HomeMy WebLinkAboutSUB199300105 Review Comments 1993-09-27 nt'Vdtc.
4741h,17'
COUNTY OF ALBEMARLE
Dept. of Planning & Community Development
401 McIntire Road
Charlottesville, Virginia 22902-4596
(804) 296-5823
September 27 , 1993
Mr. Fred Missel
c/o The Cox Company
220 East High Street
Charlottesville, VA 22902
RE: Status on Redfields Project
Dear Fred:
After our conversation of Friday, September 24, 1993 , I thought
it may be helpful to send a quick note on the status of the three
Redfields projects currently under review:
Redfields Recreation Center:
Waiting for Engineering approval. Erosion Control plan final
approval pending.
Redfields Phase 2A:
Per my letter dated September 24 , 1993 , a landscape plan will be
required prior to signature of plat. During our last conversation
I understand that you are agreeable to this provision. Please
contact me if this is not correct.
Per Site Review Comments of September 2 , 1993 in her memo to me,
Babette Thorpe of Zoning will retain her tentative approval until
a building permit is issued for the Recreation Center. Given our
agreement about the landscape plan and the subsequent issuance of
the Recreation Center Building Permit, we should be able to grant
preliminary approval. A letter will then be sent from this
department stating this approval.
Prior to final signature of plat, be sure to post road bonds and
erosion control bonds . Required landscaping shall be planted at
time of signature or the developer may request from Zoning to
post bond.
Fred Missel
Page 2
September 27 , 1993
Watershed at Redfields Phase 1C: 471 I q3
Reduced road bond to be posted within a day or two per Gaylon
Beights. Plat signing to occur shortly after.
If you should have any questions or comments regarding the above,
please do not hesitate to contact me.
Sincerely,
Yolanda A. Hipski
Planner
YAH/blb