Albemarle County Planning Commission
Final Minutes – November 16, 2021
Albemarle County Planning Commission
Final Minutes November 16, 2021
The Albemarle County Planning Commission held a public hearing on Tuesday, November 16,
2021 at 6:00 p.m.
Members attending were Julian Bivins, Chair; Corey Clayborne; Rick Randolph; Daniel Bailey;
and Tim Keller.
Members absent: Karen Firehock, Jennie More.
Other officials present were Charles Rapp, Director of Planning; Tori Kanellopoulos; Rachel
Falkenstein; Andy Herrick, County Attorney’s Office; and Carolyn Shaffer, Clerk to the Planning
Commission.
Call to Order and Establish Quorum
Mr. Bivins said the meeting began at 6:03 PM. He said it was an electronic meeting. He asked
Ms. Shaffer to establish a quorum.
Consent Agenda
Mr. Bivins said there were no items on the consent agenda. He asked Ms. Shaffer if there was
anyone signed up for matters not listed on the agenda.
Other Matters Not Listed on the Agenda from the Public
Ms. Shaffer said there were two speakers signed up.
Mr. Neil Williamson introduced himself as president of the Free Enterprise Forum, a privately
funded public policy organization focused on Central Virginia’s local governments. He asked how
long it should take to get a building permit and said in Albemarle County, it was currently taking
over four months to get a building permit issued. He said the Community Development
Department and Free Enterprise Forum agreed that was unacceptable. He stated that on Friday
morning, their sources indicated there were over 300 residential and commercial permits sitting
in the plans review queue alone. He said that this person did not have updates to share on them;
however, they were not lost, just waiting.
He stated that these applications were properly filed with thousands of dollars in fees, which
increased on July 1, and they were not actively being reviewed—they were waiting in Albemarle’s
permit pending purgatory between received and filed. He said they recognized these lowly
building permits did not have the clever Economic Development Authority project code name like
Night Rider, PACKET, or Daffodil, nor do they represent brand new residential developments with
hundreds of units. He said that instead, these new construction projects, large and small, across
Albemarle County, included new homes, fulfilling the comprehensive plan, additions to help
Grandma age in place with her family, an extra bathroom to make mornings a little easier for
growing families. He said these not-so-sexy projects represent not only millions of dollars in fees
and related activity for Albemarle County, these delays impact project cost and these families ’
quality of life.
2
Albemarle County Planning Commission
Final Minutes – November 16, 2021
He said they had been engaged since the summer with Community Development Department
staff and the Blue Ridge Homebuilder’s Association to identify and address these concerns. He
said they appreciated CDD’s efforts and transparency with the issues they faced. He said they
knew CDD staff was working across the County organization to tackle these challenges—but it
was not getting better, it was getting worse. He stated they found it was critical that elected and
appointed officials understand the vast scope of the problem and help find and fund a solution
now. He said as an advisory body, the Free Enterprise Forum understood that the Planning
Commission had a legal responsibility to review the Capital Improvement Plan on tonight ’s
agenda, where new CDD software could potentially be funded. He said in addition, this body
regularly weighed in on the Community Development Work Plan.
Mr. Williamson continued that considering this close coordination with Community Development,
the Forum believed it was within the Planning Commission’s purview to advocate for, one,
dedication of significant additional resources and personnel to permit intake and review for
Community Development. He said that the second was to invest now in a new software platform,
perhaps via the CIP, to allow for efficient processing of all applications. He said that three was in
the spirit of the Land Use Reform Committee (LURC), the Development Initiative Steering
Committees (DISC I and II), to establish a broad- based committee, charged with reviewing and
streamlining the development procedures to get permits and projects approved and completed in
Albemarle County. He said that while this may seem kind of a larger scope than the Planning
Commission’s normal procedures, nothing could be more impactful. He said for them to get
Albemarle County Community Development moving again.
Mr. Peter Krebs said he was from the Piedmont Environmental Council (PEC) and that tonight,
the Commission would be hearing and speaking about the comprehensive plan and the CIP. He
said they were actually closely related, and it was not bad to consider them both at the same time.
He said that last night, the Charlottesville City Council approved its comprehensive plan. He said
the two localities were definitely not the same, but there were likely to be some key common
themes, such as climate action, housing, historic preservation, green infrastructure, transportation
and mobility, and everything it takes to be a highly livable community. He said that included parks,
greenways, and well-connected neighborhoods. He said PEC had worked with Albemarle County
for the last 50 years on issues of this kind, and they were excited to be a part of this iteration as
well. He said as he said to City Council last night, the CIP was where the values enumerated in
the comprehensive plan were made manifest.
Mr. Krebs stated that when thinking about the CIP and the next five years, he hoped they all built
upon some of the things that Albemarle had been doing extremely well lately. He said they made
the commitment to improving resident quality of life through the creation of sidewalks, greenways,
and other forms of connectivity. He said they had taken an approach to economic growth that
rewarded local enterprises and fostered prosperity by helping local residents live healthy lives
and unleashing their productivity. He said they had taken important first steps to open Biscuit Run
with an initial mini phase slated for fall of 2022. He said between ACE and a handful of other
programs, more than 100,000 acres of land had been protected for agriculture, forestry, and
natural habitat. He said County staff had done a fabulous job of leveraging state transportation
dollars, yielding a phenomenal return on their investment in them. He said as they thought about
this upcoming budget, they should build on their recent wins. He said Albemarle County had a
vision on how to be a terrific, great place to live. He said the comprehensive plan was the what
3
Albemarle County Planning Commission
Final Minutes – November 16, 2021
and the why, and the budget was the how. He thanked the Commission and said he looked
forward to listening to the rest of the meeting.
Work Sessions
CIP Fiscal Years 2020-2027
Mr. Bivins thanked them for the observations and comments and said they would move into the
first of their two work sessions that evening, which was the CIP for fiscal years 2020 to 2027.
Mr. Andy Bowman introduced himself as Andy Bowman, chief of budget in the Department of
Finance and Budget. He said unfortunately, Ms. Kuwazama was unable to join them this evening,
but he would be joined by Rosalyn Schmitt, chief operating officer of the school division. He said
Ms. Schmitt, school staff, County staff, and he regularly partnered on a number of joint
government and school budget issues, including the CIP. He said he was also joined that evening
by Tia Mitchell, the senior budget analyst in her office. He said she primarily worked in the areas
of the capital budget and the planning for that. He said their presentation was a streamlined
version of one that staff had provided to the Board of Supervisors and School Board on October
20. He said he wanted to provide as much of that same information for a discussion heading into
the FY23 budget development process so that the Planning Commission could see the same
information as they start that process next week. He said that Ms. Firehock was not there that
evening so they would be sure to get that information to her in advance.
Mr. Bowman said although he had streamlined it somewhat, this presentation would likely have a
more financial orientation than a usual Planning Commission meeting. He said he had not
modified this drastically because he wanted to make sure he provided the same thing to all the
bodies involved in the CIP process. He noted that some of the Planning commissioners he had
met before and some he had not. He said part of the reason was that last year, when they were
putting together the FY23 budget, there was no CIP. He said the County was in the middle of the
pandemic and there was a tremendous amount of uncertainty, and at that time it was decided to
instead of focus on a long-range picture and focus on the impacts of the pandemic and what might
be able to be unpaused from a number of projects that were paused at the start of the pandemic.
He said this would be the first time they had discussed the CIP with the Planning Commission in
a while, and as they got back into more routine long-range planning, that would continue in the
future.
Mr. Bowman said he would begin by providing an overview of the County’s financial position as it
stands since the start of the pandemic. He said he would then speak to where they currently were
as an organization with the capital program and how that informed their thinking into the future.
He said beyond those broader concepts, he would then discuss the FY23–27 process in a little
more detail, looking at the calendar, the role of the CIP Advisory Committee, and some of the
initial assumptions in staff’s approach to prepare for that committee’s work. He said he and Ms.
Schmitt would briefly provide some preliminary and summary information on some of the
proposed capital projects that have been identified by the Board and School Board.
Mr. Bowman said they had some questions to prompt that discussion for the Planning
Commission, which he would share in advance as a reference: “How does your awareness of the
County’s past, present, and future inform your thinking about the overall capital program?” both
in terms of their process and their projects, and “What additional information will you be looking
4
Albemarle County Planning Commission
Final Minutes – November 16, 2021
for as the CIP Advisory Committee recommends and the Board of Supervisors adopts a FY 23-
27 CIP?” as the Planning Commission heads into the spring to adopt a capital plan for the first
time in two years. He said certainly as they followed up with Ms. Firehock and get her prepared
for the advisory committee, they would include that feedback as well.
