HomeMy WebLinkAboutSDP200700078 Legacy Document 2007-10-11 (3)1 pF AL
L IXtG1ISSA
ALBEMARLE COUNTY PLANNING
STAFF REPORT SUMMARY
Project Name: SDP 07 -078: NGIC
Staff: David Pennock, Jonathan Sharp
Expansion — Preliminary Site Plan
Planning Commission Public Hearing:
Board of Supervisors Hearing:
October 9, 2007
Not applicable
Owners: Next Generation, LLC
Applicant: United Land Corporation
Acreage: 15 acres within the 116 acre parcel
Rezone from: Not applicable
Special Use Permit for: Not applicable
TMP: Tax Map 33, Parcel 1 D (in part) and 1 F
By -right use: CO, Commercial Office zoning
(in part)
with Special Use permits to allow Research
Location: East of Seminole Trail [Route 29N]
and Development Laboratories and
at the end of Boulders Road [Private]
Residential uses
Magisterial District: Rivanna
Proffers /Conditions: Yes
Requested # of Dwelling Lots: n/a
DA— X RA —
Proposal: Request for preliminary site plan
Comp. Plan Designation: Industrial Service
approval for construction of two four -story
in the Community of Piney Mountain in the
office buildings totaling 178,800 square feet
Development Area
and site preparation work related to a future
project for a 120 -unit residential building.
Character of Property: This property is
Use of Surrounding Properties: Adjacent to
currently partially wooded, with some meadow
the existing National Ground Intelligence
areas, unimproved roadways, and drainage
Center (NGIC) and to low density
swales.
residential /rural uses
Factors Favorable: (see report)
Factors Unfavorable: (see report)
RECOMMENDATION:
The preliminary site plan cannot be approved as submitted
STAFF PERSON:
PLANNING COMMISSION:
SITE PLAN:
PROPERTY OWNER:
APPLICANT:
David E. Pennock, Jonathan Sharp
October 9, 2007
SDP 07 -078: NGIC Expansion — Preliminary Site
Plan
Next Generation, LLC
United Land Corporation
APPLICANT'S PROPOSAL:
Request for preliminary site plan approval for construction of two four -story office buildings totaling
178,800 square feet and site preparation work related to a future project for a 120 -unit residential
building. This project was called up for review by the Planning Commission.
CHARACTER OF AREA:
This project ise within an area east of Route 29N at the end of the previously constructed portion of
Boulders Road, which currently serves the National Ground Intelligence Center (NGIC). Camelot and
Briarwood subdivisions are on the west side of Route 29N at this location, and General Electric has a
facility nearby. The North Fork of the Rivanna River flows adjacent to portions of the NGIC site. The
surrounding properties include mostly low- density rural residential uses, the majority of which are also
owned by this applicant.
PLANNING AND ZONING HISTORY:
ZMA 07 -003 NGIC Expansion: This property was rezoned to Commercial Office in August, 2007,
with proffers and a proffered application plan showing the construction of two office buildings and a
residential building, as well as the extension of Boulders Road and some associated improvements to
Route 29.
SP 07 -031 Special Use Permit - Residential Units: A special use permit was approved with conditions
in August, 2007 in order to allow Research and Development Laboratories.
SP 07 -032 Special Use Permit - Research & Development; Labs: A special use permit was approved
with conditions in August, 2007 to allow residential uses on this property.
ZMA 99 -002 Value America: A rezoning was submitted in 1999 for Light Industrial on a portion of
TMP 33 -1D, but was eventually withdrawn.
SP 99 -033 NGIC Access Road: A special use permit was granted in August, 1999 to allow fill in the
floodplain for the construction of the access road (now known as Boulders Road).
COMPREHENSIVE PLAN:
The Comprehensive Plan designates this property as Industrial Service in the Community of Piney
Mountain in the Development Area.
