HomeMy WebLinkAboutSP200700004 Legacy Document 2007-09-06COUNTY OF ALBEMARLE
PLANNING STAFF REPORT SUMMARY
Project Name: ZMA 06-09 5`h Street -Avon Center
Staff: Claudette Grant
SP 07-04 5`h Street -Avon Center —
Parking Structure
Planning Commission Public Hearing: July 24, 2007
Board of Supervisors Hearing: September
12, 2007
Owners: New Era Properties, LLC and Avon Holdings
Applicant: New Era Properties, LLC, with LeClair
LLC (TMP 77-11 E)
Ryan as the contact and The Cox Company as the
consulting engineer
Acreage: 86.895 Acres
Rezone from: LI Light Industrial and RA Rural Area
(existing zoning) to PDSC Planned Development
Shopping Center District with special use permit for
parking structure.
TMP: Tax Map Parcel 76M1 -2A, 76M1 -2B, 76M1 -4A,
By -right use: Industrial , office, and limited
77-11 E
commercial uses (No residential use) and agricultural,
Location: Northeast intersection of Interstate 64 and
forestal, and fishery uses; residential density (0.5
Fifth Street Extended (Rt 631) bounded on the east by
unit/acre)
Avon Street Extended and directly bounded on the
north by Moore's Creek. The Willoughby subdivision is
also located to the north. Access is Bent Creek Road.
(Attachments A and B)
Magisterial District: Scottsville
Proffers: Yes
Proposal: Approximately 476,355 square feet of non-
Requested # of Dwelling Units: 0
residential (commercial) uses with special use permit
for parking structure.
DA (Development Area): Neighborhoods 4 & 5
Comp. Plan Designation: Community Service/Mixed
Use -community -scale retail wholesale, business and
medical offices, mixed use core communities and/or
employment services, and residential (6.01-34
units/acre)
Character of Property: The majority of the site is
Use of Surrounding Properties: Commercial uses
undeveloped with woodland. There is an access road
such as fast food restaurants are located adjacent in
and the former Grand Piano warehouse building both
the City. The Willoughby residential subdivision is
located on this property. An old landfill was located on
located nearby as well as 1-64.
the eastern portion of the site.
Factors Favorable:
Factors Unfavorable:
1. The road connection from 5`h Street via Bent
Staff has found the following substantive matters for
Creek Road to Avon Street Extended creates
this rezoning that are still outstanding:
an additional east/west connection in this
portion of the County and City.
1. This request is located within the I-64
2. This development will add additional
and Avon Street entrance corridors.
commercial/retail uses to a portion of the
Several of the ARB comments remain
County (Southern Urban area) where there are
unaddressed.
currently not many of these uses for the
2. The Comprehensive Plan Amendment
residents.
features regarding architecture, urban
design, and landscape treatment still
need to be addressed.
3. A completed work plan approved by DEQ
regarding environmental concerns
relating to the old landfill remains
outstanding. A proffer has been provided
that will ensure that the work plan is
completed and approved by DEQ prior to
approval of the first final site plan.
4. Cultural resources remain to be
addressed.
5. In order to avoid the old landfill, the
Greenway trail crosses a stream in a
manner that is unknown and goes off site
on property not owned by the applicant.
6. Language for Road Improvements
Proffer needs to be revised so that such
improvements are satisfied by
construction.
7. Pedestrian access from Avon Street
needs to be addressed.
8. The potential for a proposed pedestrian
interconnection to the adjacent
Willoughby development needs to be
provided.
The following lists technical issues, some of which
regard the proffers that are still outstanding.
1. Critical Slopes Waiver request. With
additional revised proffer language staff
feels that this issue can be
recommended for approval.
2. Location of all stream crossings will need
to be identified on plan, including the
crossing for the greenway trail.
3. Language regarding tree conservation
areas and the forest stewardship plan
need to be provided.
4. Additional details regarding the passive
open space/trailhead park area are
needed, such as size, and types of
amenities being proposed.
RECOMMENDATION: Without resolution of the aforementioned outstanding issues, staff cannot recommend
approval. Should the PC wish to recommend approval of this proposal to the Board, inclusive of proffers and the
application plan, staff recommends that this recommendation be based on resolution of the outstanding issues
before the Board acts on this rezoning.