Mr. Bowman said first they would focus on financial planning, and 19 months ago as the pandemic
was beginning, the County was nearing the end of the FY 21 budget development process. He
said as the pandemic began, they went through a process wherein that entire budget had to be
scrapped and redone in a matter of weeks. He said that to navigate that unprecedented
uncertainty—not only of what the County’s revenues would be, but what the delivery of basic
services would look like during the pandemic—the County adopted what was called a “3-6-6
approach” to financial management, which was shorthand for managing the last three months of
FY20, looking at the first six months of FY21 and then at the last six months of FY 21, and as
things improved or worsened along the way, they would adjust their planning as needed.
He said fortunately, every time they had been able to go to the Board of Supervisors and provide
a quarterly interim report, that outlook had improved as the economy had recovered over the
pandemic. He commented that the pandemic was still ongoing, and the economy had stabilized
and recovered. He said that the Board and School Board had ensured the County’s financial
foundation. He said the County was compliant with its financial policies, and the three AAA bond
ratings had been reaffirmed in June 2021. He said initiatives were advanced as the County’s
revenue numbers improved and became clearer.
Mr. Bowman moved to his next slide, entitled “Where are we now? Where are going?” He said he
would discuss the County’s present and future together because he wanted to draw clear
connections about how current circumstances are informing staff’s thinking about the FY23–27
CIP process. He said the first factor to consider was the impact of the global supply chain
disruption and increased cost of raw materials. He said the County was not immune from these
global factors and that some projects had received higher bids than when the projects were initially
budgeted or had experienced schedule delays. He said the County had been working to ensure
that budget figures and numbers were correct and realistic for project budget items that had not
yet gone out to bid or had been under contract. He said the state approved requirements the
previous year regarding energy efficiency, which were in line with the County’s climate action
goals. He noted that projects needed to be developed to meet these new state standards.
Mr. Bowman said that while managing in the interim, the County had flexibility due to a $4 million
capital budget stabilization reserve that the Board of Supervisors had created for FY22. He said
that the capital program was already underway before any work began on the FY23–27 plan. He
said the capital budget was $147 million for 65 capital projects. He said $147 million is not a
meaningful number by itself, so he would provide a few data points for more context. He explained
that $91 million had been appropriated for capital projects in the past 11 months between what
had been unpaused in January, such as the expansion of Crozet Elementary, as well as what had
been included in the budget adopted on July 1, such as the next phase of the downtown courts
renovation project. He said much of the $147 million was relatively new funding, but the remainder
was underway in different phases of development. He said that some of the construction would
extend beyond FY22 because of the nature of capital projects.
Mr. Bowman said that the work needed to implement the current projects had to be considered
when addressing the next five-year planning process. He said that staff had analyzed data for the
5
Albemarle County Planning Commission
Final Minutes – November 16, 2021
past eight years, and though the nature of capital projects varied year to year, they found that the
current rate of execution was around $35 million a year. He said the budget processes and
systems needed to be aligned heading into the next fiscal year. He said his third point was that
there would be an updated comprehensive plan and strategic plan within the next five years. He
said the School Board had adopted an updated strategic plan over the summer of 2021, and the
Board had extended the strategic plan to the end of FY23 on October 13.
Mr. Bowman stated that the County staff thought about the transition to the updated
comprehensive plan and strategic plan in two ways. He said that first, the intent of the CIP would
not be to develop projects where all financial operational capacity would be committed before a
strategic plan and comprehensive plan had been updated. He said there were community needs
that could be planned for during the five-year period, but those had to be balanced with the
outyears and the unknown so that there would be flexibility to respond to the changes. He sa id
that for example, they may have a portion of the outyears just with an undesignated reserve
amount for priority strategic community projects, knowing that while they had a lot more certainty
than they did a year ago in the pandemic, and there still was much unknown, particularly in years
three through five.
Mr. Bowman said this approach was also used to recognize that there were community
conversations taking place. He said the Board of Supervisors heard from regional jail facility
assessment in October that they had implications in the future. He said part of this approach was
to be a little more flexible in the outyears and get ahead of those community conversations and
the County’s regional partners. He said he expected there was a question that may be on the
Planning Commission’s mind now: “If they were less defined in the outyears, when would they
update that?”
Mr. Bowman said those who had been with the County a while may recall that prior to the
pandemic, the County would often be in a pattern of every year going through CIP review, where
one year, there would be a full look at the five years of the CIP, and then the following year, there
may be more refined and minor adjustments. He said given the approach they were describing,
at the different times in the pandemic, they felt it would be appropriate to provide a five-year
update as best they could, maintain that flexibility, and maybe a year from now when they were
looking at FY24 –28, to take a fresh look at those five years.
Mr. Bowman said he had presented a lot of concepts in the last two slides and would summarize
them in terms of present and future. He said they were updating their current project cost from
reality of current market conditions and supply chain issues. He apologized and said he had
forgotten a fourth item. He said the other thing they were considering currently was that both with
the Board and the School Board, long-term priorities existed in the operating budget as well. He
said as they were developing a capital process with the CIP Advisory Committee, there would
also be working with the Board of Supervisors around long-range policy discussions to position
themselves and their operating budget and make sure those two plans worked together to make
one cohesive long-range financial plan.
He said to summarize those four points, first was the reality of project cost and being updated for
current market conditions; second, in this five-year period, they were going to consider the starting
needs of the institution projects reflecting the current efforts underway of the $147 million capital
budget; and third, they were going to emphasize flexibility in the outyears, knowing they were in
the middle of the comprehensive and strategic plan updates. He said that did not mean they would
6
Albemarle County Planning Commission
Final Minutes – November 16, 2021
have funding out there, but there would be a little less to find than they would see in a typical year.
He said finally, they would be considering the capital decisions in the context over operating
budget and their total financial picture of the Board.
Mr. Bowman said they would move on from high-level concepts to a more nuts-and-bolts
approach about the work that would be ahead in the coming weeks and into the budget process.
He said though they were talking to the Planning Commission here on November 16th, there was
a lot of work already underway. He said the school division had a long-range space planning
committee and started a little ahead of this process. He said they had received a report from that
committee in September and worked through a proposal that was considered as part of this long-
term capital planning process, and they had a discussion with the joint boards in October to get
some of their input into the process and some of the concepts were being worked there. He said
in November and December would be the CIP Advisory Committee and also the work sessions
with the Board of Supervisors on operating five-year planning, and how those plans would inform
each other. He said from there, they would pick up in February with a release of the school’s draft
funded request, County Executive’s recommended budget, and then all of the public processes
and work sessions that take place through the spring, ultimately leading to the adoption of the
budget and the CIP in May.
Mr. Bowman said he would next focus on the role of the CIP Advisory Committee. He said that
was a committee comprised of two Board members, two School Board members, one Planning
commissioner, and one community representative. He said they were charged with a few things,
firstly to review and evaluate a proposal that was recommended by staff as a starting point, then
the CIP committee would make a recommendation and modify that starting point. He said they
were to ensure that the proposal was aligned with the County’s financial policies, established
principles, and guidelines. He said they would next make a recommendation to the County
Executive for his consideration and preparation of the recommended FY23 capital budget, and
the FY23–27 CIP. He said there would also be a report out to the Board, staff, and Planning
Commission as well that would accompany that recommendation, so it would be more than just
the dollars and cents of the projects.
Mr. Bowman said that the work of the CIP Advisory Committee was within a similar framework to
what they had in last year’s process, which was very focused on a short timeframe of FY21 and
22, and this would have a longer timeframe. He said the prioritization of their projects would begin
as it did in most years, with funding the County’s obligations and its maintenance and replacement
programs before they considered additional projects. He said that was not automatic funding, and
for maintenance and replacement requests, staff performed its due diligence to scrub those
numbers to ensure they were in line with standards and the ability to execute the other concepts
they had talked about this evening.
He said before that, they would get into four criteria, the first of which was the alignment with the
County’s strategic plan priorities and the new reality due to the pandemic. He said last year, there
were projects that focused on broadband, and the importance of that priority became even more
evident in the pandemic and was elevated as a priority when they went through last year’s budget
process. He said that second, they would be looking at the ability to execute a project. He said
this was a lens that considered that existing $147 million capital budget, the other barriers they
had to implement to proposed projects and how and when they would be able to proceed. He said
third was to look at the ongoing operating cost impacts, which connected to having a single
coherent financial picture where their capital plan was talking to their operating plan. He said there
7
Albemarle County Planning Commission
Final Minutes – November 16, 2021
were going to be some capital investments, there was going to be a pretty wide range of day-to-
day costs, and they wanted to make sure as they were constructing or opening a new facility that
they would be able to operate them.
