HomeMy WebLinkAboutSUB199300105 Review Comments 1994-10-26 COUNTY OF ALBEMARLE RECEIVE
D
4LL34,17-u"i nun
2 61994
�''lannrn
g Dept.
MEMORANDUM
TO: Yolanda Hipski, Planner
FROM: Don Franco, Civil Engineer II inr
DATE: 26 October 1994
RE: Redfields 2A
As you are aware, I have had numerous recent telephone
conversations with both Mr. Gaylon Bates and Mr. Fred Missel .
I wish to update on the status of the project based on these
conversations and other recently submitted information.
1 . Proof of recordation of a revised Albemarle County
Standard Stormwater Maintenance/BMP Facilities Maintenance
Agreement was received 20 October 1994 from Kirk Hughes &
Associates .
2 . An as-built survey of the spillway crests was requested by
this Department in order to clarify potential
inconsistencies identified during recent site visits. Mr.
Bates reports that his contractor' s survey of as-built
conditions indicates that the construction was
satisfactorily completed. Specifically, the principle and
emergency spillway crests are within 0 . 30 inches and 0 . 04
inches, respectively, of the design elevations . Based on
this information, it is our understanding that the
Refields pond has been constructed in general accordance
with the approved plans .
Please contact me at your earliest convenience if you have
questions regarding these comments or require additional
information.
DF/