine a table on
Sheet V3 with this information (block acreage, unit type, and unit count for each unit type). Please also draw the
block lines on the layout sheets and add a label with the block number.
a. Ensure that all parcel boundaries, owner names, TMP numbers, acreages, and recorded instrument
numbers are added to the drawings for all parcels visible on the final site plan/final plat. First submittal:
Comment stands pending further reviews.
7. [32.5.2 (b)] Please clarify where parking will be provided for each unit. Identify whether units will have garages
located on the individual lots. First submittal: Comment addressed, parking is being reviewed as part of site plan
and road plans.
a. Per Section 18-4.12.15, all parking spaces shall be established on the same lot with the primary use to
which it is appurtenant, except as authorized by section 18-4.12.8. Unless the Zoning Administrator allows
parking to be provided in a different location in accordance with Section 18-4.12.8, lots 22-27 will need to
be revised so that the minimum required parking is provided on each lot. First submittal: Comment
addressed, parking is being reviewed as part of site plan and road plans.
8. [32.5.2 (a); 14-302 (13)(7)] Please amend the watershed note on Sheet 1 to state whether that is a water supply
watershed. First submittal: Comment addressed.
WWW.ALBEMARLE.ORG
401 McIntire Road, North Wing, I Charlottesville, VA 22902-4579
9. [32.5.2 (f)] Show and label the limits of the WPO stream buffer across all applicable drawings. First submittal:
Comment stands. WPO buffer not shown on plat
a. [34-302(B)(10)] Final plat must contain a note stating "The stream buffer(s) shown hereon shall be
managed in accordance with the Albemarle County Water Protection Ordinance. First submittal:
Comment stands, note not provided.
10. [32.5.2 (k); 14-303 (E); 14-303 (L)] Please show the location of all proposed sewer and drainage easements. On the
final plat/site plan, revised the labels so they state either "public" or "private" and the easement type and
dimensions. First submittal: Comment addressed.
11. [32.5.2 (1); 14-303 (E); 14-303 (L)] On the final plat/site plan, please label all new utility easements as "public" or
"private" and state the easement type and dimensions. First submittal: Comment addressed
12. [32.5.2 (e)] On the final site plan, please provide details about the existing landscape features that will preserved (if
any) as described in Section 18-32.7.9.4(c). State the general types of trees or shrubs that exist (e.g. deciduous
trees, caliper range at breast height, etc.) and label these features on the existing conditions drawing and the
landscaping plan. First submittal: Comment being reviewed with road plan and site plans.
13. [32.5.2 (n)] Please state the proposed surface materials for all parking lots, travel ways, walkways, etc. in a label on
the site plan drawings. First submittal: Comment being reviewed with road plan and site plans.
14. [32.5.2 (n)] Please identify all proposed recreational areas and amenities. Per Sheet 6 of the Application Plan,
Blocks 7 & 8 can both feature trails, playgrounds, etc. The site plan only identifies those areas as open space and
no amenities are shown. The final site plan must demonstrate compliance with all applicable regulations from
Section 18-4.16 related to recreation prior to approval. First submittal: Comment being reviewed as part of the
site plan for this project Final site plan has not vet been submitted for review. Prior to final plat approval. this
comment must be addressed through the final site plan application review/approval process.
a. [ZMA201800012] The site plan does not show a clubhouse within the Block 8 open space parcel (Open
Space B). Clubhouses are one of the permitted uses specified on Sheet 6 of the Application Plan. Please
explain whether a clubhouse is proposed or has been considered. If a clubhouse will be provided,
associated parking must be provided in Block 3, per notes under the table on Sheet 6 of the Application
Plan. These does not appear to be much space available for any off-street parking. First submittal:
Comment being reviewed as part of the site plan for this project. Final site plan has not vet been
submitted for review. Prior to final plat approval, this comment must be addressed through the final site
plan application review/approval process.
15. [32.5.2 (n)] The Vera Rubin Place connection to the emergency access road on the adjacent parcel (TMP 091A1-
00-00-OOOEO) will need to have bollards installed to prevent use of that emergency access by private vehicles.
First submittal: Comment being reviewed through road plan and site plan applications.
