January 25, 2022
County of Albemarle I Community Development Department
Planning Services
RE: COMMENT RESPONSE to Review:
SUB20210036, Southwood Village 1 Subdivision, dated November 20, 2021
TO: Ms. Rebecca Ragsdale
P 434.327.1689
www.timmons.com
Please find below our responses to review of the plat referenced above (Southwood Village 1 Subdivision);
we appreciate your comments and review. Included (below) are comments provided by Albemarle County
with responses (in red), accordingly:
Subdivision Ordinance Comments:
I. [14-302(A)(1)] Name: The name of the plat should include information on the
blocks and number of lots included with the application. Example: 'Portion of
Blocks 3. 4. 5. 7. and 8. Lots 1-40)". Rev1: Comment addressed.
2. [14-302(A)(4)(5)]; [14-317]; [14-303(L)] Easements:
a. Confirm that all easements are shown on the plat that were shown on
the site plan and road plans. It appears that many are missing from the plat.
There are private drainage easements, stormwater management
easements, and an emergency access, as examples, that are not being
shown. Please cross reference all the easements shown on prior approved
plans with what is being proposed on this plat. All easements need to be
platted and dimensions of the easements need to be shown
Rev1: Some easements are still not being shown. See attached markup of plat.
Rev2: Comment not fully addressed. Landscape easements on lots for street trees
are not shown on plat. Pedestrian access easement is not shown between lots 1 D
and 2A. See Enginneering
Addressed. See Sheet 9 for landscape easement adjacent to Wardell Crest. See Sheet 7 for Access
Easement at Lots 1D — 2A.
b. There is an accessway for lots 15-24, however there is only an access
easement shown on the lots and no easement for the access from Cardinal
Hill Lane provided. Access easements, as well as private drainage
easements, require maintenance agreements. See templatethatyou can
modify here. County Attorneys Office approval is needed.
Rev1: Comment partially met. Deeds were submitted 8/23/21 and
will need to be reviewed and approved prior to plat approval.
Rev2: Plat corrected. Deed checklist and comments attached.
c. The public drainage easements require a deed of dedication to
the County. County Attorneys Office approval is needed.
Rev1: Comment partially met. Deeds were submitted 8/23/21 and
CIVIL ENGINEERING I ENVIRONMENTAL I SURVEYING I GIs I LANDSCAPE ARCHITECTURE I CONSTRUCTION SERVICES
will need to be reviewed and approved prior to plat approval.
Rev2: See Engineering comments below. (deed topic)
d. Coordinate with Engineering on the SWM easements and deeds.
Reference [14-431]. Rev1: Comment partially met. Deeds were
submitted 8/23/21 and will need to be reviewed and approved prior to
plat approval. Rev2: See Engineering comments below. (deed topic)
e. The emergency access that was shown on the site plan is not being
shown on the plat. An access easement over the emergency access is
needed, as it crosses lots.
Rev1: Partially met. Access easement is still not shown on the plat,
however emergency access is shown. Deeds were submitted 8/23121
and will need to be reviewed and approved prior to plat approval.
Rev2: The public access easement shown below on the site plan is
not shown on the final plat. It should be clear on the plat that the
access easement is for the benefit of Lot 13 as well.
Addressed. See Sheet 7. Included in label (at Cardinal Hill) is reference to Lots 8-13 for
private access
f. Note that if any required landscaping is provided on a lot not owned/controlled by
the HOA, then a landscaping easement will be required.
Rev1: Comment partially met. Deeds were submitted 8/23/21 and will need to be
reviewed and approved prior to plat approval. Rev2: Landscape easements not
provided on plat. Addressed. Please see sheet at Wardell Crest.
Grading easements are needed for the grading done on parcel 90A1-1 D, since this
is 'offsite' work. Easements must be provided for other improvements (such as
drainage pipes and the F/R emergency access).
Rev1: Please indicate on the plat whether the grading easement is public or private. If it is
private, a deed will not be needed.
h. There was pedestrian access shown between lots 18 and 19 that is not being
shown on this plat. Again, please cross reference the plat with the approved site plan.
Rev1: Comment partially met. Easement now shown. Deeds were submitted 8/23/21
and will need to be reviewed and approved prior to plat approval. Rev2: Pedestrian
access easement not shown between lots 18 and 19. Also not shown between lots
1 D and 2A. Addressed. Please see sheet 8
nat is the 10 foot public access easement? Is this the trails? Will these be
dedicated to the County? If so, a greenway/trail deed will be required.
