Loading...
HomeMy WebLinkAboutSP200400050 Legacy Document 2007-08-20irRct�i'' COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902-4596 Phone (434) 296-5832 August 16, 2007 Peter Sheeran Sheeran Architects 226 East High Street Charlottesville, VA 22902 RE: SP# 2004-00050 Flow Automotive Companies Sales/Display Dear Mr. Sheeran: Fax (434) 972-4012 On May 2, 2007, the Albemarle County Board of Supervisors took action on SP #2004-00050 to allow expansion of the Flow Volkswagen -Audi -Mazda dealership, including outdoor display and sale of automobiles in the Entrance Corridor on Tax Map 78, Parcel 15E in the Rivanna District. This special use permit was approved based on the following conditions: 1. Vehicles shall not be elevated anywhere on site; 2. Vehicles shall be displayed only in areas indicated for display shown on the site plan entitled "Flow Automotive," prepared by the Collins Engineering, dated April 2, 2007; 3. Display parking shall be only in designated striped parking spaces as identified on this plan; 4. Final site plan approval is subject to ARB approval of the landscape plan (submitted with the site plan). Landscaping shown on the plan may be required to be in excess of the minimum requirements of ARB guidelines or the Zoning Ordinance to compensate for the negative visual impact of the proposed use, particularly regarding the retaining wall on the west side of the property; 5. Final site plan approval is subject to the recordation of easements for ingress/egress, as well as the installation, maintenance and use of parking spaces, planter islands, and landscaping on adjacent parcels (Tax Map 78, Parcels 15D and 15E); and 6. Final site plan approval is subject to ARB approval of the lighting plan (which shall be submitted with the site plan). Maximum light levels on site shall not exceed 30 foot candles. Maximum spillover lighting requirements must also be met. Please be advised that although the Albemarle County Board of Supervisors took action on the project noted above, no uses on the property may lawfully begin until all applicable approvals have been received and conditions have been met. This includes: compliance with conditions of the SPECIAL USE PERMIT; approval of and compliance with a SITE PLAN/SITE PLAN AMENDMENT; and approval of a ZONING COMPLIANCE CLEARANCE. In the event that the use, structure or activity for which this special use permit is issued is not commenced within twenty-four (24) months from the date of Board approval, it shall be deemed abandoned and the permit terminated. The term "commenced" means "construction of any structure necessary to the use of the permit." If you have questions or comments regarding the above -noted action, please do not hesitate to contact Sherri Proctor at 296-5832. Sincerely, V. Wayne Cilimberg Director of Planning Cc: Gary A Howie 2883 Seminole Trail Charlottesville Va 22911 Tex Weaver Chuck Proctor Sherri Proctor File