16. [14-302 (A)(4) and 14-302 (A)(5)] Prior to final site plan approval, an easement plat application must be submitted,
reviewed, approved, and recorded for all proposed public and private easements. First submittal: Comment stands.
If the applicant intends to get the plat approved prior to approval of the final site plan, then this comment is no
longer applicable. However, if the applicant intends to get the final site plan approved prior to the final plat, a
supplemental easement plat application must be submitted, reviewed, approved, and recorded prior to the final
plat. Please provide information on the applicants intent for timing of the plat/site plan approvals.
17. [32.6; 14-311] Prior to final site plan and final plat approval, a Water Protection Ordinance (WPO) plan and Road
Plan Application must be approved. See Engineering Division comments for further information. First submittal:
Comment stands, see Engineering Division comments.
18. [14-317] An instrument evidencing maintenance of all required improvements that will not be owned or
maintained by the County is required with the final plat. This includes private street and alley easements, sidewalk
easements (if applicable), buffer easements, landscaping easements (if applicable), etc. First submittal: Comment
stands as of 1/7/2022. Please be aware that a text amendment is going to the County Board of Supervisors in
March 2022 that will revise this Code section. The text amendment is going to result in elimination of the need
for a separate instrument evidencing maintenance of private improvements to be submitted/reviewed/recorded
W W W.ALBE MARLE.ORG
401 McIntire Road, North Wing, I Charlottesville, VA 22902-4579
as part of the final plat review. Instead, a note will only need to be added to the plat once the text amendment is
adopted. More information will be forthcoming.
19. [4.17] Please provide a full lighting plan with the final site plan in compliance with Section 4.17 of the Zoning
Ordinance with the final site plan. First submittal: Comment only applies to final site plan.
20. [14-434] Prior to final plat approval for any block, streets serving and within each block must be built or bonded.
First submittal: Comment stands.
a. [14-311 and 14-316] Approval of a road plan application is required prior to final site plan and plat
approval. This is required to demonstrate compliance with County and VDOT road design requirements.
Additional comments regarding street design and requirements may be forthcoming pending completion
of Engineering review. First submittal: Comment stands. Once road plans are approved, this comment will
be addressed.
21. [32.6] The final site plan must comply with all applicable requirements of Section 32.6 and 32.7 prior to approval.
First submittal: Comment only applies to final site plan.
22. [32.7.9] Please provide a landscaping plan that complies with all requirements of Section 32.7.9 on the final site
plan. This includes the following:
a. [32.7.9A (c)] Existing landscape features as described in this Code section. First submittal: Comment only
applies to final site plan.
b. [32.7.9.5] Street trees 50 feet on center along roads A.2, B, C, D.1, and D.2. First submittal: Comment only
applies to final site plan/road plan.
c. [32.7.9.6] Minimum 5% of overall parking area landscaping, including one tree per every 10 parking spaces
proposed. Please provide a calculation on the landscaping plan identifying the percentage and sq. ft. of
required and proposed parking area landscaping. First submittal: Comment only applies to final site plan.
d. [32.7.9.7] Screening for double frontage lots. First submittal: Comment only applies to final site plan/road
plan.
e. [32.7.9.8] Minimum total landscaping canopy for the site area. Site area is calculated as described in
Section 32.7.9.8 (c). Please provide a calculation on the landscaping plan identifying the percentage and sq.
ft. of required and proposed canopy area. First submittal: Comment only applies to final site plan.
f. All proposed landscaping must be species identified on the Albemarle County Approved Plants List. First
submittal: Comment only applies to final site plan.
g. Canopy areas for specific tree and shrub species can be obtained from the Plant Canopy Calculations
table. First submittal: Comment only applies to final site plan.
23. [32.7.9.9] Please add a note to the Landscape plans stating, "All landscaping shall be installed by the first planting
season following the issuance of the first certificate of occupancy within the development." First submittal:
Comment only applies to final site plan.
24. [32.7.9.9] Please add a note to the Landscape plans stating "All landscaping and screening shall be maintained in a
healthy condition by the current owner or a property owners' association and replaced when necessary.
Replacement material shall comply with the approved landscape plan." First submittal: Comment only applies to
final site plan.
