HomeMy WebLinkAboutZMA201600015 Staff Report 2016-09-19 ARCHITECTURAL REVIEW BOARD STAFF REPORT Project#/Name ARB-2016-104: Oakleigh Rezoning Amendment Review Type Conceptual review for an amendment to a Rezoning Parcel Identification 045000000026A0 Location On the south side of Rio Road West,across from Woodburn Road Zoned Neighborhood Model District(NMD)/Entrance Corridor(EC) Owner/Applicant Oakleigh Albemarle LLC/Edwards Design Studio(Steve Edwards) Magisterial District Rio Proposal To amend a rezoning(the previously approved proffers,Code of Development and Application Plan)to allow an assisted living facility on the rear half of the site. Context The site is located on Rio Road West,across from Woodburn Road.To the west of the site is the Garden Spot nursery.To the east is Berkmar Crossing, a 1-,2-and 3-story office/retail development.A small townhouse development is located across Rio Road to the north.The Charlottesville Health and Rehab Center and the Berkeley subdivision are to the south.The parcel consists of open pasture fronting the EC,with a mature wooded area beyond. Visibility Buildings A and B fronting the EC will be clearly visible from the EC. Building C and the townhomes block will have less visibility.Building D,due to its size and its position on the high point of the parcel,will also be visible. ARB Meeting Date September 19,2016 Staff Contact Margaret Maliszewski 1 PROJECT HISTORY The site was previously occupied by a small farmstead-one of the last remaining historic farmsteads in the County's development areas. It consisted of a turn-of-the-century wood frame farmhouse,a barn,and outbuildings. A demolition permit was approved for the site in 2005.The farm buildings were located in the midst of an oak `leigh' (meaning oak meadow in Old English)on the upper part of the property. Several of these trees still stand.The ARB has reviewed several applications for development of the parcel,as outlined in the table below. DATE APPLICATION/REVIEW TYPE RESULT 9/6/2005 ARB-2005-100: Oakleigh Townhomes 11/7/2005 ARB-2005-126: Oakleigh Townhomes The ARB provided preliminary comments on a preliminary plan to construct 52 townhomes. 3/6/2006 ARB-2006-08: Oakleigh Townhomes 9/17/2007 ARB-2007-56: Oakleigh Farm The ARB completed an advisory review of a rezoning proposal for 101 dwelling units and up to 28,000 sf of commercial uses. 02/02/2009 ARB-2008-177: Oakleigh The ARB completed a preliminary review of a site plan implementing the 2007-08 rezoning. 11/10/2009 ARB-2009-19: Oakleigh The ARB reviewed and approved a final site plan with conditions; a C of A was issued. PRIMARY CHANGES TO THE PLAN • The back/upper half of the site has been reconfigured to accommodate an assisted living facility(Building D). • The tree preservation area has been reduced in size. • Buildings D—I,K and L have been eliminated. • Building C has been shifted behind Building B and reduced in size. • Stormwater facilities have been reconfigured. • Two pocket parks have been added. 2 ANALYSIS REF GUIDELINE ISSUE RECOMMENDATION Structure design 1 The goal of the regulation of the design of development Architectural designs have not been When architectural plans within the designated Entrance Corridors is to insure that submitted with the rezoning application. are submitted for review new development within the corridors reflects the traditional However,the applicant has indicated that with the site plan submittal, architecture of the area.Therefore,it is the purpose of ARB the design of Buildings A and B (the Block address the following review and of these Guidelines,that proposed development 1 and 2 buildings that front the Entrance issues: within the designated Entrance Corridors reflect elements of Corridor)is not intended to change from design characteristic of the significant historical landmarks, what was previously approved by the ARB. The design of buildings in buildings,and structures of the Charlottesville and These buildings have two lower levels of the development should Albemarle area,and to promote orderly and attractive retail/office space and an upper level of exhibit compatibility in development within these corridors.Applicants should note residential units for a total of three stories. form,character and that replication of historic structures is neither required nor materials. desired. Building C in Block 3 is proposed as a two- 2 Visitors to the significant historical sites in the story commercial building.Block 4 includes Show how the form and Charlottesville and Albemarle area experience these sites as a row of townhouses.The buildings in both massing of Building D ensembles of buildings,land,and vegetation. In order to of these blocks will have reduced visibility result in an appropriate, accomplish the integration of buildings, land,and vegetation from the Entrance Corridor,but some compatible appearance characteristic of these sites,the Guidelines require attention visibility is anticipated. Consequently,a along the Entrance to four primary factors: compatibility with significant level of compatibility with Buildings A and Corridor. historic sites in the area;the character of the Entrance B would be appropriate. Corridor; site development and layout;and landscaping. Provide site sections to 3 New structures and substantial additions to existing Building D in Block 5 -the assisted living clarify the visibility and structures should respect the traditions of the architecture of facility-is a large two-story building, relative proportions of the historically significant buildings in the Charlottesville and currently shown at approximately 220' x various buildings. Albemarle area. Photographs of historic buildings in the 