HomeMy WebLinkAboutSP200700026 Legacy Document 2007-08-29ALBEMARLE COUNTY DEPARTMENT OF COMMUNITY DEVELOPMENT
STAFF REPORT
Proposal: SP 07 - 26 Crozet Station
Staff: Claudette Grant
Planning Commission Work Session:
Board of Supervisors Hearing: November
August 28, 2007
14, 2007
Owners: Crozet Shopping Center, LLC
Applicant: Crozet Shopping Center, LLC
(Sandra Everton)
(Sandra Everton) with Gregory Solis, Atwood
Architects
Acreage: 3.2 acres
Special Use Permit for: residential use in a
C-1 commercial district and a parking
structure addition to the northeast corner of
the site.
TMP: TM: 56A2 Part 1 P: 01-29
By -right use: C-1 Commercial (retail sales
Location: Crozet Shopping Center, north of
and service uses; and residential use by
Three Notch'd Road (Route 240); approx. '/4
special use permit (15 units/acre)
mile east of its intersection with Rt. 810.
(Attachments A & B)
Magisterial District: White Hall
Conditions: No EC: Yes
Proposal: 30 residential units to be located
Requested # of Dwelling Units: 30
above the existing Crozet Shopping Center
buildings and a parking structure addition to
the northeast corner of the site.
DA (Development Area) Community of
Comp. Plan Designation: Community of
Crozet
Crozet: Downtown, CT 6- Urban Core
Character of Property: Developed with
Use of Surrounding Properties:
mixed commercial uses and historic
Commercial, residential, library,
resources; the site slopes down to a stream
emergency/rescue station, and railroad
in rear of the properties.
tracks.
RECOMMENDATION: Provide guidance to applicant and staff.
Crozet Station
PC Work Session 8/28/07
STAFF PERSON:
PLANNING COMMISSION:
Work Session - Crozet Station
Claudette Grant
August 28, 2007
Specifics of Proposal:
The site is currently developed with a mix of commercial uses. The applicant approached staff in
2006 for some preliminary feedback regarding possible redevelopment of properties in Downtown
Crozet. At that time staff advised the applicant that a pre -application work session early on would
be beneficial to review the Crozet Master Plan recommendations for Downtown with the
Commission and to get the public involved in providing input on redevelopment of the site. A pre -
application work session with the Planning Commission was held on May 30, 2006. Since the work
session, the applicant decided to split the redevelopment of the shopping center into three phases
and apply for a special use permit for residential uses in a commercial district as phase one.
Petition:
PROJECT: SP 2007-00026 Crozet Station
PROPOSED: 30 residential units to be located above the existing Crozet Shopping Center buildings
and a parking structure addition to the northeast corner of the site.
ZONING CATEGORY/GENERAL USAGE: C-1 Commercial - retail sales and service uses; and
residential use by special use permit (15 units/ acre)
SECTION: 18.22.2.2.6 uses permitted the R15 Zoning District (15 units/acre) and 18.22.2.2.9
Parking Structure
COMPREHENSIVE PLAN LAND USE/DENSITY: Community of Crozet; designated CT 6 Urban
Core, which allows for a mix of commercial, office, retail, and other uses along with residential uses
up to 18 units an acre and up to 36 units an acre in a mixed used setting, according to the Crozet
Master Plan.
ENTRANCE CORRIDOR: Yes
LOCATION: Crozet Shopping Center, north of Three Notch'd Road (Route 240); approx. 1/4 mile
east of its intersection with Rt. 810
TAX MAP/PARCEL: 56A2-01-29
MAGISTERIAL DISTRICT: White Hall
Background:
On May 30, 2006, the Planning Commission held a pre -application worksession on this project.
(See Attachments C & D) Several questions were posed and discussed during the worksession. At
the worksession, the Commission reviewed and discussed the proposal with staff and the applicant,
took public comment, and responded to the preliminary questions posed by staff.
What has changed?
After the pre -application work session in May, 2006, the applicant decided to reduce the area of his
request and only redevelop a portion of the shopping center. His current request reduces the
number of residential units to 30 from 72. The square footage of commercial uses also decreased
from 42,000 square feet to 28,059 square feet. The applicant and staff met several times after the
worksession and as a result the applicant decided to request a special use permit for residential
uses in a C-1 (Commercial zoning district) and for a parking structure.