ZMA 2006-00009 51h Street -Avon Center
PETITION
PROJECT: ZMA 2006-09/5th Street -Avon Center
PROPOSAL: Rezone 86.895 acres from LI - Light Industrial zoning district which allows industrial, office,
and limited commercial uses (no residential use) with proffers and Rural Areas: agricultural, forestal, and
fishery uses; residential density (0.5 unit/acre) to PD -SC - Planned Development Shopping Center zoning
district which allows shopping centers, retail sales and service uses; and residential by special use permit
(15 units/acre) Approx. 476,355 sq. ft. of commercial uses with special use permit for parking structure in
accordance with Section 5.1.41.
PROFFERS: Yes
EXISTING COMPREHENSIVE PLAN LAND USE/DENSITY: Community Service/Mixed Use -community -
scale retail wholesale, business and medical offices, mixed use core communities and/or employment
services, and residential (6.01-34 units/acre) Neighborhoods 4 & 5
ENTRANCE CORRIDOR: Yes
LOCATION: Northeast intersection of Interstate 64 and Fifth Street Extended (Rt 631), bounded on the east
by Avon Street Extended. Access is Bent Creek Road.
TAX MAP/PARCEL: 76/M1 -2A, 76/M1 -2B, 76/M1 -4A, 77/11E
MAGISTERIAL DISTRICT: Scottsville
CHARACTER OF THE AREA
The property is located at the Northeast corner of the intersection of Interstate 64 and Fifth Street Extended
(Rt 631). Uses adjacent to the site include commercial uses such as fast food restaurants and gas stations.
Some of the area is undeveloped with woods and Moore's Creek. The Willoughby residential subdivision is
also located nearby as well as Interstate -64.
SPECIFICS OF THE PROPOSAL
The applicant has proposed a 476,355 square foot shopping center which includes a variety of commercial
retail uses and two (2) additional pad sites for employment uses with a range of 46,391 — 61,855 square
feet. (See Attachment C) A park/open space area and trail are located on a portion of the site. This
property is currently accessed from Bent Creek Road off of 5th Street. The proposed access would include
the Bent Creek Road access as well as access from Avon Street Extended. The site is easily accessible
from Interstate 64.
The proposed project is a Planned Development Shopping Center to include an 84,500 square foot grocery
store, a home improvement store with 150,000 square feet, a major retail store with 150,000 square feet,
one (1) retail area with 19,000 square feet, and one (1) restaurant with 11,000 square feet. A 48,134 square
foot parking structure, 65 feet in height, is also proposed to be located between the home improvement
store and the major retail store.
The parcel fronts two streets - 5th Street via Bent Creek Road and Avon Street Extended. A public street is
proposed through the site which connects 5th Street and Avon Street Extended, but also circulates around
majority of the site. Two additional thoroughfares run east and west on the site and connect to the main
road.
APPLICANT'S JUSTIFICATION FOR THE REQUEST
The applicant has requested the rezoning to accomplish the goals of the Comprehensive Plan for
Community Service/Mixed Use -community -scale retail wholesale, business and medical offices, mixed use
core communities and/or employment services, and residential (6.01-34 units/acre) in Development Areas:
(Neighborhoods 4 & 5).
PLANNING AND ZONING HISTORY
The western portion of the property is part of the original Willoughby farm, and in the 1960's and 1970's it
was designated for a major shopping center. From 1975-85 it was part of the Willoughby Planned Unit
Development. In 1985, ZMA 85-15 was approved with proffers, rezoning 49.377 acres to LI. In 1989, ZMA
89-14 was approved with proffers, adding 4.516 acres to the LI district.
During the 1995-96 review and update of the Land Use Plan, the recommendation for Industrial Service
remained unchanged. In 1997 a Comprehensive Plan Amendment was requested from Industrial Service to
Regional Service (the Brass, Inc. proposal, CPA 97-05). After a series of public meetings and joint sessions
with the City of Charlottesville, the Planning Commission recommended to the Board of Supervisors a
designation of Community Service/Mixed Use. The Board subsequently further refined the recommended
Comprehensive Plan language, and was prepared to adopt it at its September 15, 1999 meeting. Prior to
the meeting, the applicant withdrew the project and the recommended language was never adopted.