Mr. Bowman stated that finally, there would be an equity statement for projects, which was not a
mathematical score or high, medium, low assessment or other criteria, but they would perhaps
look at a similar matrix in terms of ranking programs and projects. He said the Department of
Finance and Budget had been partnering with the County’s Office of Equity and Inclusion to assist
County departments to be able to better incorporate a perspective equity lens when considering
service changes at the start of the budget process—whether that be a capital project or an
operating program. Mr. Bowman said a lot of this had grown out of the County ’s adoption of its
new value of community. He clarified that while he said it was new, it had been a while since it
had been adopted in recent history.
He said focusing on some fundamental questions, such as how changes to services or programs
reduce existing disparities or enhance quality of life and wellbeing or access to services, and
whether particular groups are more impacted by those programs, with impact meaning positive
or negative, and if there were project impacts, if there were things the County could do to offset
those. He said this was a discussion the Board had throughout working on the cigarette tax and
how that would be implemented, considering the equity impacts in terms of who benefitted or
carried the burden of that program and what the County could do to mitigate that. He said this
would be taking some of that process and discussion and making it a more regular part of the
County’s business as future proposals were evaluated.
Mr. Bowman said that the next of the assumptions that the CIP Advisory Committee would be
working with was that revenue sources would be explored in the context of the total five-year
financial plan. He said some of that would go into discussions they would have with the Board of
Supervisors in November and December. He said there was recent enabling authority provided
by the state. He said he mentioned the cigarette tax as one that the Board was pursuing, and the
Board of Supervisors had also expressed interest in October about pursuing a plastic bag tax,
which would have funding related to other environmental programs that, while still in early stages
of development with the Board, was revenue that could factor into future planning. He said they
had the impact of the summer 2021 bond refinancing. He said the County’s AAA ratings were
upheld. He said given the current market, they were able to issue a large amount of ARPA
proceeds at very low rates that would create capacity that did not exist in the plan prior to the
pandemic.
Mr. Bowman stated that they also looked at ARPA funding and how other opportunities may be
leveraged to support the County’s priorities. He said a good example of that would be broadband,
where the Board of Supervisors set aside around $4.5 million of ARPA funding to leverage
additional funding from the state to meet broadband needs in the community, and there would be
more information from the state in the coming months. He said they would also continue to monitor
the capital bond market environment and the County’s authority to issue bonds. He said these
were all revenue options out there that could create capacity. He said that as they had discussed
with the Board, their initial scenario assumed that there would be no changes to the real estate
tax rate for operating or capital costs in FY 23–27.
Mr. Bowman said this was a starting point in recognizing that much had changed from prior years,
and there were other options available that could be pursued, even with their current resources,
8
Albemarle County Planning Commission
Final Minutes – November 16, 2021
to make things happen. He said that as they had placed an increased emphasis in the Office of
Budget and Management on looking at capital projects and what might be possible as projects
come, whether it be over budget or under budget, they were looking from a management
perspective of how to create additional capacity for the CIP Advisory Committee and the Board
to work with.
Mr. Bowman said that in summary, they had spent the past two years using the 3-6-6 budget
management approach, and they were now in a place where they were able to establish and
maintain a strong financial foundation. He said they had been able to adjust their plans as they
went along, and they were implementing a capital program of $147 million. He said they were
going to head into a capital process through FY23–27 and the CIP Advisory Committee would
recommend a plan for the County Executive’s consideration; the Board would adopt a plan for the
first time since FY20 due to the pandemic. He said the plan would reflect current efforts of projects
underway, emphasize flexibility, recognizing their guiding documents for priorities were in the
middle of process updates. He stated they were also going to be considering not just the capital
program but how the operating program worked as well. He said with that, he would touch on
some projects that had been identified by the Board of Supervisors for consideration.
Mr. Bowman said on March 29, at the end of the FY22 budget process, when the American
Rescue Plan was announced, before they knew all the details, they met with the Board of
Supervisors to understand within the strategic plan the other priorities they had identified and
what items were on the top of their list of priorities. He said they shared this again with the Board
last month, and he would not discuss all of these projects in detail because they were not
necessarily all capital projects. He said in the spring, the Board was able to provide funding to
phase two of the Rio Road Corridor Plan Study, and that was the third bullet on this slide. He said
the fourth one, broadband infrastructure, would hopefully be financed through ARPA funding in
combination with state funding, so there would be no impact to the capital budget. He said this
was an example of other resources being used to deliver on these projects.
Mr. Bowman said other items on this list would be likely familiar to the Planning Commission. He
listed some of these, which included older neighborhood infrastructure such as sidewalks and
multi-modal connectivity, transportation leveraging program with SmartScale projects and the
Eastern Avenue Bridge, parks and recreation infrastructure amenities such as the current in
Biscuit Run, and there was a long-term master plan to build out that park to provide for community
needs. He said these were just examples of projects, and there would be other staff-identified
priority projects that they were working through as well. He said they could come back to this if
there were questions in the future, but he wanted to turn it over to Ms. Schmitt to talk through the
work of the school division and where they had been for the last couple of months.
Ms. Rosalyn Schmitt said that the School Board had recently updated their strategic plan. She
said before she presented the list of recommended projects from the school division, she would
provide an overview of how it fit within their strategic vision. She said after a rigorous community
and stakeholder engagement process, the School Board had recently adopted a strategic plan,
which had helped guide the process and priorities when thinking about the CIP. She said the
strategic plan, entitled “Learning for All,” included a vision that their learners were engaged in
authentic, challenging, and relevant learning experiences, becoming lifelong contributors and
leaders in their dynamic and diverse society. She said the specific goals and objectives related to
capital priorities were listed on the slide. She said getting the right resources to educators and
students for their teaching and learning was key to their success. She continued that they believed
9
Albemarle County Planning Commission
Final Minutes – November 16, 2021
the project criteria as developed by the long-range planning advisory committee, on the righthand
side of the slide, were in close alignment with their vision and mission.
Ms. Schmitt said using their defined project criteria, the listed projects were recommended. She
said it was a needs-based request that addressed key themes of equity and investment in existing
facilities as well as new investments needed to support the long-term capacity needs of their
growing County. She said the price tag may seem large; however, it was built upon the
accumulating capital needs of the school division over many years. She said adequate capacity
continued to be a need for the school division, which was supported by the 10-year enrollment
projections and reinforced by both the recently completed development and student yield analysis
and 30-year population forecast.
Ms. Schmitt stated that for over 15 years, the school division had been in a practice of expanding
existing facilities and, when necessary, deploying mobile classroom units in the interim. She said
as these schools all reached a saturation point where expansion was no longer practical, there
was a recommended strategy for land acquisition and the construction of new facilities. She said
for the first time in a long time, there would be several new schools listed. She said they also
recommended investments into school renovations at all levels to bring incremental updates
division-wide and in alignment with the strategic plan, ensuring that each student had access to
high-quality learning environments. She said there should be a reliable elevator service to ensure
safety and access at all times. She said the importance of a healthy environment and having
reliable technology infrastructure reflected urgent and necessary investments as highlighted by
the Covid-19 pandemic, so it recommended a new investment in indoor air quality systems and
construction of a data center. She said a detailed justification for each of these projects was
included in the 2021 Long-Range Planning Advisory Committee Report.
Mr. Bowman thanked Ms. Schmitt and said they would now open this to Planning Commission
discussion. He said there were two questions that were presented in the beginning, and he wanted
to hear from the Planning Commission in terms of how their awareness of the County ’s past,
present, and future informed their thinking about the overall capital program, in terms of process
and projects, and what additional information they would be looking for as the CIP Advisory
Committee recommended and the Board adopted a FY23–27 CIP.
Mr. Bivins said that the commissioners were somewhat silent on these issues, and staff had given
them a good bit of information. He said he would like to hear about, out of the funding methods
that were unpaused this year, how much or what types of projects they might see have an impact
on their own community development, so they had a sense of Mr. Rapp and his colleagues to
have the resources that line up with the ongoing strategic plan and some of the items that had
come up thus far.
Mr. Bowman said that was timely, because staff and Mr. Rapp had met several times over the
past few weeks about transportation and future plans. He said they were looking at what they
called the “transportation leveraging program,” which included a combination of state matching
funds and other multi-modal projects. He said he was trying to establish where the timeline was
for those future priorities identified by the Planning Commission and the Board to make sure they
position themselves to draw on those state matches as they could and support the
interconnectivity in other areas. He said if Mr. Rapp or Ms. Mitchell wanted to add to anything he
said, that was certainly one of the areas of strategic priority to the Board of Supervisors, and they
called them non-strategic priorities. He said funding was included as part of the work the CIP
10
Albemarle County Planning Commission
Final Minutes – November 16, 2021
Advisory Committee did, and that would certainly be part of the committee’s discussions as part
of this process as well.
Mr. Bivins said that they were told at some point there were lots of system updates that were
going to take place in general around the County’s business, and he was wondering if those would
be funded from here or funded other ways. He said it would be particularly helpful to know about
their own Community Development’s software needs, and just in general about the County’s.