Rev1: If this is a public easement, as labeled, it needs a dedication and deed to the County.
Public means open to the public. If it is intended to only serve residents of the
development, it needs to be labeled as private and be privately maintained.
j. A maintenance agreement for retaining walls that cross property lines will need to
be submitted and approved. Also, revise the retaining wall easement label to state
"retaining wall maintenance easement" and not just "maint easement". Again, include
dimensions of the easements.
Rev1: Comment partially met. A minimum of 5' from the wall needs to be
established for the easement on the private lots. There are easements that need to
be added for retaining walls, see attached markup of the plat. Deeds were submitted
8123/21 and will need to be reviewed and approved prior to plat approval. Rev2:The
minimum easement width has not been established on the plat and is also not
specified in the Declaration. Addressed. Retaining wall easements are a minimum of 5'
wide and presented as such.
3. [14-302(A)(8)], Proposed Lots. Include a table of proposed lots by Block. This is a
COD requirement also.
Rev 1: Comment Addressed Rev2: How was this comment previously addressed?
Only line and curve tables, along with on area tabulation chart is included on the plat.
Based on the plat there are 61 proposed lots. Please explain why all lots were not
numbered consistently and sequentially? Why are some numbered as 1A, 1B, for
example?
Addressed. See last sheet for Lot table with unit / lot types.
The site plan breakdown on left and plat on right;
(images omitted)
4. [14-302(A)(9)] Building sites. Modify the building site note to the following: "Lots 1-41, and the
residue of Tax Map Parcel 90A1-1 E each contain a building site that complies with section
4.2.1 of the Albemarle County Zoning Ordinance".
Rev1: Comment addressed.
5. [14-302(A)(14)] Land to be dedicated in fee or reserved. Include the location,
acreage, and owner of all land to be dedicated to the public or reserved in a
deed for the residents of this development. This includes required open space,
and any land that may be being dedicated to the County. Clarify if any land or
easement is being dedicated for public use.
Rev1: See Sheet C4.06 in the most recent site plan amendment on the required open
space. This open space should be platted and noted as open space, as it is required
under the zoning. Plat the open space areas, label, and include the acreage. As
commented above, the covenants and restrictions that cover the open space will need
to be reviewed and approved by the County Attorney's office. Rev2: Comment not
fully addressed with regard to open space.
Open space present at rear of Lots 14-23 .. annotated on Sheet 4
6. [14-303(F)] Show the block areas per the rezoning on the overall
sheet key on the plat. Rev1: Comment addressed. Rev2: A key was
provided on Sheet 1 but blocks are not clearly delineated on that
sheets or all other sheets.
Block locations are presented in key and further emphasized for clarity. Table showing
Blocks, lots, unit type on last sheet of plat (sheet 12).
7. [14-303(G)] Ownership of common areas.
a. Indicate the intended ownership of all common areas and
open space. See comments on the easements and the open
space under the code of development.
b. How will the shared parking for the condos be maintained? Will an
easement be provided for those parking areas for the shared
parking? If so, show the easement. Maintenance will need to be
assured for those parking areas, as well as a shared parking
agreement.
c. Maintenance of these areas will need to be provided via a recorded
document, such as HOAdocument.
Rev1: Comment not addressed. A response was not included in the
response letter to these comments. See above comment about the open
space and declaration review. Rev2: Comment partially addressed. I believe
Note 10 is intended to help address this comment but should be expanded to
list all specific areas that will be maintained by the HOA. Addessed. Note 12
added sheet 1.
8. [14-307.1] Show the limits of the dam break inundation zone on the plat.
Rev I: Comment addressed.
9. [ 14-411] Public street standards. Revise the dedication label to read "hereby
dedicated for public use".
Revl: Comment addressed.
10. [18-30.7] Label and show the preserved slopes on the plat. It appears that some of the
lots may be impacting the preserved slopes.
Rev 1: Compare the site plan to the plat. The preserved slopes shown on the plat
are different than those on the site plan. If the site plan is correct, grading/lots are
not impacting slopes, however if the plat is correct, grading/lots are impacting
slopes. Please clarify. See sheet C4.10 from site plan, clippedbelow.
