Loading...
HomeMy WebLinkAboutSDP202200002 Correspondence 2022-01-10 (2)BOHLERI County of Albemarle Community Development Department 401 McIntire Rd, North Wing Charlottesville, VA 22902 Attn: Kevin McCollum Dear Mr. McCollum: 9100 Arboretum Parkway, Suite 360 Richmond, VA 23236 804.893.8200 January 10, 2022 Via Electronic Mail Re: SDP202100079 Initial Site Plan 1s' Review Response Multi -Family Residential Development Seminole Trail & Ashwood Blvd Charlottesville, VA 22911 Albemarle County BE # V192076 Bohler is pleased to submit on behalf of RST Development, LLC the Final Site Plan 1" Submission for the Multi -Family Residential Development in Charlottesville, Virginia. The following is our comment response letter addressing comments received from various departments. Each comment is addressed and responded to as follows: Plannina Services / Kevin McCollum Comment 1: [36.1(c)] County records show there is an outstanding initial site plan fee balance of $615.66. This fee will need to be paid prior to Friday, December 3, 2021 in order for the initial site plan to be approved. Response 1: Comment acknowledged. The outstanding balance has been resolved. Comment 2: [32.5.2(b) and 15.3] Will any of the dwelling units be subdivided into individual properties? If so, show lot lines and provide their dimensions on each proposed lot. Response 2: The dwelling units will not be subdivided. Comment 3: [32.5.2(i)] Please clarify the following: a. Private Road C is the only vehicular accessway within the site that is labeled as a private road. Please verify that this is being done in order to provide the inter parcel access to the adjoining property, as shown on the ZMA Application Plan. If so, a private street easement that grants access to the adjoining parcel needs to be recorded prior to the final site plan approval. b. Please verity that all other travelways are not intended to be either public or private streets. Response 3: a. Yes, Archer Ave (Private Road C) will provide inter parcel access. Comment acknowledged. b. No other travelways are intended to be private streets. w . BohlerEngineering.com Kevin McCollum BOHLERI Initial Site Plan 15' Review Response January 10,2022 Page 2 of 14 Comment 4: [32.5.2(a)] Revise the Parcel ID label on the Cover Sheet to state "Tax Map and Parcel Number" or simply "TMP." Please include a reference to both TMP 46-108 and TMP 46-109. Response 4: Sheet C-101 has been revised to state TMP 46-108 and TMP 46-109 Comment 5: [32.6.2(a)] Please include a placeholder for the Final Site Plan application number and include a reference to the Initial Site Plan application: SDP202100079. Response 5: A space was left under "RST Residences" on sheet C-101 for the Final Site Plan application number. The sheet also references SDP202100079 Comment 6: [32.5.1(c)] Provide setback lines on the Site Plan sheets. Response 6: Building setback lines are shown on sheets C-301 thru C-303. Comment 7: [32.6.2(a)] Provide the Site Data table shown on Sheet C-300 on the Cover Sheet. Response 7: Site Data has been provided on the cover as requested, see Sheet C-100. Comment 8: [32.6.2(a)] Paste a copy of the conditions associated with SE202000003 onto one of the general notes sheets. Response 8: SE 2020-00003 RST Residences Special Exception Conditions are shown on sheet C-102. Comment 9: [32.6.2(i)] Zoning approval of the proposed parking requirements and the provided layout is required prior to Final Site Plan approval. Response 9: Layout has been revised to meet county requirements. Please see sheet C- 300 thru C-303. Comment 10: [32.6.2(a)] Correct any reference to PID to TMP including labels for adjacent properties. Response 10: All references to PID have been corrected to TMP. Please see the cover sheet C-101 and demo sheets C-200 — C- 204 Comment 11: [General Comment] Please add the Site Review Committee (SRC) signature panel (attached) to the cover sheet. Response 11: The SRC signature panel added to sheet C-101 in the lower right corner. Comment 12: [32.5.2(k)(1), 32.6.2(g)] Any new easements required for water, sewer, drainage facilities, or any proposed utilities will need to be reviewed, approved, and recorded prior to final site plan approval. Please submit an easement plat application