Mr. Bowman responded that currently, this was a Community Development issue, but it was also
a County-wide issue. He said those things touch every County department, and they touch every
citizen who tries to interact with the County in a virtual way. He said they have a process of
probably three or four years for looking at their systems and how they were integrated or not. He
said they were working with the IT department, Community Development, Human Resources,
and Finance and Budget staff to figure out a plan for what an end-to-end process looked like in
the timing of all those phases to be implemented through the next few years to modernize the
County’s core systems.
He said they could improve system access and data access between systems, reevaluate manual
systems, and create systems that were faster for staff to train and learn on, which could have
corresponding effects on recruitment and retention. He said that would be a core part of the CIP,
and the CIP Advisory Committee would look at that. He said that also tied to their theme of the
operating budget because technology had an infrastructure side and an ongoing maintenance
side to implement that. He said they were trying to look at it from all angles to ensure both plans
were cohesive, and that would be a consideration in this year’s process.
Mr. Bivins asked if they would not be seeing anything soon and if they would see this sometime
next year.
Mr. Bowman replied that the groundwork was happening right now, and this was credited to the
Board of Supervisors for the last couple of years. He said they had funding managed through their
Project Management Office, which had been renamed the Performance and Strategic Planning
Office, where they had project managers to handle those in ways the County had not done
historically. He said although the funding would not take place until July 1, 2023, a lot of the
groundwork and business process analysis necessary for that to be successful and to buy a
system was currently underway.
Mr. Randolph asked Mr. Bowman to go back to a slide that said that the County had appropriated
$91 million since January 2021. He said his question was asked what percentage of those funds
was provided through ARPA versus the percentage that actually came out of Albemarle County-
generated funds.
Mr. Bowman said of that $91 million, currently none of it was related to the American Rescue Plan
Act. He said the reason for that was because the County adopted its budget in early May, and
though ARPA was announced in late March or so, the details of when the County would receive
funding were not until mid-May, when they received around $10 million or so in initial funding. He
said part of the plan was to set the stage with the Board of Supervisors. He said one of the
differences in ARPA funding was that they had just gone through an exhaustive process with the
Coronavirus Aid Recovery Economic Security Act. He said they had a very tight timeline to spend
that funding when it was provided in spring of 2020 to be expended by the end of 2021.
11
Albemarle County Planning Commission
Final Minutes – November 16, 2021
He stated that the framework they discussed with the Board of Supervisors was that they knew
from the ARPA timeline that they would have multiple years to spend that funding, so they had a
moment to take a timeout and pause with the strategic aspects and not rush. He said they certainly
wanted to get that into the community and support it, but also to have the time to be deliberate
and take the opportunity to have matching funds with the state funding. He said what was not in
the $91 million was the County’s $20 million of ARPA funding, a portion of which the Board had
said was allocated in the current fiscal year to support programs that were around more human
services functions, and the bulk of that funding was intended to be looked at for the FY23–27
budget process.
Mr. Randolph said certainly when looking at the FY21 budget, he recalled that the Board had an
active discussion about the potential need to phase in a property tax increase over the course of
the next four or five fiscal years. He said this was in 2019, but they were in FY20 in the budget.
He said looking at the FY21–25 budgets, he recalled there was active discussion about a need to
augment resources to address the yawning needs within the CIP—not only from the school
division side of the ledger, but from general government. He said he just wanted to express some
concern about a slide where they had submitted a kind of cerberus paribus, all things being equal,
that there would not be an increase in property taxes.
He said if there were limited funds coming out of the ARPA source, and there were an even more
dramatic set of school division capital needs, combined with the goals and objectives of the Board
to address inequities out there in terms of sidewalks and conveniences for pedestrians, it was
unclear where those funds would come from. He said that $36 million was the last authorization
by the taxpayers for a bond issue, and $36 million would not begin to come close to addressing
the needs in the capital plan as he saw it. He said attached to that was the concern that interest
rates may be going up in the very near future, and the window of opportunity for bonding
authorization looked like it was narrowing dramatically. He said he had one more question about
transit shelters, then he would cede the floor to other members of the Commission.
Mr. Bowman thanked Mr. Randolph for that feedback. He said two slides he had taken out were
ones they had discussed with the Board and School Board related to this change in tax rate, in
terms of where they were two years ago and where they were now. He said he did not have those
slides, but he could speak conceptually to where they were currently. He said it was a starting
point, and the CIP Advisory Committee and Board of Supervisors could take it in a different
direction, but Mr. Randolph was correct in that they had planned back in the winter of 2019 prior
to the pandemic and contemplated an additional penny a that would be in effect from FY21
through FY25. He said when the FY21 budget was recommended by the County Executive, there
was not that additional penny included, and it was essentially delayed a year. He said before any
action was taken on that, the pandemic started, and all the budgets were redone in a matter of
weeks because everything had changed. He said that was why they could not simply go back to
that plan as a starting point.
Mr. Bowman said they looked at project schedules and lead times, and there were a lot to execute.
He said one of the things they were seeing already were school projects over the summer with
tight delivery windows, and if materials did not arrive, there were some projects that had to be
moved a year. He said when thinking about these projects being borrowed heavily, it tied into the
cash and debt analysis of when the funds needed to be available and when the project needed
to be completed. He said they would have more capacity than they did in the winter 2019 session
12
Albemarle County Planning Commission
Final Minutes – November 16, 2021
because of the refinancing that took place, which Mr. Randolph had alluded to with the lower-
than-average interest rates. He said he believed they were below 2%, which was far lower than
what the County had seen historically. He said there would be capacity available there as well.
He said there were options with revenues that the state had granted in the past two years that
could also be explored.
Mr. Bowman stated that he would share information they gave to the Board on November 3 that
he did not include in this presentation, such as the very dramatic change in their economy in the
fourth quarter. He said if they were to look at what happened in the fir st three quarters of FY21,
there would be a year-over-year revenue growth of about 2.6%. He said typically, what would be
seen if there were no pandemic, the fourth quarter would be within a percent or so of the 2.6%
figure. He said the actual observed revenue growth in the fourth quarter was plus 7%, which was
an unprecedented change. He said as that was happening, based on how they allocated funding
to capital, school division, and local government, there would be some additional funding available
in the local base. He said what was seen in the local data was that those trends would continue
into 2022.
Mr. Bowman stated that the Board of Supervisors was given a preview on November 3, and as
part of the Board’s long-range planning on November 17, he would discuss data they were seeing
and how things were changing, and then there would be a budget amendment coming before the
Board in December. He said part of this was that there were changes seen in the local economy
that had not been seen before, and some flexibility in their financing that did not exist, so part of
the thinking was not that taxpayers would not be considered in the future but ensuring the due
diligence to explore other options in that capacity that they had gained. He said that t hey could
certainly disagree with that approach, but that was the rationale presented in terms of why there
was a different approach to what was considered in the winter of 2019.
Mr. Randolph commented that he noticed that transit shelters were listed as a desirable entity to
be supported by the CIP budget, and the Planning Commission had reviewed several
redevelopment projects and special use projects where transit was discussed. He said the
developer was urged to provide transit stops, but he believed that there was not support from the
County or Board of Supervisors to provide transit stops. He said that rather than be part of the
CIP budget, the developers should have a hand in funding those—especially when the projects
were on a public transit route. He said it was not the role of local government to provide that post-
facto. He said that it was appropriate to request and expect transit shelters alongside the requests
for bike lanes and sidewalks from developers.
Mr. Bowman said that Mr. Randolph’s point was well taken. He said there were state programs
that could provide funding to put the transit stops in place, adding that the County was undergoing
transit planning studies, and those studies could affect the future.
Mr. Keller said that in the past, there was a “budget 101” presented at the beginning. He said that
citizens listened to the presentations, so it would be helpful to have a succinct discussion about
the different components of input and output to the County budget so that the CIP would be
contextualized. He said that it had been helpful in the past to show the duration of the projects
rather than just the dollar amounts. He said that ongoing and large expenditures, such as the
northern high school and courts improvements, were presented with projected durations. He said
the Planning Commission used to receive a presentation each year before the budget process
began that discussed the staff hopes for budget items for Community Development and Planning
13
Albemarle County Planning Commission
Final Minutes – November 16, 2021
and how those were broken down into which were ongoing budget funded and which had to be
pushed out to the CIP. He said that there were discussions with the previous planning director
about not funding small area plans from the CIP.
Mr. Bowman said the presentation was a good, general overview. He said that there was a lot
more to consider, and it should be considered up front. He said it was important to have a sense
of what would be funded outside of the CIP process. He said he would follow up on Mr. Randolph’s
point about increased property taxes. He said that there had been interesting discussions when
there was concern about revenue about how the pieces would fit into the budget. He asked if it
could be assumed that the reason staff was not suggesting real estate tax increases was because
it was anticipated that the assessment value of properties would increase significantly, especially
with inflation.
