Loading...
HomeMy WebLinkAboutWPO201800014 Other 2022-01-25VIRGINIA DEPARTMENT OF ENVIRONMENTAL QUALITY GENERAL VPDES PERMIT FOR DISCHARGES OF STORMWATER FROM CONSTRUCTION ACTIVITIES (VAR10) NOTICE OF TERMINATION 2019 Permit Coverage Number (VAR10# ): LIM to @- Section 1. Operator/PermRtee Information. The person or entity that has active permit coverage approval and operational control over construction activities to ensure compliance with the general permit. A person with signatory authority for this operator must sign the certification in Section VII (per Part III. K. of the VAR10 Permit). Construction Activity„ Operator Name: Contact Person: Address: f &9i , City, State, Zip Code: '�5�s tAa�tOd Phone Number: � , , T699 L I Primary Email: g2 0 �oer„srf.�ow CC Email: �t��ras".r- + Section 11. Construction Activity Location Information. Project site Information. Construction Activity Name: a+Uee'tf Address: kwkp/504 ju&wetr w.4 (15-5 PNJ50q AP-) City and/orCounty and Zip Code: .€€ Latitude and Longitude (6-digit, decimal degrees format): Lam- - ID5b6 0 S' L DA6 - 7S.407954 Section -Ill. Reason for Terminating Coverage under the General Permit. The operator shall submit a Notice of Termination within 30 days after meeting one or more of the following conditions (select one or more): IDAA. Necessary permanent control measures included in the SWPPP for the site are in place and functioning effectively and final stabilization has been achieved on all portions of the site for which the operator is responsible. When applicable, long-term responsibility and maintenance requirements for permanent control measures shall be recorded in the local land records prior to the submission of a Notice of Termination; ❑ 0. Another operator has assumed control over all areas of the site that have not been finally stabilized and obtained coverage for the ongoing discharge; ❑ C. Coverage under an alternative VPDES or state permit has been obtained; or ❑ D. For residential construction only, temporary soil stabilization has been completed, the operator has provided written notification to the homeowner about the importance of final stabilization and incorporating a copy of the notification and signed certification statement into the SWPPP, and the residence has been transferred to the homeowner. Rev 04/2019 PAGE 1 ; 6 CONSTRUCTION GENERAL PERMIT (VAR10) NOTICE OF TERMINATION 2019 V;' Section IV. Participation in a Regional Stormwater Management Plan. If your site discharges to a regional stormwater management facility, provide information related to the regional stormwater management plan. Attach a separate list if discharging multiple regional facilities. Regional Storrwater Management Facility Type: �(;GitONKL STort+'MN 1Li3ASa.�—Co�w'N 5{p2ruw.Kt?Z, r-ta�,tLA Address: 1p. # OWF0' Of ot. K rN)2oArD City and/or County and Zip Code: C14rota Lo44E7LAWC, ✓A. Z2.9/IF Latitude and Longitude (6-digit, decimal degrees format : �� % 38. 0 2? (0' CP 8 ' 7 � �( Total Acres Treated by Regional Facility • (� AL (report to one -hundredth of an acre): Impervious Acres Treated by Regional Facility Z.g50.C. (report to one -hundredth of an acre): Section V. Perpetual Nutrient Credits. If your site is utilizing nutrient credits, provide information related to the perpetual nutrient 14'& credits that were acquired in accordance with § 62.1-44.15:35 of the Code of Virginia. Attach a separate list if needed. . Nonpoint Nutrient Credit Generating Entity (Bank Name): Perpetual Nutrient Credits Acquired (pounds/acres/year): include the affidavit of sale for all nutrient credits acquired. Is the affidavit of sale of nutrient credits attached? OYES ONO p:: Section VI. Permanent Control Measures. If applicable, list the post -development stormwater management facilities or best management practices (BMPs) that were constructed and installed as part of this activity to comply with the stormwater management technical criteria (structural and nonstructural, on -site and off -site). Attach a separate list if needed. If you have permanent control measures, the following items are required to