25. [ZMA201800012] Final site plan and plat must demonstrate compliance with tracking requirements for providing
affordable housing units as provided on Sheet 10 of the Application Plan. Additional comments related to
affordable housing units proposed may be forthcoming at time of final plat/site plan review. First submittal:
Comment not addressed. Please identifv which lots/units will be affordable housing. State whether the units will
be for -sale or for -rent. See Sheet 30 of the ZMA201800012 Application Plan for further information on
affordable housing requirements.
New Comments Final Plat:
26. [General Comment] Plat sheets were not in correct order and Sheet V8 was missing. Please revise on the next
submittal and ensure that all sheets are order and numbered correctly.
WWW.ALBEMARLE.ORG
401 McIntire Road, North Wing, I Charlottesville, VA 22902-4579
27. [14-302 (A)(3)] Please revise the label for Vera Rubin Place so that both segments of the street state that it is a
private street easement.
28. [14-302 (A)(5), 14-414] Please see attached ACSA comments. All proposed ACSA easements must comply with
ACSA requirements. Revise ACSA easements shown on plat as directed by ACSA staff.
29. [14-302 (A)(14)] Please revise all street labels so that they identify whether the streets are public right-of-ways or
private streets.
a. [14-426 and 14-428 (B)] Please add a note to Sheet V1 stating that all public street right-of-ways shown
hereon are dedicated to Albemarle County for public use.
30. [14-302 (13)(1)] Please add a date of last revision.
31. [14-303 (E)] Please provide dimensions for the rear lot boundary of Lot 4. See Engineering Division comment #4
for more information.
32. [14-303 (G)] Please identify who will own the proposed open space areas shown on the plat.
33. [14-303 (M)] Please see attached E911 comments. Street names require revisions. Please coordinate with E911
directly to obtain approvable street names.
34. [14-303 (N)] Please revise Note 6 on Sheet V1 so that it clearly states that the private streets shown on the plat
may not be accepted by VDOT. Please state the specific names of each proposed private street.
35. [14-306] Please see attached Engineering Division comment #1. Please provide documentation that the applicant
has a right to establish a private street easement on TMP 91-11. Conversely, if the private easement for Galaxie
Farm Lane already exists, please update the easement labels on all applicable drawings to state the recorded
instrument number of the plat that created the private street easement.
a. [14-303 (A)] If the private street easement on TMP 91-11 is going to be created with this plat, please add
a statement of consent to division to Sheet 1 for the property owner of TMP 91-11.
b. [14-303 (0)] Please add a signature line for the owner of TMP 91-11 under the statement of consent to
division if necessary, per comments above.
c. [14-302 (A)(15)] State the name, address of TMP 91-11 as a note on Sheet V1 if necessary, per comments
above.
d. [14-303 (P)] Add a notary panel next to the signature line for the owner of TMP 91-11 if necessary, per
comments above.
36. [14-311] Please revise note 18 on Sheet V1, per Engineering comment #6d.
Please contact Cameron Langille in the Planning Division by using blaneille(@albemarle.ore or 434-296-5832 ext.3432 for
further information.
WWW.ALBEMARLE.ORG
401 McIntire Road, North Wing, I Charlottesville, VA 22902-4579
Comments from Other Reviewers.
Albemarle County Engineering Division - John Anderson, 4anderson2@albemarle.org - Requested changes, see attached.
Albemarle County Architectural Review Board (ARB) - Margaret Maliszewski, mmaliszewski@albemarle.ora - No
objection, see attached.
Albemarle County E911 - Elise Kiewra, ekiewra@albemarle.orQ - Requested changes, see attached.
Albemarle County Inspections - Betty Slough, bslough@albemarle.org - Requested changes, see attached.
Albemarle County Fire Rescue - Howard Lagomarsino, hlagomarsino@albemarle.org - No objection, see attached.
Albemarle County Service Authority - Richard Nelson, rnelson@serviceauthority.org - Requested changes, see attached.
Virginia Department of Transportation (VDOT) - Doug McAvoy, douglas.mcavoy@vdot.virginia.gov - No objection, see
attached.
