HomeMy WebLinkAboutWPO201900068 Bond 2022-01-17Internal Use Only
Date Received:
Fee Paid:
Received by:
Intake: Forward to Program Administrator
BOND INSPECTION REQUEST
APPROVED PLAN #: WP0201900068
PROJECT NAME (including Phase #): RED HILL PHASE 2 GYM ADDITION AND RENOVATION
(As listed on the approved plan)
TrfisSortn is used to request a reduction or release of a bond. A fee is required for each inspection. Please
check t ropriate box below for the requested inspection(s). Fees includes 4% Technology Fee.
Inspections for urposes of bond reduction or release will require a separate fee for each bond.
❑ VSMP/VESCP Erosio ntrol, Stormwater Management and/or Mitigation per
Water Protection Ordinance tions 17-207 & 17-208 $294.32
❑ Reduction ❑ Rele
❑ Subdivision (roads, drainage, etc.) per Sub dl n Ordinance sections 14-435 & 14-438 $307.84
❑ Reduction ❑ Release
❑ Water & Sewer bond per Subdivision Ordinance section 14- $307.84
❑ Reduction ❑ Release
❑ Site Development Performance bond (Incomplete Site Work & Landscaping $344.24
❑ Reduction (site work only) ❑ Release
TOTAL FEES
Submit requests to: Department of Community Development, 401 McIntire Road, North Wing, Charlottesville,
VA 22902, Attention: Management Analyst — Phone 434-296-5832; Fax 434-972-4126. All roads and
stormwater facilities will require construction record drawings, inspection reports, videos/photos, plats/esmts,
certifications, and completion processes through VDOT or DEQ (refer to County acceptance procedures).
Bonds will not be reduced or released without record drawings and inspection documentation per the state
requirements and County's published procedures. A minimum 20% of the original posting is held until
acceptance of all bonded improvements. For Site Development Performance bonds, if landscape installation is
part of the bonded site work, a request for reduction should only be made once all landscaping is complete.
If all required documentation is not received within 30 days of receipt of this request, this application shall be
deemed incomplete and shall be rejected. If rejected, a new application, supporting documentation and fee will
be required. Applications may be withdrawn for a full refund within 30 days of receipt.
If this is a reduction request, the revised estimate will be prepared by the plan reviewer and sent to the owner.
Please provide contact information.
EMAIL: AYATES@VIRTEXCO.COM & WARMENTROUTOVIRTEXCO.COM
OR REGULAR MAIL ADDRESS: 17840 Forest Hill Ave, Suite A
Richmond, Va 23225
Signature of Owner/Developer
W ILLIAM J. ARMENTROUT JR. (CONTRACTOR) 1 /17/2021
Print Name Date
Revised 7/15/2014, 7/20/2015, 11/3/2015, 8/14/2017, 1/28/2020, 7/l/2021