the County for review. The final site plan will need to be updated so that all easements are shown and labeled identifying easement type, whether it's public or private, a width dimension, and the recorded instrument with deed book and page number. Response 12: Comment Acknowledged. w . BohlerEngineering.com Kevin McCollum BOHLERI Initial Site Plan 15' Review Response January 10, 2022 Page 3 of 14 Comment 13: [32.7.9.7 (a)(3)] Please provide a construction detail in plan and profile view of the proposed dumpster enclosure. The detail should identify materials to be used, color, dimensions, etc. Response 13: A dumpster enclosure detail has been added to sheet C-902 Comment 14: [32.7.8 and 4.17] Lighting Plan a. [4.17.4 (a)] Provide manufacturer cut -sheets for all proposed outdoor luminaires. b. [4.17.4 (a)] All proposed outdoor luminaries exceeding 3,000 lumens must be full -cutoff fixtures. Please provide documentation from the manufacturers that all fixtures will be full -cutoff. c. Please state the pole height of all outdoor luminaires. d. [4.17.4 (b)] Please add a note to which states "Each outdoor luminaire equipped with a lamp that emits 3,000 or more initial lumens shall be a full cutoff luminaire and shall be arranged or shielded to reflect light away from adjoining residential districts and adjacent roads. The spillover of lighting from luminaires onto public roads and property in residential or rural areas zoning districts shall no exceed one-half footcandle." Response 14: a. Cut sheets have been provided. b. Note 2. on sheet C- 710 thru C-713 was added to reflect comment. c. The pole heights are stated on the Luminaire schedule on sheets C- 711 thru C-713. d. Note 2. on sheet C- 710 thru C-713 was added to reflect comment. Comment IS: [32.6.2(f)] Provide a typical street section for Private Street C (See Engineering comment is applicable). Response IS: Typical street sections for Archer Ave (Private Road C) can be found on sheet C-309. Comment 16: [General Comment] Final site plan must meet all other requirements of 18-32.6, 18-32.7, and 18-32.8 prior to final approval. Response 16: Comment acknowledged. Engineerina Services / John Anderson Comment 1: VDOT Road Design Manual, Appendix A(1), prohibits 'parking within 20 feet of any intersection measured from the curb return of the intersection.' Recommend remove parking proposed within 20-ft. of any VDOT Road Design Manual No parking zone. For example: Int. travelway A and private road C; travelway E and private road C. Ref. Appendix A(1), p. A(1)-77. Response 1: The parking along Archer Ave (Private Road C) has been updated so there is no parking within 20' of intersection curb return. The parking has been removed or shifted at the intersections of Archer Ave and Travelway A, Travelway B, Travelway D, and Travelway E. Dimensions have been added for clarity. See sheets C-302 and C-303. w . BohlerEngineering.com BOHLERI Kevin McCollum Initial Site Plan 1s' Review Response January 10, 2022 Page 4 of 14 Comment 2: Similarly, parallel parking is proposed coincident with curb return on travelway A, at entrance/exit to roundabout (Int. travelway B and travelway A). Recommend eliminate parallel parking proximate to roundabout on travelway A, both N and S of the roundabout intersection. Response 2: The parking has been shifted or removed at the intersection of Travelway A and Travelway B by the roundabout. Dimensions have been added for clarity. Please see Sheet C- 301 and C-303. Comment 3: C-501 a. Check match -line labels (recommend revise match -line sheet references to ref. C-503, C-501, etc.) b. Re -designation of steep slopes is a process not accomplished automatically by field run survey, or submittal of a site plan. Please see 18-30.7.4.b.1.h., and submit new topographic information for Engineering review. Submit a steep slopes exhibit. Response 3: a. The matchline references have been updated on all C-500s sheets. b. Comment acknowledged. Steep Slope exhibit will be provided under separate cover Comment 4: Remove proposed improvements (parking/travelway/s, or grading) located on preserved steep slopes unless such slopes are re -designated as non -steep by Albemarle county, via process outlined at 18-30.7.4. Response 4: Comment