HomeMy WebLinkAboutSUB200600272 Other 2008-01-02CHRONOLOGY
DATE
ACTION
COMMENTS
4 -07
Received complaint
(wishes to remain anonymous) via e-mail;
indicates that Nahoor Road has been used for
construction, marketing, and contractors indicate
that continued access will remain. RPD approval
and subdivision notes require only one point of
access. No 14 -404 waiver has been granted.
4 -26 -07
Called Michael Lane Developer
(h)434.293.3712 — Left him a message
4 -30 -07
Received return phone call
He left a message
5 -2 -07
Called Michael Lane
(c)434.953.3867 — Left him a message
5 -2 -07
Received return phone call
Michael Lane explained several items:
1. Primary access, driveways, and
mailboxes for all lots will be on Michelle
Lane
2. He wants the option of a second access
for the preservation tract — farming
equipment, etc — to be from Nahoor Rd.
3. Nahoor is private
4. Preservation Tract has frontage on
easement and owns to center of Nahoor
for large distance