Loading...
HomeMy WebLinkAboutSUB199300105 Correspondence 1994-10-12 To: Don Franco From: Yolanda Hipski Subject: Redfields Phase 2A Date: 10/12/94 Time: 9:25a Can you notify me if the stormwater detention facility for the above project is completed? The applicant would like to get the plat signed. Prior to our signature, I would like to confirm that the basin is completed as previously required in my approval letter to the applicant (condition 1b).