acknowledged. Improvements have remained for now, while the steep slope exhibit is under review. Steep Slope exhibit will be provided under separate cover for review. Comment 5: C400-C404 a. Add flow lines to storm pipes. b. Label all travelways. c. On either C-400 (Grading) or C-500 (Utility) series of FSP sheets, label all pipes and inlets. d. Provide VDOT LD-204 stormwater inlet computations. e. Provide VDOT LD-229 storm drain design computations. f. Provide storm profiles. g. With FSP, demonstrate compliance with storm runoff requirements at U.S. Rt. 29, where ISP proposes to increase runoff onto U.S. Rt. 29, without stormwater capture or conveyance. Response 5: a. All flow arrows for storm pipes are shown on sheets C-401 thru C- 404. b. All travelways have been labeled on sheets C-400 to C-404 c. All pipes and inlets are labeled on sheets C-400s (Grading) and C- 500s (utility). d. Storm inlet computations have been provided e. Storm drain comps have been provided f. Storm profiles can be found on sheet C-801 thru C-803 g. Inlet comps have been provided for the infrastructure on route 29 to show compliance. w . BohlerEngineering.com Kevin McCollum BOHLERI Initial Site Plan 15' Review Response January 1Q 2022 Page 5 of 14 Comment 6: C-500: Label all travelways. Response 6: The travelways have been labeled on sheet C-500 Comment 7: C-503 a. Compare proposed storm structure easement with Albemarle County Design Standards Manual easement diagram, p. 15, to ensure easement sufficient for installation and future maintenance. Link: httl)s://www.albemarle.org/Home/ShowDocument?id=270 Response a: Acknowledged — easements have been provided per the criteria laid out in the Design Standards Manual. b. Add flow lines to all storm pipes (C501-0503). Add flow lines to SWIM facility outfalls. Response b: Flow arrows were added to all storm pipes on sheets C-501 thru C-503. c. GIS indicates natural conveyance at approximate location of 80,000 cf SWIM facility proposed outfall, but this outfall must comply with state stormwater management regulations at 9VAC25-870-65 (water quality; VRRM.xls) and 9VAC25-870-66 (water quantity; energy balance at discharge to natural conveyance). Please ensure FSP is consistent with WPO Plan design. Response c: Acknowledged — plans have been revised to be consistent. d. Albemarle does not accept improvements within public drainage easement; i.e., retaining walls. Revised design (C-503) to remove pipe crossing beneath stepped retaining walls. Response d: Vault 1 has been updated so that the outfall does not run through the walls. Please se sheet C-503. e. Show /label existing drainage easement for existing storm line between Ex. Grate inlet (located along proposed 20,000 cf detention system outfall) and Ashwood Blvd. right-of-way. If easement does not exist, provide public drainage easement over existing elements of storm line on development parcel that lie beyond Ashwood Blvd. right-of-way. Response e: A drainage easement has been added to the outfall of the 20,000 cf system. Please see sheet C-502. f. Since design relies on existing storm elements, verify adequacy of existing storm pipes, grates, etc. Response f: Storm computations have been provided for the existing system, immediately downstream of the proposed improvements. g. Provide public drainage easement between proposed t20.000cf UG detention system (SWIM facility easement) and existing storm system (grate inlet). Response g: A drainage easement has been added to the outfall of the 20,000 cf system. Please see sheet C-502. h. Label easement over outfalls (storm pipes) downstream of SWIM facilities public drainage, and submit separate easement plat. Response h: The easements over the outfalls have been labeled as public drainage easements. Please see sheets C-502 and C-503. w . BohlerEngineering.com Kevin McCollum BOHLERI Initial Site Plan 15' Review Response January 10,2022 Page 6 of 14 i. Please check match -line sheet reference labels. Response is The matchline references have been updated on all C- 500s sheets. j. Note: Easement plate must be recorded prior to WPO Plan approval, and WPO plan must be approved prior to FSP approval. Response j: Comment Acknowledged Comment 8: C-403 a. Label underground detention system. b. Show /label SWIM facility easement. c. Avoid impact to currently mapped preserved steep slopes; impact appears imminent with proposed retaining wall design. Applies to other design elements and grading, C-401, C-402, as well. If field run survey indicates topography flatter than 25%, comment will be withdrawn provided applicant coordinates survey with Engineering (slopes exhibit /survey data submittal required). d. Acquire temporary off -site construction or permanent grading easement, as needed, to construct proposed retaining walls along southern parcel boundary. Applies to C-401, C-402, as well, where proposed grading or improvements may require temporary or permanent easement beyond development parcel boundary. Response 8: a. Vault 1 has been labeled on sheet C-403 b. Vault 1 easement has been labeled on sheet C-403 as "10' SWM facility easement" c. Acknowledged — steep slope exhibit will be submitted under separate cover for review. d. It is intended for all construction to take place within the proposed LOD and property boundary as indicated on the grading plan, including the retaining wall construction. Comment 9: C-402 a. Label SWIM facility easement b. Provide /label public drainage easement over SWIM facility outfall pipe. Response 9: a. Vault 2 has been labeled on sheet C-402. b. A public drainage easement has been added and labeled to the outfall pipe of Vault 2 Comment 10: C-401 a. Provide capture for runoff from entrance to this development, at U.S. Rt. 29, since approximate 8' vertical grade break sends uncaptured runoff into U.S. Rt. 29 NBL. b. Resolve apparent conflict between CG-12 and inlet on E side of roundabout (Int. travelway A-travelway B). c. Provide spot elevations to ensure positive drainage to inlets, especially grate inlets in pavement (travelway E, for example). Response 10: a. System is being analyzed, however currently unable to capture the runoff here due to the depth of the proposed system b. The inlet has been changed to a manhole and has been out of the ramp. wewv. BohlerEngineering.com Kevin McCollum BOHLERI nitial Site Plan 15' Review Response January 10, 2022 Page 7 of 14 c. Comment acknowledged, and the grading plan has been updated to include grading plan spot elevations. Comment 11: C-305 a. Proposed Road A/Rt. 29 sight distance (left) vertical separation between sight line and U.S. Rt. 29 pavement appears to be < 0.25'. If as -built condition prevents 680' sight distance left, the intersection of Road A / Rt. 29 may require constructive revision prior to zoning (or road plan) bond release, or VDOT acceptance of this entrance onto U.S. Rte. 29 NBL. Response 11: a. Comment Acknowledged. Comment 12: C-303 a. Unless overlooked, please provide paver detail and curb transition detail (Private Road C). b. Recommend remove 6 parking spaces at east end of private road C, 3 spaces north and south of 6.7' R curb bullnose to enhance visibility and safety for operators reversing from these six spaces, and for vehicles approaching on private road C. Response 12: a. Details have been provided for pavement material. b. The 6 spaces near the end of Archer Ave (private road C) have been removed. Please see sheet C-303. Comment 13: C-302 a. 4.5' sidewalk width near retaining wall is insufficient; provide Min. 5' sidewalk width. b. Provide guardrail for parking spaces that face retaining walls. c. Provide /label street name signs for internal travelways. Response 13: a. The sidewalk has been updated to be more than 5'. The retaining walls have also been removed from this area. b. The walls on sheet C-302 have been removed. Guardrail has been added to sheets C-301 and C-303 where parking spaces face retaining walls. c. Street name signs have been added at the roundabout, the intersection of Seminole Trail and Travel Way A, the intersection of Ashwood Boulevard and Archer Ave (Private Road C), and the intersections of Archer Ave (Private Road C) and Travelways A, B, D, and E. Comment 14: C-301 a. Provide roll-top curb at roundabout at proposed grass paver fire access since CG-6 may limit clearance for fire apparatus. b. Provide roll-top -to -CG6 curb transition detail. Response 14: a. A label was added to call out roll top curb at fire access. B. Detail has been added. w . BohlerEngineering.com BOHLERI Kevin McCollum Initial Site Plan 1s' Review Response January 10, 2022 Page 8 of 14 Comment 15: C-301 — C-303 (C301-C-304) Note: certain comments may be duplicative.] a. Provide sealed geotechnical drawings for retaining wall height > 4-ft. b. Label all traffic control signs (No parking, stop, speed limit, etc.). c. Recommend against curb radii < 3'. Recommend curb wipe -down for radii < 3'since such tight radii susceptible to damage, or rapid deterioration. (see Roundabout, for example). d. Label curb type/s, incl. CG-12. e. Show /label attached unit drive /garage entrance curb radius. Response 15: a. Comment acknowledged — plans will be provided under separate cover. b. Signs have been labeled — see site plan sheet C-400. c. All radii have been updated to be at least 3'. d. Curb types have been labeled. See typical labels on sheets C-301 thru C-303. e. Radii have been added and labeled. Comment 16: C-200: Provide deed bk.-pg. reference for Ashwood Blvd. right-of-way. Response 16: Existing conditions have been updated accordingly. Building Inspections / Betty Slough Comment: Add the following note to the general notes page: 1. Retaining walls greater than 3 feet in height require a separate building permit. Walls exceeding 4 feet in height require a stamped engineered design also. Walls require inspections as outlined in the USBC. 2. Accessible parking spaces, access isles, and accessible route shall be installed in accordance with ICC ANSI A117.1-09 and the 2015 Virginia Construction Code. 3. Where the flood level rims of plumbing fixtures are below the elevation of the manhole cover of the next upstream manhole in the public sewer, the fixtures shall be protected by a backwater valve installed in the building drain, branch of the building drain or horizontal branch serving such fixtures. Plumbing fixtures having flood level rims above the elevation of the manhole cover of the next upstream manhole in the public sewer shall no discharge through a backwater valve. 4. All roof drains shall discharge in a manner not to cause a public nuisance and not over sidewalks. 5. Buildings or structures built before January 1, 1985 must have an asbestos survey performed in order to apply for a demolition permit. Asbestos removal permits are required if positive for such from Albemarle County and VDOLI. Contact VDOLI for their additional requirements and permits for demotion projects at 540-562-3580 x131. 6. All water, sewer and fire lines require NEW inspection and testing procedures. The ACSA performs any testing and inspections of the public sewer and water main(s). The Albemarle County Building Inspections Department (ACBID) does a visual inspection and witnesses the testing of the building drain, water service pipe and the sprinkler lead- in connection. The developer/contractor is responsible to retain a Special Inspector as outlined in the updated Albemarle County Policy for Site Utilities to perform the visual inspection and testing of all utilities not covered by the ACSA or ACBID. This includes building sewers, water and fire line branches between the main and the meter(s)/building(s). The Special Inspector's report must be submitted and approved by w . BohlerEngineering.com Kevin McCollum BOHLERI Initial Site Plan 15' Review Response January 10, 2022 Page 9 of 14 the Albemarle County Engineering Department prior to a Certificate of Occupancy being issued. Note to developer: Due to required distances from lot lines and structures as required by the NFPA, underground propane tanks may be prohibited. Plan accordingly. Response: Building Inspection notes have been added to sheet C-102. Information Services (E911) / Elise Kiewra Comment 1: Travelways A,B,C,D,E, will all require a road name. If travelway C will eventually connect/ have an intersection with Archer Ave it will have to named Archer Ave. Response 1: Private road C has been labeled as Archer Ave. Future roads names will be finalized prior to next submission. Service Authority / Richard Nelson Comment 1: Submit a PDF and 2 hard copies of the utility plan and water/sewer data sheets to ACSA. Response 1: Acknowledged. Water/data sheets will be submitted under separate cover. Comment 2: RWSA sewer capacity certification