255'. It sits at the highest point of the site. area,as well as drawings of architectural features,which (The EC street fronting this parcel ranges Revise the Code of provide important examples of this tradition are contained in from an elevation of 550' at the east to 570' Development to eliminate Appendix A. at the west.The high point of the site is at standards that are either 4 The examples contained in Appendix A should be used as a an elevation of 590'.)This building will covered by EC guidelines, guide for building design:the standard of compatibility with have greater visibility than the buildings are more limiting than the the area's historic structures is not intended to impose a that were previously proposed at the back of EC guidelines,or are rigid design solution for new development.Replication of the site.Careful massing to break down the vague. the design of the important historic sites in the area is scale of the building will be needed. A level neither intended nor desired. The Guideline's standard of of consistency with the forms,materials, compatibility can be met through building scale,materials, and general character of Buildings A and B 3 and forms which may be embodied in architecture which is would be appropriate. contemporary as well as traditional.The Guidelines allow individuality in design to accommodate varying tastes as The review of the architectural designs of well as special functional requirements. the proposed buildings can occur with the 9 Building forms and features, including roofs,windows, site plan review. Site sections will be useful doors,materials,colors and textures should be compatible at that time to clarify visibility and scale. with the forms and features of the significant historic buildings in the area,exemplified by(but not limited to)the The Code of Development(Sheet 5) buildings described in Appendix A[of the design includes information on form,massing, guidelines].The standard of compatibility can be met style,materials,etc.Much of this through scale,materials, and forms which may be embodied information is very detailed and would in architecture which is contemporary as well as traditional. either be addressed during the ARB review The replication of important historic sites in Albemarle of the proposal,or proposes a requirement County is not the objective of these guidelines. that is more limited than the EC guidelines. 10 Buildings should relate to their site and the surrounding Other standards are somewhat vague and context of buildings. open to interpretation. Eliminating such text 11 The overall design of buildings should have human scale. would help avoid confusion in future Scale should be integral to the building and site design. reviews. 13 Any appearance of"blankness"resulting from building design should be relieved using design detail or vegetation, or both. 14 Arcades,colonnades,or other architectural connecting devices should be used to unify groups of buildings within a development. 15 Trademark buildings and related features should be modified to meet the requirements of the Guidelines. 16 Window glass in the Entrance Corridors should not be highly tinted or highly reflective. Window glass in the Entrance Corridors should meet the following criteria: Visible light transmittance(VLT)shall not drop below 40% Visible light reflectance (VLR)shall not exceed 30% Specifications on the proposed window glass should be submitted with the application for final review. Compatibility with the character of the Entrance Corridor 5 It is also an important objective of the Guidelines to The applicant has indicated that the design The design of buildings in establish a pattern of compatible architectural characteristics of buildings A and B,which front the the development should throughout the Entrance Corridor in order to achieve unity corridor, is not intended to change from exhibit compatibility in and coherence.Building designs should demonstrate what was previously approved by the ARB. form,character and 4 sensitivity to other nearby structures within the Entrance Those designs were considered consistent materials. Corridor.Where a designated corridor is substantially with the architecture of the Entrance developed,these Guidelines require striking a careful Corridors.Maintaining a level of balance between harmonizing new development with the consistency among all proposed buildings existing character of the corridor and achieving would be appropriate. compatibility with the significant historic sites in the area. 12 Architecture proposed within the Entrance Corridor should use forms, shapes, scale,and materials to create a cohesive whole. Accessory structures and equipment 17 Accessory structures and equipment should be integrated In the previously approved plans, None at this time. into the overall plan of development and shall,to the extent mechanical equipment for Buildings A and possible,be compatible with the building designs used on B was to be screened at lower levels by the site. brick screening walls and at upper levels by 18 The following should be located to eliminate visibility from a recessed area in the roof.Dumpsters are the Entrance Corridor street.If,after appropriate siting,these shown at the ends of the A and B parking features will still have a negative visual impact on the lots. Details of the screening methods can Entrance Corridor street, screening should be provided to be reviewed with future site plan submittals. eliminate visibility.a. Loading areas,b. Service areas,c. The mechanical equipment note will be Refuse areas,d. Storage areas, needed on the site and architectural e. Mechanical equipment,f.Above-ground utilities, and drawings. g. Chain link fence,barbed wire,razor wire,and similar security fencing devices. 