County of Albemarle
COMMUNITY DEVELOPMENT DEPARTMENT
��BGIN�Q'
VSMP Permit Plan Review
Project title:
WPO2021-00064 VSMP Plan, DS Tavern
Project:
WPO2021-00064
Plan preparer:
Jonathan Garber, PE / Lineage Architects
P. O. Box 991, Verona, VA 24482
igarber(a lineagearch.com
Owner or rep.:
Ivy Road RE LLC — 800 E. Canal Street, Ste 1900
Richmond, VA 23219
Applicant:
Janet Artz, 3449 Ivy Road, Charlottesville, VA 22901
Janet e 0704capitol.com
Plan received date:
3 Nov 2021
(Rev. 1)
23 Dec 2021
Date of comments:
15 Dec 2021
(Rev. 1)
11 Jan 2022 — Approved. SWPPP: single item at A.I.e., below.
Reviewer:
John Anderson
401 McIntire Road, North Wing
Charlottesville, VA 22902-4579
Telephone: 434-296-5832
WWW.ALBEMARLE.ORG
County Code section 17-410 and Virginia Code §62.1-44.15:34 requires the VSMP authority to act on any
VSMP permit by issuing a project approval or denial. This project is approved.
A. Stormwater Pollution Prevention Plan (SWPPP)
The SWPPP content requirements can be found in County Code section 17-405. A SWPPP must contain
(1) a PPP, (2) an ESCP, (3) a SWMP, and (4) any TMDL measures necessary.
1. SWPPP:
a. Please revise SWPPP cover to include ref. to WP02021-00064. (Rev. 1) Not addressed
/Withdrawn. Eventual approval stamp will identify WPO2021-00064.
b. Sec. 6.A.: PPP Exhibit: Please show initial location of. (Rev. 1) Addressed.
i. Rain gauge
ii. Portable sanitary facilities (porta-john), as required
iii. Covered non -hazardous waste dumpster, if required
iv. Vehicle wash waters, draining to trapping measure (Not a sediment trap design, per se,
but shallow depression — 1-2 backhoe buckets. Avoid direct drainage to tributary to
Little Ivy Creek.)
v. Concrete wash -out
vi. On -site fuel, if required
vii. Paint, stucco, chemical storage
c. Sec. 8: Although county personnel will inspect, Applicant is required to retain qualified
(contractor/third-party) E&S inspection personnel to perform ESC inspections and evaluate
compliance relative to VESCH, Yd Edition, 1992. (Rev. 1) Persists. As ollow-up: WPO plan may
be approved without name, telephone number, and qualifications of personnel conducting
inspections, but a qualified individual must be listed prior to receiving a Grading Permit. (Jeff
Testerman appears qualified, iftertified Land Disturber /RLD.)
B. Pollution Prevention Plan (PPP) —see SWPPP item b. above. (Rev. 1) Addressed.
The PPP content requirements can be found in County Code section 17-404.
C. Stormwater Management Plan (SWMP)
Engineering Review Comments
Page 2 of 4
VSAP Regulation 9VAC25-870-108 requires the VSMP authority to approve or disapprove a SWAP. This
plan is approved.
1. Please combine individual sheets submitted into a single plan set (single file /.PDF). (Rev. 1) Addressed.
2. Revise plan set title to include ref. to WPO202100064. (Rev. 1) Addressed.
3. C01 Note that `Jon Garber is the certified land disturber until a general contractor is hired by the owner at
which time liability for land disturbance shifts to the general contractor,' does not effect transfer of
environmental responsibility to the GC. Please see Sec. 10 of SWPPP template, Delegation of Authority,
which effects transfer. Note: Sec. 10 of SWPPP is complete with Delegation of Authority from Janet Artz
to Jeff Testerman. It appears C-01 Note may be obsolete, or require update. (Rev. 1) Addressed.
4. C04: Include note explaining whether demo material is to be sent to a landfill, or whether an alternative
waste site is proposed. Note: SWPPP must reflect off -site export, unless material is sent to landfill. (Rev. 1)
Addressed.
5. C-05B
a. Include statement affirming all post -developed flow is sheet flow that meets requirements at
9VAC25-870-66.D., if this is the case. (Rev. 1) Addressed.
b. VRRM Site Tab indicates TP Load Reduction Required (lb/yr)=0.141b. Please copy statement
from C-05A that `Water quality requirements indicate a 0.14 pounds phosphorus offset is required.
Owner intends to purchase this on the third -party market.' Note, plan may not be approved
without letter of nutrient credit availability from Ivy Creek bank, the only bank eligible to provide
credits, given location of project. Please see DEQ NPS Nutrient Trading Data Viewer at: NPS
Nutrient Trading Data Viewer (arcgis.com) (Rev.1) Addressed.