will be required. Response 2: Comment Acknowledged Comment 3: RWSA will need to approve the proposed water main connection. Response 3: Comment Acknowledged Comment 4: The offsite sewer easement will need to be recorded with the Clerk's Office prior to utility plan approval. ACSA will need to review and approve the draft deed and plat prior to recordation. Response 4: Comment Acknowledged Architectural Review Board / Margaret Maliszewski Comment 1: This plan will be reviewed by the ARB on November 15, 2021. ARB action letter/comments will be provided after that meeting. Response 1: Comment acknowledged. We have received the ARB comments and will be resubmitting shortly. Department of Transportation / Adam Moore Comment 1: Please provide Auto -TURN diagrams for both entrances to demonstrate that 13' lane widths will allow vehicles to turn into the development. Response 1: Please see sheet C-308 for the Auto -Turn diagram which shows a fire truck through the site. Comment 2: Provide vertical profiles for both entrances. Response 2: Vertical profiles have been added as requested. w . BohlerEngineering.com BOHLERI Kevin McCollum Initial Site Plan 1s' Review Response January 10, 2022 Page 10 of 14 Comment 3: Show a "Keep Right" sign (R4-7) at the beginning of the entrance median at Ashcroft Dr. Response 3: A "Keep Right" sign was added at the median on Ashwood Boulevard, on both sides of the entrance median on Archer Ave, and at the intersection of Seminole Trail and Travelway A. Comment 4: The left -turn lane from Ashcroft Dr. needs at least 100' of taper. If there is not enough room to build this, it will require a Design Waiver. Response 4: The left turn lane on Ashwood Boulevard has been updated to have a 100' taper. Comment 5: The sight -distance -left profile for the entrance on Rte 29 comes as close as 3" to the proposed ground. Tolerance this tight is impractical for highway construction. Sight -distance -left will be checked before the applicable land -use permit is closed. Response 5: Comment Acknowledged. Comment 6: The sight -distance -right for the entrance on Ashwood Blvd looks onto a 4-lane divided highway. Redraw the sight -distance -right line and profile using the proper distance from Table 2-5 of Appendix F of the Road Design Manual. Response 6: The sight distance right for the entrance on Ashwood Blvd extends until it gets to the T intersection on Seminole Trail. Comment 7: The sight -distance lines for the Ashwood Blvd entrance appear to be hidden from view on Sheet C-306. Please change the view settings so they are visible and reprint. Response 7: The sight distance line is now shown in plan view on sheet C-306. Comment 8: Please show limits of mill and overlay in full lane widths required to complete this work on plans, ensuring compliance with Standard Drawing WP-2. Response 8: Mill and overlay limits are shown on sheets C-301 thru C-304 Comment 9: Note that the final plan must show conformance with the VDOT Road Design Manual Appendices B(1) and F, as well as any other applicable standards, regulations or other requirements. Response 9: Comment acknowledged. w . BohlerEngineering.com BOHLERI Department of Health / Alan Mazurowski Kevin McCollum Initial Site Plan 1s' Review Response January 10, 2022 Page 11 of 14 Comment 1: The plan proposes to utilize public water & sewer systems for the new construction. There does not appear to be any existing private wells that would be affected according to both the site plan and VDH records. Our records are spotty, but there does appear to be a number of existing septic systems that served the former trailer park. Number of systems and their locations are not documented. Therefore, I recommend that verbiage be added to the plan to indicate that any septic tanks that are encountered be abandoned in accordance with VDH policies and procedures. Response 1: This note was added as note 3 under "Demolition Notes" on sheets C-200 thru C-204. Department of Fire Rescue / Howard Lanomarsino Comment 1: The plans indicate allowable building height of up to 65 feet. An emergency/fire vehicle access road/route needs to provide an unobstructed travel way width of 20 ft. if buildings/structures are under 30 feet tall and 26 ft. on at least one side if