Mr. Bowman thanked Mr. Keller for the feedback about a budget 101 and said that new Board
members would receive that education during onboarding. He said that beyond the plan before
the Commission, there were other high-level budget questions in terms of where the money came
and went and other basic mechanics. He said he appreciated the feedback to show the projects
over time, and that could be achieved. He said the CIP Advisory Committee had recommended,
and it was then adopted, that studies would no longer be funded from the CIP. He said that funding
had been set aside to move forward projects such as the Rivanna Corridor Study and the Rio
Corridor study. He said the County Assessor would update the reassessment discussion to the
Board of Supervisors on December 15. He said it was assumed at the time of the 2022 budget
adoption that there would be a reassessment of an additional +1.75% compared to 2021. He said
there were signs for a higher reassessment, but it was too early to be sure, and he did not have
an exact number.
Mr. Keller thanked Mr. Bowman.
Mr. Clayborne said it was good to meet Mr. Bowman. He asked to see the slide for the school
CIP proposal and said he did not know what was included in the school renovations. He asked if
there was coordination to complete renovation projects at the same time, such as installing HVAC
systems and redoing windows and roofs at the same time. He asked if the numbers reflected any
coordination with ARPA funding or other funds.
Ms. Schmitt said it was important to note that the projects used to be called “below-the-line”
projects, and they did not include the maintenance replacement projects. She said there was a
comprehensive maintenance replacement program that included maintenance for windows, roofs,
and mechanical equipment. She said coordination between those projects was attempted where
it made sense. She said that the indoor air quality project had the opportunity to receive matching
funds from ARPA.
Mr. Clayborne thanked Ms. Schmitt for her answer. He asked to confirm that it would be a
separate maintenance budget that would fund specific projects.
Ms. Schmitt said that was correct.
Mr. Clayborne asked what level of priority was placed on utility projects. He said he saw a bullet
list of how projects were prioritized, and he was curious how much went to site readiness.
14
Albemarle County Planning Commission
Final Minutes – November 16, 2021
Mr. Bowman said that there was around $2 million in a public-private partnership fund for the CIP.
He said the fund was related to the $147 million. He said that separate from the CIP, there was
an economic development fund maintained to handle issues with site readiness, state and federal
funds, and provide opportunities for performance agreements.
Mr. Clayborne said that was helpful. He asked if accessibility and public safety projects were
included in the equity portion because he did not see any.
Mr. Bowman asked if Mr. Clayborne meant pedestrian safety.
Mr. Clayborne said he was considering fire stations or police stations.
Mr. Bowman said the largest cost for public safety was the maintenance replacement program.
He said that through the comprehensive plan, there had been a 20-year path to build stations
around the urban area, and there were no new stations planned. He added that there were other
long-term goals for public safety.
Mr. Clayborne asked if ADA upgrades were tied in with equity.
Mr. Bowman said that retrofitting facilities and ADA compliance would be considered part of that,
and it was part of the maintenance replacement budget.
Mr. Bailey said he was curious how the broadband infrastructure support from the federal
government impacted the County’s funding. He asked if the CIP could be supplemented with
federal dollars for broadband.
Mr. Bowman responded that there was usually a delay as funding made its way through the state
governments and agencies, based on experience with the CARES and ARPA funding, and there
were no details at the time. He said there was $4.5 million from ARPA funding, and he hoped
there would be a dollar-for-dollar match from the state.
Mr. Bailey said that the FCC had published a broadband map, and judgment was based on areas
with one or fewer providers. He said that the areas with one or fewer providers often received
prioritization for federal funding. He said it would be interesting to see the cross reference with
the County from a GIS perspective.
Mr. Carrazana said he appreciated the discussion about the school improvements, five-year plan,
and priorities. He said there were other priorities outlined—water, sewage, and transit—and asked
if there was the same level of detail in terms of costs associated with those. He said the Crozet
Master Plan was recently approved and included several infrastructure needs. He said asked if
the same rigor was applied to the master plans and CIP that was applied to the schools. He asked
where the County was with getting the detail on the infrastructure needs.
Mr. Rapp explained that many of the projects in the master plans were dependent upon grant
funding cycles. He said that those projects included sidewalk, trail, and road improvements,
among other infrastructure improvements. He said that the first phase of planning the projects
included identifying them in the small area plans and corridor studies. He continued that the next
phase would vet the projects through engineering studies or additional ways to identify costs and
funding mechanisms. He said that once the funding mechanisms and costs were identified, then
15
Albemarle County Planning Commission
Final Minutes – November 16, 2021
the project could be brought to Mr. Bowman’s team to discuss how to best fund the project—
either through County funds, a state grant, a federal grant, or other sources. He said it took some
time to work through the details of the projects to ensure that once funds were committed, the
projects would be implemented. He said that projects were not as simple as drawing a line on a
map where a sidewalk should go, and there were several variables that needed to be considered
for each project.
Mr. Carrazana said he appreciated Mr. Rapp’s response, and perhaps his reference to Crozet
was incorrect. He continued that there had been infrastructure issues in the County for years. He
said that some of the issues were listed, from sewer to water to transit. He wondered if the County
was able to get the same level of detail in terms of costs prioritization for those projects as was
seen with the School Board. He said that the School Board’s needs for new schools and upgraded
infrastructure were real, but there were other important projects to address—broadband issues,
sidewalk issues, and ADA issues. He asked if there was more detail that was available in a
comprehensive CIP and if the data was available or could be made available.
Mr. Bowman responded that the data was available. He said that as the projects went through
the advisory committee, there would be estimates and timelines, among other details, provided.
He said that those details could be shared with the whole Planning Commission. He said that he
was thinking about what his team could present to help the Planning Commission provide input
during the FY24–28 CIP process. He thanked Mr. Carrazana for his statement.
Mr. Bivins said that part of the conversation had focused on what had happened to the funding
appropriated from the current and previous administrations. He asked if Mr. Bowman or a group
of people in the County were prepared to receive and utilize funds from the Build Back Better
plan. He said that his colleagues and Mr. Rapp had mentioned that there were projects that
aligned with that philosophy.
Mr. Bowman said that when ARPA funding was announced in the spring, an analyst’s position
was restructured to be focused full time on federal planning. He said that at the time, CARES
funding was wrapping up and ARPA funding had begun, and it was unsure what other funding
resources would be available. He said that the analyst was in touch with the national, regional,
and state organizations.
Mr. Bivins said that it would be helpful for Mr. Bowman to have a detailed conversation at a later
date with the Planning Commission about how the CIP integrated with what was presented, which
would be helpful as they began to think about the larger issues surrounding the comprehensive
plan. He said it would also be helpful to the community. He said that the Planning Commission
often heard about school capacity issues when there were large projects being considered. He
said that he sat on an unrelated advisory committee for the School Board, and he has said at
those meetings that it would be helpful if the School Board would say publicly what the plan for
capacity was. He said that the County’s expectations for housing capacity were partly contingent
on if the community knew that there would be space for the children to learn. He said that a lot of
misconceptions about school capacity were brought up during project reviews. He said that if a
School Board member was able to correct those misconceptions, many of the problems among
the community would be ameliorated.
16
Albemarle County Planning Commission
Final Minutes – November 16, 2021
Ms. Schmitt said that the most comprehensive document was the long-range planning report. She
said that the plan was dependent on funding, and the struggle of the School Board was that the
plans did not guarantee that the capacity would increase in the following years.
Mr. Bivins said that the School Board’s public affairs liaison should go to the community and the
press and explain what the plans were. He said that the feedback the Planning Commission
received felt uninformed of the plans for the school’s capacity. He said he would not open the
hearing for public comment and would leave the public comment to be addressed at the Board of
Supervisors meeting. He said that he assumed that Mr. Bowman had ways to receive public
feedback. He believed that the Commission had provided several requests for more details about
projects in terms of the connections to areas of concern and resources for Community
Development. He said getting responses would allow the backlog of permits to be lessened and
for big projects to be handled effectively and efficiently.
Mr. Bowman thanked the Commission. He said that the discussion and feedback was helpful for
the short-term and long-term. He said that if there was more interest in the County budget process
or financial policies, he and his staff were available to discuss the process on a fundamental level
outside of the regular meeting times.
Mr. Bivins thanked Mr. Bowman.
Comprehensive Plan and Zoning Ordinance Update
Mr. Bivins introduced the next work session, the comprehensive plan and zoning ordinance
update.
Mr. Rapp said that he would introduce the topic. He said that there were no specific presentation
materials and that it was early on in the planning stages, but it had been a while since the Planning
Commission received an update on the projects. He said that since the last work session, the
scope and an engagement approach of the comprehensive plan had been discussed with the
Board of Supervisors. He said that there was zoning ordinance work underway and that more
would come with the comprehensive plan update.
