Loading...
HomeMy WebLinkAboutSDP200500019 Bond Release 2022-01-21 (2)GUSNPENEL, INC. 525 Grove Avenue 0 Charlottesville, VA 22902 0 (804)216-9200 Email: kimt@easylivinghomes.com ❑ web: www.easylivinghomes.com December 20, 2021 Mr. Frank Pohl County Engineer County of Albemarle Department of Community Development 401 McIntire Road, Room 227 Charlottesville, VA 22902-4596 RE: Abington Place Townhouses — Final Bond Release ' 17 ye05 DDO/`t' Dear Frank: In my letter of August 18, 2020 I laid out a proposal for a way forward to obtain the complete release of the $396,432 bond outstanding on Abington Place. Since that time we have proceeded to implement that plan. We have made the stormwater repairs you identified. We have furnished documentation from the contractors and others that the work was done. Where appropriate we have supplied videos of the completed work. You and I met in Abington and identified locations for repairs to the sidewalks. Those repairs have been made. In my letter I said we would make the asphalt repairs identified by F&R in their inspection report dated August 31, 2015. These repairs have been completed. F&R's field inspection report of the repairs is attached. At this time we request full and final release of the outstanding bond on the townhouse portion of the project. It has been a pleasure working with you to resolve this matter. Sincerely, V/ Clement Tingley ;44 C:\Users\kimti\Documents\Business 2015\engineer\Abington Place\Townhouse facilities acceptance\Letter to Pohl rel bond.docx