Loading...
HomeMy WebLinkAboutSDP202100089 Review Comments Initial Site Plan 2022-01-14401 McIntire Road, North Wing County Of Albemarle Charlottesville, VA 22902-4579 COMMUNITY DEVELOPMENT DEPARTMENT Telephone: 4 W W W.ALBEMA34-296-5832 RLE.ORGRLE.ORG �IRGINSQ' Memorandum January 6, 2022 Revised January 14, 2022 John Beirne 968 Olympia Dr. Suite 1 Charlottesville, VA 22911 ibeirne@wwassociates.net RE: SDP202100089 Stonefield Block C2-1 Initial Site Plan SRC Review Comments Dear Mr. Beime: The Site Review Committee has reviewed the development proposal referenced above. Initial comments from the following divisions of the Department of Community Development and other agencies, as applicable, are attached: Albemarle County Planning Services (Planner) Albemarle County Engineering Services (Engineer) Albemarle County Architectural Review Board (ARB) Albemarle County Information Services (E911) Albemarle County Building Inspections Albemarle County Department of Fire Rescue Albemarle County Service Authority (ACSA) Virginia Department of Transportation (VDOT) Rivanna Water and Sewer Authority (RWSA) Virginia Department of Health (VDH) Comments reflect information available at the time the development proposal was reviewed and should not be considered final. However, the Site Review Committee has attempted to identify all issues that will be required to be resolved prior to approval of the initial site plan. Please contact me at your earliest convenience if you have questions or require additional information. Sincerely, `a, / N*e - Kevin McCollum Senior Planner I Albemarle County Planning Services (Planner) —Kevin McCollum, kmccollum@albemarle.org —Required changes: Comments to be addressed prior to final site plan approval: 1. [32.5.2(a)] Please include a reference to the Initial Site Plan Number: SDP202100089 and include a place holder for the Final Site Plan Number. 2. [32.5.2(a)] Please provide the total number of sheets at the bottom of the Sheet List Table on the Cover Sheet. 3. [32.5.2(a)] Please revise the owner information and any deed book reference to reflect the most recent deeds associated with the property. Based on Albemarle County GIS information it appears the most recent deed for the property was recorded in Deed Book 5649 page 429. In addition, please include a reference to the Plat recorded in Deed Book 5645 page 731. 4. [32.5.2(a)] In the Site Date table on the Cover Sheet please: a. Include a reference to all applicable Rezonings associated with the property. b. Include Steep Slopes — Managed with the Overlay District information. c. Include a reference to the two special exceptions (SE2021-25 and 26) associated with this property. 5. [32.5.2 (a)] Please provide a breakdown of the types and quantities of dwelling units that will be provided. In the "Proposed Use" note on Sheet 1, state "Multifamily residential — apartments" as the proposed use. Then provide a breakdown of how many units of each of the following are proposed: a. Multifamily dwelling units measuring 500 square feet or less; b. 1-bedroom multifamily units; c. 2 or more -bedroom multifamily units. 6. [32.6.2(i), 4.121 The Zoning Administrator must approve the proposed number of parking spaces prior to Final Site Plan approval. Please submit a justification or parking study for the proposed number of parking spaces. a. Based on a Zoning Determination written February 26, 2020 there are 1236 required parking spaces and 1262 provided parking spaces for the Stonefield Shopping Center (Blocks A, B, C1, C2, D3, and El). This determination suggests that there are 26 additional shared parking spaces currently available as surplus at Stonefield. b. The proposed initial site plan on C2-1 appears to eliminate some of those shared parking spaces while only providing 160 structured parking spaces for the proposed residential use. Based on the proposed rate of 1.75 spaces/unit the proposed 160 space parking garage would not be providing sufficient parking. c. Please confirm (1) whether this site will be self -parked, similar to Stonefield Block D-1, D2, E2, etc. or (2) whether this site will continue to share parking with the Stonefield Shopping Center. i. If this site is self -parked the remainder of the Stonefield Shopping Center will continue to have sufficient parking. Block C2-1 will need to provide additional parking for the residential component and/or will need to submit a parking study suggesting the proposed 160 spaces will be sufficient. Block D-1 for reference has parked at a lower rate than 1.75 spaces/unit. ii. If parking is shared, fewer spaces are needed to be added, but additional revisions will need to be made showing that some of the parking in the garage is available to the public. d. Revise the parking calculations on the Cover Sheet accordingly. 