Ms. Tori Kanellopoulos said she would share slides and would be joined by Rachel Falkenstein.
Ms. Kanellopoulos said that there would first be an update on the comprehensive plan, followed
by an explanation of the goals and rationale for the update. She continued that the next part of
the presentation would cover the updated phasing plan for the project scope and timeline and the
phase 1 engagement plan for collaboration between community members, County staff, the
Planning Commission, and Board of Supervisors.
Ms. Kanellopoulos explained that the comprehensive plan established Albemarle County’s long-
range vision that guided growth, development, and change for the next 20 years. She said it
assisted County staff, committees, boards, and the Board of Supervisors when developing public
policies related to private land use activities and use of resources in Albemarle. She said it served
as the basis for land development regulations and decisions such as rezoning and special use
permits, capital improvements, County programs, and the distribution of County dollars to
programs and agencies. She said that the plan divided Albemarle County into designated
development areas, which were approximately 5% of the County or 35 square miles. She said
17
Albemarle County Planning Commission
Final Minutes – November 16, 2021
that rural areas were approximately 95% of the County or 695 square miles. She said that the
intent was to focus development in the urban areas to create quality living areas, avoid sprawl,
improve access to services, and protect the rural areas. She continued that each development
area had its own master plan.
Ms. Kanellopoulos said that the County staff presented a draft phasing plan and project budget
estimate to the Board of Supervisors during the February 3, 2021 and March 17, 2021 work
sessions. She said that the Board had expressed the desire for a more streamlined process to
allow concurrent work on the comprehensive plan and other high-priority projects. She said that
the County staff presented a revised draft phasing plan to the Planning Commission at a work
session on April 13, 2021. She said that the Commission had expressed support for a concurrent
comprehensive plan and zoning ordinance update.
Ms. Kanellopoulos said that the Board had held two work sessions to review updated
comprehensive plan materials. She said at an October 6, 2021 work session, the Board
expressed support for concurrent comprehensive plan and zoning ordinance updates. She said
at a November 03, 2021 work session, the Board adopted a resolution of intent for the
comprehensive plan update that included the updated phasing plan and phase 1 engagement
plan. She said that the Board requested more information on the working group, and more
information about the group would be discussed later.
Ms. Kanellopoulos said that it would be helpful to share details about the rationale for the
comprehensive plan update and why an update was appropriate. She said that since the 2015
comprehensive plan update, the County had undertaken substantial planning and policy
initiatives, and those efforts were not integrated into the existing comprehensive plan. She said
an example was that the Board of Supervisors had prioritized a strategic plan in the Fall of 2018,
which included climate action planning, economic development, infrastructure planning,
revitalization of aging neighborhoods, and expanded broadband access—all relevant to the
comprehensive plan. She said that several planning and policy efforts had been adopted by the
Board since 2015. She said that those included the Economic Development Office’s Project
ENABLE, the Climate Action Plan, and Housing Albemarle. She said that the Office of Equity and
Inclusion was created in 2018 to further the County’s commitment to provide the highest level of
public service and enhance the quality of life for all residents. She said that “community” was
subsequently added to the County’s organizational values, which stated: “We expect diversity,
equity, and inclusion to be integrated into how we live our mission.”
Ms. Kanellopoulos said that Albemarle was a growing community, as demonstrated by the
population growth over the previous decade and the number of residential units that had been
constructed the previous five years. She that according to the U.S. Census Bureau, Albemarle
County’s population increased by 10% from 2010 to 2019. She continued that the growth was not
uniform across the County. She said the Albemarle County Equity Profile, co-authored by the
Office of Equity and Inclusion and the UVA Equity Center, showed that over 37% of Albemarle
County households were ALICE—or Asset-Limited, Income-Constrained, Employed
Households—and an additional 9% of households were living in poverty, according to 2018 data.
She said that demand had increased for urban services and infrastructure, especially during the
pandemic with demand for public parks and broadband access.
Ms. Kanellopoulos said she would discuss the content of the existing comprehensive plan and
why an update was appropriate. She said an example was that the existing implementation
18
Albemarle County Planning Commission
Final Minutes – November 16, 2021
chapter included 70 priorities with no clear prioritization or order for completion. She said that the
chapter included 80 indicators of progress intended to be tracked annually, but tracking the data
was unsustainable. She continued that the number of indicators made it unclear what success
looked like to community members. She said that the comprehensive plan included inconsistent
and conflicting recommendations; examples were that different master plans had different land
use categories, and master plan language conflicted with comprehensive plan language. She said
that the inconsistencies made it difficult for the staff to evaluate development proposals and to
consider the plan’s content when making recommendations to the Board of Supervisors.
Ms. Kanellopoulos said that the County was undertaking multimodal system planning with the
Virginia Department of Transportation. She said it would allow urban street-types to be
constructed such as the ones found in downtown Crozet and in the recently adopted standards
outlined in the Rio/29 form-based code. She said that the state code provision required the
coordination of transportation planning with land-use planning and provided an opportunity to
integrate climate related initiatives.
Ms. Kanellopoulos stated that there was the opportunity to integrate the best practices that existed
in the County’s policies and plans. She said there was a variety of examples of successful and
award-winning planning efforts. She said those included Minneapolis 2040, which addressed
housing and affordability; Richmond 300, which focused on environmental justice, walkability, and
economic growth through clear priorities; and Memphis 3.0, which focused on flexibility and
enabling the growth of urban assets by reinvesting in areas of activity.
Ms. Kanellopoulos said that the comprehensive plan update was in support of the County’s
mission “to enhance the wellbeing and quality of life of all community members through the
provision of the highest level of service consistent with the prudent use of public funds.”
Ms. Kanellopoulos said that the project goals were listed on her slide and highlighted the rationale
for the update. She said that the first goal was to update the plan content to reflect County-wide
strategic initiatives such as climate action planning, economic development, and multimodal
transportation planning. She said that the second goal was to ensure that equity was integrated
into the engagement process and plan content, consistent with the County’s recently added
“community” organizational value. She said that the third goal was to improve plan usability by
articulating clearly prioritized goals, incorporating metrics for tracking progress, and applying a
modern, streamlined document design.
Ms. Kanellopoulos said that the updated phasing plan incorporated the feedback from the
Planning Commission and the Board of Supervisors and supported the project goals. She said
that the phasing plan outlined the four phases and the general timeline. She said that the project
started the 4th quarter of 2021 and was expected to conclude in the 2nd quarter of 2024. She
said that the plan also included concurrent zoning ordinance updates.
Ms. Kanellopoulos said that the current phase was phase 1, growth management policy and
framework. She said the phase included the review, evaluation, and update of the growth
management policy, using lenses of equity, climate action, and capacity projections. She said that
a capacity analysis for housing and economic development was underway to determine if there
was capacity for the projected growth. She said that the phase would align the comprehensive
plan with the County’s updated values, identify the level of detail that should be included in the
plan, and develop a framework approach. She said it was an opportunity to identify the content
19
Albemarle County Planning Commission
Final Minutes – November 16, 2021
and level of detail that should be included in the comprehensive plan, as well as what content
should be included in other County plans, such as the climate action plan or economic
development strategic plan. She said that the work in Phase 1 would provide a focused approach
for the subsequent phases.
Ms. Kanellopoulos said that the second phase was policy review and framework design. She said
that the goal was to identify major topics of the comprehensive plan, evaluate existing conditions
for the topics, and update policy statements, goals, and frameworks through the lenses of equity
and climate action. She said that anticipated topics included transportation, economic
development, land use, resource planning, and rural area planning. She said that the topics could
be adjusted based on work in phase 1 or feedback from the community. She said that phase 2
would include content from updated County plans and policies. She said community engagement
would be conducted especially for topics that needed significant updates; for example,
transportation would need more community engagement as the topic included the County’s first
multimodal systems plan.
Ms. Kanellopoulos said that phase 3 was strategy development. She said that the County’s action
steps and implementation approach would be reviewed during phase 3. She said that action steps
would be used to implement the policy goals for each major topic identified in phase 2. She said
that the existing comprehensive plan refers to the action steps as “the strategies.” She said that
priorities and metrics for each topic area were to be identified to allow for clear tracking of progress
and success.
Ms. Kanellopoulos said that phase 4 was the final draft review, and the full document would be
drafted during this phase based off the work from the previous phases. She said that efforts would
be focused to find and eliminate inconsistencies in the plan. She said that the community and
decision makers would be engaged on plan priorities. She said there would be a public hearing
process with the Planning Commission and Board of Supervisors for final adoption of the plan.