On July 8, 2003, a revised Comprehensive Plan Amendment (CPA 03-02) was submitted and the Planning
Commission held the first of three worksessions regarding the request. The revised request included the
Avon Street and Grand Piano property, which expanded the project area by 30.48 acres. The Avon Street
property was formerly the City landfill. At its meeting on September 8, 2004, the Board of Supervisors
adopted Comprehensive plan language to be added to the Neighborhood 4 Profile. This property is
currently designated Community Service/Mixed Use in the Comprehensive Plan.
BACKGROUND
A public hearing was held with the Planning Commission on October 10, 2006 for the subject ZMA. This
public hearing was deferred because staff did not receive pertinent requested information for adequate
analysis. The October 10, 2006 public hearing was deferred to a work session on December 5, 2006, at
which the applicant agreed to resubmit information that the Planning Commission requested. The applicant
submitted revised information, but staff did not have sufficient time to review the new material and provide
comment to the Planning Commission for the December 5, 2006 meeting. The applicant gave a
presentation and scheduled a follow up work session with the Commission. The Planning Commission also
provided the following comments and suggestions of things that needed to be addressed at the next work
session, which was scheduled for January 23, 2007:
o The PC wants to try to avoid scheduling a work session again in the future to only receive an update
with the PC really not working on any of the issues.
o In reference to the Commission's concern Ms. Grant indicated that the revised plan and the proffers
have been submitted to staff for staff review. Staff's intent is that at the work session scheduled for
January 23rd the Commission will have information from staff's review that will assist the
Commission in discussion regarding this project. A traffic study revision has also been submitted
and will be discussed at the work session in January. The Commission had the following concerns
or request:
o The PC would like a comparison for consistency of the Comprehensive Plan with the submitted
proposed plan.
o The PC would like to see proffers with more commitment to the Main Core and Shell Certification
Program.
o What is the applicant's commitment to providing active recreation space?
o The Commission would like more information regarding the location of existing old growth forest and
rock outcrop previously discussed as well as a comparison of these existing natural resources with
the proposed plan.
o Ms. Joseph asked to discuss the field densification for the road. She asked that it be a topic of
conversation, particularly about what testing has been done.
The next work session was actually held on March 6, 2007 rather than January 23, 2007. The Commission
discussed and answered staff's questions outlined in the staff report. The following information lays out the
questions and resolution put forth by the Commission and includes additional discussion between the
Commission, staff and the applicant (The current status of each issue follows in bold italics):
1. Should a critical slopes waiver be processed as part of this rezoning?
The Planning Commission agreed to accept the concept design with the understanding that the applicant
would not have to process the critical slopes waiver request until the final site plan, but would include
appropriate language in the proffers for mitigation.
As agreed upon during the Planning Commission work session on March 6, 2007, the applicant has
not submitted a critical slopes waiver request. However, staff feels that the applicant has provided
enough information with one exception that could allow the critical slopes waiver to be
recommended for approval now rather than during site plan process. The exception is that if
additional language in the proffer is provided regarding conditions for erosion and sediment control
measures around the Moore's Creek (similar to what was completed for Biscuit Run) staff could
most likely recommend approval of this waiver with the rezoning.
2. Should a special use permit for disturbance in the floodway of Moore's Creek be processed
concurrent with this rezoning?
The creek is a vital waterway. The Planning Commission agreed to accept the concept design with the
understanding that the applicant would provide appropriate language regarding mitigation in the proffers.
The applicant offered to craft a proffer that the entire stream channel has to be substantially restored and
that they would pursue with VDOT bridges for stream crossings.
Proffer 7 Moore's Creek Erosion and Buffer Projects and Proffer 2 Road Improvements address
these concerns. There are two additional stream crossings shown on the plans that do not appear
to be bridges. One crossing is in regard to the main road on the site and the other crossing relates
to the location of the greenway trail going off the site.
3. Should further work be done by the applicant to reduce encroachment into the stream
buffers?
The Planning Commission agreed to accept the concept design with the understanding that the applicant
would provide appropriate language regarding mitigation in the proffers. It was noted that there is a pretty
significant increase in potential disturbance which the applicant agreed to address in the proffers.