Comprehensive Plan:
Crozet Station is located in Downtown Crozet, which is one of the major themes of importance in
the Crozet Master Plan. Analysis and additional details regarding this project and its relation to the
Crozet Master Plan can be found on pages 3 and 4 of Attachment C.
Crozet Station 2
PC Work Session 8/28/07
Principles of the Neighborhood Model -- Conformity with the Neighborhood Model is assessed
below.
Pedestrian
The plan does not clearly depict pedestrian orientation on the site. A
Orientation
sidewalk is shown at the front of the site, adjacent to Route 240, and a
pedestrian way is shown at the rear of the site. Site development would be
expected to include sidewalks along the adjacent roadways as well as an
internal system of pedestrian connections to parking, buildings and to
adjoining properties.
Neighborhood
While street trees are shown on the plan, there is also an expectation that
Friendly Streets
there will be provisions for pedestrian safety, such as crosswalks that are
and Paths
internal and external to the site. In addition, streetscape furniture and
enhancements would be expected such as benches, and trash
receptacles.
Interconnected
Near the northwest corner of the property there is a vehicle and pedestrian
Streets and
way shown that is to continue across phases two and three. This would
Transportation
serve as an interconnection for the site. There is also an interconnection
Networks
shown on the eastern portion of the site.
Parks and Open
The applicant has not provided any park and open space amenities. Staff
Space
suggests parks and open space include the Greenway (terminus),
commons, square where commercial character is on the ground floor,
greens, and plazas. There is also a required 100 -foot stream buffer along
the rear property lines and opportunities to provide greenway connections
both parallel to Parrot Creek or across to connect the neighborhoods north
of Downtown.
Neighborhood
This property is located in Downtown Crozet, intended to be a center for
Centers
several neighborhoods and a central place in Crozet.
Buildings and
The applicant has submitted building schemes which show a variety of
Spaces of Human
one, two and three story additions to the existing building. The Architectural
Scale
Review Board (ARB) has expressed a preference for 1 additional story on
the western portion of the building in order to protect the mountain views.
The Master Plan recommends 2-4 stories from main level and up to 5
stories by exception for Downtown Crozet.
Relegated Parking
Parking is not relegated in the portion of the property that is adjacent to
Route 240. This principle is not fully met. There is additional discussion
regarding this later in the report.
Mixture of Uses
This project is proposing a mix of both residential and commercial uses.
This principle is met.
Mixture of Housing
The applicant proposes only apartments/multifamily. The proposal would
Types and
be expected to meet the affordable housing policy goals. The applicant has
Affordability
indicted that the apartments will be affordable, but there has been no
commitment as yet to providing affordable units.
Redevelopment
The applicant has indicated that the existing commercial buildings would
remain on the site and that the residential buildings would be built above
the existing buildings. The applicant has also indicated that the existing
buildings would be renovated with the addition of space.
Site Planning that
The site is sloping in some locations. However, the majority of the additions
Respects Terrain
to the site will occur above the existing buildings with exception of the
parking structure.
Crozet Station
PC Work Session 8/28/07
Clear Boundaries The project is located entirely with in the Community of Crozet and the
with the Rural nearest boundary with the Rural Area is north of Downtown at the Crozet
Areas Elementary School northern property boundary.
Discussion:
The following describes issues mentioned in the staff report for the original pre -application work
session, followed by the Commission's feedback on the issues. (See also Attachments C & D) The
revised information submitted by the applicant follows in bold:
Historic Preservation
Should contributing structures to possible future historic district be demolished for new
development?
Generally, the Commission felt that there should be a major effort toward preservation of the
buildings in the area proposed for redevelopment. If the buildings could not be saved, a
"tribute" to the buildings should be provided. The intent was to maintain the "feel of historic
downtown" and its charm. If they could be preserved, the buildings from Crozet Pizza to the
corner should be the main focus. The design of the old train depot is a type of design that
might be worth emulating as part of this project. The most important part of the project
visually is the buildings and areas along Three Notch'd Road. What is behind those
buildings is not of as much concern. Staff is expected to work with VDOT to try to minimize
widening of Three Notch'd Road in order to retain the look and feel of the existing block.
