Loading...
HomeMy WebLinkAboutSUB199300105 Review Comments 1994-10-26 COUNTY OF ALBEMARLE RECEIVE D 4LL34,17-u"i nun 2 61994 �''lannrn g Dept. MEMORANDUM TO: Yolanda Hipski, Planner FROM: Don Franco, Civil Engineer II inr DATE: 26 October 1994 RE: Redfields 2A As you are aware, I have had numerous recent telephone conversations with both Mr. Gaylon Bates and Mr. Fred Missel . I wish to update on the status of the project based on these conversations and other recently submitted information. 1 . Proof of recordation of a revised Albemarle County Standard Stormwater Maintenance/BMP Facilities Maintenance Agreement was received 20 October 1994 from Kirk Hughes & Associates . 2 . An as-built survey of the spillway crests was requested by this Department in order to clarify potential inconsistencies identified during recent site visits. Mr. Bates reports that his contractor' s survey of as-built conditions indicates that the construction was satisfactorily completed. Specifically, the principle and emergency spillway crests are within 0 . 30 inches and 0 . 04 inches, respectively, of the design elevations . Based on this information, it is our understanding that the Refields pond has been constructed in general accordance with the approved plans . Please contact me at your earliest convenience if you have questions regarding these comments or require additional information. DF/