WWW.ALBEMARLLORG
401 McIntire Road, North Wing, I Charlottesville, VA 22902-4579
t� OF ALB
County of Albemarle
COMMUNITY DEVELOPMENT DEPARTMENT
��BGIN�Q'
Final Subdivision
Project title: Galaxie Farm Final Subdivision Plat
Project file number: SUB2021-00183
401 McIntire Road, North Wing
Charlottesville, VA 22902-4579
Telephone: 434-296-5832
WWW.ALBEMARLE.ORG
Plat preparer:
Kristopher C. Winters, LS — Roudabush, Gale & Associates, Inc. (RGA)
900 Second St. SE, Suite 201, Charlottesville, VA 22902
kwinters(a),,roudabush.com
Owner or rep.:
Galaxie Farm Investments, LLC
600 East Water Street, Suite H
Charlottesville, VA 22902
Applicant:
Riverbend Development, Inc., 455 Second St. SE, Suite 400
Charlottesville, VA 22902
al�riverbenddev.com; simpson( riverbenddev.com
Plan received date:
1 Nov 2021
Date of comments:
15 Dec 2021
Reviewer:
John Anderson, PE
SUB201-00183, Engineering review comments:
1. V 15: Is it unclear if Galaxie Farm Investments has authority to establish private right of way on county -
held property (County of Albemarle School Board). Please confirm (via document, correspondence with
County School Board, etc.) that private right-of-way across County of Albemarle School Board property
has been coordinated with County of Albemarle School Board.
2. V 13 (which follows 177): Mae Jemison Lane street name does not match ROAD plan street name (Mary
Jackson Ct.). Please reconcile.
3. V8 appears to be missing, please check, revise plat as needed.
4. V5
a. Lot 4 boundary (blue circle) appears ambiguous in location of C8 and lot line 46.79'. Please
ensure all lot lines, Lot 4, are defined.
Engineering Review Comments
Page 2 of 3
b. Please provide inset detail for L=0.62', Lot 1, to clarify whether part of C9 or C12.
c. Please direct reviewer to Lot nearest C50, reviewer cannot locate C50.
5. V2: Please provide deed bk.-pg. ref for existing access/right-of-way to Shelhorse parcel NW of subdivision
along Ex. Galaxie Farm Lane. This may help explain how proposed Yar Private R/W along this travelway
might operate. Yar Private R/W along Galaxie Farm Lane on TMP 91-11 appears to require County of
Albemarle School Board consent.
6. VI
a. Provide signature block for County of Albemarle School Board (private right-of-way), TMP 91-
11,as needed.
b. List County of Albemarle School Board as Owner to division (Var. Private R/W).
c. Please list TMP 91-15, and Owner information for TMP 91-15.
d. Note 18 references SUB202000098, a discontinued Road Plan for a previous layout, a Road Plan
since abandoned. SUB202000098 was not approved. Please revise this note. Neither the active
road plan under review or prior road plan is instrument for SWM facility or SWM access
easements. This subdivision plat includes a SWM easement.
e. Note 6 appears to conflict with nearly all development streets, which are proposed with public
right-of-way as public streets to be maintained by VDOT. Recommend revise Note to indicate
`some' streets rather than `the streets' which appears to suggest all streets. It is incumbent on
Road Plan design (SUB202100179), construction, and As -built condition to ensure that Marie
Currie Court, Mary Jackson Court, and Galaxie Farm Lane meet VDOT standards sufficient for
acceptance into the secondary system of state highways.
7. General
a. Unless overlooked, please provide SWM facility access easement, at V 13 that follows V 12.
Engineering Review Comments
Page 3 of 3
b. Note: Once all subdivision /easement plat review comments are addressed, Engineering will
format public drainage and SWM facility easement deeds using county attorney office -prepared
templates.
Thank you.
Please call if any questions — tel. 434.296-5832-x3069, or email ianderson2@albemarle.org.
SUB202100183 Galaxie Farm sub final 121521.docx
Review Comments for SUB202100183 Final Plat
Project Name: GALAXIE FARM SUBDIVISION - FINAL - DIGITAL
Date Completed: I Monday, November 01, 2021 1 Department/DivisiordAgency: Review Status:
Margaret Maliszewski I CDD ARB No Objection
Pager County of Albemarle Printed On: 12/17/2021
�� pF AL8
County of Albemarle
GEOGRAPHIC DATA SERVICES OFFICE
COMMUNITY DEVELOPMENT DEPARTMENT
��8GIN14'
PLAN REVIEW COMMENTS - E911
TMP: 09100-00-00-00900,09100-00-00-01500
DATE: 12/2/21
Elise Klewra
ekiewra@albemarle.org
tel: 434-296-5832 ext. 3030
fax:434-972-4126
Page 3 says Galaxie Farm Rd instead of Galaxie Farm Ln, please update this to say Galaxie Farm Ln.