The existing buildings related with this SP request are not considered historic.
Mix of Uses & Residential Density
Is the mix of residential and commercial/retail uses appropriate?
Generally, the Commission felt that the mix of residential and commercial/retail uses was
appropriate with the increased amount of 56,000 square feet if they keep affordable
residential units in the mix.
Applicant proposes to provide 28,059 square feet of commercial space and 30
residential units. The proposal would be expected to meet the County's affordable
housing policy goals.
Design and Layout
What features of the design and layout does the Planning Commission find appropriate?
What would the Planning Commission suggest to improve the layout and design?
The Commission suggested that the part of the project containing the existing IGA and the
large parking area be addressed to reorient the buildings differently towards Route 240.
The applicant needs to work on better solutions to relegate the parking on the eastern
portion of the property, particularly at the grocery store, and to provide a buffer. The
topography of the site was noted as a concern to have to be dealt with. The western end of
the project should be kept looking "Crozetish". If this moves forward, details should be
provided to show how the green area relates to the rest of the site. If there are residential
units information on urban open space or amenities should be provided as well as an
interconnection to the east.
Crozet Station 4
PC Work Session 8/28/07
The revised plan dated May 23, 2007 (See Attachment E) shows a parking lot adjacent
to Route 240. The existing buildings are located to the rear of the parking area. The
lack of relegated parking remains an issue.
Questions for the Commission Based on This Submittal:
Desian and Lavout
Does the Planning Commission find the design and layout of the site appropriate,
particularly as it relates to relegated parking?
As mentioned in the previous staff report, the Crozet Master Plan does not suggest any specific
design or layout for redevelopment of this property. The proposed plan shows parking adjacent to
Route 240. At the pre -application worksession, the Commission mentioned the importance of
providing relegated parking on this site. Rather than site new buildings closer to the street, the
applicant is proposing to use the existing parking lot and add residential units to the existing
structure. A parking garage located in the north east corner of the site is also proposed. One
alternative would be to provide the residential units in the location of the existing parking area,
closer to the street, so the residential units would have a relationship to the street and provide
parking below the units. The downside to this suggestion would be that the commercial buildings
would no longer have a well defined street presence, and staff believes that the proposed layout,
while not ideal, does preserve the opportunity for redevelopment of a commercial area on Three
Notch'd.
Mixture of Housing Types and Affordability
Should there be a mixture of types within this development and a provision of affordable
units?
This is a relatively small development at 30 apartment units. There is not a mixture of housing types
within this residential development. There is an expectation that at least 15% affordable housing
units be provided. The applicant has explained that the apartments will be affordable; however, as
yet no commitment has been made towards affordable housing.
Scale of Buildings
Is the height and massing of the buildings appropriate?
The applicant provided proposed building schemes that show variations of additional 1, 2 and 3
story tall buildings to the ARB. When the ARB reviewed the proposal, they expressed concern
about the potential loss of mountain views depending on the height of the proposed units. At the
ARB meeting on April 2, 2007 the ARB stated preference for 1 additional story rather than 2 or 3
additional stories. The ARB also expressed a preference for the proposed massing of the building
to be lower in height on the west end/portion of the building to preserve the expansive view of the
Blue Ridge Mountains. The ARB was satisfied with the building height on the eastern side of the
proposed building addition being an additional 2 or 3 stories tall. Does the Planning Commission
agree with the ARB's recommendation?
Other Issues
The applicant still has a variety of more detailed issues to be resolved, such as engineering and
ARB comments. VDOT also has concerns regarding ingress and egress to the site. The applicant
is aware of all of the concerns from staff review. However, the applicant and staff would like
Crozet Station 5
PC Work Session 8/28/07
direction from the Commission regarding the issues provided in this report before further submittals
are made.
ATTACHMENTS
Attachment A
— Tax Map
Attachment B
— Vicinity Map
Attachment C
— May 30, 2006 Staff Report
Attachment D
— Action Memo from the May 30, 2006 Planning Commission meeting
Attachment E
— Proposed Plan dated May 23, 2007
Attachment F —
ARB comments dated April 24, 2007
Crozet Station 6
PC Work Session 8/28/07