Loading...
HomeMy WebLinkAboutSUB199300105 Action Letter 1993-09-02 s of�c iU 9 `�RGIN�P COUNTY OF ALBEMARLE Dept. of Planning & Community Development 401 McIntire Road Charlottesville, Virginia 22902.4596 (804) 296-5823 MEMORANDUM TO: Development Corporation of Virginia FROM: Yolanda A. Hipski, Planner DATE: September 2, 1993 RE: Site Review Comments - SUB-83-105 - Redfields Phase 2A Final Site Plan The Site Review Committee reviewed the above referenced plan/plat on September 2, 1993. Pertinent comments from the following agencies are attached: • Planning Department - contact Planner - 296-5823 • County Engineer - contact Jack Kelsey - 296-5861 • Fire Officer - contact Jay Schlothauer - 296-5832 • Service Authority - contact Pete Gorham - 296-5810 oW* Health Department - contact Gary Rice - 972-6259 • Virginia Department of Transportation - contact John DePasquale - 296-n102 • Soil Conservation Service - contact Gordon Yager - 296-9337 • Watershed Management - David Hirschman - 296-5861 • Zoning - contact Babette Thorpe - 296-5875 The Committee' s comments will reflect information available at the time the plan/plat was reviewed, but should not be considered final. Please revise the plan/plat to include the attached comments and submit seven ( 7) full size copies and one 11 x 17 copy of the revised plan/plat no later than 5 : 00 p.m. September 13, 1993. Site Review Comments - Redfields, Phase 2A Page 2 September 2 , 1993 No plan/plat will be scheduled for Planning Commission review until all necessary information and items marked with ** on the comments are submitted, in a form satisfactory to the Director of Planning and Community Development. Provided that you meet the stated deadline for revisions , and the revisions are satisfactory, your plan/plat will be heard by the Planning Commission on October 5, 1993, 7 : 00 p.m. , Meeting Room #7 , Second Floor, County Office Building, 401 McIntire Road. THE APPLICANT OR A REPRESENTATIVE MUST BE PRESENT AT THE PLANNING COMMISSION MEETING. The Planning Commission will not review plans/plats which occasion sight distance, grading, or other easements (excluding those for public utilities) , without evidence from the developer that permission is obtainable. This evidence must be submitted by the revision deadline for this item to proceed to the Planning Commission at the above-noted date. In such case in which the developer does not revise the plan to include recommendations of the committee, the developer shall submit in writing to the agent by the revision date a statement as to the reasons and justification for not incorporating such recommendations in the revised plan. Thank you. YAH/blb cc: The Cox Company SITE REVIEW COMMENTS - SUB-93-105 - REDFIELDS PHASE 2A FINAL SITE PLAN ** 1. Variation in site development plans and subdivision plats from approved PRD application plans may be permitted by the Director of Planning and Community Development ( Section 8 . 5 . 6 . 3 of the Zoning Ordinance) . The Director may administratively approve minor modifications after finding that such variations are generally in keeping with the spirit and concept of the approved application plan; in accordance with the Comprehensive Plan; and in accordance with the regulations currently in effect. Sheet 8 of 25 indicates a total of 57 lots shall ultimately be constructed with Phase 2 . However, the rezoning plan allowed "49 suburban single family detached residential units" . "Road L" , or "Canvas Back Lane" , was allowed a total of 26 units. This plan, however, creates a total of 30 residential lots and one pump station lot. Confirm this increase does not interfere with prior road approvals for vehicle trips allowed. The previous rezoning plan indicated 23 . 4 acres shall be "Open Space and one Single Family detached" . Confirm that at lease 23 . 4 acres shall remain as "Open Space and one single family detached" in Phase 2 . ( See comment 2 ) . Once these items have been addressed, be sure to revise Page 3 of 25 of the packet to redistribute these lots . Be sure the total number of lots does not exceed the original approval nor the Open Space area decrease in size. These variations must comply with Section 8. 5 . 6 . 