Loading...
HomeMy WebLinkAboutZMA201600015 Correspondence 2016-06-30 Johnathan Newberry From: Johnathan Newberry Sent: Thursday, June 30, 2016 7:01 PM To: Robbie Gilmer Subject: RE: 3pm, Room B, Mandatory Pre-app meeting on Oakleigh ZMA Attachments: Mandatory Pre-app Comments for Oakleigh Rezoning Amendment; TMP 45-26A Oakleigh proposed plan Sheet 1.pdf Hey Robbie, I meant to get with you at our pre-app on Monday about Oakleigh. I had to send out the attached comments by today, but page one of the attached . df shows their proposal. One question: J.T. From: Robbie Gilmer Sent:Tuesday,June 21, 2016 2:11 PM To:Johnathan Newberry<jnewberry@albemarle.org> Subject: RE: 3pm, Room B, Mandatory Pre-app meeting on Oakleigh ZMA J.T. I was heading to the pre-app meeting yesterday when I was called to a structure fire out in Keswick. Did anyone have any questions for me? Robbie Sent,from my Verizon Wireless 4G LTE Droid On Jun 17, 2016 11:36 AM, Johnathan Newberry<jnewberry@albemarle.org>wrote: Just to further clarify, I divided the questions into what I believe are the most applicable divisions. Please don't feel the need to send me anything ahead of the meeting(unless you want to), but my plan is to use a portion of the meeting time to run through drafted answers to these questions. Thanks. Planning: 1. Can a by-right reduction be applied to any cash proffers (existing or prop 1 3. Can we apply for a Site Plan Amendment following the Rezon whole new Site Plan application process? 9. Do we need to designate SP in our Permitted Uses or what fa Planning + Housing: 2. How will the affordable housing policy effect this project wit Planning, Engineering, Fire/Rescue(?): 4. Do our roads need to be public or can they be private particu townhomes? Planning and Zoning: 5. Is the approved Riverside Village Rezoning submittal a suitab our existing format? The difference being their COD is includ was originally a separate document. 6. In terms of expediting the required Rezoning/SP, recommenc County review? 10, Are there things we can do now (i.e. submit individual COD va lot requirements, etc) to speed things up so they don't slow u: 2 Planning, Zoning and Engineering: 7. Are the proposed allowable uses acceptable and/or will any c rezoning process? See the following Permitted Uses table. 11. Does a Block Plan make sense now? If not, how would it best Engineering: 12. If the GIS shows critical slopes on site but our topography dol need a critical slopes waiver? Zoning: 13. Do we need to submit our tree bond now if we are rezoning. we are planning to save at this point? From: Johnathan Newberry Sent: Friday, June 17, 2016 10:54 AM To: Ron Higgins<rhigginsAalbemarle.org>; Michael Vieira<mvieira(a serviceauthority.org>; Robbie Gilmer <rgilmer@albemarle.org>; Margaret Maliszewski <MMaliszewski@albemarle.org>; Moore,Adam PE (VDOT) <Adam.Moore@,vdot.virginia.gov>; 'Deel, Justin(VDOT)'<Justin.Deel(a�vdot.virginia.gov>; Frank Pohl<fpohl@albemarle.org>; Matthew Wentland <mwentland@albemarle.org> Cc: Elaine Echols<EECHOLS@albemarle.org> Subject: 3pm, Room B, Mandatory Pre-app meeting on Oakleigh ZMA 3 All, I would like to quickly draw your attention to the 13 questions on page 3 of the pre-app narrative. I think I can address many of these questions,but there are some where I will need your input and others that are best answered by a different division. Just wanted to put it on your radar screen. I have large paper copies on the plans in my office if anyone would like to see them ahead of Monday afternoon. Thanks, J.T.Newberry Planner County of Albemarle, Planning Division 434-296-5832, ext. 3270 4 In addition, we would like answers to the following questions: 1. Can a by-right reduction be applied to any cash proffers (existing or propose( ?. How will the affordable housing policy effect this project with the proposed 3. Can we apply for a Site Plan Amendment following the Rezoning or do we ne whole new Site Plan application process? 4. Do our roads need to be public or can they be private particularly with the pr townhomes? 5. Is the approved Riverside Village Rezoning submittal a suitable format to folk our existing format? The difference being their COD is included in their plan s was originally a separate document. 6. In terms of expediting the required Rezoning/SP, recommend how we can be County review? 7. Are the proposed allowable uses acceptable and/or wIN any create dif'ficultie! rezoning process? See the following Permitted Uses table. 8. Are the Questionable Uses (highlighted in red) exemplified in the chart accurc the use? 9. Do we need to designate SP in our Permitted Uses or what falls under the Cot 10. Are there things we can do now (i.e. submit individual COD variations regardii lot requirements, etc) to speed things up so they don't slow us down later? 11. Does a Block Plan make sense now? If not, how would it best be configured? 12. If the GIS shows critical slopes on site but our topography doesn't how is that need a critical slopes waiver? 13. Do we need to submit our tree bond now if we are rezoning? Can we submit we are planning to save at this point? 5