Staff is aware that some portions of the roads on this site will encroach into the stream buffers.
However, staff feels the encroachment of roadways into the stream buffers are minimal compared to
the importance of protection of some of the areas around the old landfill that are eroding near the
stream banks. Staff also feels that as long as the mitigation in the proffers relating to the Creek and
landfill are adhered to that the impact of encroachment on the stream buffers will be very minimal.
4. Should further work be done by the applicant to assure all areas designated for tree
preservation will be preserved?
The Planning Commission agreed subject to the applicant providing an acceptable proffer to include
language that the replanting will be done. The preservation areas should be areas where no disturbance is
anticipated. Conservation areas will be those areas anticipating tree disturbance and will have conditions
for replanting. The tree preservation areas will need to be reduced on the plan and conservation areas
designated.
The applicant has added Proffer 5, Tree Conservation Areas, which generally says that only certain
types of land disturbance will occur in areas on the plan noted as "Conservation Areas" The proffer
goes on to explain that replacement of trees will be in accord with an approved Greenway Park and
Pedestrian Master Plan. While staff finds this proffer to be acceptable, the forest stewardship plan
will have to specify what obligations the developer and future owner(s) have. Any replacement of
trees will be tied to the site plan review and approval. There are no preservation areas shown on the
plan.
5. Should the applicant commit to the Historic/Archeological Resource recommendation of
staff?
The Planning Commission agreed with the applicant about his commitment to provide the Phase 1 study at
this point. The applicant was unsure whether they wanted to do Phase 2 or 3. The Phase 1 study would be
done before the grading.
Proffer 9, Cultural Resources describes the completion of a Phase I Historic Resources Survey prior
to land disturbance on the site for each such Potential Resource Site to be disturbed. While this
proffer begins to satisfy what the Planning Commission agreed to, it is unclear to staff what the
intent of the following language in the proffer is: "for each such Potential Resource Site to be
disturbed. " Attachment D, specifically describes what staff would like to see in this proffer.
The staff, Commission, and the applicant also discussed expectations for commitments to LEED
Certification and road improvements.
Proffer 6, LEED Standards for Core & Shell Development address LEED Certification and bonding as
discussed above with Mr. Edgerton.
Attachment E describes VDOT's recent comments that they are satisfied with the proposed project.
Analysis of this project with the Comprehensive Plan and Neighborhood Model have been previously
completed with past public hearing and work sessions. However, the following issues relating to the
Comprehensive Plan Amendment and Neighborhood Model remain outstanding:
Landfill:
A portion of the proposed site consists of an old landfill. During the March work session with the Planning
Commission staff explained that they would be meeting with the State of Virginia Department of
Environmental Quality (DEQ) representatives and the applicant to discuss concerns relating to the old
landfill. The landfill area contains the connector road through the site, and pads for future employment
opportunities/sites, which help to meet the "mixed use" expectations outlined in the Comprehensive Plan.
Since the last work session, the applicant has been working on developing a work plan that should address
concerns relating to development of this site on a portion of the old landfill. At the meeting on May 2, 2007
with the applicant and DEQ, it was decided that a work plan would be completed and approved by DEQ
prior to the Planning Commission public hearing. The applicant agreed to provide a proffer stating this.
Proffer 8 describes a completed work plan that is approved by DEQ. To date, the work plan is still being
developed and DEQ still needs to approve it. Although the work plan continues to be a work in progress,
staff is aware that the applicant has been working towards completing the work plan and eventually getting
approval from DEQ. The expected timing for completion of the work plan will not precede the Planning
Commission public hearing, but Proffer 8 will require that this be completed prior to approval of the first final
site plan.
Greenway Trail:
The plan shows a greenway trail around the perimeter of the site. Part of Moore's Creek is a boundary for
this project and the plan shows the trail adjacent to Moore's Creek. Initially, the trail was shown entirely on
the subject property. Since the applicant and DEQ have begun discussions about the old landfill, the
applicant revised the plan to show a portion of the trail crossing the Creek and now located to its' north on
property that is not owned by the applicant. The banks of the Creek are eroding and revealing portions of
the old landfill, making it unsafe and not desirable on the subject property as is. Staff anticipates that in
order to keep the trail in the original location, this area would need to be filled in. Without a work plan in
place it is difficult to know if this would be an acceptable option or not an option at all. Location of the trail as
shown on the plan remains an outstanding issue as it might not be feasible for the trail to cross Moore's
Creek.