19 Screening devices should be compatible with the design of the buildings and surrounding natural vegetation and may consist of: a.Walls,b. Plantings,and c.Fencing. 21 The following note should be added to the site plan and the architectural plan: "Visibility of all mechanical equipment from the Entrance Corridor shall be eliminated." Lighting Information on lighting was not included None at this time. with the rezoning application and can be reviewed with future site plan submittals. Landscaping 7 The requirements of the Guidelines regarding landscaping New landscaping is not addressed in the With future site plan are intended to reflect the landscaping characteristic of many current submittal.However,it is anticipated submittals,provide of the area's significant historic sites which is characterized that landscaping will be consistent with the assurance that the utility by large shade trees and lawns.Landscaping should promote previously approved plan.Planting area easement and the planting visual order within the Entrance Corridor and help to along the EC frontage is occupied by an along the EC frontage can 5 integrate buildings into the existing environment of the electric easement. In the previous plan,the coexist. corridor. utility line was to be moved underground. 8 Continuity within the Entrance Corridor should be obtained Assurance should be provided with the by planting different types of plant materials that share future site plan submittal that the utility similar characteristics. Such common elements allow for easement and the planting can still coexist. more flexibility in the design of structures because common Planting area is available along many of the landscape features will help to harmonize the appearance of interior travelways and sidewalks.The development as seen from the street upon which the landscape plan can be reviewed with the site Corridor is centered. plan submittals. 32 Landscaping along the frontage of Entrance Corridor streets should include the following: a.Large shade trees should be planted parallel to the Entrance Corridor Street. Such trees should be at least 3'% inches caliper(measured 6 inches above the ground)and should be of a plant species common to the area. Such trees should be located at least every 35 feet on center. b.Flowering ornamental trees of a species common to the area should be interspersed among the trees required by the preceding paragraph.The ornamental trees need not alternate one for one with the large shade trees.They may be planted among the large shade trees in a less regular spacing pattern. c. In situations where appropriate,a three or four board fence or low stone wall,typical of the area, should align the frontage of the Entrance Corridor street. d.An area of sufficient width to accommodate the foregoing plantings and fencing should be reserved parallel to the Entrance Corridor street,and exclusive of road right-of-way and utility easements. 33 Landscaping along interior roads: a. Large trees should be planted parallel to all interior roads. Such trees should be at least 2%inches caliper(measured six inches above the ground)and should be of a plant species common to the area. Such trees should be located at least every 40 feet on center. 34 Landscaping along interior pedestrian ways: a.Medium trees should be planted parallel to all interior pedestrian ways. Such trees should be at least 2%inches caliper(measured six inches above the ground)and should 6 be of a species common to the area. Such trees should be located at least every 25 feet on center. 35 Landscaping of parking areas: Few interior parking lot tree islands are Provide sufficient space a. Large trees should align the perimeter of parking areas, shown,but the parking lots are not very between retaining walls and located 40 feet on center.Trees should be planted in the deep, and none have more than two rows. parking lots/travelways to interior of parking areas at the rate of one tree for every 10 accommodate required parking spaces provided and should be evenly distributed Planting area is available on some,but not trees. throughout the interior of the parking area. all,parking perimeters.Perimeter trees will b. Trees required by the preceding paragraph should be important,particularly for Building D,to Ensure that the retaining measure 21/2 inches caliper(measured six inches above the help integrate the large building into the wall construction method ground); should be evenly spaced; and should be of a surroundings. Retaining walls are shown allows for the planting of species common to the area. Such trees should be planted in close to parking lots—as close as 4' at trees and shrubs in close planters or medians sufficiently large to maintain the health building D and less at Building C. Greater proximity to the walls. of the tree and shall be protected by curbing. separation may be needed to meet the c. Shrubs should be provided as necessary to minimize the planting requirements. parking area's impact on Entrance Corridor streets. Shrubs should measure 24 inches in height. 