Loading...
HomeMy WebLinkAboutSUB200600272 Other 2008-01-02CHRONOLOGY DATE ACTION COMMENTS 4 -07 Received complaint (wishes to remain anonymous) via e-mail; indicates that Nahoor Road has been used for construction, marketing, and contractors indicate that continued access will remain. RPD approval and subdivision notes require only one point of access. No 14 -404 waiver has been granted. 4 -26 -07 Called Michael Lane Developer (h)434.293.3712 — Left him a message 4 -30 -07 Received return phone call He left a message 5 -2 -07 Called Michael Lane (c)434.953.3867 — Left him a message 5 -2 -07 Received return phone call Michael Lane explained several items: 1. Primary access, driveways, and mailboxes for all lots will be on Michelle Lane 2. He wants the option of a second access for the preservation tract — farming equipment, etc — to be from Nahoor Rd. 3. Nahoor is private 4. Preservation Tract has frontage on easement and owns to center of Nahoor for large distance