buildings /structures are over 30 feet tall. Response 1: Archer Ave (Private Road C), Travelway B, and the parking lot on the east side of Building 2 have been widened to 26' outside of parking to provide a fire lane. Please see sheets C-301 thru C-303 for dimensions. Comment 2: Where widths are such that parking will obstruct to minimum trave way width, no parking markings/signs are required Response 2: Acknowledged. Comment 3: Emergency/fire vehicle access roads need to be clear of overhead obstructions at 13 ft 6 in. and below. This includes trees and other natural obstruction. Response 3: Acknowledged. Notes have been added to the plan to limb trees as appropriate. Comment 4: To accommodate fire apparatus, turn radii serving fire apparatus access must be a minimum of 25ft., unless it is demonstrated in a suitable fashion that fire apparatus can negotiate a proposed radius (for the calculation our ladder truck is 47 feet long with a 21 ft 42 in wheel base) Response 4: Turning Radii have been updated to a min of 25' as requested. Comment 5: Road grade cannot exceed 10%. Response 5: The maximum grade on all Travelways is 10% along Travelway B near the intersection with Archer Ave. Comment 6: Provide a note on the plans of the required ISO fire calculation for the buildings. Response 6: Note has been added. Comment 7: Indicate on the plan the ACSW flow test to ensure adequate fire flow per calculation in comment # 6 Response 7: Fire flow test being coordinated at time of submission. w . BohlerEngineering.com BOHLERI Kevin McCollum Initial Site Plan 1s' Review Response January 10, 2022 Page 12 of 14 Comment 8: As determined by calculations in # 6, provide the number of hydrants with spacing in accordance with the required fire flow calculation (This generally starts at 500 feet and arranged so that no building is more than 250 feet from a hydrant, but the distances are further reduced as the required fire flow increases). Response 8: Fire hydrants have been added per design. Comment 9: In areas without buildings, hydrant spacing is required every 1000 ft to accommodate transportation emergencies. Response 9: Comment Acknowledged. Comment 10: If fire suppression systems or standpipes are installed the FDC must face the road, on address side and there needs to be hydrant within 100 ft. of the FDC, arranged so that when hydrant and FDC are in use for emergency operations, hose does not obstruct travel way. Response 10:Comment acknowledged. Rivanna Water and Sewer Authority / Victoria Fort and Dvon Vega Comment 1: All materials and methods of construction shall comply with the latest version of the General Water and Sewer Design and Construction Standards — Version 1.0, adopted in December 2015, except as modified below or modified in special notes. Response 1: The Rivanna Water & Sewer Authority (RWSA) General Water & Sanitary Sewer Notes have been added to sheet C-102. Comment 2: RWSA shall approve all construction materials and methods of construction. A preconstruction conference shall be held with RWSA prior to the start of any work. Response 2: The Rivanna Water & Sewer Authority (RWSA) General Water & Sanitary Sewer Notes have been added to sheet C-102. Comment 3: The contractor shall be responsible for notifying Miss Utility (1-800-552-7001). Response 3: The Rivanna Water & Sewer Authority (RWSA) General Water & Sanitary Sewer Notes have been added to sheet C-102. Comment 4: RWSA Engineer (Victoria Fort at (434) 977-2970 ext. 205) shall be notified three business days prior to the start of construction. Response 4: The Rivanna Water & Sewer Authority (RWSA) General Water & Sanitary Sewer Notes have been added to sheet C-102. Comment 5: All work is subject to inspection by RWSA staff. No tie-ins to the existing system shall be made without coordination with and the presence of RWSA staff. No work shall be conducted on RWSA facilities on weekends or holidays without special written permission from RWSA. Response 5: The Rivanna Water & Sewer Authority (RWSA) General Water & Sanitary Sewer Notes have been added to sheet C-102. w . BohlerEngineering.com BOHLERI Kevin McCollum Initial Site Plan 1s' Review Response January 10, 2022 Page 13 of 14 Comment 6: For sanitary sewer line construction: RWSA