Architecture, Urban design and landscape treatment:
The Comprehensive Plan amendment specifically describes the following treatments that are important
elements to the development of this property:
a. The integration of building facades and rooflines;
b. Architectural massing and form of individual buildings;
c. Architectural materials and color;
d. Design of parking areas;
e. Design/landscape treatment of streets and interior travelways, pedestrian, bicycle and
vehicular, including traffic calming;
f. Buffers and screening in areas impacted by critical sight lines;
g. Enhancements to preservation areas and open spaces and improvements to planned public
civic and greenway areas;
h. Street lighting, signage and hardscape features;
i. Recreational and civic improvements.
Several of these elements have not been addressed by the applicant. The ARB has also described a need
for similar elements to be addressed in this plan, which will be discussed later in the report. At a minimum
staff would like something that shows how these elements will be addressed, whether it be on a plan or in
the proffers.
Pedestrian Orientation: While sidewalks and trails are shown on the plan the entire site is not readily
accessible for pedestrians from Avon Street. One barrier that causes inaccessibility for pedestrians is the
environmental concern associated with the old landfill being readily visible on the property. As previously
mentioned location of the greenway trail remains an outstanding issue. If a pedestrian wanted to walk from
Avon Street to 5t" Street it would be challenging because there are no sidewalks on the main road and the
trail may or may not be developed out to Avon Street Extended. This development should be as pedestrian
friendly as possible. Staff believes additional efforts, such as adding pedestrian access from Avon Street
Extended, are equally important and should be made to meet this principle.
Other: The applicant has provided interconnected streets and transportation networks. However, as
mentioned in previous staff reports, staff feels consideration should be made for providing at a minimum a
pedestrian connection opportunity to the adjacent Willoughby development.
While the applicant is providing as shown on the plan a passive open space/trailhead park area; no details
of the park have been provided. The size is not known, nor the types of amenities being provided in these
spaces. It would be helpful for staff to have more details of this area in order to what level of park/open
space will be provided for the public.
Parking on this site is not completely relegated. However, the plan for a 65 foot tall structured parking facility
will help reduce the sea of parking shown in the lots.
There are steep slopes, rock, streams, wooded areas, floodplains and sensitive soils located on this site.
There are areas on this site where critical slopes will be disturbed and stream buffers will be encroached
upon due to locations of the road. Staff feels the stream buffers that will be encroached on by the proposed
road are minimal compared to the importance of protection of some of the areas around the old landfill that
are eroding near the stream banks.
STAFF COMMENT
Relationship between the application and the purpose and intent of the requested zoning district:
The purpose and intent of the Planned Development — Shopping Centers (PD -SC) district is to permit the
development of neighborhood, community and regional shopping centers in accordance with the
comprehensive plan. These districts serve areas not conveniently and adequately provided with a broad
range of commercial and service facilities. The existing Light Industry (LI) zoning district provides for
industries, offices and limited commercial uses which are compatible with and do not detract from
surrounding districts. Staff believes that the proposal meets the intent of the PD -SC.
Public need and justification for the change: The County's Comprehensive Plan supports development
in the designated development areas that is consistent with use, density, and form recommended in the
Plan. Fifth Street -Avon Center's uses and form are viewed as being generally in conformity with the
Comprehensive Plan.
Impact on Environmental, Cultural, and Historic Resources: There appear to be impacts on
environmental, cultural, or historic resources. A significant portion of this site is wooded and much of the
proposed development would be located in areas where the Open Space Plan shows wooded areas.
Critical Slopes will significantly be removed or impacted by this development due to the needed site grading
and public utility extensions (water & sewer). There are stream buffers and floodplains that will be disturbed.
As previously discussed and requested, the applicant is now showing conservation areas, but no
preservation areas. Much of the site will be disturbed in some manner, although the Moore's Creek will be
preserved.
The applicant provides a proffer that begins to address historic resources. However, the language in the
proffer does not specifically address staff's request, which is described in Attachment D.