7. [32.5.2 0)(k)(1), 32.6.2(g)] Show all existing and any proposed easements. Any new easements required for water, sewer, drainage facilities, or any proposed utilities will need to be reviewed, approved, and recorded prior to final site plan approval. Please submit an easement plat application the County for review. The final site plan will need to be updated so that all easements are shown and labeled identifying easement type, whether it's public or private, a width dimension, and the recorded instrument with deed book and page number. 8. [32.5.2 (n)] Please provide more information on the proposed dumpster enclosure. Per Section 18-4.12.19 of the Zoning Ordinance, the following requirements apply to dumpster pads/enclosures: a. [4.12.19 (a)] Dumpster pads shall have a concrete surface. b. [4.12.19 (b)] The pad shall extend beyond the front of each dumpster so that the front wheels of a truck servicing the dumpster will rest on the concrete, but in no case shall the length of a concrete pad be less than eight feet beyond the front of the dumpster. c. [4.12.19] Please provide a plan and profile view construction detail of the dumpster enclosure on the final site plan. The detail should show the dimensions and materials of the proposed enclosure. d. Please see Engineering Division comment #4c for further information. 9. [32.6.20), 32.7.9] Please include a landscape plan that shows all proposed landscaping improvements and changes. Please include and amend all applicable landscaping information approved alongside previous site plans. a. [32.7.9.8] Provide an overall tree canopy on the site of at least 10%. 10. [32.7.4.1] Please see attached Engineering Division comments. A Water Protection Ordinance (WPO) application amendment must be submitted, reviewed, and approved prior to final site plan approval. Please contact Engineering Division staff with specific questions related to WPO requirements. 11. [32.7.8 and 4.17] If any outdoor lighting is proposed, please provide a lighting plan will need to be included with the final site plan submission that complies with all applicable regulations specified in Section 4.17 of the Zoning Ordinance. This includes: a. Provide footcandle measurements within the property and along all property lines. Use a light loss factor of 1.0 to determine footcandles on site. b. [4.17.4 (a)] Provide manufacturer cut -sheets for all proposed outdoor luminaires. c. [4.17.4 (a)] All proposed outdoor luminaries exceeding 3,000lumens must be full -cutoff fixtures. Please provide documentation from the manufacturers that all fixtures will be full -cutoff. d. Please state the pole height of all outdoor luminaires. e. [4.17.4 (b)] Please add a note to which states "Each outdoor luminaire equipped with a lamp that emits 3,000 or more initial lumens shall be a full cutoff luminaire and shall be arranged or shielded to reflect light away from adjoining residential districts and adjacent roads. The spillover of lighting from luminaires onto public roads and property in residential or rural areas zoning districts shall not exceed one-half footcandle." 12. [32.7.2.1] Please see Fire Rescue comments #7 and #8 below. It appears that some of the internal travelways do not meet minimum width standards for emergency access apparatuses. Please coordinate directly with Fire Rescue staff to verify specific requirements for widths based on the proposed building height. Final site plan will not be approved until all Fire Rescue requirements have been met. 13. [General Comment] Please add the Site Review Committee (SRC) signature panel (attached) to the cover sheet. 14. [General Comment] Add a date of revision. 15. [Section 32] Final site plan must comply with all applicable requirements of Section 32.6, 32.7 and 32.8 of the Zoning Ordinance prior to final approval. Please contact Kevin McCollum at the Department of Community Development at kmccollum@albemarle.org or 296- 5832 ext. 3141 for further information. Comments From Other Reviewers: Albemarle County Engineering Services (Engineer) — John Anderson, janderson2@albemarle.org — Requested changes, see attached. Albemarle County Architectural Review Board (ARB) — Khristopher Taggart, ktaeQart@albemarle.org — Requested changes, see below. Staff has no objection to Initial Plan, ARB action letter pending meeting on 1/18/22. A Certificate of Appropriateness is required prior to final site plan approval. The following items and all items on the ARB Final Site Plan Checklist must be addressed: 1. Provide architectural designs with the neat submittal. Note that the upper portions of the building elevations must be designed to eliminate blankness and achieve appropriate form, scale, etc. 2. Provide a roof plan that shows the dimensions of all proposed rooftop mechanical equipment and show rooftop mechanical equipment on the architectural elevations. Show how all visibility of mechanical equipment from the Entrance Corridors will be eliminated. 