may require bypass pumping for tie- ins to the existing system. All doghouse manholes must be pressure -tested before a connection is made to the system. Response 6: The Rivanna Water & Sewer Authority (RWSA) General Water & Sanitary Sewer Notes have been added to sheet C-102. Comment 7: The location of existing utilities as shown on the plans is from data available at the time of design and is not necessarily complete or accurate. The Contractor shall be responsible for the verification of the location, size and depth of all existing utilities, both surface and subsurface. The Contractor shall immediately notify the Engineer of any discrepancies between the plans and field conditions. The Contractor shall use due diligence to protect all utilities and structures from damage at all times, whether shown on the plans or not. Damage to any existing utilities shall be repaired by the Contractor to the original condition at no additional cost to the Owner. Response 7: The Rivanna Water & Sewer Authority (RWSA) General Water & Sanitary Sewer Notes have been added to sheet C-102. Comment 8: Erosion and sediment control facilities shall no be permitted in the RWSA easement without special written permission from RWSA. No grading shall be permitted in the RWSA easement unless permitted otherwise by RWSA in writing. Response 8: The Rivanna Water & Sewer Authority (RWSA) General Water & Sanitary Sewer Notes have been added to sheet C-102. Comment 9: No blasting shall be permitted within 100 feet of RWSA facilities without written permission and RWSA approval of the blasting plan. Ground monitoring during blasting and a pre -blast survey may be required. For blasting within 100 feet of any operative RWSA sewerlines, bypass pumping and/or pre- and post -CCTV may be required. RWSA may also require certification from a licensed professional engineer stating that the proposed blasting will not damage any RWSA facilities. Damage to any utilities due to blasting shall be repaired by the Contractor to the original condition at no additional cost to the Owner. Response 9: The Rivanna Water & Sewer Authority (RWSA) General Water & Sanitary Sewer Notes have been added to sheet C-102. Comment 10: The contractor shall observe minimum separation requirements for utility crossings. When a crossing is made under an existing facility, adequate structural support shall be provided for the existing pipe. The area of the crossing shall be backfilled with compacted 57 stone to the springline of the existing pipe. Response 10: The Rivanna Water & Sewer Authority (RWSA) General Water & Sanitary Sewer Notes have been added to sheet C-102. w . BohlerEngineering.com BOHLERI Kevin McCallum Initial Site Plan 1st Review Response January 10, 2022 Page 14 of 14 Comment 11: New water main installations shall be pressure tested, chlorinated, flushed and have water samples approved prior to making any permanent connection to the public water system. Approved methods of filling and flushing new water mains will be required to prevent any contamination of the public water system. Response 11: The Rivanna Water & Sewer Authority (RWSA) General Water & Sanitary Sewer Notes have been added to sheet C-102. Comment 12: All easements for new RWSA facilities shall be recorded prior to placing the new facilities into service. Response 12: The Rivanna Water & Sewer Authority (RWSA) General Water & Sanitary Sewer Notes have been added to sheet C-102. Comment 13: No permanent structural facilities will be permitted in the RWSA easement. This includes building overhangs, retaining walls, footers for any structure, drainage structures, etc. Response 13: The Rivanna Water & Sewer Authority (RWSA) General Water & Sanitary Sewer Notes have been added to sheet C-102. Comment 14: Trees are not permitted in the RWSA easement. Response 14: The Rivanna Water & Sewer Authority (RWSA) General Water & Sanitary Sewer Notes have been added to sheet C-102. Should you have any questions regarding this project or require additional information, please do not hesitate to contact me at (804) 893-8200. Sincerely, Bohler Engineering VA, LLC Ryan Yauger, P.E. RY/em H:\19\Vl92076\Administrative\Letters\211122 Initial Site Plan 1st Response RST CRL.doc w .BohlerEngineering.com