Anticipated impact on public facilities and services:
Streets and Roads: The primary impact will be on Fifth Street and Bent Creek Road in the City of
Charlottesville. These roads located in the City will need to be upgraded and incorporated into the City
street system. City staff has been provided information on the proposal and proffers have been provided to
address impacts on the City streets.
The existing entrance to the site includes a bridge over Moore's Creek, which will need to be improved. It is
a public right of way that is privately maintained because the bridge was never accepted into the state
maintenance system. The applicant has provided proffers to address needed improvements to this bridge.
The applicant is not showing curb and gutter or sidewalks on the main road through the development. The
Comprehensive Plan Amendment describes the main road through this development in the following
manner:
"The former warehouse access road should become a parkway along Moore's Creek, but should not be
designed as a major thoroughfare. The road need not be improved with curbing, but should, to the
extent feasible, be confined mainly to the existing travelway and disturbed area. To avoid additional
disturbance to this stream buffer, sidewalks should not be required on this road. The greenway along
Moore's Creek is recommended as a pedestrian alternative."
Should this property be subdivided, the subdivision ordinance requires curb and gutter, sidewalks, street
trees, and connectivity. A waiver process of the subdivision ordinance is available per Section 14-410
Standards for all streets and alleys.
Fire, Rescue, Police: The Monticello Fire -Rescue station has been constructed off of Mill Creek Drive
Extended and provides service to this site. Currently, the Monticello station adequately serves this area,
meeting response time standards. Response time along the Avon Street Extended corridor of the
Development Area is approximately 5 minutes. However, response times may be affected by continued
growth in the area. Albemarle County 5th Street Office Building contains the County's Police Department,
although the police patrol all areas of the County. Current policy of police services recommends an average
response time of 10 minutes for all Development Areas.
Stormwater Management: The plan does not indicate conceptual measures for stormwater detention. Since
this development proposal lies adjacent to flood plain of Moore's Creek, the applicant may be considering a
detention waiver.
Utilities: Albemarle County Service Authority indicates that water and sewer service is available to serve the
site.
Anticipated impact on nearby and surrounding properties: Surrounding properties are already
experiencing a change in character as new development has already occurred around them in the City of
Charlottesville, and in the County. With residences on the north side of Fifth Street -Avon Center, it is
important to protect these residential uses from roads and commercial uses adjacent to them in Fifth Street -
Avon Center. Landscape screening and stream buffers may help to protect these residences.
ARCHITECTURAL REVIEW BOARD COMMENT
The proposed 5th Street — Avon Center development falls within the 1-64 and Avon Street Entrance
Corridors. This project was reviewed by the ARB on January 16, 2007. Only one of the ARB's comments
has been addressed. The following list outlines the outstanding ARB comments. Many of these comments
relate to the design elements of this site that were previously mentioned in this report as lacking. While staff
would prefer to see all of these outstanding issues addressed with the rezoning, it is possible for some
issues to be addressed at time of site plan. Staff recommendations follow each item below in bold italics.
Traditional "back of building" materials shall not be used for the home improvement and major retail
spaces. Translucent roofing materials shall not be visible from the EC. (Visibility shall be determined by
the ARB.) Roofs or parapet walls shall be used to eliminate visibility of rooftop equipment from the ECs.
Staff would like to see this issue addressed as part of the re -zoning through a proffer
commitment, although addressing it at site plan is an option.
2. Maintain all grading on site along the southern/southwestern property boundary. Maintain a minimum
50' deep planted buffer on site along the southern/southwestern property boundary. Planting in this
buffer shall consist of a mix of evergreen and deciduous trees planted in an informal pattern (not planted
in regularly spaced rows).
Although the retaining wall on the south side of the property has been shifted slightly to the
east, these issues have not been sufficiently addressed. Staff suggests a proffer commitment to
address this concern.
3. Trees shall be provided along both sides of Bent Creek Parkway at 40' on center, 2 '/2" caliper minimum
at planting.
This issue can sufficiently be addressed during the site plan process.
4. Provide tree islands in the parking areas so that no more than 10 parking spaces run consecutively
without a tree island. Trees in parking lot interiors and perimeters shall be planted at 2'/2" caliper
minimum.
Staff suggests a proffer commitment to address this concern.