be included with this form in order to complete your Notice of Termination submittal: ❑ A. Engineer's Certification Statement ❑ B. As -built plans (construction record drawings) — digital [3C. As -built plans (construction record drawings) —full-sized, paper ❑D. StormwaterManagementPlans—digital CIE. BMP Maintenance Agreement — notarized original, for public and private projects under DEQ s VSMP Authority Stormwater Management Facility Types fp)ease choose from the fogowfna hmv types). Bioretention 1 Bioretention 2 Bioretention basin Bioretention filter Constructed Wetland 1 Constructed Wetland 2 Constructed wetlands Dry Swale 1 Dry Swale 2 Extended detention (2 x WQ Vol) Extended Detention Pond 1 Extended Detention Pond 2 Extended detention -enhanced Filtering Practice 1 Filtering Practice 2 Grass Channel Grassed swale infiltration (1 x WQVol) infiltration (2 x WQVop Infiltration 1 nfiltration 2 Other 116 (manufactured treatment device, etc.) Other IIC (manufactured treatment device, etc.) Permeable Pavement 1 Permeable Pavement 2 Rainwater Harvesting Retention basin 1(3 x WQ Vol) Retention basin II (4 x WQ Vol) Retention basin 111(4 x WQ Vol with aquatic bench) Sand filter Sheetflow to Vegetated Filter or Conserved Open Space 2 Soil Amendments Urban Bioretentlan Vegetated filter strip Vegetated Roof 1 Vegetated Roof 2 Wet Pond 1 Wet Pond 2 Wet Swale 1 Wet Swale 2 ry Rev 0412019 PAGE 2I6 CONSTRUCTION GENERAL PERMIT (VAR10) NOTICE OF TERMINATION 2019 Stormwater Management Facility #1 BMP Type: Date BMP Became Functional: Address (If available): City and/or County and Zip Code: Latitude and Longitude 6-digit, decimal degrees format): Receiving Water(s) (outfall discharge): Total Acres Treated (report to one -hundredth of an acre): Impervious Acres Treated (report to one -hundredth of an acre): Stormwater Management Facilfty#2 BMPT e: Date BMP Became Functional: Address (if available): CitV and/or County and Zl ;Code: Latitude and Longitude (6dl It, decimal degrees format): Receiving Water(s) (outfall discharge): Total Acres Treated (report to one -hundredth of an acre): Impervious Acres Treated (report to one -hundredth of aniacre): Stormwater Management Faculty#3 BMP Type: Date BMP Became Functional: i Address (if available): City and/or County and ZipjCcde: Latitude and Longitude (6digit, decimal degrees format): Receiving Water(s) (outfail disch'a e): Total Acres Treated (report to one -hundredth of an!acre): Impervious Acres Treated (report to one -hundredth of an acre): Rev 04/2019 PAGE 3 16 CONSTRUCTION GENERAL PERMIT (VAR10) NOTICE OF TERMINATION 2019 Section VII, Certification. This Certification must be signed by a person representing the operator identified in Section I. and meeting the requirements of 9VAC25-880-70 Part III K. Certification: "I certify under penalty of law that I have read and understand this Notice of Termination and thatthis document and all attachments were prepared in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system or those persons directly responsible for gathering the information, the information submitted is to the best of my knowledge and belief true, accurate, and complete. I am aware that there are significant penalties for submitting false information including the possibility of fine and Imprisonment for knowing violations." Printed Name: Signature (signed in Ink): Date: Section Vill. Submittal Instructions. Please submit this form to the Virginia Stormwater Management Program (VSMP) Authority that has jurisdiction for your construction activity. If the locality is the VSMP Authority, please submit your form directly to the locality, do NOTsend this form to DEC, A list of local VSMP Authorities is available here: VSMP Authorities. If DEQ is the VSMP Authority please send to: Department of Environmental Quality office of Stormwater Management Suite 1400 PO Box 1105 Richmond VA 23218 constructiongp0clep vireinia eov if the locality is the VSMP Authorityplease send to: Permit terminations may be delayed if there are outstanding annual permit maintenance fee balances due. Rev 04/2019 PAGE 4 16