3 . Therefore, request from the Director of Planning and Community Development a variation of the Redfields Zoning Plan in accord with Section 8 . 5 . 6 . 3 . to allow a new distribution of lots in Phase 2 . Please call me if you have any questions . ** L.- Remove reference to "future development" on Page 6 of 25 , replace with "Open Space and one Single Family Dwelling" . Staff cannot administratively approve this variation. ** 3 . Zoning Proffer 4 states: "The proposed recreation center shall be constructed with Phase I" . I understand the applicant has had extensive discussions with both the Zoning Administrator and the Director of Planning and Community Development. Ms . Thorpe of the Zoning Department clearly noted in her comments that her approval will not be issued until a building permit has been has been issued and construction started for the recreation center. I am confirming this issue with the Director of Planning and Community Development. If you have any comments regarding timing, please contact me, or Babette, as soon as possible. 4 . I have discussed the pump station location with the Albemarle County Service Authority. I understand that, given design constraints such as slope, this location may be difficult to change. This department, however, is concerned about possible conflicts between residential lots and noxious characteristics of pump stations (visual, noise, odor) . ** 5. If the pump station shall remain at its proposed location, this department will require screening between the pump station and residential lots . Provide a double staggered row of wet tolerable screening trees, spaced fifteen ( 15 ) feet on center. Note "This screening shall be maintained and replaced if any should die". ** 6 . Be sure to note the pump station shall be dedicated to the Albemarle County Service Authority. ** 7 . On Page 6 of 25 , be sure to note the access easement to the pumping station. Also, note that the setback must be 20 feet. If you wish to modify this setback, submit a request in accord of Section 8 . 6 . 5 . 3 ( see comment 1 ) . ** 8 . A landscape plan shall be required for the double frontage lots ( lots 25 , 26 ,' 27, 28 , 29 and 30 ) . ** 9. Address comments from all other agencies . ''®114 a 'w— ay friRcirly' COUNTY OF ALBEMARLE Department of Engineering 401 McIntire Road Charlottesville, Virginia 22902-4596 RECEIVED (804) 296-5861 MEMORANDUM 4Ub' . 1 1993 Planning Dept TO: Yolanda Hipski, Planner . FROM: Don Franco, PE - Engineer tP RE: Site Review Meeting of 2 September 1993 DATE: August 31, 1993 Redfields Phase 2-A Preliminary Plat (SUB-93-105) Watershed Boundary - Upper Rivanna River watershed, Moores Creek subwatershed Streams/Watercourses - Intermittent streams as shown on site plan. An intermittent tributary to Moores Creek runs along the eastern edge of the parcel. Moores Creek roughly follows the railroad tracks at the northern tip of the parcel. Wetlands - 2 ponds are associated with the intermittent stream at the eastern edge of the parcel. Water Resources Protection Areas Ordinance - Applies only to the main stem of Moores Creek along the parcel's northern edge. Moores Creek does not seem to be affected by this phase of the development. Final Plat approval will not be granted until satisfactory address of the following: 1. Subdivision plat should be at 1" = 100' and the maximum sheet size should be 11"x18" with a 1" border; 2. The drainage easements associated with the VDOT right-of-way shown on the subdivision plat (sheet 6/25) should be dedicated to public use; 3. The portion of the drainage easements between lots 18/19 and 6/7 and 10' below the outfall of the drainage pipe extending beyond the VDOT right-of-way should be dedicated to public use; and 4. Department of Engineering approval of grading and drainage plans and calculations. FAX (804) 972-4060 Yolanda Hipski August 31, 1993 Page 2 5. Completion of the stormwater detention facility, partially bonded under the phase 1B erosion control bond or submittal of calculations which demonstrate that the existing structure provides adequate stormwater detention for 2A and all previously approved improvements; 6. Recordation of a County standard "Maintenance Agreement" (see attached) is required for the stormwater management facility. 