Project site, circled: Since first (NPS data viewer) stream encountered (downstream) is impaired, DEQ
restricts eligible banks to a single bank Avy Creek bank; this bank appears to have sufficient available
phosphorus credits to support this project. See contact information below.
Bank data (View Project Information (army.mil)):
Engineering Review Comments
Page 3 of 4
SPONSOR
Ivy Creek Nutrient Bank, LLC
405 Ivy Farm Drive
Charlottesville, VA 22901
POC
Jon Roller • Consultant
Ecosystem Services, LLC
1739-AAllied Street
Charlottesville, VA 22903
Email: jon@ecosystemservices.us
Phone: (540) 578-4296
David Slutzky - Owner
VA
Email: David@fermataenergy.00m
Phone:(434) 9895888
6. General:
a. Note: Nutrient credit purchase (0.14 lb.) is not required for VSMP /WPO plan approval, but is
required prior to receiving a Grading Permit. (Rev. 1) Acknowledged. Applicant (letter d.
12/21/21): `Understood.'
b. An Approved WPO plan is required prior to site plan approval. (Rev. 1) Acknowledged.
c. A state permit (VAR10) is not required for this project (LOD z0.57 Ac.). (Rev. 1)
Acknowledged.
D. Erosion and Sediment Control Plan (ESCP)
Virginia Code §62.1-44.15:55 requires the VESCP authority to approve or disapprove an ESCP. This plan
is approved.
No item 1.
2. C-05:
a. Please show and label stream buffer. (Shown on C-04, but also need to display on C-5). (Rev. 1)
Addressed.
b. Please revise critical steep slopes label to read critical slopes (steep slopes exist in development
areas, critical slopes in Waal areas). (Rev. 1) Addressed.
c. Please provide SF downslope of septic field, upslope of critical slopes. (Rev. 1) Addressed.
d. Label proposed drain field. (Rev. 1) Addressed.
e. Indicate location of earth /stone stockpile, if any. (Rev. 1) Addressed.
f Indicate location of staging /equipment storage area, if any. (Rev. 1) Addressed.
g. Provide SF for earth stockpile, as needed. (Rev. 1) Addressed.
3. C06: Include paved construction entrance with wash rack detail from Albemarle County Design Standards
Manual, p. 8; link: hams://www.albemarle.org./home/showpublisheddocument/270/637202458267970000
Note: County ESC Inspector assigned to project may consider whether to allow Trackout® control mat in
lieu of a typ. stone construction entrance, in lieu of a paved construction entrance with wash rack.
Inspectors evaluate on a case -by -case basis, and consider compliance performance, but request ACDSM p.
8 detail be placed on the plan for reference, in case it is needed. (Rev. 1) Addressed.
Engineering Review Comments
Page 4 of 4
Process:
After approval, plans will have to be bonded. The bonding process is begun by submitting a bond estimate request
foam and fee to the Department of Community Development. One of the plan reviewers will prepare estimates and
check parcel and easement information based on the approved plans. The County's Management Analyst will
prepare bond agreement foams, which will have to be completed by the owner and submitted along with cash,
certificates or sureties for the amounts specified. The agreements will have to be approved and signed by the County
Attorney and County Engineer. This may take 24 weeks to obtain all the correct signatures and forms.
This plan proposes 0.14 lb. nutrient credit purchase. Although nutrient credit purchase is not required for WPO plan
approval, it is required prior to pre -construction, to receive a Grading Permit.
After bonding and agFeeffients [and nutrient credit purchase] are complete, eaunt staff will entef
to the state- 119� famest prouessing, this is done elowanically with the emails pFavided an the applivation. P9Q_
on 19eal 1.7SA,412 authemy appFaval. At this time, the Pl-;Q poFtian 4the applioation fees will have to be paid diFee#y they will issue a-
o lotto_ This should be ..opted to the county. ..
After DEQ ea eFage is issued, via the ,.aveFage letw, the County can hold a pre -construction conference.
Applicants must complete the request for a pre -construction conference form, and pay the remainder of the
application fee. The form identifies the contractor and responsible land disturber, and the fee remaining to be paid.
This will be checked by county staff, and upon approval, a pre -construction conference will be scheduled with the
County inspector. At the pre -construction conference, should everything proceed satisfactorily, a joint VSMP and
grading permit will be issued by the County so that work may begin.
County forms can be found on the county website forms center under Engineering Applications:
httos: //www. albemarle. org/government/com munity-develonment/aooly-for/engineering-anal is ations
Thank you.
Please call if any questions — tel. 434.296-5832-x3069, or email 4anderson2(a)albemarle.org .
WPO202100064_DS Tavem_011122revI