5. The 30'-35' light pole height illustrated in the application plan is not approved with the rezoning. Light
pole height is subject to ARB review/approval with the site development plan.
This can be addressed by revisions to the application plan.
6. Illuminated wall signs shall be limited to the north side of the home improvement, structured
parking/retail, and major retail spaces.
Staff would like to see this issue addressed as part of this re -zoning through a proffer
commitment, although addressing it at site plan is an option.
PROFFERS (See Attachment G)
Staff is concerned with the following regarding the proposed proffers. Staff recommendations follow each
proffer in bold italics.
2. Road Improvements. The proffer says in part, "Regardless of whether a road improvement described
in Proffer 2 has been accepted by VDOT or the City for public use, no building permit, certificate of
occupancy or other County approval shall be denied due to noncompliance with any obligation of Proffer
2 that relates to completion of a public road improvement so long as the plans for such road
improvement have been approved by VDOT or the City and sufficient bond has been supplied to satisfy
all costs to complete such road improvement."
Staff feels that these types of improvements should not be satisfied by bonding. While the
language for this proffer has been revised, staff remains concerned that the proffer will be
satisfied and building permits cannot be held up, if these improvements are bonded.
4. Greenway Park and Pedestrian Trails Master Plan. The proffer makes reference to "a County Park
Authority."
The County does not have such an authority.
5. Tree Conservation Areas.
Page 6 of this staff report describes the concern and suggested additional terms that will need to
be followed in order to make this proffer work.
7. Moore's Creek Erosion and Buffer Projects. This proffer describes projects relating to erosion located
in the subject area of Moore's Creek that the County would like to see completed.
While this proffer is acceptable, staff would like the actual map referenced in the proffer to be
included.
8. Former Landfill Site; Work Plan; Department of Environmental Quality.
Page 7 of this staff report describes the concerns/issues relating to this proffer. in addition to
the concerns previously mentioned in this report, a portion of this proffer relates specifically to
the construction of Bent Creek Parkway. Staff feels this proffer should also pertain to the entire
site development in the land fill area, not just the roadway construction.
9. Cultural Resources.
Page 6 of this report describes staff's concern with this proffer. Staff would like to see
clarification of the proffer language.
SUMMARY
Staff has identified the following factors, which are favorable to this rezoning request:
1. The road connection from 5t" Street via Bent Creek Road to Avon Street Extended creates
an additional east and west connection in this portion of the County and City.
2. This development will add additional commercial/retail uses to a portion of the County that
lacks a variety of retail shopping options; particularly as residential development in this
portion of the County continues to be built.
10
Staff has found the following substantive matters for this rezoning that are still outstanding:
1. This request is located within the 1-64 and Avon Street entrance corridors. Several of the
ARB comments remain unaddressed. As previously described in this report, some of the
ARB's concerns may be able to be addressed during the site plan process and these would
require technical fixes, but staff has also recommended ARB issues/concerns in this report
that need to be addressed with the rezoning and are substantive matters.
2. Similar to number 1 above, the Comprehensive Plan Amendment features regarding
architecture, urban design, and landscape treatment still need to be addressed.
3. A completed work plan approved by DEQ regarding environmental concerns relating to the
old landfill remains outstanding. A proffer has been provided that will ensure that the work
plan is completed and approved by DEQ prior to approval of the first final site plan.
4. Cultural resources remain to be addressed.
5. In order to avoid the old landfill, the Greenway trail crosses a stream in a manner that is
unknown and goes off site on property not owned by the applicant. Completion of the work
plan approved by DEQ is needed in order to provide feasible guidance regarding the
location of the trail.
6. Language for Road Improvements Proffer needs to be revised so that such improvements
are satisfied by construction.
7. Pedestrian access from Avon Street needs to be addressed.
8. The potential for a proposed pedestrian interconnection to the adjacent Willoughby
development needs to be provided.
The following lists technical issues, some of which regard the proffers that are still outstanding:
1. Critical Slopes Waiver request. With additional revised proffer language staff feels that this
issue can be recommended for approval.
2. Location of all stream crossings needs to be identified on plan, including the crossing for the
greenway trail.
3. Language regarding tree conservation areas and the forest stewardship plan need to be
provided.