7. Department of Engineering approval of the Erosion & Sediment Control Plan. COUNTY OF ALBEMARLE RECEIVED 9��" ®_� SEP 0 1 199i 7 Plannin g Dept. MEMORANDUM TO: Yolanda Hipski, Planner FROM: Babette Thorpe, Zoning Assistant DATE: September 1, 1993 RE: Redfields, Phase 2A Site Review Comments 1. You and I have discussed with the applicant the timing involved between reviewing this plan and the construction of the recreation center. As you know, proffer #4 of ZMA-89-18 stated: "The proposed recreation center shall be constructed with Phase 1" . The Zoning Administrator has agreed that we can accept this plan for review, without the recreation facility having been built. We will not issue tentative approval for phase 2A unless a building permit has been issued for the recreation center. We will not issue final approval until construction has begun on the pool. Please discuss this with the Director of Planning to insure that he concurs with this approach. 2 . Proffer #8 (2) of ZMA-89-18 calls for a 20-foot open space strip and landscape easement adjacent to Tax Map 76, parcel 49B. Please have the applicant show this open space and easement. 3 . Please clarify the intent of the easements shown on Lots 20 through 30. Will these areas be graded and replanted? Or are these to be areas in which no clearing or grading is to take place? :�V s la%\ it `j�>x io �, g COMMONWEALTH of VIRGINIA DEPARTMENT OF TRANSPORTATION P 0 BOX 671 RAY D. PETHTEL CULPEPER,22701 DONALD R.ASKEW COMMISSIONER DISTRICT ADMINISTRATOR Mr. William D. Fritz September 1, 1993 Dept. of Planning & Community Development County of Albemarle 401 McIntire Road Charlottesville, Va. 22901-4596 Dear Mr. Fritz : We have reviewed the final plat for the subject development and offer the following comments: SUB-93-105 - Redfields Phase 2A Final Plat No Comment As always, any work done on VDOT right of way must be under permit as issued by the Charlottesville Residency. Sincerely, mes C. Call Des. Draft. Tech. cc: Ms. A.G. Tucker TRANSPORTATION FOR THE 21ST CENTURY U.S. Department o tgr / cu | ture Page - 1 Soil Conservation Service 8/25/93 ------------_-------------------------------____-------------------------_ NONTECHNICAL SOILS DESCRIPTION REPORT FOR DESCRIPTION CATEGORY - A6R Survey Area- ALBEMARLE COUNTY , VIRGINIA _____---------------------------------- __________________________________ Map Symbol Description ----------_---------------____-----------_----------____---______-----__ __ 21B [ULPEPER FINE SANDY LOAM, Z TO T PERCENT SLOPES Culpeper soils are deep and well drained . Permeability and available water capacity are moderate . Runoff erosion hazard vary with slope from medium to severe . Ti | th is good . The organic matter content and the natural fertility are low. React / on commonly / s very strongly acid or strongly acid throughout , but / s variable / n the surface layer because of local liming . The root zone extends to a depth of W inches . Bedrow / s generally at a depth of 50 inches or more . The subsoil has moderate shrink-swell potent / a | . 21[ CULPEPER FINE SANDY LOAM, T TO 15 PERCENT SLOPES Culpeper soils are deep anU well drained . Permeability and available water capacity are moderate . Runoff erosion hazard vary with slope from medium to severe . Ti | th / s good . The organic matter content and the natural fertility are low. React / on commonly / s very strongly acid or strongly acid throughout , but is variable in the surface layer because of local liming . The root zone extends to a depth of ]b inches . Bedrock / s generally at a depth of 50 inches or more . The subsoil has moderate shrink-swell potential . 39D HAZEL LOAM, 15 TO 25 PERCENT SLOPES Hazel soils are deep excessively drained soils . Permeability / s moderately rapid . Available water capacity / s low. Surface runoff / s rapid to very rapid . The hazard of erosion is severe to very severe .The subsoil has low shrink-swell potential . The root zone extends to a depth of 20 inches . The organic matter 6ontent and the natural fertility are ( ow. This soil commonly is strongly acid or very strongly acid . Depth to bedrock ranges from 20 to 40 inches . 