3. Provide the standard mechanical equipment note on the architectural drawings: Visibility of all mechanical equipment from the Entrance Corridor shall be eliminated. 4. Provide a lighting plan for review. The plan should include all proposed architectural (wall- and ground mounted) lighting. Reinstalled streetlights must match the previous approval. 5. Provide the standard lighting note on the lighting plan. 6. If planting is added, provide plant species that are native to the region from the approved plant list. 7. If planting is added, add the standard plant health note to the plan: All site plantings of trees and shrubs shall be allowed to reach, and be maintained at, mature height; the topping of trees is prohibited. Shrubs and trees shall be pruned minimally and only to support the overall health of the plant. 8. Revise the site plan to show limits of work. 9. Provide adequate tree protection fencing on site plans for future review. Albemarle County Building Inspections — Betty Slough, bslou hg @albemarle.org — Requested changes, see below 1. Replace note 8 under the Coordination Notes section on Drawing C-2 with the following: All water, sewer and fire lines require NEW inspection and testing procedures. The ACSA performs any testing and inspections of the public sewer and water main(s). The Albemarle County Building Inspections Department(ACBID) does a visual inspection and witnesses the testing of the building drain, water service pipe and the sprinkler lead-in connection. The developer/contractor is responsible to retain a Special Inspector as outlined in the updated Albemarle County Policy for Site Utilities to perform the visual inspection and testing of all utilities not covered by the ACSA or ACBID. This includes building sewers, water and fire line branches between the main and the meter(s)/building(s). The Special Inspector's report must be submitted and approved by the Albemarle County Engineering Department prior to a Certificate of Occupancy being issued. Albemarle County Information Services (E911) — Elise Kiewra, ekiewra@albemarle.org - No objection. Albemarle County Department of Fire Rescue — Howard Lagomarsino, hlaQomarsino&albemarle.org — Requested changes, see below. 1. During demolition and construction, the following fire prevention steps are required, so please note this on the plan: a) Smoking shall be prohibited in areas where smoking makes conditions such as to make smoking a hazard and these areas shall be designated with no smoking signs per Virginia Statewide Fire Prevention Code. b) Areas where smoking can occur, shall have appropriate receptacles for discarded smoking materials per Virginia Statewide Fire Prevention Code. c) Per the Virginia Statewide Fire Prevention Code, vehicular access for firefighting shall be provided at all construction and demolition sites, provide access to within 100 ft. of temporary or permanent fire department connections, and have no overhead wiring or other overhead obstructions lower than 13 ft. 6 inches; this access may be via permanent or temporary road, but shall be capable of supporting fire apparatus in all weather conditions. d) Contractor shall ensure the street numbers are always plainly visible from the frontage street during construction per the Virginia Statewide Fire Code e) An approved water supply for firefighting operations shall be in place and available as soon as combustible materials arrive on site. f) Waste and combustible debris shall be removed from the building at the end of each day and disposed of in accordance with the Virginia Statewide Fire Code g) Fire extinguishers shall be provided, with not less than one approved fire extinguisher at each stairwell, on all floor levels where combustible materials have accumulated, in every storage and construction shed and in areas of special; hazards, such as where flammable and combustible liquids are stored or used, in accordance with the Virginia Statewide Fire Code h) Operations involving the use of cutting and welding shall comply with the Virginia Statewide Fire Prevention Code and shall require a permit from the Albemarle County Fire Marshal's Office 2. Provide a note on the indicating the ISO calculated needed fire flow for the building 3. Provide a fire flow test for the water supply/hydrants 4. Indicate the locations of fire hydrants pursuant to the needed fire flow calculation in # 2 and spaced according to this calculation (This starts at 500 feet and arranged so that no building is more than 250 feet from a hydrant, but note that the distances are further reduced as the required fire flow increases). 