Code of Development Comments:
11. [Code of Development]: The stream buffer is within Lot 36 which is not permitted
per the COD. Revise so that the buffer is not located on lots.
=v1: Comment addressed.
12. [Code of Development]: Vehicle Trips per Day
a. Include the daily vehicle trip count with this plat, per the Traffic Impact
requirement on Page 17 of the COD.
Rev1: Comment addressed.
13.Code of Development]: Affordable Housing
a. Include the number of affordable units provided with this plat and minimum
number of affordable units required per the COD, per the requirement on Page 21.
b. Include a table showing affordable units required, provided, and total across
the development.
c. Label the affordable units on the plat.
Rev1: Comment partially addressed. The individual lots need to be labeled to
identify which lots will be affordable. Rev2: Comment not addressed. In addition
to labeling ADU lots, lots subject to CDBG funds and County of Albemarle
construction easement must be designated. COD page21:
Addressed ADU lot provision (total number) part of sheet 1, note 13
14. [Code of Development]: Trails
a. The plat includes Blocks 9-11 where future trails, buffers, open space, etc
are required. These will need to be platted in the future.
Rev1: Comment addressed. See above for comments related to platting of open
space for this area/blocks. Rev2: Response letter indicated see prior response?
Addressed insofar as open space is shown (0.847 Acres behind lots 14-23)
15. [Code of Development]: Required Amenities/Open Space
a. Label the provided required amenity areas and greenspaces on the plat.
b. Include a table showing the required amen ities/greenspace and showing
whathasbeen provided with this plat. This table should be continually
updated with submittals. The requirements are included on Page 15 of the
COD. Note that both the required amount (sq. ft. or acreage) and type (e.g.
neighborhood park) must be included in the table and labeled/shown on the
plat.
c. An exhibit may also be provided, as a supplemental document, showing
where the rest of the required amenities/open space for the Blocks included
in this submittal will be located (to show there is sufficient space for them).
Rev1: Comment not addressed. While the response stated this
information was provided on sheet 12, it was not provided on that
sheet. See comment #5 above. Rev 2: Comment not addressed.
Plat will not address amenity assignments.
Engineering Comments:
Show all drainage easements. Show the SWM Forest & Open Space Easement on the
plat. Disturbed areas from Village 2 should not be located in the F&OS easement. All
easements should be labelled whether they are dedicated to public or private use. It
appears an easement is missing on Pipe 205A. Easements will also be needed on
mitigation areas outside of the buffer. Pipe 205 now included in SWM Facility Easement
for this area .. SWM Forest & Open Space Easement now included. Said SWM Forest &
Open space easement includes mitigation areas shown on plan.
2. The following note will need to be placed on the Plat:
"The SWM Forest and Open Space Easement is subject to the guidance
set forth by DEQ in the Virginia Stormwater Management Program. The
areas will remain undisturbed in a natural, vegetated state, except for
activities as approved by the local program authority, such as forest
management, control of invasive species, replanting and revegetating,
passive recreation (e.g., trails), and limited bush hogging to maintain
desired vegetative community (but no more than four times a year)."
Addressed.
3. A Deed of Dedication will need to be signed and recorded for the SWM facility
easements. This will be filled out by the County and forwarded to the applicant
when the final plat is nearing approval. This deed cannot be prepared until all
easements are shown. (deed topic)
4. A deed will also be required for the public drainage easements. This will filled
be out by the County and forwarded to the applicant when the final plat is
nearing approval. This deed cannot be prepared until all easements are
Shown. (deed topic)
Other reviewers:
No Objections received from: Fire Rescue and E-911; VDOT-See attached letter
dated October 14, 2021; 1 believe ACSA (*) comments, if any, were sent directly
to you.
(Please see next page for ACSA comments)
(*) ACSA comments rec'd Jan. 19, 2022 via Richard Nelson:
Good afternoon Joe,
Below are comments for SUB202100036 Southwood Village 1 Final Plat, dated September
29, 2021:
Include existing ACSA sewer easement along Sheet S. Copy of deed and plat attached.
Addressed.
Delineate which lots will be affordable housing and market price. This information will be
used to track homes that will receive a connection fee credit
Per coordination with planning, this info will be referenced by site plan with regard to specific
lot ADU assignments. We are noting number of ADU lots with Survey Note.
Thank you.
Joe Medley / Timmons Group / 540.607.7500