She said the hope was that after the four phases were completed, there would be an updated
comprehensive plan that achieved project goals, reflected the County’s strategic initiatives and
priorities, integrated equity, and identified community priorities and metrics for tracking progress.
Ms. Rachel Falkenstein said that she would discuss how the phase 1 engagement plan was
developed. She said that the approach for engagement planning was to scope engagement plans
for each phase of work as the process evolved. She said this would allow reflection and
responsiveness to community feedback on effective methods.
Ms. Falkenstein said she would discuss engagement goals that were crafted. She said that the
first goal was to conduct outreach and collaborate with community members whose perspectives
had not been historically represented in County processes, such as age, race, place, income, or
other demographic factors. She said that the second goal was to develop and implement a
transparent community engagement and decision-making process so that there was a clear
understanding of how feedback was used. She said that the third goal was to provide consistent
and varied opportunities for community input throughout the update process.
Ms. Falkenstein stated that best practices and examples from other localities were examined to
inform the engagement approach. She said that the engagement approach of the Minneapolis
2040 plan was used as an example. She said that Minneapolis completed a comprehensive plan
20
Albemarle County Planning Commission
Final Minutes – November 16, 2021
update in 2019 and at the beginning of the process had developed engagement goals. She said
the goals had allowed the planning to be intentional about the design of the engagement methods.
She said that the second planning effort researched was the Richmond 300 plan, which created
an advisory council to shape and review the content of the comprehensive plan as well as to build
awareness and encourage community participation. She said that the Richmond 300 plan had an
application for community members to serve on the council, and members were selected based
on community demographics such as age, ethnicity, race, and place of residence. She said the
American Planning Association, a professional association for urban planners, had adopted a
code of ethics that focused on how planners serve diverse groups and how to recommend
planning activities that integrated historic contexts, equity, and social justice.
Ms. Falkenstein stated that the engagement approach for phase 1 involved four major
components. She said that the flow chart to the left of the slide illustrated the main elements of
the County’s engagement approach. She said the approach included internal staff, working
groups, broad public engagement, and legislative review. She said each group would be
supported by in-person and online outreach and communication.
Ms. Falkenstein stated that the engagement plan called for the creation of a team of
interdepartmental leaders. She said the purpose of the team would be to coordinate planning
efforts across local government divisions and departments and to assist in gathering input on the
existing comprehensive plan and draft content. She said that external partners, such as the City
of Charlottesville and UVA, and service providers, such as Rivanna Water and Sewer Authority
and Albemarle County Service Authority, would support the team. She said that neighborhood
planning staff would prepare work products to include a background report with a summary of
existing conditions and a history of the comprehensive plan. She said the background report
would inform the process and serve as the foundation for educational materials. She said there
would be case study and precedent research on growth management and best practices to
produce a draft growth management policy.
Ms. Falkenstein reported that the working group was an 8-to-12-person group of community
members who would advise County staff on plan recommendations and community engagement
approaches, and support community outreach efforts by sharing information with community
networks, their neighborhoods, and their communities. She said the working group would meet
approximately once a month and would include staff-led training on fundamentals of urban
planning and community development content before beginning discussion of potential
recommendations with policy options. She stated that the goal of integrating these trainings was
to ensure that all members had a shared understanding and background information to inform the
subsequent discussions.
Ms. Falkenstein said that in alignment with the engagement goals for the process, County staff in
Planning, the Office of Equity and Inclusion, and in Communications and Public Engagement
would use the County demographic data and equity profile to design an application and a selection
process that was representative and inclusive of the County. She said staff had access to
workgroup resources from other localities, such as Richmond, as she spoke about earlier, and
the design efforts where they had used similar approaches in their design of the committee. She
noted that they were going back to the Board of Supervisors with information sharing about this
selection process in an upcoming Board meeting in December.
21
Albemarle County Planning Commission
Final Minutes – November 16, 2021
Ms. Falkenstein said the next topic of their engagement would focus on community workshops,
where the broad public engagement would come into play. She said they would provide a variety
of opportunities for community members to participate in the planning process through several
workshops. She said these would provide opportunities to learn about existing conditions in the
County and planning practices and for members of the community to provide input on potential
policies and conceptual plans and review draft policies and plans.
Ms. Falkenstein said the formats and methods for the community workshops would include a
variety of different content, topics, and designs. She said there would be virtual and in-person
events with presentations, videos, and activities. She said they also envisioned pop-ups and
roadshows at various locations throughout the County, online and paper questionnaires, artist or
collaborator-led engagement events, and in-person and virtual meetings for specific interests or
populations depending on the topic, with ongoing evaluation of engagement processes.
Ms. Falkenstein said that their last topic, legislative review, included engagement work with the
Planning Commission and the Board of Supervisors. She said they would facilitate work sessions
with both groups to review policy and planning options, existing conditions data, community
engagement summaries, and draft planning concepts and policies. She stated that work sessions
would be held with the Board at the start and end of each phase to review comprehensive plan
content and scope of work for the upcoming phase. She said the Planning Commission would
have more frequent work sessions, perhaps two or three per phase; they were planning at least
two for phase one.
Ms. Falkenstein said that all aspects of internal and external engagement would be supported by
a robust communications and outreach plan, including an online website hub that was consistently
updated with plan progress, upcoming engagement opportunities, summaries of past events, and
educational materials. She said County staff would also utilize existing County outreach and
communications tools, including the County newsletter via email, the social media accounts, and
the networks of their working group. She stated that materials and engagement opportunities
would be provided in both English and Spanish, with translation services for other languages
made available as was possible and needed. She said that additionally, County staff would be
available for one-on-one discussions in community outreach at reoccurring pop-ups at various
locations throughout the County.
Ms. Falkenstein said that she would finally discuss the rationale for this approach. She said it first
integrated the new organizational value of “community,” which stated that they expect diversity,
equity, and inclusion to be integrated into how they lived their mission. She said second was that
their engagement plan aligned with existing staff capacity and resources that the Board had
agreed to allocate to this project within the Community Development work program and budget.
She stated that third, the Board had stated the desire for a strategic update to the comprehensive
plan with a phased approach. She said based on the Board and Planning Commission feedback,
they had designed an engagement plan that offered the appropriate level of engagement to
support the stated goal of the comprehensive plan update and the engagement goals that
previously shared and the engagement goals that focused on resources and staff efforts on
achieving those goals.
Ms. Falkenstein said the next steps for this project were to refine the working group selection
criteria and process as she had mentioned. She said that would be a consent agenda item to the
Board in December for them to sign off on, and then they would begin outreach in trying to recruit
22
Albemarle County Planning Commission
Final Minutes – November 16, 2021
for the working group. She said they would continue working on their capacity analysis and
background research. She said in December of 2021, they would do outreach on the working
group and have a live application for members of the community to apply, and in January 2022
would be the public kickoff where they would begin the broad public engagement on the
comprehensive plan update.
Ms. Falkenstein said that there was now an opportunity to ask any questions there may be or to
share feedback, especially related to content they thought should be focused on in the update
process itself.
Mr. Bivins asked Ms. Falkenstein if she were looking for input from the commissioners on broad
topics, and if so, if they could pause that for tonight to give them some time to think about that
more rigorously, and then come back and wrestle with it. He said people probably had things they
wanted, but he knew there were two commissioners absent who would absolutely cherish the
opportunity to be engaged in that kind of thought process.
Ms. Falkenstein stated that it was meant as an information sharing for the Planning Commission,
but she was also open to suggestions if any came to mind as they were sharing that. She said
the phasing process itself in the phasing plan and the engagement plan had already been kind of
endorsed by the Board, and they had directed them to begin work on it, so there was not much
they could change on those big pieces right now. She said if there were details that came to mind
that should be focused on, they were definitely open to hearing that, and they could come back
at a later time, though they did have two work sessions planned for phase one to come back to
as well.
Mr. Bivins thanked her for that clarity.
Mr. Clayborne thanked Ms. Falkenstein for her presentation. He asked how fresh voices would
be brought onto the advisory committees to ensure that it was not the same people on everything.
Ms. Falkenstein said that was a good question. She said an answer had not yet been fully detailed,
but the staff was in the process of meeting with a team from the Office of Equity and Inclusion
and Communications and Public Engagement offices. She said she suspected there would be
targeted outreach to communities, a community engagement van would show up in
neighborhoods, and flyers would be distributed among other methods to get the word out.
Mr. Clayborne said he had forgotten about the van.
Mr. Randolph said he recalled that there were 52 meetings of the Planning Commission during
the previous deliberation and development process of the comprehensive plan. He said that two
years into that process, there was an election that resulted in many new members of the Board
of Supervisors. He said that the Planning Commission had provided a finished product to the
Board, and the Board had revised the comprehensive plan without significant consultation with
the Planning Commission. He said that the Commission had reviewed the final plan, but he did
not believe there was a lot of discussion.