48E LOUISBUR6 VERY STONY SANDY LOAM, 25 TO 45 PERCENT SLOPES Louisburg soils are deep and well drained . Permeability is rapid , and the available water capacity / s low. Eros / on hazard varies from severe to very severe . The subsoil has very low shrink-swell potential . The root zone extends to a depth of about 40 inches . The organic matter content and natural fertility are low. The soil / s strongly acid or very strongly acid thou8hout , but react / on / s variable because of local liming . Bedrock is generally at a depth of more than 48 inches . U.S. Department of Agriculture Page - ! Soil Conservation Service $a/a 72 FEATURES Survey Area- AL q± COUNTY, VIRGINIA ; Cemented l :Potential 2—-Risk of corrosion Map s ol and . Bedrock . pan . Subsidence-- frost :Uncoated so name : Depth Hardness 1 Depth Hardness : Initial Total : action : steel Concrete In R R in ae 2JJm 48- 48 HARD - - - MODERATE MODERATE MODERATE 21C ±Jam a- m HARD - - - MO RATE MODERATE MODERATE 3e HAZEL m- g HARD - - - MODERATE LOW HIGH 48E 3\S. 40- 40 HARD - - - LOW MODERATE U.S. Department of Agriculture Page - 1 Soil Conservation Service 8/25/93 WATER FEATURES Survey Area- ALBEMARLE COUNTY, VIRGINIA Map symbol and :Hydrologic: Flooding High water table soil name l group 1Freq Duration Months 1 Depth Kind Months (Ft) 21B CULPEPER C NONE - 6.0- 6.0 - t1C CULPEPER C NONE - 6.0- 6.0 - 39D HAZEL C NONE - 6.0- 6.0 - 48E LOUISBURG B NONE - 6.0- 6.0 - • • U.S. Department of Agriculture Page - 1 Soil Conservation Service 8/25/93 SOIL INTERPRETATION REPORT Survey Area- ALBEMARLE COUNTY, VIRGINIA Map Symbol, Shallow Dwellings Small Local Streets Lawns, Soil Name Excavations Without Commercial and Roads Landscaping, Basements Buildings and Golf Fairways 21B CULPEPER MODERATE MODERATE MODERATE SEVERE SLIGHT Depth To Rock Shrink-swell Shrink-swell Low Strength Too Clayey Slope Z1C CULPEPER MODERATE MODERATE SEVERE SEVERE MODERATE Depth To Rock Shrink-swell Slope Low Strength Slope Too Clayey Slope Slope 39D HAZEL SEVERE SEVERE SEVERE SEVERE SEVERE Depth To Rock Slope Slope Slope Slope Slope 48E LOUISBURG SEVERE SEVERE SEVERE SEVERE SEVERE Slope Slope Slope Slope Large Stones Slope ALBEMARLE COUNTY SERVICE AUTHORITY MEMO To: Yolanda A. Hipski, Planner FROM : Peter C. Gorham, Civil Engineer I DATE: September 2, 1993 RE: Site Plan Technical Review for: Redfields Phase 2A Final Plat The below checked items apply to this site. (TM 76R Parcel 1) x 1. This site plan isAWVOtiat within the Authority's jurisdictional area for: X A. Water and sewer B. Water only C. Water only to existing structure D. Limited service X 2. A 12 inch water line is located approximately onsite 3. Fire flow from nearest public hydrant, located ist from this site plan, is gpm+ at 20 psi re al. X 4. An 8 inch sewer line is located onsitexkbotamx. 5. An Industrial Waste Ordinance survey form must be completed. X 6. No improvements or obstructions shall be placed within existing or future easements. X 7. Water and sewer plans are currently under review. 8. and plans have been received and approved. 9. No plans are required. X 19. Final water and sewer plans are required for our review and approval prior to tiNaVFOVER4A granting tentative approval. 11. Final' site plan may/may not be signed. 12. RWSA approval for water and/or sewer connections. - Comments: Pump station shall be sized to serve applicable portions of Phase 5. Pump station shall also be located to serve future Phase 5. The site plan does not show or incorrectly shows: meter locations water line size water line locations sewer line size sewer line locations expected wastewater flows easements expected water demands SUB-93 105 4o1r11)4.7., eAt.gb ! C, :,.11 REcEiv,E0 ' nE' U i993 COUNTY OF ALBEMARLE Department of Inspections Planning Dept. Charlottesville, Virginia 22901-4596 (804) 296-5832 MEMORANDUM To: Yolanda Hipski - Planner From: Jay Schlothauer - Deputy Director of Inspections Date: August 31, 1993 Re: Redfields Recreation Center - Major Amendment (SDP-93-039) (plans revised August 26, 1993) The Inspections Department and the Fire Prevention Office have no further comments. Approval may be granted by this office. JS/js cc: Fred Missel - The Cox Company file