4. Additional details regarding the passive open space/trailhead park area are needed, such as
size, and types of amenities being proposed.
RECOMMENDATION
Without resolution of the aforementioned outstanding issues, staff cannot recommend approval. Should the
PC wish to recommend approval of this proposal to the Board inclusive of proffers and the application plan,
staff recommends that this recommendation be based on resolution of the outstanding issues before the
Board acts on this rezoning.
11
SP 2007-04 — SDecial Use Permit for Parkina Structure
Engineering Comments: Staff does not have any significant engineering issues regarding the proposed
parking structure use.
STAFF COMMENT
Staff will address each provision of Section 31.2.4.1 of the Zoning Ordinance as follows:
31.2.4.1: Special Use Permits provided for in this ordinance may be issued upon a
finding by the Board of Supervisors that such use will not be of substantial detriment to
adjacent property,
The proposed parking structure use is not expected to have extreme impacts on the adjacent
properties. The parking structure will be located in a shopping center between a home
improvement store and a retail store. The portion of the property where the parking structure is
located is adjacent to Interstate 64. The parking structure use may create some elevated noise
when in use, but probably not any more than the adjacent highway. As shown on the plan there
is a landscape enhancement owned by VDOT.
that the character of the district will not be changed thereby and
Considering the proposed use is a shopping center, staff believes that the use of a parking
structure is somewhat minimal in nature and will not change the character of the district as an
element of an approved shopping center.
that such use will be in harmony with the purpose and intent of this ordinance,
Staff has reviewed this request for compliance with the purpose and intent of the Zoning Ordinance, and
identified no conflict that would arise as a result of its approval.
with uses permitted by right in the district,
The proposed PD -SC district would be appropriate for the shopping center planned for the
property. The PD -SC district allows commercial and service establishments permitted by right in
the C-1, CO and HC districts. (Section 25.2.1). One intent of the PD -SC district is to create the
development of neighborhood, community and regional shopping centers. PD -SC districts are
intended to serve areas not conveniently and adequately provided with a broad range of
commercial and service facilities. Regulations are intended to encourage planned commercial
centers with carefully organized buildings, service areas, parking areas and landscaped areas.
Parking structures are allowed in the PD -SC district by special use permit (Section 25.2.2).
There are small scale commercial uses already located in the vicinity. This proposed
development will add a larger commercial venue to a portion of the County that is somewhat
underserved with a variety of commercial uses for the residents living near there. This site is
also in an entrance corridor. The SP for the structured parking was reviewed by the ARB on
February 20, 2007. The ARB's recommendation follows: "Noting that insufficient information on
the architecture of the building was available for review, the ARB has no objection to the
request for the Special Use Permit and further notes that "back of building" materials shall not
be used for the parking structure."
with the additional regulations provided in section 5.0 of this ordinance,
Section 5.1.41 PARKING LOTS AND PARKING STRUCTURES states that "A site plan shall
be required for each parking lot and parking structure, unless the requirement is waived as
provided in section 32.2.2." A waiver has not been requested. A site plan will be expected.
and with the public health, safety and general welfare.
The public health, safety, and general welfare of the community is protected through the special use
permit process which assures that uses approved by special use permit are appropriate in the location
requested. VDOT and Albemarle County Service Authority concerns have been addressed. (See
12
Attachment F)
SUMMARY
Staff has identified the following factors, which are favorable to this request:
1. The use of a parking structure will provide an alternative to the "sea" of parking that would otherwise
result from surface parking.
Staff has not identified any factors, which are unfavorable to this request.
RECOMMENDED ACTION
Staff finds that this request generally complies with the provisions of the Zoning Ordinance and the
Comprehensive Plan, and recommends approval of SP 07-04 without conditions.
ATTACHMENTS:
ATTACHMENT A: Tax Map
ATTACHMENT B: Location Map
ATTACHMENT C: General Development Plans, dated June 22, 20067
ATTACHMENT D: Memorandum from Julie Mahon dated February 19. 2007
ATTACHMENT E: Electronic Mail from Joel Denunzio dated July 10, 2007
ATTACHMENT F: Memorandum from VDOT dated February 26, 2007, and ACSA comments dated
February 26, 2007
ATTACHMENT G: Proffers dated June 22, 2007
13