HomeMy WebLinkAboutSUB199300105 Approval - County Final Plat 1994-01-24 •ikGINxP
COUNTY OF ALBEMARLE
Department of Engineering
401 McIntire Road
Charlottesville, Virginia 22902-4596
(804) 296-5861 RECEIVED
January 24, 1994 JAN 2 4 1994
Mr. Fred Missel, ASLA lannlncg D4
The Cox Company .
220 East High Street
Charlottesville, VA 22902
re: Redfields Phase 2A
Dear Mr. Missel:
Your memorandum and supporting documentation on the above referenced project has been
reviewed. Final Plat approval is hereby granted by this department. Prior to final signature,
the items and conditions listed below must be satisfactorily addressed.
11 1. Fieldstone Road and Canvas Back Lane must be built/bonded.
D2. A Subdivision Bond must be posted for the proposed detention basin located near the end
of Canvas Back Lane.
3. Pursuant to previous discussions, a revised Albemarle County Standard Stormwater
Maintenance/BMP Facilities Maintenance Agreement must be recorded for the
stormwater detention basin (the upgraded pond) and the Phase 2a detention structures
(level spreader and potential detention pond). This agreement is required to cover the
additional structures and eliminate confusion regarding the applicability of the previously
recorded agreement. The agreement should supersede the previous document and
reference the SUB 90-180, SUB 91-153, SUB 93-029, and SUB 93-065 subdivision
plans.
4. Department of Engineering approval of Erosion Control Plan.
FAX (804) 972-4060
Mr. Fred Missel
24 January 1994
Page 2
As discussed in our telephone conversation of 24 January 1994, items 2 and 4 above must be
accomplished prior to the start of any land disturbance activities. All construction at this time
should be conform with the above referenced final plat. Please contact me at your earliest
convenience if you have questions regarding these comments or require additional information.
Sincerely,
1,90-k rviA,v-ico
Don Franco, PE
ACF/
CC: Jack Kelsey
Bobby Shaw
YAci
Babette Thorpe
Job File - SUB 93-105
Reading File - b93105_e.fm