August 24, 2007
Walter Smith
8374 Schuyler Road
Schuyler, VA 22969
RE: SP# 2007-00011 Oak Ridge Church Picnic Pavilion
Dear Mr. Smith:
Fax (434) 972-4012
On July 11, 2007, the Albemarle County Board of Supervisors took action on SP # 2007-00011
to allow construction of a 20'x 40' picnic pavilion on Tax Map 126, Parcel 21A in the Scottsville
District. This special use permit was approved based on the following conditions:
1. Special Use Permit 2007-11 shall be developed in general accord with the concept
application plan and building details, provided by the applicant and received February
26, 2007 (Attachment A). However, the Zoning Administrator may approve revisions to
the concept application plan to allow compliance with the Zoning Ordinance;
2. The picnic pavilion shall be limited to eight hundred (800) square feet and shall not
include bathroom facilities or vehicular access;
3. The area of assembly shall be limited to a maximum one hundred ninety-five (195) seat
sanctuary; occasional church gatherings beyond the normal capacity of the sanctuary
shall be permitted;
4. There shall be no day care center or private school on site without approval of a
separate special use permit; and
5. Construction of the eight hundred (800) square foot picnic pavilion shall commence
within five (5) years or this special use permit shall
Please be advised that although the Albemarle County Board of Supervisors took action
on the project noted above, no uses on the property may lawfully begin until all
applicable approvals have been received and conditions have been met. This includes:
compliance with conditions of the SPECIAL USE PERMIT;
approval of and compliance with a SITE PLAN; and
approval of a ZONING COMPLIANCE CLEARANCE.
In the event that the use, structure or activity for which this special use permit is issued is not
commenced within sixty (60) months from the date of Board approval, it shall be deemed
abandoned and the permit terminated. The term "commenced" means "construction of any
structure necessary to the use of the permit."
If you have questions or comments regarding the above -noted action, please do not hesitate to
contact Sherri Proctor at 296-5832.
Sincerely,
V. Wayne Cilimberg
Director of Planning