5. If fire suppression systems or standpipes are installed the FDC must face the road, on address side and there needs to be hydrant within 100 ft. of the FDC, arranged so that when hydrant and FDC are in use for emergency operations, hose does not obstruct travel way. 6. Place a note on the plan to indicate C & O thread is installed on all connections. 7. Project will require fire apparatus access roads that provide proper width of 20 ft where aerial apparatus is not required or 26 ft where aerial apparatus is required. 8. Due to the height of the building, ensure there is a fire apparatus access road for aerial apparatus access. This road shall have an unobstructed travel width of 26 ft., the road providing aerial apparatus access shall be no less than 15 ft from the building and no more than 30 ft from the building, the road providing aerial apparatus access shall be parallel to one entire side of the building and shall have no overhead utility of power lines. 9. Indicate on the plans the methods to be utilized to prevent parking from obstructing fire apparatus access roads. 10. Commercial operations (stores, businesses etc) require a knox installation to ensure 24 hour access. Location of installation can be determined in consultation with Fire Marshal staff. Albemarle County Service Authority — Richard Nelson, melson@serviceauthority.org — Requested changes, see below. 1. RWSA and City of Charlottesville Sewer Flow Capacity Certification will be required. 2. Provide fixtures counts and initial booster pump flow range to determine if the existing meter is adequately sized. 3. The parking garage ramp will be required to have a minimum separation of 10-feet from existing ACSA utilities. 4. Submit a copy of the updated plan to ACSA ATTN: Alex Morrison. Virginia Department of Transportation — Doug McAvoy Jr., douglas.mcavoy@vdot.vir ig nia.gov — Requested changes, see attached. Rivanna Water and Sewer Authority —Victoria Fort and Dyon Vega, vfort@rivanna.org and dvega@rinavvan.org — Requested changes, see below. 1. RWSA will require a sewer flow acceptance prior to fmal site plan approval. The request will need to be sent to us by ACSA and will include the following: a) Estimated average daily dry weather sewage flow (ADDWF) b) Point of connection into RWSA system (which manhole) c) Number of units/square footage d) Estimated in-service date Virginia Department of Health — Alan Mazurowski, alan.mazurowski@vdh.vir iginia.gov—No objection. �q off nig 401 McIntire Road, North Wing Charlottesville, VA 22902-4579 County of Albemarle Telephone: 434-296-5832 COMMUNITY DEVELOPMENT DEPARTMENT WWW.ALBEMARLE.ORG ��BGIN�Q' Site Plan review Project title: Stonefield Towncenter Block C2-1 (SDP202100089), Initial Site Plan Project file number: SDP202100089 Plan preparer: John Beirne, PE, W W Associates / 968 Olympia Drive, Suite 1 Charlottesville, VA 229111 ibeime(a),,wwassociates.netl Owner or rep.: OCT Stonefield Property Owner, LLC, 230 Royal Palm Way, 2nd Floor Palm Beach, FL, 33480 [ odesai(a),oconnorco.com ] Plan received date: 29 Nov 2021 Date of comments: 22 Dec 2021 Plan Coordinator: Kevin McCollum Reviewer: John Anderson Engineering has reviewed this initial site plan and offers these review comments. SDP202100089. Stonefield block C2-1 1. CI: May require parcel data be revised, if TMP 061 WO-03-00-019A5 is an accurate tax map reference for development parcel. 2. General a. WPO (Amendment) approval is prerequisite to ESP approval for this development. Please submit a WPO plan Amendment at earliest convenience (common plan of development; criteria 2C, if no increase in rate /volume of storm runoff, from initially permitted values). Amend corresponding WPO plan for this section of Stonefield (initially permitted as Albemarle Place). b. Note: If development proposes an increase in volume or rate of storm runoff above those initially permitted with Albemarle Place, then this project is subject to 2B technical design criteria (SWM). c. List associated WPO plan/s on sheet C-L d. Show runoff conveyance (roof leader lines, for example). Confirm no new storm system pipes or inlets are proposed or required. Provide LD-204, stormwater inlet computations, and LD-229, storm sewer design computations, as needed. 