Loading...
HomeMy WebLinkAboutZMA201600015 Review Comments 2016-08-22 Johnathan Newberry From: Alexander Morrison <amorrison@serviceauthority.org> Sent: Monday, August 22, 2016 1:59 PM To: Johnathan Newberry Cc: Robbie Gilmer Subject: ZMA201600015: Oakleigh JT, I have reviewed the above referenced ZMA and have the following comments: • Water/sewer construction plan submittal to the ACSA will be required at the final site plan stage. • Water and sewer infrastructure will be reviewed during the construction plan review. • Additional fire hydrant coverage on site will be required (Fire/Rescue will comment on proper spacing and placement). • A master meter will be required for the assisted living building. • Water service will be supplied through the Stillhouse pressure band. • A grease interceptor will be required. • RWSA Wastewater Capacity Certification may be required at the final site plan stage. If required the ACSA will file for this certification. I have CC'ed Robbie Gilmer because he will handle fire hydrant placement and density for the site (I am not familiar with the requirements for an assisted living building). None of the comments above affect our position on the ZMA so I hereby recommend approval of ZMA201600015. Alexander J. Morrison, P.E. Civil Engineer Albemarle County Service Authority 168 Spotnap Road Charlottesville,Virginia 22911 (0)434-977-4511 Ext. 116 (C) 434-981-5577 (F)434-979-0698 1