He said that there was an election scheduled during the process for the current update to the
comprehensive plan. He said he was concerned that in the case of the election of a new Board,
the new Board would want to significantly revise the comprehensive plan. He said he wanted to
23
Albemarle County Planning Commission
Final Minutes – November 16, 2021
see provisions for opportunities for the Board to consult with the Planning Commission if the Board
desired to make significant revisions to the comprehensive plan. He said that he felt there was
disconnect between what the Planning Commission had believed to be the final project and what
the final product was after the Board had revised it. He said he was not criticizing the Board, and
he thought the plan was better from the involvement of the new supervisors. He continued that it
was difficult as Planning commissioners to have drastic revisions and not be included in the
process.
Mr. Keller said he remembered that time as Mr. Randolph had. He said that when he joined the
Planning Commission, most of the work on the comprehensive plan had been completed. He said
that the commissioners who had joined at the same time as the new Board members had little
input into the plan update. He said he thought there was a lot of doublespeak about equity and
inclusion. He said that the groups of people who had been excluded from County decision-making
processes were different from those who self-selected for these roles. He said that in
Charlottesville, there was a movement to have more diverse voices at the beginning of the
planning processes. He said that as the projects got closer to finalization, the traditional voices
that had been heard had felt excluded and started to have input. He said that he hoped the County
would provide a way for all the voices to speak to one another from the beginning. He said he
was not sure a large committee to represent everybody was the right approach. He said he did
not have an answer to that problem.
Mr. Bivins thanked the commissioners for their comments. He asked that there be time built in for
the commissioners and supervisors to sit together and discuss the plan now, not once the plan
had been nearly finalized, so that the discussion can be had before an endpoint was reached. He
said that the supervisors should be made aware of the request to have multiple discussions
between the Planning Commission and Board of Supervisors. He said that he hoped that a
working group could be created that avoided the tension that was experienced around the Crozet
Master Plan. He said it should be made clear who the decisionmakers were and that the working
group can offer opinions and observations, but the process was ultimately legislative, and the
decisions of the working group would not necessarily be included in the final plan. He said it was
important to set this tone to avoid a negative experience. He said he understood there would be
a time to sit down and talk with staff about the County’s plans.
Mr. Rapp said he believed those opportunities would present themselves. He said the discussion
was at a high level, and there was a lot to share about the process, phases, and topics. He said
policies would be reviewed in phase 1, such as the growth management policy. He said the
approach would help keep the County on track to prevent revisions to the final product. He said if
the policies and framework were agreed upon, then the community, Planning Commission, and
Board of Supervisors could work together to produce a final product.
Mr. Bivins said there were no more questions, so Mr. Rapp could begin his presentation on zoning
ordinances.
Mr. Rapp said that the zoning ordinances were undergoing a first phase called modernization. He
said two ordinances had been brought to the Commission through resolutions of intent that dealt
with density and waivers and special exceptions. He said two more were part of the category that
examined land uses, and the land uses for each zoning category would be consolidated into a
chart, and the uses would be simplified. He said that the current chart was 16 pages long with
very specific uses outlined.
24
Albemarle County Planning Commission
Final Minutes – November 16, 2021
Mr. Rapp stated that the setbacks would be reexamined. He said that the setbacks were
complicated, with multiple approaches in each zoning classification, and they should be made
clearer for people applying the ordinances. He said those topics would come before the
Commission soon. He said that development regulations such as landscaping, lighting, and road
standards, would be worked through as they were approached in the comprehensive plan. He
said a consultant would be hired to assist in examining the ordinances, and each topic would
come before the Planning Commission for input.
Mr. Bivins said there were no comments, and that since Mr. Rapp was just providing an update,
the meeting would keep moving. He asked if Ms. Falkenstein had gotten the feedback that she
needed. Mr. Bivins thanked Mr. Rapp for his work.
Committee Reports
Mr. Keller said he had updates from MPO Tech, stating that there was a needs assessment for
transportation that was a joint House Bill 542 and 2021 that passed. He said there were people
in various agencies working on the assessment, and there was a large transit equity component
in the assessment. He said the findings would be presented to the legislature at the next legislative
sessions. He said the fact that a former transportation secretary who had worked for Democrats
and Republicans was in the governor elect’s cabinet boded well for transportation. He said that it
would be useful to have the Smart Scale rating changes explained to the Commission.
Mr. Keller said he understood under the new scoring that the County would not have received
three of the projects it had received under Smart Scale. He said the projects would have likely
been funded because of the additional revenue, but it was detrimental to the areas that did not
have a large urban population. He said that besides changing criteria, shrinking the buffer may
benefit pedestrian and bicycle ways, but it could have a detrimental impact on the funding because
it looked at a smaller area and excluded potential points. He said there would be an interesting
payback to rural areas in the next administration, and new members would be appointed to the
transportation committee boards. He said that the new criteria would be approved while the
administration was in place and would be the standards for the next Smart Scale round.
Mr. Rapp said that Mr. Chuck Proctor would be the person to speak on the topic.
Mr. Keller said it was a 20-minute presentation, and he assumed the Commission would have
another 20 minutes of questions. He said there were staff shortages, so some of the studies were
to be pushed out longer.
Mr. Randolph said he thought it was a good idea for Mr. Proctor to speak to the Commission and
the Board of Supervisors at a joint meeting.
Mr. Bivins said that would be important. He said that the Commonwealth had focused on
chokepoints in traffic, and the chokepoints lined up where the infrastructure had not kept pace
with the population movements. He said that a presentation he heard stated that the
Commonwealth would be funding the places where people were stuck in traffic. He said that none
of the criteria made it seem like funding would be coming to the County, even though there was
commerce through I-64 and I-81. He said that the recalibration of Smart Scale was about how
people were stuck in cars.
25
Albemarle County Planning Commission
Final Minutes – November 16, 2021
Mr. Keller said that made sense, and the increased difficulty to get projects funded should be
considered.
Mr. Bivins asked if there were more committee reports. He then introduced the next agenda item.
Old Business/New Business
Mr. Bivins said there was new business. He asked if the Commission was meeting next week.
Mr. Rapp said that there were no public hearings scheduled at this time.
Mr. Bivins asked if any commissioner wanted to meet the next week. He asked to confirm that the
Commission did not need to vote to not meet.
Mr. Herrick said that if there was no business to come before the Commission, then there was no
need to meet.
Mr. Bivins said he did not have a calendar in front of him. He asked when the Commission should
meet again.
Mr. Rapp said the next meeting was on December 07, 2021. He said there were three public
hearings scheduled for that day. He there was another meeting on December 14. He said that
there were already requests for January and February public hearings. He said that scheduling
usually happened in January, but he might have to start earlier to accommodate the requests to
work through the volume. He said he might propose possible January meeting dates at one of the
December meetings before the 12-month calendar was finalized.
Mr. Bivins said that seemed fine.
Mr. Keller said that there was a statement made in the MPO Tech Committee about 1,700 new
homes that would come before the Planning Commission. He said that was primarily three
projects, and two of the projects fell under the category for significant VDOT review, implying the
opportunity for developer concessions that might alleviate the transportation issues that existed
or were exacerbated by the development. He said the County had had smaller projects where it
had not been able to get impact fees from the developers. He said that the number of houses was
over 2,000 when the Southwood development was added and did not include the North Pointe
development. He said that for all the talk of no housing, it was a lot of units.
Mr. Rapp said there was quite a bit at the southern and northern ends of the County, and the
amount on both ends was under review.
Mr. Keller asked if the number was closer to 4,000.
Mr. Rapp responded that he did not have the exact number. He said if some of the larger projects
were added together, the number would be in the 3,000 range.
Mr. Keller said there was so much pressure to build. He asked if it would be helpful to share what
developments were in the pipeline publicly.
26
Albemarle County Planning Commission
Final Minutes – November 16, 2021
Mr. Rapp said that most of the projects were rezonings, so they were not yet a pproved. He said
that the projects had been submitted and were under review. He said there was a community
meeting for Southwood coming up, and that had not been brought to the Commission. He said
there were other rezonings in various phases. He said that was part of the backlog that the
Commission would address over the next months.
Mr. Keller said that it would be interesting to show people the reality of the projects when people
claimed that there was no development taking place. He said it did not have to be site specific.
He said that he wanted to publicly announce what was in the pipeline for housing development.
Mr. Rapp said that could happen.
Mr. Bivins asked for additional business. He said that the Commission would not meet the
following week. He said that they would meet again on December 7. He told everyone to be safe.
Adjournment
The Planning Commission adjourned its meeting at 8:20 p.m.
_____________________________________
Charles Rapp, Director of Planning
(Recorded by Carolyn S. Shaffer, Clerk to Planning Commission & Boards; transcribed by Golden
Transcription Services)