3. C=6: Please label TMP 061 WO-03-00-019A5, the parcel underdevelopment. 4. C-7 a. Confirm if existing parking spaces fronting wall at Northrop Grumman are to remain as active parking spaces. b. Label parking lot drive aisle width at its narrowest point, outside proposed building garage access. c. Confirm if 2-way traffic along parking aisle outside the proposed parking garage, between Northrop Grumman and first floor parking garage access, persists. If 2-way movement persists: i. Provide auto -turn figures for sedans approaching the first floor garage access from either direction, exterior to the garage, and with vehicles entering and exiting, simultaneously, without conflict, with 1'-2' min. clearance (2' preferred) between vehicles. ii. Recommend mirrors mounted at garage entry to expand field of vision for vehicles entering or exiting first floor access. Recommend mirror at 2"d floor garage access. iii. Clarify whether a waste management vehicle will tip dumpster located in dumpster enclosure, since physical constraints prevent this. Multiple conflicts are apparent if design intent is for a typical waste management vehicle to tip dumpster located within enclosure. Please avoid service /passenger vehicle conflict/s at first floor garage entry. d. Provide auto -turn figures for second floor parking garage access, identical with auto -turn figures for first floor garage access. Auto -turn figures should show 2"d floor access width sufficient for 2 sedans arriving (enteringlexiting) simultaneously, with sufficient clearance to avoid conflict. Engineering Review Comments Page 2 of 2 (Sedans have been discontinued by at least one major North American automaker, with SUVs, vans, and trucks now the dominant share of vehicles sold in the U.S.) At a minimum, ensure 1' clearance (via Autotum figures) for typical passenger sedans at 1 n/2"d floor garage points of entry. e. Three parking spaces are shown beneath the garage 2°d floor access. Confirm that no (new) vertical /horizontal members (beams/girders) will obstruct or impede use of (or displace portion of) these 3 Ex. parking spaces. Ramp may cantilever above spaces, in which case, conflict may be avoided. f Ensure proposed exterior access door meets ADA requirements for landing, clearance, etc. Please ensure outward opening will not strike a passing pedestrian. Design should provide measure of assurance that a pedestrian passing immediately outside the door is not vulnerable to door strike. g. Label sidewalk width (adjacent to Bond Street), narrowest dimension. h. Provide a stop bar for vehicles exiting the first -floor garage access. i. Recommend elevated (4"-6") concrete landing (or similar measure) at first floor garage access as calming measure to limit vehicle speed for vehicles that may bypass garage access to use parking southeast of 286' parking lot aisle (distance to District Ave). Physical constraints, active parking, limited sight lines at garage exit, parking areas beyond garage entrance present potential conflicts and a hazard at first floor garage access. Vehicle -pedestrian proximity, inattention, etc. appear to have contributed to a pedestrian fatality at Stonefreld, at a crosswalk at District and Bond, in 2016. Please feel free to call if any questions: 434.296-5832 -x3069 ( landerson2(a),albemarle.or ). Thank you I Anderson SDP202I00089 StonefieldTowncenter blockC2-1 ISP 12222Ldoc COMMONWEALTH of VIRGINIA DEPARTMENT OF TRANSPORTATION Stephen C. Brich, P.E. 1401 East Broad Street Commissioner Richmond, Virginia 23219 December 2, 2021 County of Albemarle Department of Community Development 401 McIntire Road Charlottesville, VA 22902 Attn: Kevin McCollum Re: Stonefield Parcel 1 Block 2C-1— Initial Site Plan SDP-2021-00089 Review # 1 Dear Mr. McCollum: (804) 7862701 Fax: (804) 7862940 The Department of Transportation, Charlottesville Residency Transportation and Land Use Section, has reviewed the above referenced plan as prepared by W W Associates, dated 29 October 2021, and offers the following comments: 1. Please confirm that nothing in this project impacts the public right-of-way. We find these plans generally acceptable. If further information is desired, please contact Doug McAvoy Jr. at (540) 718-6113. A VDOT Land Use Permit will be required prior to any work within the right-of-way. The owner/developer must contact the Charlottesville Residency Transportation and Land Use Section at (434) 422-9399 for information pertaining to this process. Sincerely, Doug McAvoy Jr., P.E. Area Land Use Engineer Charlottesville Residency VirginiaDOT.org WE KEEP VIRGINIA MOVING