REASON FOR PLANNING COMMISSION REVIEW:
Request for review of a preliminary site plan by the Planning Commission in accordance with Section
32.4.2.6. This application has been requested for review by a member of the Planning Commission
(Attachment Q.
2
STAFF COMMENT:
This project was reviewed for compliance with the Zoning Ordinance, as well as the Application Plan and
proffers approved with the ZMA for this project. Based on recent changes to the design, the plan is no
longer in compliance with the approved application plan. A stormwater management facility is proposed
along the southwest line of the office buildings. This facility requires substantial grading that will extend
from the edge of these buildings through the 20 -foot buffer and in to the adjacent parcel. As such, two
waivers are necessary for the plan to proceed as submitted. First, the application plan must be amended
through approval of a "Minor Variation to the Approved Plan ", in accordance with proffer #4 of ZMA 07-
003. Assuming approval of such a variation, the applicant must also pursue a waiver in order to disturb the
required 20 -foot buffer that abuts all residential and rural areas districts. This waiver requires the approval
of the variation referenced above, as well as approval by the Planning Commission, in accordance with
Section 21.7.3 of the Zoning Ordinance. Neither of these waivers has been requested at this time.
The applicant has worked with other members of the Site Review Committee to resolve issues presented
during the initial review of the site plan. This proj ect has been reviewed by the Site Review Committee with
additional comments presented below as conditions.
RECOMMENDED ACTION:
Based on the non - conformity with the approved Application Plan, as well as the lack of a necessary
waiver for buffer disturbance, the preliminary site plan cannot be approved as submitted. These
modifications must be approved prior to preliminary approval of the site plan.
The final site plan shall also be subject to these conditions:
❑ 1. The Current Development Division shall not accept submittal of the final site plan for signature
until tentative final approvals for the following conditions have been obtained. The final site
plan shall not be signed until the following conditions have been met:
❑ a. Current Development Planner approval to include:
❑ i. Approval of Lighting Plan, including specification sheets and photometric layouts
for proposed new lights, in accordance with Section 4.17.
❑ ii. Approval of Landscaping Plan, including required screening, in accordance with
Section 32.7.9.
❑ iii. Approval of Conservation Plan, in accordance with the approved Application Plan.
❑ iv. Conditions of both Special Use Permits must be included on the site plan.
❑ b. Current Development Engineer approval to include review of all applicable items as
specified in the Design Standards Manual, as well as:
❑ i. Erosion and Sediment Control Plan.
❑ ii. Stormwater Management Plan.
❑ iii. Please provide all needed easements (or at a minimum for preliminary approval, a
letter of intent) from the United States of America for grading, drainage easements,
use of the pond, etc. A drainage easement will be needed from both proposed outfalls
of the NGIC expansion. Drainage easements should be shown correctly over ditches
and drainage structures.
❑ iv. Parking areas cannot exceed 5% grade in any direction.
❑ v. Grading errors shown on the proposed plan must be corrected.
❑ c. Albemarle County Building Official approval.
❑ d. Fire and Rescue Division approval to include:
❑ i. Verify adequate fire flow is available.
❑ e. Albemarle County Service Authority approval to include:
❑ i. Dedication of offsite water and sewer is required prior to final approval.
❑ ii. Approval of final water and sewer construction drawings.
❑ f. Virginia Department of Transportation approval to include:
❑ i. Approval of plans for all State maintained portions of the property and entrances
into the site.
❑ ii. Road and drainage plans need to be provided for the extension of Boulders Road.
• iii. The plan needs to address the need for a right turn lane into the site.
• iv. The plan needs to show the proffered improvements to route 29.
❑ v. The entrance to the site at Boulders Road needs to be designed in accordance with
the Minimum Standards of Entrances to State Highways and VDOT ' s Road
Design Manual.
ATTACHMENTS:
A. Vicinity Map
B. Preliminary Site Plan
C. Approved Application Plan
D. Letter requesting Planning Commission Review
0