36 Landscaping of buildings and other structures: a. Trees or other vegetation should be planted along the front of long buildings as necessary to soften the appearance of exterior walls.The spacing, size,and type of such trees or vegetation should be determined by the length,height,and blankness of such walls. b. Shrubs should be used to integrate the site,buildings,and other structures; dumpsters,accessory buildings and structures;"drive thru"windows; service areas;and signs. Shrubs should measure at least 24 inches in height. Development pattern and Grading _ 6 Site development should be sensitive to the existing natural Significant natural features remaining on Clarify and make consistent landscape and should contribute to the creation of an site are the mature oak trees that are throughout the proposal organized development plan.This may be accomplished,to grouped near the high point of the site and whether 13 or 14 trees are the extent practical,by preserving the trees and rolling near the northwest corner of the site.A to remain. terrain typical of the area; planting new trees along streets major part of the previous proposal was the and pedestrian ways and choosing species that reflect native preservation of the mature trees.The Ensure that retaining wall forest elements; insuring that any grading will blend into the applicant has indicated that the location and construction surrounding topography thereby creating a continuous condominiums proposed in the previous allows for the trees required landscape;preserving,to the extent practical,existing application are no longer feasible,and the at the perimeter of parking significant river and stream valleys which may be located on condition of many of the trees has lots and planting at the base 7 the site and integrating these features into the design of diminished since the previous approval.The of the walls.Maximum surrounding development; and limiting the building mass applicant's proposal for the development of height for retaining walls and height to a scale that does not overpower the natural this parcel now includes an assisted living that are visible from the settings of the site,or the Entrance Corridor. facility located at the high point of the site, Entrance Corridor is 6'. 39 The relationship of buildings and other structures to the necessitating the removal of 24 trees.The Taller walls must be Entrance Corridor street and to other development within the applicant's tree expert indicates that eight of terraced and planted. corridor should be as follows: these trees are structurally compromised or a.An organized pattern of roads, service lanes,bike paths, have recently declined. and pedestrian walks should guide the layout of the site. b. In general,buildings fronting the Entrance Corridor street Thirteen or 14 mature trees are proposed to should be parallel to the street.Building groupings should remain. (Tree#34 is shown south of be arranged to parallel the Entrance Corridor street. Building C,but is not numbered on the c.Provisions should be made for connections to adjacent plan.) Seven of these trees are located pedestrian and vehicular circulation systems. across the front of the proposed building d.Open spaces should be tied into surrounding areas to and are described as"spectacular." provide continuity within the Entrance Corridor. e. If significant natural features exist on the site(including Tree preservation was a significant factor in creek valleys, steep slopes, significant trees or rock the 2006-2009 ARB reviews.The quantity outcroppings),to the extent practical,then such natural of mature trees to remain was considered a features should be reflected in the site layout. If the positive feature in the development, provisions of Section 32.5.6.n of the Albemarle County showing sensitivity to the existing Zoning Ordinance apply,then improvements required by landscape,helping to integrate the that section should be located so as to maximize the use of development into the surroundings,and existing features in screening such improvements from maintaining a tie to the historic character of Entrance Corridor streets. the site.Fewer trees would be preserved f.The placement of structures on the site should respect with the current proposal,but some prime existing views and vistas on and around the site. examples would remain. They are expected 40 Site grading should maintain the basic relationship of the site to still maintain a visual presence on the site to surrounding conditions by limiting the use of retaining walls and to help integrate the assisted living and by shaping the terrain through the use of smooth,rounded facility into the surroundings. land forms that blend with the existing terrain.Steep cut or fill sections are generally unacceptable.Proposed contours on the Maintaining the health of the existing trees grading plan shall be rounded with a ten foot minimum radius to remain will be important. Grading is where they meet the adjacent condition.Final grading should shown within the driplines of five of these achieve a natural,rather than engineered,appearance. trees(including#34).Also,the retaining Retaining walls 6 feet in height and taller,when necessary, wall on the west side of Building D extends shall be terraced and planted to blend with the landscape. around the travelway and within the 41 No grading,trenching,or tunneling should occur within the driplines of three trees to remain.An 8 drip line of any trees or other existing features designated for arborist has been working with the applicant preservation in the fmal Certificate of Appropriateness. at this site for several years. Adequate tree protection fencing should be shown on,and Correspondence from the applicant coordinated throughout,the grading,landscaping and erosion indicates that the health of the trees to and sediment control plans. remain is supported by limiting the 42 Areas designated for preservation in the final Certificate of excavation footprint near the trees, Appropriateness should be clearly delineated and protected increasing the clearance from the building on the site prior to any grading activity on the site.This to the trees,and using permeable pavers in protection should remain in place until completion of the the vicinity of the trees. Also, a tree development of the site. preservation proffer states that a tree 43 Preservation areas should be protected from storage or preservation plan for 13 trees will be movement of heavy equipment within this area. included with the Final Site Plan and a bond will be posted to guarantee replacement of trees that may die within five years of the issuance of the last Certificate of Occupancy. With this proposal,extensive retaining walls would be used to develop the site.Building D is surrounded on three sides by retaining walls.Those walls extend around the pocket park that fronts Building D,and to Building C,whose parking lot is also surrounded by walls.At the pocket park,the wall extends through the drip lines of three of the trees to remain(#7, 8 and 9). 