Loading...
HomeMy WebLinkAboutWPO202100059 Action Letter 2121-11-24�.i OF AL8 County of Albemarle m COMMUNITY DEVELOPMENT DEPARTMENT VSMP Permit Plan Review Project title: Crozet Self Storage Project file number: WPO202100059 Plan preparer: Clint Shifflett [Clint.Shifflett@timmons.com] Owner or rep.: Brenda Yousef [brendayousef@gmail.com] Plan received date: Oct. 25, 2021 Date of comments: Nov. 24, 2021 Reviewer: David James [djames2@albemarle.org] 401 McIntire Road, North Wing Charlottesville, VA 22902-4579 Telephone: 434- 29 6 - 5 832 WWW.ALBEMARLE.ORG County Code section 17-410 and Virginia Code §62.1-44.15:34 requires the VSMP authority to act on any VSMP permit by issuing a project approval or denial. This project is denied/approved. The rationale is given in the comments below. The VSMP application content requirements can be found in County Code section 17-401. A. Stormwater Pollution Prevention Plan (SWPPP) The SWPPP content requirements can be found in County Code section 17-405. A SWPPP must contain (1) a PPP, (2) an ESCP, (3) a SWMP, and (4) any TMDL measures necessary. 1. Please submit the SWPPP. B. Pollution Prevention Plan (PPP) The PPP content requirements can be found in County Code section 17-404. 1. Please submit with the SWPPP. C. Stormwater Management Plan (SWMP) VSMP Regulation 9VAC25-870-108 requires the VSMP authority to approve or disapprove a SWMP. This plan is denied, and the reasons are provided in the comments below. The stormwater management plan content requirements can be found in County Code section 17- 403. 1. Show the building's roof drain connection(s). 2. It appears discharge from the site will enter an impaired waterway. The first assessed waterway appears to be Lickinghole Creek. If so, it is ok to purchase nutrient credits from within the HUC 02080204, if credits are available. 3. Please provide Letter of availability from the nutrient provider on the plans and the HUC they're in. 4. Please record the SWM maintenance agreement prior to plan approval. 5. Provide lining (type) requirements for constructed channels. 6. Provide concrete inlet shaping (IS-1) on any structure with a 4' or greater drop. 7. Pipe 207 (public) should be 15" min. diameter. 8. Size storm inlet 208 & 100 (DI-1) for half -clogged condition. [VDOT DM] 9. Show SWM Facility Easement for basin. 10. Locate trees outside of drainage easements and basin embankment. Engineering Review Comments Page 2 of 3 D. Erosion and Sediment Control Plan (ESCP) Virginia Code §62.1-44.15:55 requires the VESCP authority to approve or disapprove an ESCP. This plan is disapproved, and the reasons are provided in the comments below. The erosion control plan content requirements can be found in County Code section 17-402. 1. Cover: a. Add WPO# under title. b. Remove signature panel (not needed for WPO plan approval). 2. Sheet 3.0: The narrative, sequence should mention the cleanout and conversion of sediment trap to a permanent basin. 3. There appears to be 2+ acres drainage area that is not going to the sediment trap (ST1) and rather the drainage is divided between the two existing culvert inlets to the south. a. Please verify the area going to the silt fence first (no more DA than '% acre per 100 LF). [VAESC HB, 3.051 b. May need to show diversion to IP or trap. 4. Sheet 3.3: a. Label the inlet and/or sediment traps for this phase. Provide design & details. b. Show OP from pipe into basin. c. Provide B/M for west slope. [VAESC HB, 3.36] 5. Provide 5' (min) distance between bottom of slope and silt fence (or diversion) placement. [VAESC HB, 3.05; ACDSM]. 6. Show offsite work in an easement. a. Obtain VDOT entrance permit prior to land disturbance. 7. Provide cut/fill volume estimate. The VSMP permit application and all plans may be resubmitted for approval when all comments have been satisfactorily addressed. For re -submittals please provide 2 copies of the complete permit package with a completed application form. Engineering plan review staff are available from 2-4 PM on Thursdays, should you require a meeting to discuss this review. Process: After approval, erosion and sediment control and stormwater management improvements must be bonded. The bonding process begins when the plan is approved, and the applicant submits a bond estimate request form and fee to the Department of Community Development. A plan reviewer will prepare estimates and check parcel and easement information based on the approved plans. The County's Management Analyst will prepare bond agreement forms, which will need to be completed by the owner and submitted along with cash, certificates or sureties for the amounts specified. The agreements will need to be approved and signed by the County Attorney and County Engineer. This may take 2-4 weeks to obtain all the correct signatures and forms. Stormwater Management Facilities Maintenance agreements will also need to be completed and recorded. The County's Management Analyst or other staff will prepare the forms and check for Engineering Review Comments Page 3 of 3 ownership and signature information. The completed forms will need to be submitted to the County, who will record the agreement. After bonding and agreements are complete, county staff enters project information in a DEQ database for state application processing, if a DEQ permit is required. DEQ reviews the application information based on local VSMP authority approval. At this time, the DEQ portion of the application fees will need to be paid directly to the state. For fastest processing, this is done electronically with the emails provided on the application. DEQ should notify applicants with instructions on how to pay fees. When DEQ approves the application, they will issue a permit coverage letter, which must be posted at the construction site. After DEQ coverage is issued, via the coverage letter, the County can hold a pre -construction conference. Applicants must complete the request for a pre -construction conference form and pay the remainder of the application fee. The form identifies the contractor and responsible land disturber, and the fee remaining to be paid. This will be checked by county staff, and upon approval, a pre -construction conference will be scheduled with the County inspector. At the pre - construction conference, should everything proceed satisfactorily, a joint VSMP and grading permit will be issued by the County so that work may begin. County forms can be found on the county website forms center under engineering; https://www.al bemarle.org/government/commu nity-development/apply-for/engineering-applications