Page 8 says Mae Jemison Ln instead of Mary Jackson Ct, please update this to say Mark Jackson Ct.
WWW.ALBEMARLE.ORG
401 McIntire Road, Suite 228 1 Charlottesville, VA 22902-4596
Review Comments for SUB202100183 Final Plat
Project Name: GALAXIE FARM SUBDIVISION - FINAL - DIGITAL
Date Completed: Monday, December 06, 2021 1 Department/DivisiordAgency: Review Status:
Reviewer: Betty Slough F� I CDD Inspections Requested Changes
Note to developer
Due to required distances from lot lines and structures as required by the NFPA, underground propane tanks may be
prohibited. Plan accordingly.
Add the following note to the general notes page:
Buildings or structures built before January 1, 1985 must have an asbestos survey performed in order to apply for a demolition
permit.
Asbestos removal permits are required if positive for such from Albemarle County and VDOLI. Contact VDOLI for their
additional requirements and permits for demolition projects at 540-562-3580 x131.
Add the following note to the general notes page:
All water, sewer and fire lines require NEW inspection and testing procedures. The ACSA performs any testing and
inspections of the public sewer and water main(s).
The Albemarle County Building Inspections Department(ACBID) does a visual inspection and witnesses the testing of the
building drain, water service pipe and the sprinkler lead-in connection.
The developer/contractor is responsible to retain a Special Inspector as outlined in the updated Albemarle County Policy for
Site Utilities to perform the visual inspection and testing of all utilities
not covered by the ACSA orACBID. This includes building sewers, water and fire line branches between the main and the
meter(s)/bu ikl ing (s).
The Special Inspector's report must be submitted and approved by the Albemarle County Engineering Department prior to a
Certificate of Occupancy being issued.
Page: 1__1 County of Albemarle Pnnted On: 12/17/2021
Review Comments for SUB202100183 Final Plat
Project Name: GALAXIE FARM SUBDIVISION - FINAL - DIGITAL
Date Completed: Monday, December 06, 2021 1 Department/DivisiordAgency: Review Status:
Reviewer: Howard Lagomarsino - Fire Rescue No Objection
Page: Fl� County of Albemarle Printed On: 12/17/2021
Review Comments for SUB202100183 Final Plat
Project Name: GALAXIE FARM SUBDIVISION - FINAL - DIGRAL
Date Completed: Tuesday, December 14, 2021 Department/DivisiordAgency: Review Status:
Reviewer: Richard Nelson ACSA Requested Changes
Page: � County of Albemarle Printed On: 12/17/2021
COMMONWEALTH of VIRGINIA
DEPARTMENT OF TRANSPORTATION
Stephen C. Brich, P.E. 1401 East Broad Street
Commissioner Richmond, Virginia 23219
November 15, 2021
County of Albemarle
Department of Community Development
401 McIntire Road
Charlottesville, VA 22902
Attn: Cameron Langille
Re: Galaxie Farms — Subdivision Plat
SUB-2021-00183
Review # 1
Dear Mr. Langille:
(804) 7862701
Fax: (804) 7862940
The Department of Transportation, Charlottesville Residency Transportation and Land Use
Section, has reviewed the above referenced plan as prepared by Roudabush, Gale, & Assoc.,
dated 21 October 2021, and finds them generally acceptable.
If further information is desired, please contact Doug McAvoy Jr. at (540) 718-6113.
A VDOT Land Use Permit will be required prior to any work within the right-of-way. The
owner/developer must contact the Charlottesville Residency Transportation and Land Use
Section at (434) 422-9399 for information pertaining to this process.
Sincerely,
Adam J. Moore, P.E.
Asst. Resident Engineer — Land Use
Charlottesville Residency
VirginiaDOT.org
WE KEEP VIRGINIA MOVING