20 Surface runoff structures and detention ponds should be Two stormwater management areas are None at this time. designed to fit into the natural topography to avoid the need identified at the back of the site and an for screening.When visible from the Entrance Corridor street, underground facility is proposed in the these features must be fully integrated into the landscape. Building B parking lot.None of the They should not have the appearance of engineered features. facilities are expected to be visible from the 44 Natural drainage patterns(or to the extent required,new EC. drainage patterns) should be incorporated into the finished site to the extent possible. 9 SUMMARY OF RECOMMENDATIONS Staff recommends the following as the primary points of discussion: 1. The revised site layout;the potential visual impact of the assisted living facility on the Entrance Corridor 2. The reduced quantity of mature trees to remain 3. Visibility of the townhomes and Building C Staff offers the following comments on the proposed rezoning: Staff recommends the ARB forward the following recommendation to the Planning Commission: The ARB has no objection to the amendment to the proposed rezoning,with the following conditions: 1. The Code of Development should be revised to eliminate standards that are either covered by EC guidelines,are more limiting than the EC guidelines, or are vague. 2. It should be clarified and made consistent throughout the proposal whether 13 or 14 trees are to remain. Staff offers the following comments for future site plan submittals: 1. When architectural and site plans are submitted for review with the site plan submittal,address the following issues: a. The design of buildings in the development should exhibit compatibility in form,character and materials. b. Show how the form and massing of Building D result in an appropriate,compatible appearance along the Entrance Corridor. c. Provide site sections to clarify the visibility and relative proportions of the various buildings. d. Provide assurance that the utility easement and the planting along the EC frontage can coexist. e. Ensure that retaining wall location and construction method allows for required planting at the perimeter of parking lots/travelways and at the base of the walls.Maximum height for retaining walls that are visible from the Entrance Corridor is 6'.Taller walls must be terraced and planted. TABLE A This report is based on the following submittal items: Sheet# Drawing Name Drawing Date/Revision Date 1 Cover Sheet 30 June 2016 2 Parcel Overview&Regional Context 30 June 2016 3 Existing Conditions Plan 30 June 2016 4 Block Plan 30 June 2016 5 Code of Development 30 June 2016 6 Application Plan 30 June 2016 10 oc Ate COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road,North Wing Charlottesville,Virginia 22902-4596 17rn a •\A 434-296-5832 ALBEMARLE COUNTY ARCHITECTURAL REVIEW BOARD TENTATIVE Agenda for September 19, 2016 ALBEMARLE COUNTY OFFICE BUILDING 1:00 PM - Room 241 NOTE: Plans and other items submitted for the regular review items listed below are available for viewing at the County Office Building. If you are interested in viewing these documents,please contact the Department of Community Development using the information listed in the letterhead. 1. Call to order 2. Establish a quorum 3. Disclosures 4. Public comment 5. Consent Agenda(no items) 6. Work Session(no items) 7. Regular Review Items a. ARB-2016-80:Old Trail Village Entrance Signs Applicant: Dave Brockman b. ARB-2016-101:Northtown Center Phase 2B Applicant: Scott Collins c. pplicant: Steve E war s 8. Other Business a. Signs for BJ's restaurant at Stonefield b. Next ARB Meeting: October 3,2016 9. Adjournment Consent Agenda—no items NOTES REGARDING PUBLIC MEETINGS 1. Each applicant is allowed to make a single presentation not exceeding 15 mmutes in length.The applicant may divide the 15-mmute allotment among vanous presenters,but the total presentation time will not exceed 15 minutes. 2 Each member of the general public who wishes to speak on a matter shall be allowed one appearance not to exceed 3 minutes 3. Any person aggrieved by any decision of the Architectural Review Board may demand a review of the application by the Board of Supervisors. Such demand shall be made by filmg a request therefore in writing with the clerk of the Board of Supervisors within ten calendar days of the date of such decision.For additional information see section 30.6.8 of the Zoning Ordinance. NOTES REGARDING ARB ACTIONS 1. Certificates of Appropriateness are valid for the same period that the corresponding site plan is valid. If there is no site plan required for the proposed work,the Certificate of Appropriateness is valid for 3 years Applicants requesting an extension of the period of validity must do so in writing The letter must be received by the Director of Planning prior to the expiration date